DAFTAR PUSTAKA 

 

Das, B.M. 1985. Principles of Geotechnical Engineering. PWS Kent. Boston.     

Das, B.M. 1993. Mekanika Tanah (Prinsip‐prinsip Rekayasa Geoteknis), Jilid 2. Penerbit Erlangga. 

Jakarta.     

Horonjeff, Robert & McKelvey F.X. 1975. Planning and Design of Airports. McGraw‐Hill. USA. 

ICAO.  1983.  Aerodromes;  Annex  14  to  The  Convention  on  International  Civil  Aviation,  Eighth  Edition. 

ICAO. 1983. Aerodrome Design Manual, Part 3: Pavement, Second Edition. 

ICAO. 1984. Aerodrome Design Manual, Part 1: Runways, Second Edition. 

Irsyam, Masyhur. 2003. Catatan Kuliah: Rekayasa Pondasi. Penerbit ITB. Bandung  Jurnal Harga Satuan Bahan Bangunan, Konstruksi & Interior. Edisi XXV Tahun XIII 2006. 

Khanna, S.K. & Arora, M.G. 1979. Airport Planning and Design, Nem Chand & Bros. Roorkee. 

India. 

Kosasih,  Djunaedi.  2003.  Catatan  Kuliah:  Rekayasa  Struktur  dan  Bahan  Perkerasan,  Modul  I. 

Penerbit ITB. Bandung. 

Kosasih,  Djuanaedi.  2005.  Jurnal:  Perbandingan  antara  Pendekatan  Desain  Struktur  Perkerasan  Kaku  berdasarkan  Lalu  Lintas  Pesawat  Udara  Campuran  dan  Pesawat  Udara  Desain  Kritis. 

Bandung 

Laporan  Akhir  Master  Plan  Bandara  Internasional  Jawa  Barat  (Volume  I).  Dinas  Perhubungan  Pemerintah Propinsi Jawa Barat. 2005. 

Laporan Akhir FeasibilityStudy Bandara Jambi. Dinas Perhubungan Pemerintah Propinsi Jambi. 

Januari 2007. 

Laporan Penyelidikan Tanah Bandara Internasional Jawa Barat. Dinas Perhubungan Pemerintah  Propinsi Jawa Barat. 2005. 

Peurifoy,  R.  L.  &  Schexnayder.  2002.  Construction  Planning,  Equipment,  and  Methods,  Sixth  Edition. McGraw Hill. USA.   

Peurifoy, R. L. & Oberlender, G. D. 2002. Estimating Construction Costs, Fifth Edition. McGraw  Hill. USA.   

Pradityo,  Wahyu  dan  Rudi  Wahyu  Setiaji.  2006.  Tugas  Akhir:  Kajian  Pengembangan  Bandar  Udara Internasional Adisutjipto Yogyakarta. Bandung.  

PT. Hutama Karya. 2007. Slide: Metode Khusus Jalan. Jakarta. 

(2)

PT.  Pembangunan  Perumahan  (PERSERO).  2003.  Buku  Referensi  untuk  Kontraktor  Bangunan  Gedung dan Sipil. PT. Gramedia Pustaka Utama: Jakarta. 

Sargious,  M.  1975.  Pavements  and  Surfacings  for  Highways  and  Airports.  Applied  Science  Publishers LTD. London. 

Soekirno, Purnomo. 2006. Slide Kuliah: Manajemen Konstruksi. Bandung. 

www.boeing.com

Yoder,  Witczak.  1975.  Priciples  of  Pavement  Design,  Second  Edition.  John  Wiley  &  Sons,  Inc. 

USA. 

 

    xii 

(3)

       

LAMPIRAN A  Hasil Perhitungan  Perencanaan Geometrik 

 

 

(4)

Tabel 1 Perhitungan Wind Rose Arah 0-180

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.94 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 0.90 0.58 0 0.11 43.32

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.94 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.94 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 0.90 0.14 0 0.11 6.35

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.94 0.04 6.88

98.62 0 - 180

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 2 Perhitungan Wind Rose Arah 10-190

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 0.95 0.58 0.01 0.11 43.35

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.64 0.04 0.60

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 0.95 0.14 0.01 0.11 6.35

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.64 0.04 6.87

98.64971 10 - 190

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 3 Perhitungan Wind Rose Arah 20-200

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 0.98 0.58 0.12 0.11 43.38

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.25 0.04 0.58

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 0.98 0.14 0.12 0.11 6.37

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.25 0.04 6.85

98.66 20 - 200

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 4 Perhitungan Wind Rose Arah 30-210

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.43 0.11 43.43

SE 1 0.18 1 0.25 1 0.14 1 0 0.99 0 0.04 0.04 0.57

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.43 0.11 6.41

NW 1 0.97 1 1.98 1 2.16 1 1.48 0.99 0.25 0.04 0.04 6.84

98.73 30 - 210

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 5 Perhitungan Wind Rose Arah 40-220

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.98 0.29 15.87

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.82 0.11 43.47

SE 1 0.18 1 0.25 1 0.14 1 0 0.91 0 0 0.04 0.57

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.98 0.65 20.47

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.82 0.11 6.45

NW 1 0.97 1 1.98 1 2.16 1 1.48 0.91 0.25 0 0.04 6.71

98.66 40 - 220

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 6 Perhitungan Wind Rose Arah 50-230

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.82 0.29 15.83

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.98 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 0.91 0 0 0.04 0.57

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.82 0.65 20.36

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.98 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 0.91 0.25 0 0.04 6.82

98.65 50 - 230

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

(5)

Tabel 7 Perhitungan Wind Rose Arah 60-240

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.43 0.29 15.72

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 0.99 0 0.04 0.04 0.57

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.43 0.65 20.11

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 0.99 0.25 0.04 0.04 6.84

98.32 60 - 240

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 8 Perhitungan Wind Rose Arah 70-250

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 0.98 0.36 0.12 0.29 15.62

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.25 0.04 0.58

S 1 1.91 1 7.52 1 5.65 1 2.99 0.98 1.76 0.12 0.65 19.86

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.25 0.04 6.85

97.99 70 - 250

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 9 Perhitungan Wind Rose Arah 80-260

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 0.95 0.36 0.01 0.29 15.58

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.64 0.04 0.60

S 1 1.91 1 7.52 1 5.65 1 2.99 0.95 1.76 0.01 0.65 19.75

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.64 0.04 6.87

97.87 80 - 260

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 10 Perhitungan Wind Rose Arah 90-270

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 0.90 0.36 0 0.29 15.55

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.94 0.04 3.21

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.94 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 0.90 1.76 0 0.65 19.65

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.94 0.07 1.91

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.94 0.04 6.88

97.76 90 - 270

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 11 Perhitungan Wind Rose Arah 100-280

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 0.95 0.36 0.01 0.29 15.58

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.64 0.04 3.20

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 0.95 1.76 0.01 0.65 19.75

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.64 0.07 1.88

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

97.86 100 - 280

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 12 Perhitungan Wind Rose Arah 110-290

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 0.98 0.36 0.12 0.29 15.62

NE 1 1.04 1 1.44 1 0.47 1 0.22 1.00 0 0.25 0.04 3.18

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 0.98 1.76 0.12 0.65 19.86

SW 1 0.11 1 0.61 1 0.72 1 0.22 1.00 0.18 0.25 0.07 1.86

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

110 - 290

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

(6)

Tabel 13 Perhitungan Wind Rose Arah 120-300

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.43 0.29 15.72

NE 1 1.04 1 1.44 1 0.47 1 0.22 0.99 0 0.04 0.04 3.17

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.43 0.65 20.11

SW 1 0.11 1 0.61 1 0.72 1 0.22 0.99 0.18 0.04 0.07 1.84

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

98.29 120 - 300

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 14 Perhitungan Wind Rose Arah 130-310

