(1) (2) (3) (4) (5) (6) Program Nilai Tambah dan Daya Saing Industri
019.07.EC 1,200,109,000
Pengembangan dan Penyelenggaraan Jasa Industri
6077 1,200,109,000
Pelayanan Publik kepada industri[Program Baru - Perubahan
Kebijakan] 137.0 Industri
6077.BAD 1,200,109,000
Lokasi : KAB. BANDUNG
Jasa pelayanan teknis pengujian BBPK
6077.BAD.005 100.0 Industri 313,000,000
Jasa pelayanan teknis pengujian U
051 313,000,000
A TANPA SUB KOMPONEN 313,000,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 4,450,000 3,600,000 40,000 90.0 OK Biaya Rapat -850,000 850,000 1.0 PKT Penggandaan dan penjilidan
-PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 148,000,000
6,450,000 6,450,000
1.0 THN ATK dan Computer Supplies
-49,950,000 49,950,000 1.0 THN Peralatan gelas/instrumen/perbengkelan -91,600,000 91,600,000 1.0 THN Bahan Baku/ Kimia/ Penolong
-PNP (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 14,400,000
14,400,000 900,000
16.0 OJ Narasumber / Tenaga Ahli [2 ORG x 2 JAM x 4 KL]
-PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 58,300,000
17,500,000 3,500,000 5.0 PRMTR Uji profisiensi -5,000,000 500,000 10.0 PKT Subkontrak pengujian -12,000,000 12,000,000 1.0 PKT Uji Banding -5,000,000 5,000,000 1.0 PKT Peningkatan Kemampuan Personil
-18,800,000 18,800,000 1.0 PKT Survailen / Akreditasi -PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 87,850,000
87,850,000 87,850,000
1.0 THN Dalam rangka pengujian
-Jasa pelayanan teknis kalibrasi BBPK
6077.BAD.017 10.0 Industri 67,000,000
Jasa pelayanan teknis kalibrasi U
051 67,000,000
A TANPA SUB KOMPONEN 67,000,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 800,000 800,000 40,000 20.0 OK Biaya rapat -PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 5,800,000
5,800,000 5,800,000
1.0 THN ATK dan Computer supply
-PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 19,000,000
10,000,000 10,000,000
1.0 PKT Uji kalibrasi peralatan ke pihak lain
-9,000,000 9,000,000 1.0 PKT Survailan / Akreditasi
-(1) (2) (3) (4) (5) (6) PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 41,400,000
41,400,000 41,400,000
1.0 THN Dalam rangka kalibrasi
-Jasa pelayanan teknis sertifikasi BBPK
6077.BAD.029 10.0 Industri 225,109,000
Jasa pelayanan teknis sertifikasi U
051 225,109,000
A TANPA SUB KOMPONEN 225,109,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 6,000,000 6,000,000 40,000 150.0 OK Biaya rapat / workshop
-PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 10,500,000
10,500,000 10,500,000
1.0 THN ATK dan Computer Supplies
-PNP (KPPN.022-Bandung I ) 522141 Belanja Sewa 3,500,000 3,500,000 700,000 5.0 OK Sewa kendaraan roda 4
-PNP (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 14,500,000
4,500,000 900,000
5.0 OJ Narasumber / Tenaga Ahli
-5,000,000 1,000,000
5.0 OK Governing board LSE
-5,000,000 1,000,000
5.0 OK Governing board LSPro
-PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 37,409,000
12,000,000 2,000,000
6.0 PKT Pengujian ke pihak lain
-5,409,000 5,409,000
1.0 PKT Peningkatan Kemampuan Personil
-20,000,000 20,000,000 1.0 PKT Survailen / Akreditasi -PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 153,200,000
153,200,000 153,200,000
1.0 THN Dalam rangka sertifikasi
-Jasa pelayanan pelatihan teknis BBPK
6077.BAD.060 5.0 Industri 110,000,000
Jasa pelayanan pelatihan teknis U
051 110,000,000
A TANPA SUB KOMPONEN 110,000,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 29,500,000 9,600,000 40,000 240.0 OK Biaya rapat -1,000,000 1,000,000 1.0 PKT Penggandaan dan laporan
-18,900,000 18,900,000 1.0 PKT Bahan Diklat -PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 11,000,000
5,900,000 5,900,000
1.0 THN ATK dan Computer Supplies
-5,100,000 5,100,000 1.0 THN Bahan baku/Kimia/penolong -PNP (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 35,000,000
35,000,000 700,000
50.0 OJ Narasumber
-(1) (2) (3) (4) (5) (6) PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 34,500,000
34,500,000 34,500,000
1.0 THN Dalam rangka penyelenggaraan pendidikan dan
pelatihan
-Jasa pelayanan teknis konsultasi BBPK
6077.BAD.061 5.0 Industri 225,000,000
Jasa pelayanan teknis konsultasi U
051 225,000,000
