DAFTAR PUSTAKA
Das, B.M. 1985. Principles of Geotechnical Engineering. PWS Kent. Boston.
Das, B.M. 1993. Mekanika Tanah (Prinsip‐prinsip Rekayasa Geoteknis), Jilid 2. Penerbit Erlangga.
Jakarta.
Horonjeff, Robert & McKelvey F.X. 1975. Planning and Design of Airports. McGraw‐Hill. USA.
ICAO. 1983. Aerodromes; Annex 14 to The Convention on International Civil Aviation, Eighth Edition.
ICAO. 1983. Aerodrome Design Manual, Part 3: Pavement, Second Edition.
ICAO. 1984. Aerodrome Design Manual, Part 1: Runways, Second Edition.
Irsyam, Masyhur. 2003. Catatan Kuliah: Rekayasa Pondasi. Penerbit ITB. Bandung Jurnal Harga Satuan Bahan Bangunan, Konstruksi & Interior. Edisi XXV Tahun XIII 2006.
Khanna, S.K. & Arora, M.G. 1979. Airport Planning and Design, Nem Chand & Bros. Roorkee.
India.
Kosasih, Djunaedi. 2003. Catatan Kuliah: Rekayasa Struktur dan Bahan Perkerasan, Modul I.
Penerbit ITB. Bandung.
Kosasih, Djuanaedi. 2005. Jurnal: Perbandingan antara Pendekatan Desain Struktur Perkerasan Kaku berdasarkan Lalu Lintas Pesawat Udara Campuran dan Pesawat Udara Desain Kritis.
Bandung
Laporan Akhir Master Plan Bandara Internasional Jawa Barat (Volume I). Dinas Perhubungan Pemerintah Propinsi Jawa Barat. 2005.
Laporan Akhir FeasibilityStudy Bandara Jambi. Dinas Perhubungan Pemerintah Propinsi Jambi.
Januari 2007.
Laporan Penyelidikan Tanah Bandara Internasional Jawa Barat. Dinas Perhubungan Pemerintah Propinsi Jawa Barat. 2005.
Peurifoy, R. L. & Schexnayder. 2002. Construction Planning, Equipment, and Methods, Sixth Edition. McGraw Hill. USA.
Peurifoy, R. L. & Oberlender, G. D. 2002. Estimating Construction Costs, Fifth Edition. McGraw Hill. USA.
Pradityo, Wahyu dan Rudi Wahyu Setiaji. 2006. Tugas Akhir: Kajian Pengembangan Bandar Udara Internasional Adisutjipto Yogyakarta. Bandung.
PT. Hutama Karya. 2007. Slide: Metode Khusus Jalan. Jakarta.
PT. Pembangunan Perumahan (PERSERO). 2003. Buku Referensi untuk Kontraktor Bangunan Gedung dan Sipil. PT. Gramedia Pustaka Utama: Jakarta.
Sargious, M. 1975. Pavements and Surfacings for Highways and Airports. Applied Science Publishers LTD. London.
Soekirno, Purnomo. 2006. Slide Kuliah: Manajemen Konstruksi. Bandung.
www.boeing.com
Yoder, Witczak. 1975. Priciples of Pavement Design, Second Edition. John Wiley & Sons, Inc.
USA.
xii
LAMPIRAN A Hasil Perhitungan Perencanaan Geometrik
Tabel 1 Perhitungan Wind Rose Arah 0-180
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.94 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 0.90 0.58 0 0.11 43.32
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.94 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.94 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 0.90 0.14 0 0.11 6.35
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.94 0.04 6.88
98.62 0 - 180
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 2 Perhitungan Wind Rose Arah 10-190
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 0.95 0.58 0.01 0.11 43.35
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.64 0.04 0.60
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 0.95 0.14 0.01 0.11 6.35
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.64 0.04 6.87
98.64971 10 - 190
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 3 Perhitungan Wind Rose Arah 20-200
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 0.98 0.58 0.12 0.11 43.38
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.25 0.04 0.58
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 0.98 0.14 0.12 0.11 6.37
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.25 0.04 6.85
98.66 20 - 200
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 4 Perhitungan Wind Rose Arah 30-210
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.43 0.11 43.43
SE 1 0.18 1 0.25 1 0.14 1 0 0.99 0 0.04 0.04 0.57
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.43 0.11 6.41
NW 1 0.97 1 1.98 1 2.16 1 1.48 0.99 0.25 0.04 0.04 6.84
98.73 30 - 210
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 5 Perhitungan Wind Rose Arah 40-220
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.98 0.29 15.87