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.82 0.29 15.83

NE 1 1.04 1 1.44 1 0.47 1 0.22 0.91 0 0 0.04 3.17

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.98 0.11 43.49

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.82 0.65 20.36

SW 1 0.11 1 0.61 1 0.72 1 0.22 0.91 0.18 0 0.07 1.82

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.98 0.11 6.47

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

98.63 130 - 310

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 15 Perhitungan Wind Rose Arah 140-320

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.98 0.29 15.87

NE 1 1.04 1 1.44 1 0.47 1 0.22 0.91 0 0 0.04 3.17

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.82 0.11 43.47

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.98 0.65 20.47

SW 1 0.11 1 0.61 1 0.72 1 0.22 0.91 0.18 0 0.07 1.82

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.82 0.11 6.45

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

98.75 140 - 320

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 16 Perhitungan Wind Rose Arah 150-330

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 0.99 0 0.04 0.04 3.17

E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.43 0.11 43.43

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 0.99 0.18 0.04 0.07 1.84

W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.43 0.11 6.41

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

98.70 150 - 330

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 17 Perhitungan Wind Rose Arah 160-340

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 1.00 0 0.25 0.04 3.18

E 1 8.24 1 20.99 1 9.68 1 3.89 0.98 0.58 0.12 0.11 43.38

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 1.00 0.18 0.25 0.07 1.86

W 1 0.68 1 2.66 1 2.23 1 0.65 0.98 0.14 0.12 0.11 6.37

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

98.64 160 - 340

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

Tabel 18 Perhitungan Wind Rose Arah 170-350

Percentage Percentage Percentage Percentage Percentage Percentage

of Wind of Wind of Wind of Wind of Wind of Wind

N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88

NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.64 0.04 3.20

E 1 8.24 1 20.99 1 9.68 1 3.89 0.95 0.58 0.01 0.11 43.35

SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61

S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48

SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.64 0.07 1.88

W 1 0.68 1 2.66 1 2.23 1 0.65 0.95 0.14 0.01 0.11 6.35

NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88

98.64 170 - 350

0 - 4 mph 4 - 8 mph 8 - 12 mph

A(%) A(%) A(%)

12 - 18 mph 18 - 24 mph 24 - 31 mph

Total

A(%) A(%) A(%)

(7)

 

 

 

 

 

 

 

 

 

LAMPIRAN B 

Hasil Perhitungan 

(8)

Tabel 19 Perhitungan Keberangkatan Tahunan Ekivalen

[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19]

No Tipe Pesawat Kelas Konfigurasi MTOW Tekanan  Jumlah  Jumlah %Beban Beban Keberangkatan FES R

2

xFES Log(R

2

xFES) W

2

/W

1

(W

2

/W

1

)

0,5

[14]*[16] FEB Keberangkatan

Pesawat Sumbu (kg) Ban Roda Roda Sumbu Roda Tahunan [11]*[12] [5]/412770 10

[17]

/[13] Tahunan

Roda (MPa) per Sumbu Utama [5]*[9]/[8] Ekivalen

Kaki Utama [11]*[12]*[18]

Roda

1 CASA‐212 5 S 14000 0.87 1 2 91 6370 1679 0.5 839.50 2.92 0.03 0.18 0.54 0.004116 3

2 F28‐MK2000 4 D 29480 0.69 2 4 92.6 6825 7202 0.6 4321.40 3.64 0.07 0.27 0.97 0.002168 9

3 F28‐MK3000 4 D 32205 0.78 2 4 92.6 7455 7202 0.6 4321.40 3.64 0.08 0.28 1.02 0.002398 10

4 F28‐MK4000 4 D 33110 0.78 2 4 92.6 7665 7202 0.6 4321.40 3.64 0.08 0.28 1.03 0.002478 11

5 F‐100 3 D 45800 0.92 2 4 94.3 10797 19624 0.6 11774.25 4.07 0.11 0.33 1.36 0.001928 23

6 B737‐200 3 D 52616 1.1 2 4 91 11970 19624 0.6 11774.25 4.07 0.13 0.36 1.45 0.002413 28

7 B737‐300 3 D 57000 1.4 2 4 92.6 13196 19624 0.6 11774.25 4.07 0.14 0.37 1.51 0.002766 33

8 B737‐400 3 D 63000 1.28 2 4 91.6 14427 19624 0.6 11774.25 4.07 0.15 0.39 1.59 0.003307 39

9 B767‐200 2 DT 136984 1.26 4 8 93.8 16061 9753 1 9753.00 3.99 0.33 0.58 2.30 0.020366 199

10 A‐310 2 DT 153000 1.24 4 8 93 17786 9753 1 9753.00 3.99 0.37 0.61 2.43 0.027513 268

12 B747‐300 1 DDT 377800 1.31 4 16 92.4 21818 1825 1 1825.00 3.26 0.92 0.96 3.12 0.72243 1318

13 B747‐400 1 DDT 412770 1.31 4 16 92.4 23837 1825 1 1825.00 3.26 1.00 1.00 3.26 1 1825

124937

3767

Total Keberangkatan Total Keberangkatan Ekivalen

(9)

 

 

 

 

 

 

 

 

 

LAMPIRAN C 

Hasil Perhitungan 

Perencanaan Geoteknik 

(10)