A Layanan Konsultasi Teknis 150,000,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 16,000,000 16,000,000 40,000 400.0 OK Biaya rapat / konsumsi
-PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 24,200,000
7,200,000 7,200,000
1.0 THN ATK dan Computer Supplies
-17,000,000 17,000,000 1.0 THN Bahan baku/Kimia/penolong -PNP (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 7,000,000
7,000,000 700,000 10.0 OJ Narasumber -PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 9,000,000
9,000,000 1,500,000
6.0 PKT Pengujian ke pihak lain
-PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 93,800,000
93,800,000 93,800,000
1.0 THN Dalam rangka pembinaan dan konsultasi
-B Layanan Konsultansi Standard 75,000,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 3,200,000 3,200,000 40,000 80.0 OK Biaya rapat -PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 7,900,000
3,100,000 3,100,000
1.0 THN ATK dan Computer Supply
-4,800,000 4,800,000
1.0 THN Bahan Baku/ Kimia/ Penolong
-PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 63,900,000
63,900,000 63,900,000
1.0 THN Dalam rangka Layanan Konsultansi Standard
-Jasa penelitian dan pengembangan BBPK
6077.BAD.062 7.0 Industri 260,000,000
Layanan kerjasama penelitian dan pengembangan U
051 260,000,000
A TANPA SUB KOMPONEN 260,000,000
PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 7,400,000 3,400,000 3,400,000 1.0 PKT Pembuatan Laporan -4,000,000 50,000 80.0 OK Biaya rapat
-(1) (2) (3) (4) (5) (6) PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 88,600,000
7,600,000 7,600,000
1.0 THN ATK dan Computer supplies
-47,000,000 47,000,000
1.0 THN Peralatan gelas/ instrumen/ perbengkelan
-34,000,000 34,000,000
1.0 THN Bahan Baku/ Kimia/ Penolong
-PNP (KPPN.022-Bandung I ) 522141 Belanja Sewa 7,000,000 7,000,000 700,000 10.0 OK Sewa kendaraan roda 4
-PNP (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 9,000,000
9,000,000 900,000
10.0 OJ Narasumber / Tenaga Ahli
-PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 24,600,000
12,000,000 3,000,000
4.0 KL Pengujian ke pihak lain
-12,600,000 12,600,000
1.0 PKT Makloon / pengerjaan oleh pihak lain
-PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 123,400,000
123,400,000 123,400,000
1.0 THN Dalam rangka kerjasama penelitian
-Program Riset dan Inovasi Ilmu Pengetahuan dan Teknologi
019.07.KB 2,044,735,000
Penelitian dan Pengembangan Teknologi Industri
6080 2,044,735,000
Kemitraan[Program Baru - Perubahan Kebijakan] 2.0 Kesepakatan
6080.AEE 110,500,000
Lokasi : KAB. BANDUNG
Kemitraan Pengembangan Litbangyasa dan Layanan Teknis BBPK
6080.AEE.001 2.0 Kesepakatan 110,500,000
Kemitraan Pengembangan Litbangyasa dan Layanan
Teknis U
051 110,500,000
A Implementasi Hasil Litbang 74,900,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 5,000,000 5,000,000 50,000 100.0 OK Rapat dengan pelanggan
-RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 17,600,000
3,200,000 400,000 8.0 OB Ketua [1 ORG x 8 BLN] -2,400,000 300,000 8.0 OB Sekretaris [1 ORG x 8 BLN] -12,000,000 300,000 40.0 OB Anggota [5 ORG x 8 BLN] -RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 21,700,000
3,000,000 3,000,000
1.0 THN ATK dan Computer supplies untuk Promosi
-3,500,000 3,500,000
1.0 THN ATK dan Bahan-Bahan Kerjasama
-15,200,000 15,200,000
1.0 THN Bahan Baku/ Kimia/ Penolong
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 30,600,000
30,600,000 30,600,000
1.0 THN Dalam rangka implementasi hasil litbang
(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 2,000,000 2,000,000 20,000 100.0 OK Biaya Rapat dengan mitra binaan
-RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 10,400,000
3,200,000 400,000 8.0 OB Ketua [1 ORG x 8 BLN] -7,200,000 300,000 24.0 OB Anggota [3 ORG x 8 BLN] -RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 7,200,000
7,200,000 900,000 8.0 OK Narasumber -RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 16,000,000
16,000,000 16,000,000
1.0 THN dalam rangka diskusi, konsultasi, dengan IKM
-Sosialisasi dan Diseminasi[Program Baru - Perubahan
Kebijakan] 100.0 orang
6080.AEF 370,000,000
Lokasi : KAB. BANDUNG
Promosi/Publikasi/Temu Pelanggan/Sosialisasi /Diseminasi Litbangyasa dan Layanan Teknis BBPK