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.82 0.11 43.47
SE 1 0.18 1 0.25 1 0.14 1 0 0.91 0 0 0.04 0.57
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.98 0.65 20.47
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.82 0.11 6.45
NW 1 0.97 1 1.98 1 2.16 1 1.48 0.91 0.25 0 0.04 6.71
98.66 40 - 220
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 6 Perhitungan Wind Rose Arah 50-230
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.82 0.29 15.83
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.98 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 0.91 0 0 0.04 0.57
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.82 0.65 20.36
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.98 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 0.91 0.25 0 0.04 6.82
98.65 50 - 230
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 7 Perhitungan Wind Rose Arah 60-240
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.43 0.29 15.72
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 0.99 0 0.04 0.04 0.57
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.43 0.65 20.11
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 0.99 0.25 0.04 0.04 6.84
98.32 60 - 240
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 8 Perhitungan Wind Rose Arah 70-250
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 0.98 0.36 0.12 0.29 15.62
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.25 0.04 0.58
S 1 1.91 1 7.52 1 5.65 1 2.99 0.98 1.76 0.12 0.65 19.86
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.25 0.04 6.85
97.99 70 - 250
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 9 Perhitungan Wind Rose Arah 80-260
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 0.95 0.36 0.01 0.29 15.58
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 1 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.64 0.04 0.60
S 1 1.91 1 7.52 1 5.65 1 2.99 0.95 1.76 0.01 0.65 19.75
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 1 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.64 0.04 6.87
97.87 80 - 260
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 10 Perhitungan Wind Rose Arah 90-270
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 0.90 0.36 0 0.29 15.55
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.94 0.04 3.21
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 0.94 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 0.90 1.76 0 0.65 19.65
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.94 0.07 1.91
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 0.94 0.04 6.88
97.76 90 - 270
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 11 Perhitungan Wind Rose Arah 100-280
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 0.95 0.36 0.01 0.29 15.58
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.64 0.04 3.20
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 0.95 1.76 0.01 0.65 19.75
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.64 0.07 1.88
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
97.86 100 - 280
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 12 Perhitungan Wind Rose Arah 110-290
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 0.98 0.36 0.12 0.29 15.62
NE 1 1.04 1 1.44 1 0.47 1 0.22 1.00 0 0.25 0.04 3.18
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 0.98 1.76 0.12 0.65 19.86
SW 1 0.11 1 0.61 1 0.72 1 0.22 1.00 0.18 0.25 0.07 1.86
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
110 - 290
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 13 Perhitungan Wind Rose Arah 120-300
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.43 0.29 15.72
NE 1 1.04 1 1.44 1 0.47 1 0.22 0.99 0 0.04 0.04 3.17
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 1 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.43 0.65 20.11
SW 1 0.11 1 0.61 1 0.72 1 0.22 0.99 0.18 0.04 0.07 1.84
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 1 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
98.29 120 - 300
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 14 Perhitungan Wind Rose Arah 130-310