Tabel 20 Elevasi Tanah Asli dan Elevasi Perataan Lokasi Runway

Stasioning Stasioning

Kiri Kanan Kiri Kanan Kiri Kanan Kiri Kanan

CL‐50m CL+50m CL‐150m CL+150m CL‐50m CL+50m CL‐150m CL+150m

0+000 33.04 38.59 36.00 36.00 1+900 35.34 35.23 36.00 36.00

0+050 30.10 39.75 36.00 36.00 1+950 35.21 35.15 36.00 36.00

0+100 31.34 38.15 36.00 36.00 2+000 35.36 35.06 36.00 36.00

0+150 33.71 39.71 36.00 36.00 2+050 35.47 35.23 36.00 36.00

0+200 37.60 40.73 36.00 36.00 2+100 35.55 35.55 36.00 36.00

0+250 41.05 41.25 36.00 36.00 2+150 35.50 35.57 36.00 36.00

0+300 41.41 41.14 36.00 36.00 2+200 34.96 35.17 36.00 36.00

0+350 41.42 40.74 36.00 36.00 2+250 35.28 34.75 36.00 36.00

0+400 41.36 40.61 36.00 36.00 2+300 35.42 34.80 36.00 36.00

0+450 41.02 40.37 36.00 36.00 2+350 35.29 35.03 36.00 36.00

0+500 40.69 40.14 36.00 36.00 2+400 35.26 35.17 36.00 36.00

0+550 40.46 39.85 36.00 36.00 2+450 35.00 35.23 36.00 36.00

0+600 40.31 39.69 36.00 36.00 2+500 34.54 34.93 36.00 36.00

0+650 40.10 39.51 36.00 36.00 2+550 34.54 34.01 36.00 36.00

0+700 39.97 39.31 36.00 36.00 2+600 34.80 34.12 36.00 36.00

0+750 39.69 39.03 36.00 36.00 2+650 35.39 34.87 36.00 36.00

0+800 39.43 38.92 36.00 36.00 2+700 34.68 35.54 36.00 36.00

0+850 39.26 38.76 36.00 36.00 2+750 34.60 35.46 36.00 36.00

0+900 38.90 38.20 36.00 36.00 2+800 34.74 35.41 36.00 36.00

0+950 38.53 37.90 36.00 36.00 2+850 34.65 35.36 36.00 36.00

1+000 37.82 38.02 36.00 36.00 2+900 33.77 35.13 36.00 36.00

1+050 37.76 37.47 36.00 36.00 2+950 33.02 34.63 36.00 36.00

1+100 37.53 37.23 36.00 36.00 3+000 33.69 34.52 36.00 36.00

1+150 37.26 36.74 36.00 36.00 3+050 34.28 34.95 36.00 36.00

1+200 36.78 36.56 36.00 36.00 3+100 34.92 35.09 36.00 36.00

1+250 36.79 36.58 36.00 36.00 3+150 34.77 35.03 36.00 36.00

1+300 36.74 36.50 36.00 36.00 3+200 34.55 34.88 36.00 36.00

1+350 36.65 36.38 36.00 36.00 3+250 34.63 34.84 36.00 36.00

1+400 36.49 36.26 36.00 36.00 3+300 34.39 34.85 36.00 36.00

1+450 36.33 36.20 36.00 36.00 3+350 34.05 35.06 36.00 36.00

1+500 36.17 36.05 36.00 36.00 3+400 34.01 34.77 36.00 36.00

1+550 36.08 36.07 36.00 36.00 3+450 34.00 34.81 36.00 36.00

1+600 36.03 35.90 36.00 36.00 3+500 34.32 34.96 36.00 36.00

1+650 35.91 35.86 36.00 36.00 3+550 34.44 35.05 36.00 36.00

1+700 35.83 35.77 36.00 36.00 3+600 34.22 35.19 36.00 36.00

1+750 35.77 35.63 36.00 36.00 3+650 34.01 35.30 36.00 36.00

1+800 35.67 35.47 36.00 36.00 3+700 34.01 35.30 36.00 36.00

1+850 35.51 35.30 36.00 36.00 3+750 34.01 35.30 36.00 36.00

Elevasi Tanah Asli Elevasi Perataan Elevasi Tanah Asli Elevasi Perataan

Indra Susatyo_15003011

Bagja Munggaran_15003081

(11)

Tabel 21 Perhitungan Volume Galian dan Timbunan untuk Perataan Tanah Lokasi Runway

Stasioning Area Area Volume Volume Volume Ket

Sumbu Cut Fill Cut Fill Cut‐

Runway Runway Runway Runway Runway Runway (m2) (m2) (m3) (m3) Volume

Strip Shoulder Shoulder Strip Fill

CL‐150m CL‐30m CL‐22.5m CL CL+22.5m CL+30m CL+150m (m3)

0+000 36.335 38.285 38.735 38.960 38.735 38.285 36.335 336.70 334.80 Cut

0+050 36.335 38.285 38.735 38.960 38.735 38.285 36.335 507.38 718.00 21101.88 26320.00 ‐5218.13 Fill 0+100 36.335 38.285 38.735 38.960 38.735 38.285 36.335 233.39 729.05 18519.08 36176.13 ‐17657.05 Fill 0+150 36.335 38.285 38.735 38.960 38.735 38.285 36.335 422.01 390.70 16385.03 27993.63 ‐11608.60 Fill 0+200 36.335 38.285 38.735 38.960 38.735 38.285 36.335 966.75 0.00 34719.08 9767.50 24951.58 Cut 0+250 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1551.19 0.00 62948.45 0.00 62948.45 Cut 0+300 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1587.28 0.00 78461.73 0.00 78461.73 Cut 0+350 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1531.48 0.00 77969.05 0.00 77969.05 Cut 0+400 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1500.21 0.00 75792.18 0.00 75792.18 Cut 0+450 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1481.68 0.00 74547.18 0.00 74547.18 Cut 0+500 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1324.52 0.00 70155.00 0.00 70155.00 Cut 0+550 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1246.61 0.00 64278.30 0.00 64278.30 Cut 0+600 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1195.63 0.00 61056.08 0.00 61056.08 Cut 0+650 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1137.49 0.00 58327.95 0.00 58327.95 Cut 0+700 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1181.21 0.00 57967.53 0.00 57967.53 Cut 0+750 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1137.49 0.00 57967.53 0.00 57967.53 Cut

0+800 36.335 38.285 38.735 38.960 38.735 38.285 36.335 934.93 0.00 51810.48 0.00 51810.48 Cut

0+850 36.335 38.285 38.735 38.960 38.735 38.285 36.335 896.21 0.00 45778.60 0.00 45778.60 Cut

0+900 36.335 38.285 38.735 38.960 38.735 38.285 36.335 773.08 0.00 41732.35 0.00 41732.35 Cut

0+950 36.300 38.250 38.700 38.925 38.700 38.250 36.300 690.96 0.00 36601.00 0.00 36601.00 Cut

1+000 36.250 38.200 38.650 38.875 38.650 38.200 36.250 777.68 0.00 36716.05 0.00 36716.05 Cut

1+050 36.200 38.150 38.600 38.825 38.600 38.150 36.200 478.88 0.00 31413.95 0.00 31413.95 Cut

1+100 36.150 38.100 38.550 38.775 38.550 38.100 36.150 411.08 0.00 22248.90 0.00 22248.90 Cut

1+150 36.100 38.050 38.500 38.725 38.500 38.050 36.100 303.68 0.00 17868.90 0.00 17868.90 Cut

1+200 36.050 38.000 38.450 38.675 38.450 38.000 36.050 198.13 0.00 12545.15 0.00 12545.15 Cut

1+250 36.000 37.950 38.400 38.625 38.400 37.950 36.000 205.50 0.00 10090.78 0.00 10090.78 Cut

1+300 35.950 37.900 38.350 38.575 38.350 37.900 35.950 186.00 0.00 9787.50 0.00 9787.50 Cut

1+350 35.900 37.850 38.300 38.525 38.300 37.850 35.900 154.50 0.00 8512.50 0.00 8512.50 Cut

1+400 35.850 37.800 38.250 38.475 38.250 37.800 35.850 112.50 0.00 6675.00 0.00 6675.00 Cut

1+450 35.800 37.750 38.200 38.425 38.200 37.750 35.800 79.50 0.00 4800.00 0.00 4800.00 Cut

1+500 35.750 37.700 38.150 38.375 38.150 37.700 35.750 33.00 0.00 2812.50 0.00 2812.50 Cut

1+550 35.700 37.650 38.100 38.325 38.100 37.650 35.700 22.50 0.00 1387.50 0.00 1387.50 Cut

1+600 35.650 37.600 38.050 38.275 38.050 37.600 35.650 19.50 0.00 1050.00 0.00 1050.00 Cut

1+650 35.600 37.550 38.000 38.225 38.000 37.550 35.600 0.00 34.50 487.50 862.50 ‐375.00 Fill

1+700 35.550 37.500 37.950 38.175 37.950 37.500 35.550 0.00 60.00 0.00 2362.50 ‐2362.50 Fill

1+750 35.500 37.450 37.900 38.125 37.900 37.450 35.500 0.00 90.00 0.00 3750.00 ‐3750.00 Fill

1+800 35.450 37.400 37.850 38.075 37.850 37.400 35.450 0.00 129.00 0.00 5475.00 ‐5475.00 Fill

1+850 35.400 37.350 37.800 38.025 37.800 37.350 35.400 0.00 33.00 0.00 4050.00 ‐4050.00 Fill

Elevasi Rencana

Ujung Kiri Ujung Kanan

(12)

Tabel 22 Perhitungan Volume Galian dan Timbunan untuk Perataan Tanah Lokasi Runway (Lanjutan)

Stasioning Area Area Volume Volume Volume Ket

Sumbu Cut Fill Cut Fill Cut‐

Runway Runway Runway Runway Runway Runway (m2) (m2) (m3) (m3) Volume

Strip Shoulder Shoulder Strip Fill

CL‐150m CL‐30m CL‐22.5m CL CL+22.5m CL+30m CL+150m (m3)

