• Tidak ada hasil yang ditemukan

Hubungan antara Kegiatan Pelatihan Maximo 7 (Purchasing) dengan Prestasi Kerja Karyawan PT Indonesia Power Unit Bisnis Pemangkitan Kamojang.

N/A
N/A
Protected

Academic year: 2017

Membagikan "Hubungan antara Kegiatan Pelatihan Maximo 7 (Purchasing) dengan Prestasi Kerja Karyawan PT Indonesia Power Unit Bisnis Pemangkitan Kamojang."

Copied!
2
0
0

Teks penuh

(1)

iv

ABSTRAK

Mochammad Riza Firdaus, 210110060050, 2013, Hubungan antara

Kegiatan Pelatihan

Maximo 7 (Purchasing)

dengan Prestasi Kerja Karyawan

PT Indonesia Power UBP Kamojang. Pembimbing Utama Duddy Zein, Drs., M.Si.

dan Pembimbing Pendamping Teddy Kurnia Wirakusumah Drs., M.I.Kom.. Jurusan

Manajemen Komunikasi Fakultas Ilmu Komunikasi, Universitas Padjadjaran

Bandung.

Penelitian ini bertujuan untuk mengetahui hubungan antara kegiatan pelatihan

Maximo 7 (Purchasing)

dengan prestasi kerja karyawan PT Indonesia Power Unit

Bisnis Pembangkitan (UBP) Kamojang setelah satu tahun terkahir. Selain itu juga

untuk mengetahui hubungan antara kegiatan pelatihan

Maximo 7 (Purchasing)

dengan prestasi kerja karyawan PT Indonesia Power UBP Kamojang pada aspek

kualitas kerja, kuantitas kerja, pengetahuan pekerjaan, serta konsistensi. Penelitian

ini menggunakan Teori Pencapaian Prestasi dari McClelland.

Metode yang digunakan dalam penelitian ini adalah metode korelasi.

Populasi adalah peserta pelatihan

In House Training Workshop Maximo 7

(Purchasing)

dari para karyawan PT Indoensia Power UBP Kamojang, dengan

jumlah sampel dalam penelitian ini yaitu seluruh anggota populasi yang berjumlah

30 orang dengan menggunakan teknik sampel jenuh. Uji Validitas menggunakan

rumus

Rank Spearman

dan uji reliabilitas menggunakan rumus

Spearman-Brown

dengan mengambil sampel uji coba instrumen yang memiliki ciri maupun

karakterisitik yang mirip dengan populasi utama yakni dari para karyawan PT

Indonesia Power UBP Kamojang Sub Unit PLTP Gunung Salak yang berjumlah 22

orang. Teknik pengumpulan data melalui kuesioner dan studi kepustakaan. Teknik

analisis data deskriptif dan statistik inferensial melalui uji hipotesis

Rank Spearman

Order Correlations

.

Hasil penelitian secara umum yaitu pada taraf signifikansi (

) = 0,05 dan

tingkat kepercayaan 95%, nilai r

s

= 0,750 dan t

hitung

(6.004) > t

tabel

(2.05) maka dapat

dikatakan terdapat hubungan yang signifikan antara kegiatan pelatihan dengan

prestasi kerja peserta pelatihan. Secara khusus pada aspek kualitas kerja didapat nilai

r

s

= 0,747 dan t

hitung

(5.954) > t

tabel

(2.05); pada aspek kuantitas kerja didapat nilai r

s

=

0,756 dan t

hitung

(6.117) > t

tabel

(2.05); pada aspek pengetahuan pekerjaan didapat nilai

r

s

= 0,593 dan t

hitung

(3.898) > t

tabel

(2.05); dan pada aspek konsistensi didapat nilai r

s

= 0,801 dan t

hitung

(7.086) > t

tabel

(2.05).