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.82 0.29 15.83
NE 1 1.04 1 1.44 1 0.47 1 0.22 0.91 0 0 0.04 3.17
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.98 0.11 43.49
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.82 0.65 20.36
SW 1 0.11 1 0.61 1 0.72 1 0.22 0.91 0.18 0 0.07 1.82
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.98 0.11 6.47
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
98.63 130 - 310
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 15 Perhitungan Wind Rose Arah 140-320
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 0.98 0.29 15.87
NE 1 1.04 1 1.44 1 0.47 1 0.22 0.91 0 0 0.04 3.17
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.82 0.11 43.47
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 0.98 0.65 20.47
SW 1 0.11 1 0.61 1 0.72 1 0.22 0.91 0.18 0 0.07 1.82
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.82 0.11 6.45
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
98.75 140 - 320
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 16 Perhitungan Wind Rose Arah 150-330
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 0.99 0 0.04 0.04 3.17
E 1 8.24 1 20.99 1 9.68 1 3.89 1 0.58 0.43 0.11 43.43
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 0.99 0.18 0.04 0.07 1.84
W 1 0.68 1 2.66 1 2.23 1 0.65 1 0.14 0.43 0.11 6.41
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
98.70 150 - 330
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 17 Perhitungan Wind Rose Arah 160-340
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 1.00 0 0.25 0.04 3.18
E 1 8.24 1 20.99 1 9.68 1 3.89 0.98 0.58 0.12 0.11 43.38
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 1.00 0.18 0.25 0.07 1.86
W 1 0.68 1 2.66 1 2.23 1 0.65 0.98 0.14 0.12 0.11 6.37
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
98.64 160 - 340
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
Tabel 18 Perhitungan Wind Rose Arah 170-350
Percentage Percentage Percentage Percentage Percentage Percentage
of Wind of Wind of Wind of Wind of Wind of Wind
N 1 3.1 1 7.56 1 3.56 1 1.01 1 0.36 1 0.29 15.88
NE 1 1.04 1 1.44 1 0.47 1 0.22 1 0 0.64 0.04 3.20
E 1 8.24 1 20.99 1 9.68 1 3.89 0.95 0.58 0.01 0.11 43.35
SE 1 0.18 1 0.25 1 0.14 1 0 1 0 1 0.04 0.61
S 1 1.91 1 7.52 1 5.65 1 2.99 1 1.76 1 0.65 20.48
SW 1 0.11 1 0.61 1 0.72 1 0.22 1 0.18 0.64 0.07 1.88
W 1 0.68 1 2.66 1 2.23 1 0.65 0.95 0.14 0.01 0.11 6.35
NW 1 0.97 1 1.98 1 2.16 1 1.48 1 0.25 1 0.04 6.88
98.64 170 - 350
0 - 4 mph 4 - 8 mph 8 - 12 mph
A(%) A(%) A(%)
12 - 18 mph 18 - 24 mph 24 - 31 mph
Total
A(%) A(%) A(%)
LAMPIRAN B
Hasil Perhitungan
Tabel 19 Perhitungan Keberangkatan Tahunan Ekivalen
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19]
No Tipe Pesawat Kelas Konfigurasi MTOW Tekanan Jumlah Jumlah %Beban Beban Keberangkatan FES R
2xFES Log(R
2xFES) W
2/W
1(W
2/W
1)
0,5[14]*[16] FEB Keberangkatan
Pesawat Sumbu (kg) Ban Roda Roda Sumbu Roda Tahunan [11]*[12] [5]/412770 10
[17]/[13] Tahunan
Roda (MPa) per Sumbu Utama [5]*[9]/[8] Ekivalen
Kaki Utama [11]*[12]*[18]
Roda
1 CASA‐212 5 S 14000 0.87 1 2 91 6370 1679 0.5 839.50 2.92 0.03 0.18 0.54 0.004116 3
2 F28‐MK2000 4 D 29480 0.69 2 4 92.6 6825 7202 0.6 4321.40 3.64 0.07 0.27 0.97 0.002168 9
3 F28‐MK3000 4 D 32205 0.78 2 4 92.6 7455 7202 0.6 4321.40 3.64 0.08 0.28 1.02 0.002398 10
4 F28‐MK4000 4 D 33110 0.78 2 4 92.6 7665 7202 0.6 4321.40 3.64 0.08 0.28 1.03 0.002478 11
5 F‐100 3 D 45800 0.92 2 4 94.3 10797 19624 0.6 11774.25 4.07 0.11 0.33 1.36 0.001928 23
6 B737‐200 3 D 52616 1.1 2 4 91 11970 19624 0.6 11774.25 4.07 0.13 0.36 1.45 0.002413 28
7 B737‐300 3 D 57000 1.4 2 4 92.6 13196 19624 0.6 11774.25 4.07 0.14 0.37 1.51 0.002766 33
8 B737‐400 3 D 63000 1.28 2 4 91.6 14427 19624 0.6 11774.25 4.07 0.15 0.39 1.59 0.003307 39
9 B767‐200 2 DT 136984 1.26 4 8 93.8 16061 9753 1 9753.00 3.99 0.33 0.58 2.30 0.020366 199
10 A‐310 2 DT 153000 1.24 4 8 93 17786 9753 1 9753.00 3.99 0.37 0.61 2.43 0.027513 268
12 B747‐300 1 DDT 377800 1.31 4 16 92.4 21818 1825 1 1825.00 3.26 0.92 0.96 3.12 0.72243 1318