1+900 35.400 37.350 37.800 38.025 37.800 37.350 35.400 0.00 216.36 0.00 6233.91 ‐6233.91 Fill 1+950 35.450 37.400 37.850 38.075 37.850 37.400 35.450 0.00 246.75 0.00 11577.66 ‐11577.66 Fill 2+000 35.500 37.450 37.900 38.125 37.900 37.450 35.500 0.00 237.17 0.00 12097.97 ‐12097.97 Fill 2+050 35.550 37.500 37.950 38.175 37.950 37.500 35.550 0.00 200.42 0.00 10939.78 ‐10939.78 Fill 2+100 35.600 37.550 38.000 38.225 38.000 37.550 35.600 0.00 136.25 0.00 8416.81 ‐8416.81 Fill 2+150 35.650 37.600 38.050 38.275 38.050 37.600 35.650 0.00 150.00 0.00 7156.25 ‐7156.25 Fill 2+200 35.700 37.650 38.100 38.325 38.100 37.650 35.700 0.00 283.36 0.00 10834.03 ‐10834.03 Fill 2+250 35.750 37.700 38.150 38.375 38.150 37.700 35.750 0.00 305.29 0.00 14716.24 ‐14716.24 Fill 2+300 35.800 37.750 38.200 38.425 38.200 37.750 35.800 0.00 266.83 0.00 14302.85 ‐14302.85 Fill 2+350 35.850 37.800 38.250 38.475 38.250 37.800 35.850 0.00 252.00 0.00 12970.64 ‐12970.64 Fill 2+400 35.900 37.850 38.300 38.525 38.300 37.850 35.900 0.00 237.86 0.00 12246.56 ‐12246.56 Fill 2+450 35.950 37.900 38.350 38.575 38.350 37.900 35.950 0.00 267.63 0.00 12637.43 ‐12637.43 Fill 2+500 36.000 37.950 38.400 38.625 38.400 37.950 36.000 0.00 379.39 0.00 16175.63 ‐16175.63 Fill 2+550 36.050 38.000 38.450 38.675 38.450 38.000 36.050 0.00 524.46 0.00 22596.17 ‐22596.17 Fill 2+600 36.100 38.050 38.500 38.725 38.500 38.050 36.100 0.00 461.81 0.00 24656.63 ‐24656.63 Fill 2+650 36.150 38.100 38.550 38.775 38.550 38.100 36.150 0.00 270.12 0.00 18298.17 ‐18298.17 Fill 2+700 36.200 38.150 38.600 38.825 38.600 38.150 36.200 0.00 281.72 0.00 13795.97 ‐13795.97 Fill 2+750 36.250 38.200 38.650 38.875 38.650 38.200 36.250 0.00 285.92 0.00 14191.03 ‐14191.03 Fill 2+800 36.300 38.250 38.700 38.925 38.700 38.250 36.300 0.00 286.64 0.00 14314.03 ‐14314.03 Fill 2+850 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 298.50 0.00 14628.52 ‐14628.52 Fill 2+900 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 465.00 0.00 19087.50 ‐19087.50 Fill 2+950 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 538.91 0.00 25097.81 ‐25097.81 Fill 3+000 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 575.15 0.00 27851.44 ‐27851.44 Fill 3+050 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 414.60 0.00 24743.65 ‐24743.65 Fill 3+100 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 298.50 0.00 17827.52 ‐17827.52 Fill 3+150 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 334.41 0.00 15822.80 ‐15822.80 Fill 3+200 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 385.50 0.00 17997.80 ‐17997.80 Fill 3+250 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 390.35 0.00 19396.17 ‐19396.17 Fill 3+300 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 411.28 0.00 20040.75 ‐20040.75 Fill 3+350 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 433.50 0.00 21119.58 ‐21119.58 Fill 3+400 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 469.68 0.00 22579.41 ‐22579.41 Fill 3+450 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 489.13 0.00 23970.19 ‐23970.19 Fill 3+500 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 397.20 0.00 22158.28 ‐22158.28 Fill 3+550 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 368.32 0.00 19138.06 ‐19138.06 Fill 3+600 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 371.49 0.00 18495.42 ‐18495.42 Fill 3+650 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 434.37 0.00 20146.67 ‐20146.67 Fill 3+700 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 418.94 0.00 21332.70 ‐21332.70 Fill 3+750 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 403.50 0.00 20560.90 ‐20560.90 Fill 1172515 766910 405605 Cut Total

Elevasi Rencana

Ujung Kiri Ujung Kanan

Indra Susatyo_15003011

Bagja Munggaran_15003081

(13)

Tabel  23  dan  24  memberikan  hasil  perhitungan  stabilitas  yang  dilakukan  dengan  menggunakan program Plaxis 7.11. 

Tabel  23  Hasil Perhitungan Plaxis: Stabilitas Statis Timbunan 

Bore Hole  Lokasi  Tinggi Timbunan, m  SF terhadap Penimbunan 

1  Runway  2.50  3.5637 

2  Runway  1.80  4.7128 

3  Runway  2.20  4.2792 

4  Runway  2.70  5.5878 

11  Apron  4.20  2.9751 

18  Taxiway  3.90  1.7904 

Keseluruhan  perhitungan  memberikan  nilai  faktor  keamanan  yang  sesuai  dengan  yang disyaratkan untuk stabilitas lereng timbunan yaitu lebih besar dari 1.5. 

Tabel  24 Hasil Perhitungan Plaxis: Stabilitas Dinamis Timbunan 

Bore Hole  Lokasi  Tinggi Timbunan, m  SF terhadap Beban Gempa 

1  Runway  2.50  2.2196 

2  Runway  1.80  2.2040 

3  Runway  2.20  2.9743 

4  Runway  2.70  4.2069 

11  Apron  4.20  2.6140 

18  Taxiway  3.90  1.1591 

Keseluruhan  perhitungan  memberikan  nilai  faktor  keamanan  yang  sesuai  dengan  yang  disyaratkan  untuk  stabilitas  lereng  timbunan  terhadap  pembebanan  gempa  yaitu lebih besar dari 1.1. Beban gempa yang digunakan dalam perhitungan adalah  sebesar 0.28g.  

Dari Tabel 23 dan 24 terlihat bahwa BH 4 memiliki ketebalan penimbunan terbesar  dan  nilai  stabilitas  yang  paling  tinggi.  Hal  ini  dikarenakan  lapisan  tanah  tepat  di  bawah lapisan timbunan di titik BH 4 memiliki parameter kekuatan geser tanah (Cu)  tertinggi  diantara  lima  borehole  lainnya.  Perbandingan  parameter  tanah  dapat  diberikan dalam Tabel 25.  

 

Tabel  25 Parameter Tanah yang Digunakan 

Bore Hole  N 

 

Cu  (kN/m

2

γ  (kN/m

3

qu  (kN/m

2

1  5  25  17  50 

2  5  25  17  50 

3  5  25  17  50 

4  9  45  16.5  90 

11  7  35  17  70 

18  7  35  17  70 

(14)

 

Gambar 1 Deformed Mesh BH 1 Akibat Timbunan   

Gambar 2 Deformed Mesh BH 2 Akibat Timbunan 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(15)

Gambar 3 Deformed Mesh BH 3 Akibat Timbunan 

Gambar 4 Deformed Mesh BH 4 Akibat Timbunan 

(16)

Gambar 5 Deformed Mesh BH 11 Akibat Timbunan 

Gambar 6 Deformed Mesh BH 18 Akibat Timbunan 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(17)

Gambar 7 Deformed Mesh BH 1 Akibat Beban Gempa   

Gambar 8 Deformed Mesh BH 2 Akibat Beban Gempa 

(18)

Gambar 9 Deformed Mesh BH 3 Akibat Beban Gempa 

Gambar 10 Deformed Mesh BH 4 Akibat Beban Gempa 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(19)