6080.AEF.007 100.0 Orang 370,000,000
Promosi/Publikasi/Temu Pelanggan/Sosialisasi
/Diseminasi Litbangyasa dan Layanan Teknis U
051 370,000,000
A Seminar Nasional Hasil Penelitian dan Pengembangan Pulp
dan Kertas 156,000,000 RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 37,900,000 15,000,000 100,000 150.0 EKS Pembuatan Prosiding -3,900,000 3,900,000 1.0 PKT ATK dan Computer Supplies
-3,000,000 3,000,000
1.0 JNS Dokumentasi dan Publikasi
-1,000,000 1,000,000 1.0 PKT Penggandaan -15,000,000 100,000 150.0 OP Seminar Kit dan Buku Panduan
-RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 5,600,000
450,000 450,000 1.0 OK Penanggungjawab -400,000 400,000 1.0 OK Ketua -350,000 350,000 1.0 OK Wakil Ketua -600,000 300,000 2.0 OK Sekretaris -3,000,000 300,000 10.0 OK Anggota -800,000 400,000 2.0 OK Pembawa Acara -RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 17,000,000
10,000,000 1,000,000 10.0 OJ Pakar/Praktisi/Pembicara Khusus -7,000,000 700,000 10.0 OK Moderator -RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 5,000,000
5,000,000 5,000,000
1.0 THN Dalam rangka koordinasi
-(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 90,500,000
67,500,000 500,000 135.0 OH Paket fullday -15,000,000 1,000,000 15.0 OH Paket fullboard -2,000,000 400,000 5.0 OH Transport Narasumber -4,500,000 150,000 30.0 OH Uang Harian Fullboard
-1,500,000 100,000 15.0 OH Transport panitia
-B Promosi Layanan Jasa 52,000,000
RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 17,600,000
3,200,000 400,000 8.0 OB Ketua -2,400,000 300,000 8.0 OB Sekretaris -12,000,000 300,000 40.0 OB Anggota -RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 5,400,000
5,400,000 900,000
6.0 OJ Tenaga Ahli [2 ORG x 3 JAM x 1 KL]
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 29,000,000
29,000,000 29,000,000
1.0 THN Dalam rangka kunjungan industri dan survey pasar
-C Pengelolaan Kerjasama 162,000,000 PNP (KPPN.022-Bandung I ) 521211 Belanja Bahan 12,000,000 5,000,000 50,000 100.0 OK Rapat dengan pelanggan
-7,000,000 100,000
70.0 PKT Seminar kit untuk temu bisnis
-PNP (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 17,600,000
3,200,000 400,000 8.0 OB Ketua -2,400,000 300,000 8.0 OB Sekretaris -12,000,000 300,000 40.0 OB Anggota -PNP (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 60,100,000
5,100,000 5,100,000
1.0 THN ATK dan Computer supplies
-55,000,000 55,000,000
1.0 THN Marketing tools: profil, brosur, kalender dll.
-PNP (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 9,000,000
9,000,000 900,000
10.0 OJ Narasumber [2 ORG x 5 JAM x 1 KL]
-PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 31,800,000
31,800,000 31,800,000
1.0 THN Dalam rangka pameran dan temu bisnis
-(1) (2) (3) (4) (5) (6) PNP (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 31,500,000
31,500,000 Paket Kegiatan Workshop / Temu Bisnis
> 21,000,000 300,000 70.0 OH Paket halfday -10,500,000 150,000 70.0 OT Transport
Penelitian dan Pengembangan Produk[Program Baru
-Perubahan Kebijakan] 2.0 produk
6080.SDA 649,088,000
Lokasi : KAB. BANDUNG Hasil litbangyasa PRN BBPK
6080.SDA.002 2.0 Produk 649,088,000
Teknologi Pengolahan Hasil Hutan U
051 159,438,000
A Pengembangan Selulosa Nanokristalin dari Dissolving Pulp
sebagai Bahan Farmasi 159,438,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 4,550,000 1,500,000 150,000 10.0 EKS Penggandaan dan Pembuatan Laporan
-1,400,000 25,000 56.0 OTK snack rapat -1,650,000 55,000 30.0 OTK makan (rapat) -RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 31,300,000
2,400,000 300,000 8.0 OB Sekretariat peneliti -24,000,000 25,000 960.0 OJ Pembantu Peneliti -1,540,000 1,540,000 1.0 KEG Pengolah Data -3,360,000 420,000 8.0 OB Koordinator -RM (KPPN.022-Bandung I )
521219 Belanja Barang Non Operasional Lainnya 3,000,000
3,000,000 3,000,000
1.0 PKT Seminar / Workshop/publikasi ilmiah
-RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 57,120,000
2,120,000 2,120,000
1.0 PKT ATK dan komputer supply
-55,000,000 55,000,000
1.0 PKT Bahan dan bahan kimia
-RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 7,200,000
7,200,000 900,000 8.0 OJ Narasumber -RM (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 25,000,000