13 B747‐400 1 DDT 412770 1.31 4 16 92.4 23837 1825 1 1825.00 3.26 1.00 1.00 3.26 1 1825
124937
3767Total Keberangkatan Total Keberangkatan Ekivalen
LAMPIRAN C
Hasil Perhitungan
Perencanaan Geoteknik
Tabel 20 Elevasi Tanah Asli dan Elevasi Perataan Lokasi Runway
Stasioning Stasioning
Kiri Kanan Kiri Kanan Kiri Kanan Kiri Kanan
CL‐50m CL+50m CL‐150m CL+150m CL‐50m CL+50m CL‐150m CL+150m
0+000 33.04 38.59 36.00 36.00 1+900 35.34 35.23 36.00 36.00
0+050 30.10 39.75 36.00 36.00 1+950 35.21 35.15 36.00 36.00
0+100 31.34 38.15 36.00 36.00 2+000 35.36 35.06 36.00 36.00
0+150 33.71 39.71 36.00 36.00 2+050 35.47 35.23 36.00 36.00
0+200 37.60 40.73 36.00 36.00 2+100 35.55 35.55 36.00 36.00
0+250 41.05 41.25 36.00 36.00 2+150 35.50 35.57 36.00 36.00
0+300 41.41 41.14 36.00 36.00 2+200 34.96 35.17 36.00 36.00
0+350 41.42 40.74 36.00 36.00 2+250 35.28 34.75 36.00 36.00
0+400 41.36 40.61 36.00 36.00 2+300 35.42 34.80 36.00 36.00
0+450 41.02 40.37 36.00 36.00 2+350 35.29 35.03 36.00 36.00
0+500 40.69 40.14 36.00 36.00 2+400 35.26 35.17 36.00 36.00
0+550 40.46 39.85 36.00 36.00 2+450 35.00 35.23 36.00 36.00
0+600 40.31 39.69 36.00 36.00 2+500 34.54 34.93 36.00 36.00
0+650 40.10 39.51 36.00 36.00 2+550 34.54 34.01 36.00 36.00
0+700 39.97 39.31 36.00 36.00 2+600 34.80 34.12 36.00 36.00
0+750 39.69 39.03 36.00 36.00 2+650 35.39 34.87 36.00 36.00
0+800 39.43 38.92 36.00 36.00 2+700 34.68 35.54 36.00 36.00
0+850 39.26 38.76 36.00 36.00 2+750 34.60 35.46 36.00 36.00
0+900 38.90 38.20 36.00 36.00 2+800 34.74 35.41 36.00 36.00
0+950 38.53 37.90 36.00 36.00 2+850 34.65 35.36 36.00 36.00
1+000 37.82 38.02 36.00 36.00 2+900 33.77 35.13 36.00 36.00
1+050 37.76 37.47 36.00 36.00 2+950 33.02 34.63 36.00 36.00
1+100 37.53 37.23 36.00 36.00 3+000 33.69 34.52 36.00 36.00
1+150 37.26 36.74 36.00 36.00 3+050 34.28 34.95 36.00 36.00
1+200 36.78 36.56 36.00 36.00 3+100 34.92 35.09 36.00 36.00
1+250 36.79 36.58 36.00 36.00 3+150 34.77 35.03 36.00 36.00
1+300 36.74 36.50 36.00 36.00 3+200 34.55 34.88 36.00 36.00
1+350 36.65 36.38 36.00 36.00 3+250 34.63 34.84 36.00 36.00
1+400 36.49 36.26 36.00 36.00 3+300 34.39 34.85 36.00 36.00
1+450 36.33 36.20 36.00 36.00 3+350 34.05 35.06 36.00 36.00
1+500 36.17 36.05 36.00 36.00 3+400 34.01 34.77 36.00 36.00
1+550 36.08 36.07 36.00 36.00 3+450 34.00 34.81 36.00 36.00
1+600 36.03 35.90 36.00 36.00 3+500 34.32 34.96 36.00 36.00
1+650 35.91 35.86 36.00 36.00 3+550 34.44 35.05 36.00 36.00
1+700 35.83 35.77 36.00 36.00 3+600 34.22 35.19 36.00 36.00
1+750 35.77 35.63 36.00 36.00 3+650 34.01 35.30 36.00 36.00
1+800 35.67 35.47 36.00 36.00 3+700 34.01 35.30 36.00 36.00
1+850 35.51 35.30 36.00 36.00 3+750 34.01 35.30 36.00 36.00
Elevasi Tanah Asli Elevasi Perataan Elevasi Tanah Asli Elevasi Perataan
Indra Susatyo_15003011
Bagja Munggaran_15003081
Tabel 21 Perhitungan Volume Galian dan Timbunan untuk Perataan Tanah Lokasi Runway
Stasioning Area Area Volume Volume Volume Ket
Sumbu Cut Fill Cut Fill Cut‐
Runway Runway Runway Runway Runway Runway (m2) (m2) (m3) (m3) Volume
Strip Shoulder Shoulder Strip Fill
CL‐150m CL‐30m CL‐22.5m CL CL+22.5m CL+30m CL+150m (m3)
0+000 36.335 38.285 38.735 38.960 38.735 38.285 36.335 336.70 334.80 Cut
0+050 36.335 38.285 38.735 38.960 38.735 38.285 36.335 507.38 718.00 21101.88 26320.00 ‐5218.13 Fill 0+100 36.335 38.285 38.735 38.960 38.735 38.285 36.335 233.39 729.05 18519.08 36176.13 ‐17657.05 Fill 0+150 36.335 38.285 38.735 38.960 38.735 38.285 36.335 422.01 390.70 16385.03 27993.63 ‐11608.60 Fill 0+200 36.335 38.285 38.735 38.960 38.735 38.285 36.335 966.75 0.00 34719.08 9767.50 24951.58 Cut 0+250 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1551.19 0.00 62948.45 0.00 62948.45 Cut 0+300 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1587.28 0.00 78461.73 0.00 78461.73 Cut 0+350 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1531.48 0.00 77969.05 0.00 77969.05 Cut 0+400 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1500.21 0.00 75792.18 0.00 75792.18 Cut 0+450 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1481.68 0.00 74547.18 0.00 74547.18 Cut 0+500 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1324.52 0.00 70155.00 0.00 70155.00 Cut 0+550 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1246.61 0.00 64278.30 0.00 64278.30 Cut 0+600 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1195.63 0.00 61056.08 0.00 61056.08 Cut 0+650 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1137.49 0.00 58327.95 0.00 58327.95 Cut 0+700 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1181.21 0.00 57967.53 0.00 57967.53 Cut 0+750 36.335 38.285 38.735 38.960 38.735 38.285 36.335 1137.49 0.00 57967.53 0.00 57967.53 Cut