Gambar 11 Deformed Mesh BH 11 Akibat Beban Gempa 

Gambar 12 Deformed Mesh BH 18 Akibat Beban Gempa 

 

(20)

LAMPIRAN D  Hasil Perhitungan  Perencanaan Biaya 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(21)

Tabel  26 Analisis Harga Satuan 

0.008 hari Mandor Rp        36,000 Rp       288 Rp      288

0.041 hari Pekerja Rp        23,000 Rp       943 Rp      943

0.008 jam Dump Truck (5) Rp      400,000 Rp       3,256 Rp      3,256

0.04 jam Bulldozer (5) Rp      115,000 Rp       4,600 Rp      4,600

Total Rp      9,087

0.016 hari Mandor Rp        36,000 Rp       588 Rp      588

0.082 hari Pekerja Rp        23,000 Rp    1,878 Rp      1,878

0.082 jam Hydraulic Excavator (5) Rp      125,000 Rp         10,204 Rp        10,204

0.224 jam Dump Truck (5) Rp      400,000 Rp         89,446 Rp        89,446

102,116 Rp      

0.018 hari Mandor Rp        36,000 Rp       633 Rp      633

0.088 hari Pekerja Rp        23,000 Rp    2,023 Rp      2,023

0.224 jam Dump Truck (5) Rp      400,000 Rp         89,446 Rp        89,446

0.088 jam Motor Grader (5) Rp      150,000 Rp         13,194 Rp        13,194

105,297 Rp       Total Rp      207,413

0.015 hari Mandor Rp        36,000 Rp       533 Rp      533

0.015 hari Pekerja Rp        23,000 Rp       341 Rp      341

0.008 jam Dump Truck Rp      400,000 Rp       3,256 Rp      3,256

Total Rp      4,130

1.1 m3 Bahan tanah kompaksi (clay) Rp        15,193 Rp    16,713 Rp        16,713

0.025 hari Mandor Rp        36,000 Rp       887 Rp      887

0.123 hari Pekerja Rp        23,000 Rp    2,833 Rp      2,833

0.123 jam Motor Grader (5) Rp      150,000 Rp         18,473 Rp        18,473

0.095 jam Dump Truck (5) Rp      400,000 Rp         38,000 Rp        38,000

0.019 jam Sheepsfoot Roller (5) Rp      250,000 Rp       4,630 Rp      4,630

Total Rp        81,536

5 1 m3 Perkerasan Lentur, tebal 80 cm Rp   1,000,000 Rp    1,000,000 Rp   1,000,000

Total Rp   1,000,000

0.008 hari Mandor Rp        36,000 Rp       288 Rp      288

0.041 hari Pekerja Rp        23,000 Rp       943 Rp      943

0.008 jam Dump Truck (5) Rp      400,000 Rp       3,256 Rp      3,256

0.04 jam Bulldozer (5) Rp      115,000 Rp       4,600 Rp      4,600

Total Rp      9,087

0.015 hari Mandor Rp        36,000 Rp       533 Rp      533

0.015 hari Pekerja Rp        23,000 Rp       340 Rp      340

0.008 jam Dump Truck (5) Rp      400,000 Rp       3,256 Rp      3,256

Total Rp      4,129

1.1 m3 Bahan tanah kompaksi (clay) Rp        15,193 Rp    16,713 Rp        16,713

0.025 hari Mandor Rp        36,000 Rp       887 Rp      887

0.123 hari Pekerja Rp        23,000 Rp    2,833 Rp      2,833

0.123 jam Motor Grader (5) Rp      150,000 Rp         18,473 Rp        18,473

0.095 jam Dump Truck (5) Rp      400,000 Rp         38,000 Rp        38,000

0.019 jam Sheepsfoot Roller (5) Rp      250,000 Rp       4,630 Rp      4,630

Total Rp        81,536

4 1 m3 Perkerasan Lentur, tebal 80 cm Rp   1,000,000 Rp    1,000,000 Rp   1,000,000

Total Rp   1,000,000

0.008 hari Mandor Rp        36,000 Rp       288 Rp      288

0.041 hari Pekerja Rp        23,000 Rp       943 Rp      943

0.008 jam Dump Truck (5) Rp      400,000 Rp       3,256 Rp      3,256

0.040 jam Bulldozer (5) Rp      115,000 Rp       4,600 Rp      4,600

Total Rp      9,087

0.015 hari Mandor Rp        36,000 Rp       533 Rp      533

0.015 hari Pekerja Rp        23,000 Rp       340 Rp      340

0.008 jam Dump Truck (5) Rp      400,000 Rp       3,256 Rp      3,256

Total Rp      4,129

1.1 m3 Bahan tanah kompaksi (clay) Rp        15,193 Rp    16,713 Rp        16,713

0.025 hari Mandor Rp        36,000 Rp       887 Rp      887

0.123 hari Pekerja Rp        23,000 Rp    2,833 Rp      2,833

0.123 jam Motor Grader (5) Rp      150,000 Rp         18,473 Rp        18,473

0.095 jam Dump Truck (5) Rp      400,000 Rp         38,000 Rp        38,000

0.019 jam Sheepsfoot Roller (5) Rp      250,000 Rp       4,630 Rp      4,630

Total Rp        81,536

4 1 m3 Perkerasan Kaku, tebal 48 cm Rp      500,000 Rp       500,000 Rp      500,000

Total Rp      500,000 APRON

TAXIWAY

Perkerasan 2

(ke Pembuangan Sementara) Disposing Tanah Kupasan

3 Kompaksi (timbunan bahan terpilih) 3

Peralatan Upah

RUNWAY Satuan

2 Land Grading

Cut

ANALISIS HARGA SATUAN (Rp/M3) No

Jumlah Harga Harga Satuan

Bahan Jenis

Pekerjaan

Total

Koefisien Bahan/Peralatan/Upah

Stripping 1

4 Kompaksi (timbunan bahan terpilih)

Perkerasan

2 Disposing Tanah Kupasan

(ke Pembuangan Sementara) Stripping 1

Stripping 1

Kompaksi (timbunan bahan terpilih)

Perkerasan Fill

3

 (ke Pembuangan Sementara) Disposing Tanah Galian

(22)

Tabel 27 Rancangan Anggaran Biaya

(m3)

Mandor 337500.00 Rp         288.00 Rp      97,200,000 Pekerja 337500.00 Rp         943.00 Rp      318,262,500 Dump Truck (5) 337500.00 Rp      3,256.00 Rp       1,098,900,000 Bulldozer (5) 337500.00 Rp      4,600.00 Rp       1,552,500,000

Total Rp      3,066,862,500 Mandor 1172514.65 Rp       588 Rp      689,173,971

Pekerja 1172514.65 Rp       1,878 Rp       2,201,527,964 Hydraulic Excavator (5) 1172514.65 Rp         10,204 Rp       11,964,825,892 Dump Truck (5) 1172514.65 Rp         89,446 Rp         104,877,068,349

119,732,596,176 Rp       Mandor 843601.15 Rp      633 Rp      534,280,726

Pekerja 843601.15 Rp       2,023 Rp       1,706,730,096 Dump Truck (5) 843601.15 Rp         89,446 Rp       75,456,980,450 Motor Grader (5) 843601.15 Rp         13,194 Rp       11,130,848,451

88,828,839,722 Rp       Total Rp      208,561,435,898 Mandor 328913.50 Rp      533 Rp      175,310,898

Pekerja 328913.50 Rp      341 Rp      112,159,505 Dump Truck 328913.50 Rp       3,256 Rp       1,070,942,370

Total Rp      1,358,412,773 Bahan tanah kompaksi (clay) 1176125.42 Rp         16,713 Rp       19,656,584,144