25,000,000 25,000,000 1.0 PKT Biaya Pengujian -RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 31,268,000
31,268,000 31,268,000
1.0 THN Dalam rangka koordinasi / diskusi / evaluasi / seminar /
pengujian
-Teknologi Pengemasan Makanan U
052 489,650,000
A Scale up skala pabrik produksi kertas kemas cerdas dan
(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 3,350,000 1,250,000 125,000 10.0 EKS Penggandaan dan Pembuatan Laporan
-1,000,000 25,000 40.0 OTK snack rapat -1,100,000 55,000 20.0 OTK makan (rapat) -RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 31,300,000
2,400,000 300,000 8.0 OB Sekretariat peneliti -24,000,000 25,000 960.0 OJ Pembantu Peneliti -1,540,000 1,540,000 1.0 KEG Pengolah Data -3,360,000 420,000 8.0 OB Koordinator -RM (KPPN.022-Bandung I )
521219 Belanja Barang Non Operasional Lainnya 3,000,000
3,000,000 3,000,000 1.0 PKT Seminar / Workshop -RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 172,800,000
5,000,000 5,000,000
1.0 PKT ATK dan komputer supply
-167,800,000 167,800,000
1.0 PKT Bahan dan bahan kimia
-RM (KPPN.022-Bandung I ) 522141 Belanja Sewa 5,000,000 5,000,000 2,500,000 2.0 KL Biaya sewa kendaraan pengangkutan bahan
-RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 7,200,000
7,200,000 900,000 8.0 OJ Narasumber -RM (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 95,000,000
95,000,000 95,000,000
1.0 PKT Biaya percobaan skala pabrik
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 37,000,000
37,000,000 37,000,000
1.0 THN Dalam rangka koordinasi / diskusi / evaluasi / pengujian
/ seminar
-RM (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 50,000,000
50,000,000 50,000,000
1.0 BUAH Alat tracking system
-RM (KPPN.022-Bandung I )
536111 Belanja Modal Lainnya 85,000,000
85,000,000 85,000,000
1.0 PKT Pembuatan aplikasi
Penelitian dan Pengembangan Purwarupa[Program Baru
-Perubahan Kebijakan] 2.0 Purwarupa
6080.SDB 915,147,000
Lokasi : KAB. BANDUNG Hasil litbangyasa PRN BBPK
6080.SDB.001 2.0 Purwarupa 915,147,000
Teknologi Pemantauan dan Pengelolaan Limbah Cair
Industri U
051 376,673,000
A Perancangan Sistem Online Monitoring pada IPAL Industri
(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 9,050,000 1,350,000 135,000 10.0 EKS Penggandaan dan pembuatan laporan
-4,400,000 55,000 80.0 OTK Biaya rapat -3,300,000 55,000 60.0 OTK Rapat FGD -RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 25,100,000
3,200,000 400,000 8.0 OB Koordinator Kegiatan -2,400,000 300,000 8.0 OB Sekretaris Kegiatan -18,000,000 25,000 720.0 OJ Pembantu Perekayasa/Peneliti -1,500,000 1,500,000 1.0 KEG Pengolah Data -RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 2,090,000
2,090,000 2,090,000
1.0 THN ATK dan komputer supply
-RM (KPPN.022-Bandung I )
521821 Belanja Barang Persediaan bahan baku 235,633,000
50,000,000 50,000,000
1.0 PKT Bahan habis pakai untuk pembuatan alat deteksi
-35,000,000 35,000,000 1.0 PKT DCS dan Transmitter -84,633,000 84,633,000 1.0 PKT Sensor detector -66,000,000 66,000,000 1.0 PKT IoT Controller -RM (KPPN.022-Bandung I ) 522141 Belanja Sewa 5,000,000 5,000,000 2,500,000 2.0 KL Sewa kendaraan angkut sampel
-RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 10,800,000
10,800,000 900,000 12.0 OJ Narasumber -RM (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 34,000,000
20,000,000 20,000,000
1.0 LS Biaya Pemasangan Alat
-4,000,000 4,000,000 1.0 KL Seminar/workshop -10,000,000 10,000,000 1.0 PKT Pengujian ke pihak lain
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 40,000,000
40,000,000 40,000,000
1.0 THN Dalam rangka diskusi / konsultansi / pengujian / setting
/ evaluasi
-RM (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 15,000,000
15,000,000 15,000,000
1.0 PKT Processing and operational 3D Printing
-Koordinator Prioritas Riset Nasional (PRN) Produk
Inovasi Tekstil Rami Berbahan Baku Ramah Lingkungan U
052 538,474,000
A Pembuatan Dissolving pulp dari rami/ limbah serat rami untuk
(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 6,900,000 3,300,000 55,000 60.0 OK Rapat -3,600,000 150,000 24.0 EKS Penggandaan dan pembuatan laporan
-RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 25,360,000
3,360,000 420,000 8.0 OB Koordinator peneliti -2,400,000 300,000 8.0 OB Sekretariat peneliti -1,600,000 1,600,000 1.0 KEG Pengolah data -18,000,000 25,000 720.0 OJ Pembantu Peneliti -RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 56,880,000
4,400,000 4,400,000
1.0 PKT ATK dan komputer supply
-52,480,000 52,480,000 1.0 PKT Bahan kimia/penolong -RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 7,200,000
7,200,000 900,000 8.0 OJ Narasumber -RM (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 15,000,000
10,000,000 1,000,000 10.0 CTH Pengujian SEM -5,000,000 5,000,000 1.0 PKT Seminar/workshop -RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 27,134,000
27,134,000 27,134,000
1.0 THN Dalam rangka penelitian
-RM (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 400,000,000
400,000,000 400,000,000
1.0 PKT Laboratory wet spinning machine
-Program Dukungan Manajemen
019.07.WA 19,083,517,000
Pengelolaan Manajemen Kesekretariatan Bidang Penelitian dan Pengembangan Industri
6042 19,083,517,000
Layanan Perkantoran[Program Baru - Perubahan Kebijakan] 1.0 Layanan
6042.EAA 18,364,126,000
Lokasi : KAB. BANDUNG Layanan Perkantoran BPPI BBPK
6042.EAA.006 1.0 Layanan 18,364,126,000
Gaji dan Tunjangan U
001 12,564,126,000
A TANPA SUB KOMPONEN 12,564,126,000
RM (KPPN.022-Bandung I )
511111 Belanja Gaji Pokok PNS 3,712,846,000
3,253,868,000 3,253,868,000
1.0 THN Belanja Gaji Pokok PNS
-458,978,000 458,978,000
1.0 BLN Belanja Gaji Pokok PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I )
511119 Belanja Pembulatan Gaji PNS 61,000
52,000 52,000
1.0 THN Belanja Pembulatan Gaji PNS
-9,000 9,000
1.0 BLN Belanja Pembulatan Gaji PNS (gaji ke 13 dan 14)
-(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I )
511121 Belanja Tunj. Suami/Istri PNS 319,644,000
273,980,000 273,980,000
1.0 THN Belanja Tunj. Suami/Istri PNS
-45,664,000 45,664,000
1.0 BLN Belanja Tunj. Suami/Istri PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I )
511122 Belanja Tunj. Anak PNS 84,156,000
72,133,000 72,133,000
1.0 THN Belanja Tunj. Anak PNS
-12,023,000 12,023,000
1.0 BLN Belanja Tunj. Anak PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I )
511123 Belanja Tunj. Struktural PNS 257,926,000
221,079,000 221,079,000
1.0 THN Belanja Tunj. Struktural PNS
-36,847,000 36,847,000
1.0 BLN Belanja Tunj. Struktural PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I )
511124 Belanja Tunj. Fungsional PNS 558,602,000
478,801,000 478,801,000
1.0 THN Belanja Tunj. Fungsional PNS
-79,801,000 79,801,000
1.0 BLN Belanja Tunj. Fungsional PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I ) 511125 Belanja Tunj. PPh PNS 23,511,000 20,152,000 20,152,000 1.0 THN Belanja Tunj. PPh PNS -3,359,000 3,359,000 1.0 BLN Belanja Tunj. PPh PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I )
511126 Belanja Tunj. Beras PNS 198,922,000
198,922,000 198,922,000
1.0 THN Belanja Tunj. Beras PNS
-RM (KPPN.022-Bandung I )
511129 Belanja Uang Makan PNS 740,160,000
740,160,000 740,160,000
1.0 THN Belanja Uang Makan PNS
-RM (KPPN.022-Bandung I )
511151 Belanja Tunjangan Umum PNS 60,193,000
51,594,000 51,594,000
1.0 THN Belanja Tunjangan Umum PNS
-8,599,000 8,599,000
1.0 BLN Belanja Tunjangan Umum PNS (gaji ke 13 dan 14)
-RM (KPPN.022-Bandung I )
512211 Belanja Uang Lembur 311,440,000
311,440,000 311,440,000
1.0 PKT Uang Lembur dan Uang Makan Lembur
-RM (KPPN.022-Bandung I )
512411 Belanja Pegawai (Tunjangan Khusus/Kegiatan/Kinerja) 6,296,665,000
6,296,665,000 6,296,665,000
1.0 THN Tunjangan Kinerja Pegawai (14 Bulan)
-Operasional dan Pemeliharaan Kantor U
002 5,800,000,000
(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I )
521111 Belanja Keperluan Perkantoran 1,682,700,000
57,500,000 500,000
115.0 OT Biaya keperluan sehari-hari perkantoran
-45,000,000 45,000,000 1.0 THN Jamuan Tamu -153,400,000 2,950,000 52.0 OB Pengemudi [4 ORG x 13 BLN] -306,800,000 2,950,000 104.0 OB Petugas Keamanan [8 ORG x 13 BLN]
-421,850,000 2,950,000 143.0 OB Pramubakti [11 ORG x 13 BLN] -464,750,000 2,750,000 169.0 OB Biaya Cleaning Service [13 ORG x 13 BLN]
-20,000,000 2,000,000
10.0 OB Tenaga Medis [1 ORG x 10 BLN]