0+800 36.335 38.285 38.735 38.960 38.735 38.285 36.335 934.93 0.00 51810.48 0.00 51810.48 Cut
0+850 36.335 38.285 38.735 38.960 38.735 38.285 36.335 896.21 0.00 45778.60 0.00 45778.60 Cut
0+900 36.335 38.285 38.735 38.960 38.735 38.285 36.335 773.08 0.00 41732.35 0.00 41732.35 Cut
0+950 36.300 38.250 38.700 38.925 38.700 38.250 36.300 690.96 0.00 36601.00 0.00 36601.00 Cut
1+000 36.250 38.200 38.650 38.875 38.650 38.200 36.250 777.68 0.00 36716.05 0.00 36716.05 Cut
1+050 36.200 38.150 38.600 38.825 38.600 38.150 36.200 478.88 0.00 31413.95 0.00 31413.95 Cut
1+100 36.150 38.100 38.550 38.775 38.550 38.100 36.150 411.08 0.00 22248.90 0.00 22248.90 Cut
1+150 36.100 38.050 38.500 38.725 38.500 38.050 36.100 303.68 0.00 17868.90 0.00 17868.90 Cut
1+200 36.050 38.000 38.450 38.675 38.450 38.000 36.050 198.13 0.00 12545.15 0.00 12545.15 Cut
1+250 36.000 37.950 38.400 38.625 38.400 37.950 36.000 205.50 0.00 10090.78 0.00 10090.78 Cut
1+300 35.950 37.900 38.350 38.575 38.350 37.900 35.950 186.00 0.00 9787.50 0.00 9787.50 Cut
1+350 35.900 37.850 38.300 38.525 38.300 37.850 35.900 154.50 0.00 8512.50 0.00 8512.50 Cut
1+400 35.850 37.800 38.250 38.475 38.250 37.800 35.850 112.50 0.00 6675.00 0.00 6675.00 Cut
1+450 35.800 37.750 38.200 38.425 38.200 37.750 35.800 79.50 0.00 4800.00 0.00 4800.00 Cut
1+500 35.750 37.700 38.150 38.375 38.150 37.700 35.750 33.00 0.00 2812.50 0.00 2812.50 Cut
1+550 35.700 37.650 38.100 38.325 38.100 37.650 35.700 22.50 0.00 1387.50 0.00 1387.50 Cut
1+600 35.650 37.600 38.050 38.275 38.050 37.600 35.650 19.50 0.00 1050.00 0.00 1050.00 Cut
1+650 35.600 37.550 38.000 38.225 38.000 37.550 35.600 0.00 34.50 487.50 862.50 ‐375.00 Fill
1+700 35.550 37.500 37.950 38.175 37.950 37.500 35.550 0.00 60.00 0.00 2362.50 ‐2362.50 Fill
1+750 35.500 37.450 37.900 38.125 37.900 37.450 35.500 0.00 90.00 0.00 3750.00 ‐3750.00 Fill
1+800 35.450 37.400 37.850 38.075 37.850 37.400 35.450 0.00 129.00 0.00 5475.00 ‐5475.00 Fill
1+850 35.400 37.350 37.800 38.025 37.800 37.350 35.400 0.00 33.00 0.00 4050.00 ‐4050.00 Fill
Elevasi Rencana
Ujung Kiri Ujung Kanan
Tabel 22 Perhitungan Volume Galian dan Timbunan untuk Perataan Tanah Lokasi Runway (Lanjutan)
Stasioning Area Area Volume Volume Volume Ket
Sumbu Cut Fill Cut Fill Cut‐
Runway Runway Runway Runway Runway Runway (m2) (m2) (m3) (m3) Volume
Strip Shoulder Shoulder Strip Fill
CL‐150m CL‐30m CL‐22.5m CL CL+22.5m CL+30m CL+150m (m3)
1+900 35.400 37.350 37.800 38.025 37.800 37.350 35.400 0.00 216.36 0.00 6233.91 ‐6233.91 Fill 1+950 35.450 37.400 37.850 38.075 37.850 37.400 35.450 0.00 246.75 0.00 11577.66 ‐11577.66 Fill 2+000 35.500 37.450 37.900 38.125 37.900 37.450 35.500 0.00 237.17 0.00 12097.97 ‐12097.97 Fill 2+050 35.550 37.500 37.950 38.175 37.950 37.500 35.550 0.00 200.42 0.00 10939.78 ‐10939.78 Fill 2+100 35.600 37.550 38.000 38.225 38.000 37.550 35.600 0.00 136.25 0.00 8416.81 ‐8416.81 Fill 2+150 35.650 37.600 38.050 38.275 38.050 37.600 35.650 0.00 150.00 0.00 7156.25 ‐7156.25 Fill 2+200 35.700 37.650 38.100 38.325 38.100 37.650 35.700 0.00 283.36 0.00 10834.03 ‐10834.03 Fill 2+250 35.750 37.700 38.150 38.375 38.150 37.700 35.750 0.00 305.29 0.00 14716.24 ‐14716.24 Fill 2+300 35.800 37.750 38.200 38.425 38.200 37.750 35.800 0.00 266.83 0.00 14302.85 ‐14302.85 Fill 2+350 35.850 37.800 38.250 38.475 38.250 37.800 35.850 0.00 252.00 0.00 12970.64 ‐12970.64 Fill 2+400 35.900 37.850 38.300 38.525 38.300 37.850 35.900 0.00 237.86 0.00 12246.56 ‐12246.56 Fill 