Mandor 1176125.42 Rp      887 Rp       1,043,223,248 Pekerja 1176125.42 Rp       2,833 Rp       3,331,963,315 Motor Grader (5) 1176125.42 Rp         18,473 Rp       21,726,564,884 Dump Truck (5) 1176125.42 Rp         38,000 Rp       44,692,765,960 Sheepsfoot Roller (5) 1176125.42 Rp       4,630 Rp       5,445,460,695

Total Rp      95,896,562,245

5 Perkerasan Lentur, tebal 80 cm 135000.00 Rp    1,000,000 Rp         135,000,000,000

Total Rp      135,000,000,000 Total Pekerjaan Runway Rp      443,883,273,416

Mandor 306848.1 Rp      288 Rp      88,372,253 Pekerja 306848.1 Rp      943 Rp      289,357,758 Dump Truck (5) 306848.1 Rp       3,256 Rp      999,097,414 Bulldozer (5) 306848.1 Rp       4,600 Rp       1,411,501,260

Total Rp      2,788,328,685 Mandor 306848.1 Rp      533 Rp       163,488,667.68

Pekerja 306848.1 Rp      340 Rp      104,451,093 Dump Truck (5) 306848.1 Rp       3,256 Rp      999,097,414

Total Rp      1,267,037,175 Bahan tanah kompaksi (clay) 2828437.52 Rp         16,713 Rp       47,271,676,272

Mandor 2828437.52 Rp      887 Rp       2,508,824,080 Pekerja 2828437.52 Rp       2,833 Rp       8,012,963,494 Motor Grader (5) 2828437.52 Rp         18,473 Rp       52,249,726,307 Dump Truck (5) 2828437.52 Rp         38,000 Rp         107,480,625,760 Sheepsfoot Roller (5) 2828437.52 Rp       4,630 Rp       13,095,665,718

Total Rp      230,619,481,631

4 Perkerasan Lentur, tebal 80 cm 206152.40 Rp    1,000,000 Rp         206,152,400,000

Total Rp      206,152,400,000 Total Pekerjaan Taxiway Rp      440,827,247,490

Mandor 227708.7 Rp      288 Rp      65,580,106 Pekerja 227708.7 Rp      943 Rp      214,729,304 Dump Truck (5) 227708.7 Rp       3,256 Rp      741,419,527 Bulldozer (5) 227708.7 Rp       4,600 Rp       1,047,460,020

Total Rp      2,069,188,957 Mandor 227708.7 Rp      533 Rp       121,323,195.36

Pekerja 227708.7 Rp      340 Rp      77,512,041 Dump Truck (5) 227708.7 Rp       3,256 Rp      741,419,527

Total Rp       940,254,763 Bahan tanah kompaksi (clay) 3180331.5 Rp         16,713 Rp       53,152,880,360

Mandor 3180331.5 Rp      887 Rp       2,820,954,041 Pekerja 3180331.5 Rp       2,833 Rp       9,009,879,140 Motor Grader (5) 3180331.5 Rp         18,473 Rp       58,750,263,800 Dump Truck (5) 3180331.5 Rp         38,000 Rp         120,852,597,000 Sheepsfoot Roller (5) 3180331.5 Rp       4,630 Rp       14,724,934,845

Total Rp      259,311,509,184

4 PerkerasanKaku, tebal 48 cm 364333.92 Rp       500,000 Rp         182,166,960,000

Total Rp      182,166,960,000 Total Pekerjaan Apron Rp      444,487,912,904 TOTAL Rp       1,329,198,433,810 Pembulatan Rp       1,329,198,434,000 Overhead 10% Rp      132,919,843,400 Contigency 5% Rp      66,459,921,700 SUBTOTAL Rp       1,528,578,199,100 Pembulatan Rp       1,528,578,200,000 Stripping

1

2 Disposing Tanah Galian

 (ke Pembuangan Sementara)

RANCANGAN ANGGARAN BIAYA

Total Biaya

Harga Satuan Jumlah

Jenis Pekerjaan

3 Kompaksi

Perkerasan

APRON

1 Stripping

2

 (ke Pembuangan Sementara) Disposing Tanah Galian

Kompaksi 3

Perkerasan

Bahan/Peralatan/Upah Volume

No

RUNWAY

1 Stripping

2 Land Grading

Cut

Fill

3

 (ke Pembuangan Sementara) Disposing Tanah Galian

Kompaksi 4

Perkerasan

TAXIWAY

Indra Susatyo_15003011

Bagja Munggaran_15003081

(23)

 

LAMPIRAN E 

Layout Desain 

 

 

(24)

                  LAMPIRAN F  Perencanaan Drainase   

 

 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(25)

Perencanaan Sistem Drainase Runway 

Perencanaan drainase runway direncanakan berada di sepanjang runway dan terbuat  dari  beton.  Direncanakan  drainase  tersebut  akan  berbentuk  segi  empat  agar  tidak  menghabiskan banyak ruang dalam prakteknya.  

1. Data Perencanaan Drainase 

Data curah hujan diambil dari tiga stasiun hujan yang dianggap berpengaruh pada  lokasi  yang  akan  dikaji  dalam  hal  ini  untuk  perencanaan  saluran  drainase  runway. 

Dalam hal ini ketiga stasiun hujan tersebut adalah: Stasiun Hujan Pakumbahan (no. 

stasiun = 20), Stasiun Hujan Kadipaten (21), dan Stasiun Hujan Majalengka (41). Data  curah  hujan  yang  diambil  merupakan  curah  hujan  hujan  harian  maksimum  dalam  satu tahun tertentu selama 10 tahun dari 1979 sampai dengan tahun 1988.  

 

Tabel 28 Curah Hujan Maksimum 3 Stasiun dalam 10 Tahun 

Pakumbahan Kadipaten Majalengka

1979 94 65 98

1980 145 56 115

1981 128 150 122

1982 140 105 90

1983 77 91 90

1984 135 79 110

1985 64 99 115

1986 68 98 115

1987 69 102 131

1988 71 105 150

Ch Maksimum (mm) Tahun

Sumber : Badan Meteorologi dan Geofisika  

2. Penentuan Curah Hujan Regional 

Penentuan  curah  hujan  regional  dilakukan  dengan  metode  rata‐rata,  yaitu  menjumlahkan curah hujan maksimum harian dari setiap stasiun hujan pada tahun  tertentu  dibagi  dengan  jumlah  stasiun  hujan.  Hasil  perhitungan  penentuan  hujan  regional terdapat pada Tabel 29. 

Contoh perhitungan Ch regional rata‐rata tahun 1979: 

mm

stasiun

majalengka Ch

kadipaten Ch

pakumbahan rata Ch

rata Ch

86 3

98 65 94

3

=

+

= +

+

= +

 

(26)

Tabel 29 Curah Hujan Regional dengan Metode Rata‐rata  Ch rata‐rata Pakumbahan Kadipaten Majalengka (mm)

1979 94 65 98 86

1980 145 56 115 105

1981 128 150 122 133

1982 140 105 90 112

1983 77 91 90 86

1984 135 79 110 108

1985 64 99 115 93

1986 68 98 115 94

1987 69 102 131 101

1988 71 105 150 109

Ch Maksimum (mm) Tahun

  3. Analisis Hidrologi 

Setelah  pengumpulan  data  curah  hujan  dan  penentuan  curah  hujan  regional,  dilakukan  analisis  harga  ekstrim  curah  hujan  untuk  mendapatkan  curah  hujan  rencana  .  Metode  yang  digunakan  untuk  analisis  harga  ekstrim  adalah  dengan  metode Distribusi Normal, Log Normal, Gumbel dan Distribusi Log Pearson III. 