-108,000,000 9,000,000 12.0 BLN Koneksi Internet -20,000,000 20,000,000 1.0 THN Sewa Hosting -40,000,000 40,000,000 1.0 THN Biaya Lembur Pegawai Non PNS
-40,000,000 40,000,000 1.0 THN Langganan RISI -5,400,000 5,400,000 1.0 THN WA Gateway -RM (KPPN.022-Bandung I )
521113 Belanja Penambah Daya Tahan Tubuh 57,000,000
57,000,000 19,000
3000.0 OH Pengadaan makanan/minuman penambah daya tahan
tubuh
-RM (KPPN.022-Bandung I )
521114 Belanja Pengiriman Surat Dinas Pos Pusat 24,000,000
24,000,000 2,000,000
12.0 BLN Biaya pengiriman surat/kawat/telex/fax
-RM (KPPN.022-Bandung I )
521115 Belanja Honor Operasional Satuan Kerja 257,400,000
205,200,000 Penanggung Jawab Pengelola Keuangan
>
36,000,000 3,000,000
12.0 OB Kuasa Pengguna Anggaran
-30,000,000 2,500,000
12.0 OB Pejabat Pembuat Komitmen I
-30,000,000 2,500,000
12.0 OB Pejabat Pembuat Komitmen II
-24,000,000 2,000,000
12.0 OB Pejabat Pembuat Komitmen III
-14,400,000 1,200,000
12.0 OB Pejabat Penguji dan Penandatangan SPM
-13,200,000 1,100,000 12.0 OB Bendaharawan Pengeluaran -43,200,000 600,000 72.0 OB Staf Pengelola -7,200,000 600,000 12.0 OB Pejabat Pengadaan Barang/Jasa
-7,200,000 300,000 24.0 OB Pengurus/Penyimpan BMN -18,000,000 Tim Pengelola Sistem Akuntansi Instansi
> 3,600,000 300,000 12.0 OB Penanggungjawab -3,000,000 250,000 12.0 OB Koordinator -2,400,000 200,000 12.0 OB Ketua Pengelola SAI
-9,000,000 150,000
60.0 OB Anggota Pengelola SAI
-34,200,000 Pengelola PNBP > 10,200,000 850,000 12.0 OB Bendahara Penerima -24,000,000 500,000 48.0 OB Anggota
-(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 65,000,000 5,000,000 5,000,000 1.0 PKT Pencetakan Spanduk / Banner
-60,000,000 50,000 1200.0 OK Biaya rapat -RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 199,000,000
94,000,000 94,000,000
1.0 THN ATK, Barang Cetak dan ARTK
-55,000,000 55,000,000 1.0 THN Computer Supply -50,000,000 50,000,000 1.0 THN Obat-obatan dan penunjang kesehatan
-RM (KPPN.022-Bandung I )
522111 Belanja Langganan Listrik 468,000,000
468,000,000 39,000,000 12.0 BLN Listrik -RM (KPPN.022-Bandung I )
522112 Belanja Langganan Telepon 24,000,000
24,000,000 2,000,000
12.0 BLN Telepon dan Indihome
-RM (KPPN.022-Bandung I )
522113 Belanja Langganan Air 12,000,000
12,000,000 1,000,000 12.0 BLN Air -RM (KPPN.022-Bandung I ) 522141 Belanja Sewa 156,000,000 156,000,000 13,000,000 12.0 BLN Sewa Kendaraan Operasional
-RM (KPPN.022-Bandung I )
522151 Belanja Jasa Profesi 18,000,000
18,000,000 900,000
20.0 OK Narasumber / Tenaga Ahli
-PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 205,000,000
50,000,000 50,000,000
1.0 THN Pendaftaran Publikasi / Pemakalah Seminar
-55,000,000 500,000
110.0 OK Pemeriksaan Medis Pegawai
-100,000,000 100,000,000
1.0 PKT Kalibrasi Peralatan Lab
-RM (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 134,000,000
15,000,000 15,000,000
1.0 PKT Iuran Anggota TAPPI dan Asosiasi lainnya
-109,000,000 109,000,000 1.0 PKT Biaya survaillance/resertifikasi/akreditasi -5,000,000 5,000,000 1.0 PKT Pendaftaran Paten -5,000,000 5,000,000 1.0 PKT Langganan DOI -PNP (KPPN.022-Bandung I )
523111 Belanja Pemeliharaan Gedung dan Bangunan 390,000,000
390,000,000 390,000,000
1.0 THN Pemeliharaan Gedung /bangunan / Halaman / Pagar
-RM (KPPN.022-Bandung I )
523111 Belanja Pemeliharaan Gedung dan Bangunan 580,000,000
580,000,000 580,000,000
1.0 THN Pemeliharaan Gedung /bangunan / Halaman / Pagar
-(1) (2) (3) (4) (5) (6) PNP (KPPN.022-Bandung I )
523121 Belanja Pemeliharaan Peralatan dan Mesin 395,200,000
185,200,000 185,200,000
1.0 THN Peralatan laboratorium riset
-100,000,000 100,000,000
1.0 THN Peralatan laboratorium uji
-110,000,000 110,000,000
1.0 THN Peralatan laboratorium Kalibrasi
-RM (KPPN.022-Bandung I )
523121 Belanja Pemeliharaan Peralatan dan Mesin 250,000,000
130,000,000 13,000,000
10.0 UNIT Pemeliharaan Kendaraan Roda 4
-4,000,000 2,000,000
2.0 UNIT Pemeliharaan Kendaraan Roda 2
-14,000,000 400,000 35.0 UNIT Pemeliharaan AC -7,000,000 70,000 100.0 OT Pemeliharaan barang inventaris
-25,000,000 500,000 50.0 UNIT Pemeliharaan Komputer -10,000,000 10,000,000 1.0 PKT Peralatan Diesel dan Instalasi 100KVA
-60,000,000 60,000,000
1.0 PKT Pemeliharaan Alat Lab