2+450 35.950 37.900 38.350 38.575 38.350 37.900 35.950 0.00 267.63 0.00 12637.43 ‐12637.43 Fill 2+500 36.000 37.950 38.400 38.625 38.400 37.950 36.000 0.00 379.39 0.00 16175.63 ‐16175.63 Fill 2+550 36.050 38.000 38.450 38.675 38.450 38.000 36.050 0.00 524.46 0.00 22596.17 ‐22596.17 Fill 2+600 36.100 38.050 38.500 38.725 38.500 38.050 36.100 0.00 461.81 0.00 24656.63 ‐24656.63 Fill 2+650 36.150 38.100 38.550 38.775 38.550 38.100 36.150 0.00 270.12 0.00 18298.17 ‐18298.17 Fill 2+700 36.200 38.150 38.600 38.825 38.600 38.150 36.200 0.00 281.72 0.00 13795.97 ‐13795.97 Fill 2+750 36.250 38.200 38.650 38.875 38.650 38.200 36.250 0.00 285.92 0.00 14191.03 ‐14191.03 Fill 2+800 36.300 38.250 38.700 38.925 38.700 38.250 36.300 0.00 286.64 0.00 14314.03 ‐14314.03 Fill 2+850 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 298.50 0.00 14628.52 ‐14628.52 Fill 2+900 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 465.00 0.00 19087.50 ‐19087.50 Fill 2+950 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 538.91 0.00 25097.81 ‐25097.81 Fill 3+000 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 575.15 0.00 27851.44 ‐27851.44 Fill 3+050 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 414.60 0.00 24743.65 ‐24743.65 Fill 3+100 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 298.50 0.00 17827.52 ‐17827.52 Fill 3+150 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 334.41 0.00 15822.80 ‐15822.80 Fill 3+200 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 385.50 0.00 17997.80 ‐17997.80 Fill 3+250 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 390.35 0.00 19396.17 ‐19396.17 Fill 3+300 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 411.28 0.00 20040.75 ‐20040.75 Fill 3+350 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 433.50 0.00 21119.58 ‐21119.58 Fill 3+400 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 469.68 0.00 22579.41 ‐22579.41 Fill 3+450 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 489.13 0.00 23970.19 ‐23970.19 Fill 3+500 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 397.20 0.00 22158.28 ‐22158.28 Fill 3+550 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 368.32 0.00 19138.06 ‐19138.06 Fill 3+600 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 371.49 0.00 18495.42 ‐18495.42 Fill 3+650 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 434.37 0.00 20146.67 ‐20146.67 Fill 3+700 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 418.94 0.00 21332.70 ‐21332.70 Fill 3+750 36.335 38.285 38.735 38.960 38.735 38.285 36.335 0.00 403.50 0.00 20560.90 ‐20560.90 Fill 1172515 766910 405605 Cut Total
Elevasi Rencana
Ujung Kiri Ujung Kanan
Indra Susatyo_15003011
Bagja Munggaran_15003081
Tabel 23 dan 24 memberikan hasil perhitungan stabilitas yang dilakukan dengan menggunakan program Plaxis 7.11.
Tabel 23 Hasil Perhitungan Plaxis: Stabilitas Statis Timbunan
Bore Hole Lokasi Tinggi Timbunan, m SF terhadap Penimbunan
1 Runway 2.50 3.5637
2 Runway 1.80 4.7128
3 Runway 2.20 4.2792
4 Runway 2.70 5.5878
11 Apron 4.20 2.9751
18 Taxiway 3.90 1.7904
Keseluruhan perhitungan memberikan nilai faktor keamanan yang sesuai dengan yang disyaratkan untuk stabilitas lereng timbunan yaitu lebih besar dari 1.5.
Tabel 24 Hasil Perhitungan Plaxis: Stabilitas Dinamis Timbunan
Bore Hole Lokasi Tinggi Timbunan, m SF terhadap Beban Gempa
1 Runway 2.50 2.2196
2 Runway 1.80 2.2040
3 Runway 2.20 2.9743
4 Runway 2.70 4.2069
11 Apron 4.20 2.6140
18 Taxiway 3.90 1.1591
Keseluruhan perhitungan memberikan nilai faktor keamanan yang sesuai dengan yang disyaratkan untuk stabilitas lereng timbunan terhadap pembebanan gempa yaitu lebih besar dari 1.1. Beban gempa yang digunakan dalam perhitungan adalah sebesar 0.28g.
Dari Tabel 23 dan 24 terlihat bahwa BH 4 memiliki ketebalan penimbunan terbesar dan nilai stabilitas yang paling tinggi. Hal ini dikarenakan lapisan tanah tepat di bawah lapisan timbunan di titik BH 4 memiliki parameter kekuatan geser tanah (Cu) tertinggi diantara lima borehole lainnya. Perbandingan parameter tanah dapat diberikan dalam Tabel 25.