Tabel 30  Perhitungan Curah Hujan 

Tahun CH  (mm) (x‐xrata)^2 logx (logx‐logx rata)^2 (logx‐logx rata)^3

1979 86 285.610 1.93281 0.00556 ‐0.00041

1980 105 7.654 2.02257 0.00023 0.00000

1981 133 946.588 2.12494 0.01382 0.00163

1982 112 82.810 2.04792 0.00164 0.00007

1983 86 274.454 1.93450 0.00531 ‐0.00039

1984 108 29.521 2.03342 0.00068 0.00002

1985 93 98.010 1.96692 0.00164 ‐0.00007

1986 94 79.210 1.97159 0.00128 ‐0.00005

1987 101 3.610 2.00289 0.00002 0.00000

1988 109 37.210 2.03610 0.00083 0.00002

∑ 1,025.67 1,844.68 20.07365 0.03101 0.00082

X

Rata‐rata

102.57 2.01

 

  102 , 567

10 667 ,

1025 =

=

= ∑

N

X

rata rata

X  

  2 , 007

10 074 , log 20

log = ∑ = =

N

X

rata rata

X  

  ( )

317 , 9 14

678 , 1844 1

2

=

− =

= ∑ −

N x

Sx x

rata rata

 

( )

059 , 9 0 007 , 2 1

log log log

2

=

− =

= ∑ −

N x x x

S

rata rata

 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(27)

 

Tabel 31 Perhitungan Distribusi Normal 

m P(weibull) Tr Kt Xtr

1 0.091 11.000 1.313 121.368

2 0.182 5.500 0.886 115.251

3 0.273 3.667 0.468 109.264

4 0.364 2.750 0.211 105.580

5 0.455 2.200 0.056 103.370

6 0.545 1.833 ‐0.392 96.961

7 0.636 1.571 ‐1.007 88.151

8 0.727 1.375 ‐1.468 81.544

9 0.818 1.222 ‐1.827 76.405

10 0.909 1.100 ‐2.115 72.294

Distribusi Normal

  Contoh perhitungan distribusi normal Untuk data (m) ke 1: 

- 0 , 09091

1 10

1 ) 1

( =

= +

= + n Weilbull m

P  

- 11

09091 , 0

1

1 = =

= P

Tr  

- Cs untuk normal =0  - Kt=1,313  

- Xtr = R

rata

rata

+ KtSx = 102 , 567 + 1 , 313 × 14 , 317 = 121 , 368 mm   Tabel 32 Perhitungan Distribusi Log Normal 

m P(weibull) Tr Kt Xtr

1 0.091 11.000 1.313 121.465

2 0.182 5.500 0.886 114.649

3 0.273 3.667 0.468 108.348

4 0.364 2.750 0.211 104.646

5 0.455 2.200 0.056 102.485

6 0.545 1.833 ‐0.392 96.467

7 0.636 1.571 ‐1.007 88.769

8 0.727 1.375 ‐1.468 83.401

9 0.818 1.222 ‐1.827 79.452

10 0.909 1.100 ‐2.115 76.427

Distribusi  Log Normal

  Contoh perhitungan distribusi log normal untuk data (m) ke 1: 

- 0 , 09091

1 10

1 ) 1

( =

= +

= + n Weilbull m

P  

- 11

09091 , 0

1

1 = =

= P

Tr  

- Cs untuk log normal =0 

- Kt=1,313  

(28)

- log Xtr = log R

rata

rata

+ Kt × S log x = 2 , 007 + 1 , 313 × 0 , 059 = 2 , 084 mm   - Xtr = 121 , 465 mm  

Tabel 33 Perhitungan Distribusi Gumbel 

m P(weibull) Tr Kt Xtr

1 0.091 11.000 1.383 122.373

2 0.182 5.500 0.803 114.058

3 0.273 3.667 0.442 108.900

4 0.364 2.750 0.169 104.989

5 0.455 2.200 ‐0.060 101.712

6 0.545 1.833 ‐0.265 98.775

7 0.636 1.571 ‐0.459 95.992

8 0.727 1.375 ‐0.655 93.196

9 0.818 1.222 ‐0.866 90.163

10 0.909 1.100 ‐1.133 86.353

Distribusi  Gumbell

  Contoh perhitungan distribusi Gumbel untuk data (m) ke 1: 

- 0 , 09091

1 10

1 ) 1

( =

= +

= + n Weilbull m

P  

- 11

09091 , 0

1

1 = =

= P

Tr  

- Kt 

⎭ ⎬

⎩ ⎨

⎧ ⎥

⎢ ⎤

⎡ ⎟

⎜ ⎞

⎛ + −

= 6 0 , 5772 ln ln 1 Tr

Tr

π  

      1 , 383

1 11 ln 11 ln 5772 ,

6 0 =

⎭ ⎬

⎩ ⎨

⎧ ⎥

⎢ ⎤

⎡ ⎟

⎜ ⎞

⎛ + −

= π  

- Xtr = R

rata

rata

+ Kt × Sx = 102 , 567 + 1 , 383 × 14 , 317 = 122 , 373 mm   Tabel 34 Perhitungan Distribusi Log Pearson 

m P(weibull) Tr Kt Xtr

1 0.091 11.000 1.366 122.341

2 0.182 5.500 0.855 114.171

3 0.273 3.667 0.404 107.424

4 0.364 2.750 0.130 103.520

5 0.455 2.200 0.033 102.159

6 0.545 1.833 ‐0.399 96.375

7 0.636 1.571 ‐0.878 90.328

8 0.727 1.375 ‐1.238 86.044

9 0.818 1.222 ‐1.517 82.852

10 0.909 1.100 ‐1.741 80.385

Distribusi  Log Pearson

  Contoh perhitungan distribusi Log Pearson untuk data (m) ke 1: 

- 0 , 09091

1 10

1 ) 1

( =

= +

= + n Weilbull m

P  

Indra Susatyo_15003011

Bagja Munggaran_15003081

(29)

- 11 09091 , 0

1

1 = =

= P

Tr  

- Cs = 0 , 566

) 317 , 14 ( 8 9

00982 , 0 10 )

)(

2 )(

1 (

) log

(log

3 3

log 3

× =

×

= ×

∑ −

x rata rata

S N N

x x

N  

- Kt=1,366  

- log Xtr = log R

rata

rata

+ Kt × S log x = 2 , 007 + 1 , 313 × 0 , 059 = 2 , 088 mm   - Xtr = 122 , 341 mm  

Selanjutnya  dilakukan  perhitungan  error  relatif  (D),  yaitu  nilai  mutlak  hasil  selisih  dari data aktual dan data hasil perhitungan dari 4 metode distribusi harga ekstrim. 

Hasil perhitungan error relatif dapat dilihat pada Tabel 35. 

Tabel 35  Perhitungan Error Relatif 

Data Normal Log Normal Gumbel Log pearson Normal Log Normal Gumbel Log pearson

133 121.368 121.465 122.373 122.341 11.965 11.869 10.961 10.992

112 115.251 114.649 114.058 114.171 3.584 2.982 2.391 2.505

109 109.264 108.348 108.900 107.424 0.597 0.318 0.233 1.243

108 105.580 104.646 104.989 103.520 2.420 3.354 3.011 4.480

105 103.370 102.485 101.712 102.159 1.963 2.848 3.622 3.174

101 96.961 96.467 98.775 96.375 3.706 4.199 1.892 4.292

94 88.151 88.769 95.992 90.328 5.516 4.898 2.325 3.338

93 81.544 83.401 93.196 86.044 11.123 9.265 0.530 6.623

86 76.405 79.452 90.163 82.852 9.595 6.548 4.163 3.148

86 72.294 76.427 86.353 80.385 13.373 9.239 0.686 5.282

error relatif (|Ch

data

‐Ch

perhitungan

|)

Rata‐rata Error 

Relatif 6.384 5.552 2.981 4.508

CH

max 

(mm)

Dari  Tabel  35  diperoleh  metode  analisis  harga  ekstrim  yang  sesuai  untuk  menentukan curah hujan rencana adalah Metode Gumbel, karena mempunyai harga  rata‐rata  D  yang  lebih  kecil  yaitu  2,981.  Selanjutnya  dicari  nilai  D  yang  minimum  dari  setiap  nilai  D  maksimum  setiap  metode,  didapat  nilai  D  maksimum  yang  mempunyai    nilai  minimum  dari  Metode  Gumbel  adalah  10,961  mm.  Nilai  D  tersebut  harus  dibandingkan  dengan  nilai  Smirnov‐Kolmogorov.  Dari  Tabel    34  untuk data N = 10 dan tingkat probabilitas 5 % didapatkan nilai D = 0,41 x 100% = 41. 