-PNP (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 245,900,000
245,900,000 245,900,000
1.0 THN Dalam rangka rangka diskusi / koordinasi / konsultansi /
evaluasi / keperluan operasional
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 246,000,000
246,000,000 246,000,000
1.0 THN Dalam rangka rangka diskusi / koordinasi / konsultansi /
evaluasi / keperluan operasional
-RM (KPPN.022-Bandung I )
524113 Belanja Perjalanan Dinas Dalam Kota 1,500,000
750,000 150,000 5.0 OH Uang harian -750,000 150,000 5.0 OT Transport Lokal -PNP (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 161,400,000
161,400,000 161,400,000
1.0 THN Dalam rangka undangan / rapat / konsinyering / monev
-RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 125,400,000
125,400,000 125,400,000
1.0 THN Dalam rangka undangan / rapat / konsinyering / monev
-PNP (KPPN.022-Bandung I )
524211 Belanja Perjalanan Dinas Biasa - Luar Negeri 102,500,000
102,500,000 Jerman > 22,500,000 4,500,000 5.0 OH Uang harian Es.II
-20,000,000 4,000,000
5.0 OH Uang harian Es.III
-60,000,000 30,000,000 2.0 OT Transport
-Layanan Perencanaan dan Penganggaran Internal[Program
Baru - Perubahan Kebijakan] 1.0 Layanan
6042.EAB 353,900,000
Lokasi : KAB. BANDUNG
Layanan Tata Usaha dan Dukungan Manajemen BBPK
6042.EAB.010 1.0 Laporan 353,900,000
Penyusunan rencana program dan penyusunan rencana
anggaran U
051 155,200,000
(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 1,000,000 1,000,000 1,000,000 1.0 PKT Penggandaan dan Penjilidan Dokumen
-RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 16,400,000
3,600,000 450,000 8.0 OB Penanggung jawab -3,200,000 400,000 8.0 OB Ketua -9,600,000 300,000 32.0 OB Anggota -RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 9,000,000
9,000,000 9,000,000
1.0 THN Dalam rangka konsinyering, bimtek, diskusi, Workshop,
Penelaahan dan Konsultasi
-RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 128,800,000
128,800,000 128,800,000
1.0 THN Dalam rangka menghadiri undangan dan konsinyering
Renstra/Renja
-Pelaksanaan Pemantauan dan Evaluasi U
052 54,200,000
A TANPA SUB KOMPONEN 54,200,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 15,000,000 9,000,000 50,000 180.0 OK Biaya rapat -6,000,000 6,000,000 1.0 PKT Penggandaan dan Penjilidan Laporan Akhir
-RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 15,200,000
3,200,000 400,000 8.0 OB Ketua -12,000,000 300,000 40.0 OB Anggota -RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 10,000,000
10,000,000 10,000,000
1.0 THN Dalam rangka diskusi dan penyampaian laporan
-RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 14,000,000
14,000,000 14,000,000
1.0 THN Dalam rangka konsinyering dan monev
-Pengelolaan data dan informasi U
053 38,800,000
A TANPA SUB KOMPONEN 38,800,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 1,000,000 1,000,000 1,000,000 1.0 THN Rapat -RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 10,400,000
3,200,000 400,000 8.0 OB Ketua -7,200,000 300,000 24.0 OB Anggota -RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 2,000,000
2,000,000 2,000,000
1.0 THN ATK dan Computer supplies
-(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I )
522131 Belanja Jasa Konsultan 15,000,000
15,000,000 15,000,000 1.0 PKT Konsultansi -RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 10,400,000
10,400,000 10,400,000
1.0 THN Dalam rangka pengelolaan data dan informasi
-Pengelolaan Keuangan dan Perbendaharaan U
054 48,800,000
A Pengelolaan Sistem Akuntansi Instansi 24,400,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 1,400,000 1,400,000 1,400,000 1.0 PKT Penggandaan dan Penjilidan Laporan
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 10,300,000
10,300,000 10,300,000
1.0 THN Dalam rangka koordinasi dan penyampaian laporan
-RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 12,700,000
12,700,000 12,700,000
1.0 THN Dalam rangka menghadiri undangan
-B Pengelolaan Barang Milik Negara 24,400,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 700,000 700,000 700,000 1.0 PKT Penggandaan dan Penjilidan Laporan
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 10,300,000
10,300,000 10,300,000