Tabel 25 Parameter Tanah yang Digunakan
Bore Hole N
Cu (kN/m
2)
γ (kN/m
3)
qu (kN/m
2)
1 5 25 17 50
2 5 25 17 50
3 5 25 17 50
4 9 45 16.5 90
11 7 35 17 70
18 7 35 17 70
Gambar 1 Deformed Mesh BH 1 Akibat Timbunan
Gambar 2 Deformed Mesh BH 2 Akibat Timbunan
Indra Susatyo_15003011
Bagja Munggaran_15003081
Gambar 3 Deformed Mesh BH 3 Akibat Timbunan
Gambar 4 Deformed Mesh BH 4 Akibat Timbunan
Gambar 5 Deformed Mesh BH 11 Akibat Timbunan
Gambar 6 Deformed Mesh BH 18 Akibat Timbunan
Indra Susatyo_15003011
Bagja Munggaran_15003081
Gambar 7 Deformed Mesh BH 1 Akibat Beban Gempa
Gambar 8 Deformed Mesh BH 2 Akibat Beban Gempa
Gambar 9 Deformed Mesh BH 3 Akibat Beban Gempa
Gambar 10 Deformed Mesh BH 4 Akibat Beban Gempa
Indra Susatyo_15003011
Bagja Munggaran_15003081
Gambar 11 Deformed Mesh BH 11 Akibat Beban Gempa
Gambar 12 Deformed Mesh BH 18 Akibat Beban Gempa
LAMPIRAN D Hasil Perhitungan Perencanaan Biaya
Indra Susatyo_15003011
Bagja Munggaran_15003081
Tabel 26 Analisis Harga Satuan
0.008 hari Mandor Rp 36,000 Rp 288 Rp 288
0.041 hari Pekerja Rp 23,000 Rp 943 Rp 943
0.008 jam Dump Truck (5) Rp 400,000 Rp 3,256 Rp 3,256
0.04 jam Bulldozer (5) Rp 115,000 Rp 4,600 Rp 4,600
Total Rp 9,087
0.016 hari Mandor Rp 36,000 Rp 588 Rp 588
0.082 hari Pekerja Rp 23,000 Rp 1,878 Rp 1,878
0.082 jam Hydraulic Excavator (5) Rp 125,000 Rp 10,204 Rp 10,204
0.224 jam Dump Truck (5) Rp 400,000 Rp 89,446 Rp 89,446
102,116 Rp
0.018 hari Mandor Rp 36,000 Rp 633 Rp 633
0.088 hari Pekerja Rp 23,000 Rp 2,023 Rp 2,023
0.224 jam Dump Truck (5) Rp 400,000 Rp 89,446 Rp 89,446
0.088 jam Motor Grader (5) Rp 150,000 Rp 13,194 Rp 13,194
105,297 Rp Total Rp 207,413
0.015 hari Mandor Rp 36,000 Rp 533 Rp 533
0.015 hari Pekerja Rp 23,000 Rp 341 Rp 341
0.008 jam Dump Truck Rp 400,000 Rp 3,256 Rp 3,256
Total Rp 4,130
1.1 m3 Bahan tanah kompaksi (clay) Rp 15,193 Rp 16,713 Rp 16,713
0.025 hari Mandor Rp 36,000 Rp 887 Rp 887
0.123 hari Pekerja Rp 23,000 Rp 2,833 Rp 2,833
0.123 jam Motor Grader (5) Rp 150,000 Rp 18,473 Rp 18,473
0.095 jam Dump Truck (5) Rp 400,000 Rp 38,000 Rp 38,000
0.019 jam Sheepsfoot Roller (5) Rp 250,000 Rp 4,630 Rp 4,630
Total Rp 81,536
5 1 m3 Perkerasan Lentur, tebal 80 cm Rp 1,000,000 Rp 1,000,000 Rp 1,000,000
Total Rp 1,000,000
0.008 hari Mandor Rp 36,000 Rp 288 Rp 288
0.041 hari Pekerja Rp 23,000 Rp 943 Rp 943
0.008 jam Dump Truck (5) Rp 400,000 Rp 3,256 Rp 3,256
0.04 jam Bulldozer (5) Rp 115,000 Rp 4,600 Rp 4,600
Total Rp 9,087
0.015 hari Mandor Rp 36,000 Rp 533 Rp 533
0.015 hari Pekerja Rp 23,000 Rp 340 Rp 340
0.008 jam Dump Truck (5) Rp 400,000 Rp 3,256 Rp 3,256
Total Rp 4,129
1.1 m3 Bahan tanah kompaksi (clay) Rp 15,193 Rp 16,713 Rp 16,713
0.025 hari Mandor Rp 36,000 Rp 887 Rp 887
0.123 hari Pekerja Rp 23,000 Rp 2,833 Rp 2,833
0.123 jam Motor Grader (5) Rp 150,000 Rp 18,473 Rp 18,473
0.095 jam Dump Truck (5) Rp 400,000 Rp 38,000 Rp 38,000