Simpulan dari penelitian ini yaitu terdapat hubungan yang signifikan antara

pelaksanaan Kegiatan Pelatihan

In House Training Workshop Maximo 7

(Purchasing)

dengan Prestasi Kerja Karyawan PT Indonesia Power UBP Kamojang

(2)

v

ABSTRACT

Mochammad Riza F irdaus, 210110060050, 2013. The Correlation of

Maximo 7 (Purchasing) Training with PT Indonesia Power UBP Kamojang Work

Achievement Employee

. The head counselor is Duddy Zein, Drs., M.Si. and the

counselor assistant is Teddy Kurnia Wirakusumah, Drs., M.I.Kom.. Majors of

Management Communication, Faculty of Communication Science, Padjadjaran

University.

The purpose of this research is to find out Correlation of Maximo 7

(Purchasing) Training with PT Indonesia Power Generation Business Unit (GBU)

Kamojang work achievement after one last year. Also on this research is to find out

Correlation of Maximo 7 (Purchasing) Training with PT Indonesia Power GBU

Kamojang work achievement on the aspect of quality of work, quantity of work, job

knowledge, and consistency. The theory that used in this research is Achievement

Theory by McClelland.

The method applied in this research was corelational explanatory survey. The

population was participant that attended In House Training Workshop Maximo 7

(Purchasing) from PT Indonesia Power GBU Kamojang employers, with the amount

of sample in this research were all member of population of 30 people with using

saturated samples. Validity and reliability test using Rank Spearman and

Spearman-Brown by taking a sample test instrument which has similar characteristics to the

main population of PT Indonesia Power GBU Kamojang Sub Unit Gunung Salak

employers that amount to 22 people. Data collecting technique is implemented by

questionnaire, and library research. The method with descriptive data analysis

technique and inferential statistic by hypothetical testing Rank Spearman Order

Correlations.

The results are at the level of significance (

) = 0.05 and 95% trust level, the

value of r

s

= 0.750 and t

count

(6.004) > t

table

(2.05), it can be said there is a significant

relationship between the training with the trainees work achievement. Specifically on

quality of work aspect obtained value of r

s

= 0.747 and t

count

(5.954) > t

table

(2.05);

on quantity of work aspect obtained value of r

s

= 0.756 and t

count

(6.117) > t

table

(2.05); on job knowledge aspect obtained value of r

s

= 0.593 and t

count

(3.898) > t

table

(2.05); also on consistency aspect obtained value of r

s

= 0.801 and t

count

(7.086) >

t

table

(2.05).

Referensi

Dokumen terkait

Untuk mengetahui efek dari ekstrak daun sukun yang diformulasikan dalam sediaan krim sebagai anti-aging sehingga dapat digunakan sebagai bahan alami dalam sediaan

Penelitian ini berjudul Representasi Perempuan Jawa Dalam Novel “Anak Semua Bangsa”. sebuah studi analisis semiotika representasi perempuan modern Jawa pada tokoh Nyai

Fajariah (2009) menggunakan fraksi etil asetat dari ekstrak etanol kayu secang untuk menguji aktivitas antibakteri terhadap Staphylococcus aureus diperoleh hasil KBM 0,25% dan

Telah dilakukan penelitian sintesis membran komposit polisulfon-poliamid (PSF- PA) dengan menggunakan beberapa variasi komposisi pelarut HCl yang bertujuan agar

Meskipun sebelum kejadian konflik yang berlangsung pada tahun 2012 pemuda bali sangat arogan dan memiliki sikap premanisme namun setelah terjadi konflik yang

Merumuskan kebijakan dalam mendukung agroforestri sebagai bentuk pengelolaan berkelanjutan (W1, W2, W3, O1, O2, O3 dan O8). Peran pemerintah sangat penting dalam menggali

Pekerjaan-pekerjaan yang yang bersifat kritis pada proyek konstruksi gedung AD Premier berdasarkan metode jalur kritis, menggunakan software Microsoft Project 2010 adalah

Penelitian ini bertujuan mengidentifikasi ketidakkonsistensinan desain alinyemen pada daerah black-spot di tikungan dan mengembangkan model yang menjelaskan hubungan