1.0 THN Dalam rangka koordinasi dan penyampaian laporan
-RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 13,400,000
13,400,000 13,400,000
1.0 THN Dalam rangka menghadiri undangan
-Layanan Pengelolaan Majalah/Jurnal Ilmiah dan Publikasi
KTI U
055 56,900,000
A TANPA SUB KOMPONEN 56,900,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 6,180,000 1,200,000 40,000 30.0 OK Biaya rapat -980,000 980,000 1.0 PKT Penggandaan dokumen -4,000,000 2,000,000 2.0 PKT Pencetakan -RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 38,720,000
900,000 450,000 2.0 Oter Penanggung jawab -700,000 350,000 2.0 Oter Redaktur -9,900,000 275,000 36.0 Oter Penyunting/editor -1,500,000 150,000 10.0 Oter Sekretariat -25,000,000 200,000 125.0 Hal Penulis artikel -720,000 180,000 4.0 Oter Desain grafis dan fotografer
-(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I )
521811 Belanja Barang Persediaan Barang Konsumsi 2,000,000
2,000,000 2,000,000
1.0 THN ATK dan Computer supplies
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 10,000,000
10,000,000 10,000,000
1.0 THN Dalam rangka diskusi / konsultansi
-Layanan Sarana Internal[Program Baru - Perubahan
Kebijakan] 22.0 unit
6042.EAD 250,791,000
Lokasi : KAB. BANDUNG
Layanan Sarana Internal BPPI BBPK
6042.EAD.006 22.0 Unit 250,791,000
Pengadaan Perangkat Pengolah Data dan Komunikasi
051 60,000,000
A TANPA SUB KOMPONEN 60,000,000
PNP (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 30,000,000
30,000,000 15,000,000 2.0 UNIT Laptop/PC -RM (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 30,000,000
30,000,000 15,000,000
2.0 UNIT Laptop/PC
-Pengadaan Peralatan Fasilitas Perkantoran
052 190,791,000
A Pengadaan Alat Laboratorium 45,791,000
RM (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 45,791,000
45,791,000 45,791,000
1.0 UNIT Alat Laboratorium
-B Pengadaan Inventaris Perkantoran 140,000,000
RM (KPPN.022-Bandung I )
532111 Belanja Modal Peralatan dan Mesin 140,000,000
20,000,000 20,000,000 1.0 PKT Mebeulair -120,000,000 120,000,000 1.0 UNIT Filter Air -C Pengadaan Buku 5,000,000 RM (KPPN.022-Bandung I )
536111 Belanja Modal Lainnya 5,000,000
5,000,000 5,000,000
1.0 PKT Buku
Layanan Pendidikan dan Pelatihan Internal[Program Baru
-Perubahan Kebijakan] 35.0 Orang
6042.EAM 114,700,000
Lokasi : KAB. BANDUNG
Layanan Pendidikan dan Pelatihan Internal BPPI BBPK
6042.EAM.006 35.0 Orang 114,700,000
Pengembangan Kompetensi / Pelatihan U
051 114,700,000
A TANPA SUB KOMPONEN 114,700,000
RM (KPPN.022-Bandung I ) 521211 Belanja Bahan 10,800,000 800,000 800,000 1.0 PKT Penggandaan Laporan -10,000,000 50,000 200.0 OK Biaya Rapat/Inhouse Training
-(1) (2) (3) (4) (5) (6) RM (KPPN.022-Bandung I )
521213 Belanja Honor Output Kegiatan 17,500,000
9,500,000 Tim Penilai TP2U
> 900,000 450,000 2.0 OK Penanggung jawab -800,000 400,000 2.0 OK Ketua -600,000 300,000 2.0 OK Sekretaris -7,200,000 300,000 24.0 OK Anggota -8,000,000 Tim Pengembangan dan Pembinaan Kompetensi
Pegawai > 3,200,000 400,000 8.0 OB Ketua -4,800,000 300,000 16.0 OB Anggota -PNP (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 6,000,000
6,000,000 6,000,000
1.0 PKT Pelatihan Teknis / Inhouse training
-RM (KPPN.022-Bandung I )
522191 Belanja Jasa Lainnya 35,400,000
35,400,000 Pelatihan Teknis / Fungsional / Workshop / Inhouse
training >
3,000,000 1,500,000
2.0 ORG Pelatihan Barang dan Jasa
-4,000,000 2,000,000 2.0 ORG Pelatihan Energy -2,000,000 500,000 4.0 ORG Pengelolaan K3 Lingkungan -2,000,000 500,000 4.0 ORG Training Excellence: Train the Trainer
-1,000,000 500,000
2.0 ORG Pelatihan Emisi Merkuri di Industri
-2,000,000 500,000
4.0 ORG Pelatihan An Effective Calibration System
-8,000,000 2,000,000 4.0 ORG Pelatihan Pemasaran -13,400,000 13,400,000 1.0 PKT Pelatihan Public Speaking
-RM (KPPN.022-Bandung I )
524111 Belanja Perjalanan Dinas Biasa 39,000,000
39,000,000 39,000,000
1.0 THN Dalam Rangka Pengurusan Administrasi Kepegawaian
dan Diklat
-RM (KPPN.022-Bandung I )
524119 Belanja Perjalanan Dinas Paket Meeting Luar Kota 6,000,000
6,000,000 6,000,000
1.0 THN Dalam rangka menghadiri undangan
-NIP 196503071993031003
Saiful Bahri
Bandung, 13 April 2021
Catatan : 1. U = Komponen Utama2. P = Komponen Penunjang 3. * = Blokir