Sehingga perhitungan dengan metode Gumbel memenuhi syarat untuk menentukan  curah  hujan  maksimum  rencana  karena  nilai  Dmaks  yaitu  10,961  lebih  kecil  dari  D  yang ditetapkan Smirnov – Kolmogorov, yaitu 41.  

 

 

 

 

 

 

(30)

Tabel 36 Nilai Smirnov – Kolmogorov 

0.20 0.10 0.05 0.01

5 0.45 0.51 0.56 0.67

10 0.32 0.37 0.41 0.49

15 0.27 0.30 0.34 0.40

20 0.23 0.26 0.29 0.36

25 0.21 0.24 0.27 0.32

30 0.19 0.22 0.24 0.29

35 0.18 0.20 0.23 0.27

40 0.17 0.19 0.21 0.25

45 0.16 0.18 0.20 0.24

50 0.15 0.17 0.19 0.23

N

Nilai Kritis

 

Curah  hujan  maksimum  rencana  dengan  periode  ulang  10  tahun  dengan  metode  Gumbel: 

- Kt  1 , 305

1 10 ln 10 ln 5772 ,

6 0 =

⎭ ⎬

⎩ ⎨

⎧ ⎥

⎢ ⎤

⎡ ⎟

⎜ ⎞

⎛ + −

= π  

- Xtr = X

rata

rata

+ Kt × Sx  

  = 102 , 567 + 1 , 305 × 14 , 317 = 121 , 35 mm   a. Kurva Intensitas Hujan 

Penentuan  Intensitas  hujan  rencana  berdasarkan  Rumus  van  Breen  dimana  curah  hujan  harian  terkonsentrasi  selama  4  jam  dengan  jumlah  hujan  sebesar  90%  dari  jumlah hujan selama 24 jam. 

Xtr mm

I 27 , 3

4 35 , 121

% 90 4

%

90 × =

=

=   

Harga I = 27,3 mm diplotkan pada kurva intensitas basis pada waktu intensitas t=240  menit,  tarik  garis  lengkung  yang  searah  dengan  garis  lengkung  intensitas  basis. 

Kurva ini merupakan intensitas hujan rencana. Untuk lebih jelas dapat dilihat pada  Gambar 13. 

Indra Susatyo_15003011

Bagja Munggaran_15003081

(31)

  Kurva Intensitas 

Rencana 

Gambar 13  Kurva Intensitas Hujan  b. Perencanaan Dimensi Saluran Drainase 

Perencanaan drainase pada runway dibagi beberapa catchment area. Air yang berasal  dari  tiap  catchment  area  ini  akan  dialirkan    menuju  saluran  drainase  yang  telah  ditentukan  dan  akhirnya  dari  beberapa  saluran  ini  akan  bergabung  menuju  kolam  penampungan. 

Direncanakan  pada  runway  dibagi  menjadi  8  catchment  area,  setiap  1  catchment  area  mempunyai  saluran  di  samping  kiri  atau  kanan  yang  berdimensi  sama  besar.  Luas  untuk  1  catchment  area  adalah  28125  m

2

.  Catchment  area  diilustrasikan  seperti  pada  Gambar 14. 

         

 

Gambar 14. Catchment Area pada Runway 

 

(32)

Contoh perhitungan penentuan dimensi untuk 1 catchment area: 

- A     = 28125 m

2

 

- nd   = 0,013 (koefisien hambatan untuk beton)  - s    = 0,02  

- v    = 1,5 m/s ( kecepatan maksimum ijin untuk bahan beton = 1,5 m/s)   - L    = 30 m 

-

0.167 0.167

2 2 0.013

*3.28* * *3.28*1.38* 1.38

3

ef

3 0.02

Tc I nd menit

s

⎡ ⎤ ⎡ ⎤

= ⎢ ⎣ ⎥ ⎦ = ⎢ ⎣ ⎥ ⎦ =  

- I  = 190 mm/jam  (dari Gambar 13) 

- 1 1 3

* * * * 0.7 *190* 28125 1.04

3600000 3600000

Q C I A m

= = = s  

- Perhitungan dimensi saluran (segi empat)  1.04 2

1.5 0.69

A Q m

= v = =  

2 2

2

; d A

d b d b A

=

=

×

=  

0.69 2 2

0.69 0.35 0.59 2

2 2 * 0.59 1.18 d

d m

b d m

=

= = =

= = =

 

- Tinggi jagaan (freeboard)  0.3* 0.59 0.18

W = = m  

- Panjang Saluran = 937.5 m  

- 1.18*0.59

0.295

2 (2 *0.59) 1.18

A bd

R = P = d b = =

+ +  

-

2 2

2 2

3 3

* 1.5* 0.016

0.01%

0.295 S v n

R

⎛ ⎞

⎛ ⎞

⎜ ⎟

⎜ ⎟

= = =

⎜ ⎟

⎜ ⎟

⎝ ⎠ ⎝ ⎠

 

Berikut pada Gambar 15 akan digambarkan mengenai potongan melintang drainase  runway. 

Gambar 15. Potongan Melintang Drainase Runway  

Indra Susatyo_15003011

Bagja Munggaran_15003081

Gambar

Tabel  1 Perhitungan Wind Rose Arah 0-180
Tabel  7 Perhitungan Wind Rose Arah 60-240
Tabel  13 Perhitungan Wind Rose Arah 120-300
Tabel  19 Perhitungan Keberangkatan Tahunan Ekivalen
+7

Referensi

Dokumen terkait

Masyarakat modern yang mulai mengerti akan pentingnya pendidikan bagi masa depan membuat arus mobilitas semakin meningkat. Aktivitas mobilitas yang dilakukan oleh

Jadi untuk dapat database WA, Anda perlu pikirkan lead magnet atau penawaran yang akan memancing target pasar menghubungi WA Anda.. Setelah umpannya ada, masuk ke

Jika tidak segera dicari metode pengendalian yang tepat, antara lain penanaman varietas kentang resisten, tanaman perangkap, ataupun rotasi tanaman (SASA, 2010),

Hasil penelitian menunjukkan bahwa penambahan bahan organik dalam media kultur jaringan krisan memberikan pengaruh terhadap tinggi tanaman, jumlah daun, jumlah akar, dan

Tujuan dari penelitian ini adalah mengetahui konsentrasi SRC maupun konjak terbaik yang bisa digunakan sebagai bahan tambahan pembuatan sosis ikan Tenggiri serta

Jual beli (tanah) dalam hukum adat merupakan perbuatan hukum pemindahan hak yang harus memenuhi tiga (3) sifat yaitu: 6 (1) Harus bersifat tunai, artinya harga yang

Flash memanipulasi vektor dan grafis raster untuk memberikan animasi teks, gambar, dan gambar diam. Mendukung dua arah streaming audio dan video, dan dapat menangkap masukan

Adapun skripsi ini disusun untuk memenuhi syarat mencapai gelar sarjana di bidang kimia.Pada kesempatan ini penulis ingin menyampaikan rasa terima kasih dan kasih sayang yang