0.019 jam Sheepsfoot Roller (5) Rp 250,000 Rp 4,630 Rp 4,630
Total Rp 81,536
4 1 m3 Perkerasan Lentur, tebal 80 cm Rp 1,000,000 Rp 1,000,000 Rp 1,000,000
Total Rp 1,000,000
0.008 hari Mandor Rp 36,000 Rp 288 Rp 288
0.041 hari Pekerja Rp 23,000 Rp 943 Rp 943
0.008 jam Dump Truck (5) Rp 400,000 Rp 3,256 Rp 3,256
0.040 jam Bulldozer (5) Rp 115,000 Rp 4,600 Rp 4,600
Total Rp 9,087
0.015 hari Mandor Rp 36,000 Rp 533 Rp 533
0.015 hari Pekerja Rp 23,000 Rp 340 Rp 340
0.008 jam Dump Truck (5) Rp 400,000 Rp 3,256 Rp 3,256
Total Rp 4,129
1.1 m3 Bahan tanah kompaksi (clay) Rp 15,193 Rp 16,713 Rp 16,713
0.025 hari Mandor Rp 36,000 Rp 887 Rp 887
0.123 hari Pekerja Rp 23,000 Rp 2,833 Rp 2,833
0.123 jam Motor Grader (5) Rp 150,000 Rp 18,473 Rp 18,473
0.095 jam Dump Truck (5) Rp 400,000 Rp 38,000 Rp 38,000
0.019 jam Sheepsfoot Roller (5) Rp 250,000 Rp 4,630 Rp 4,630
Total Rp 81,536
4 1 m3 Perkerasan Kaku, tebal 48 cm Rp 500,000 Rp 500,000 Rp 500,000
Total Rp 500,000 APRON
TAXIWAY
Perkerasan 2
(ke Pembuangan Sementara) Disposing Tanah Kupasan
3 Kompaksi (timbunan bahan terpilih) 3
Peralatan Upah
RUNWAY Satuan
2 Land Grading
Cut
ANALISIS HARGA SATUAN (Rp/M3) No
Jumlah Harga Harga Satuan
Bahan Jenis
Pekerjaan
Total
Koefisien Bahan/Peralatan/Upah
Stripping 1
4 Kompaksi (timbunan bahan terpilih)
Perkerasan
2 Disposing Tanah Kupasan
(ke Pembuangan Sementara) Stripping 1
Stripping 1
Kompaksi (timbunan bahan terpilih)
Perkerasan Fill
3
(ke Pembuangan Sementara) Disposing Tanah Galian
Tabel 27 Rancangan Anggaran Biaya
(m3)
Mandor 337500.00 Rp 288.00 Rp 97,200,000 Pekerja 337500.00 Rp 943.00 Rp 318,262,500 Dump Truck (5) 337500.00 Rp 3,256.00 Rp 1,098,900,000 Bulldozer (5) 337500.00 Rp 4,600.00 Rp 1,552,500,000
Total Rp 3,066,862,500 Mandor 1172514.65 Rp 588 Rp 689,173,971
Pekerja 1172514.65 Rp 1,878 Rp 2,201,527,964 Hydraulic Excavator (5) 1172514.65 Rp 10,204 Rp 11,964,825,892 Dump Truck (5) 1172514.65 Rp 89,446 Rp 104,877,068,349
119,732,596,176 Rp Mandor 843601.15 Rp 633 Rp 534,280,726
Pekerja 843601.15 Rp 2,023 Rp 1,706,730,096 Dump Truck (5) 843601.15 Rp 89,446 Rp 75,456,980,450 Motor Grader (5) 843601.15 Rp 13,194 Rp 11,130,848,451
88,828,839,722 Rp Total Rp 208,561,435,898 Mandor 328913.50 Rp 533 Rp 175,310,898
Pekerja 328913.50 Rp 341 Rp 112,159,505 Dump Truck 328913.50 Rp 3,256 Rp 1,070,942,370
Total Rp 1,358,412,773 Bahan tanah kompaksi (clay) 1176125.42 Rp 16,713 Rp 19,656,584,144
Mandor 1176125.42 Rp 887 Rp 1,043,223,248 Pekerja 1176125.42 Rp 2,833 Rp 3,331,963,315 Motor Grader (5) 1176125.42 Rp 18,473 Rp 21,726,564,884 Dump Truck (5) 1176125.42 Rp 38,000 Rp 44,692,765,960 Sheepsfoot Roller (5) 1176125.42 Rp 4,630 Rp 5,445,460,695
Total Rp 95,896,562,245
5 Perkerasan Lentur, tebal 80 cm 135000.00 Rp 1,000,000 Rp 135,000,000,000
Total Rp 135,000,000,000 Total Pekerjaan Runway Rp 443,883,273,416
Mandor 306848.1 Rp 288 Rp 88,372,253 Pekerja 306848.1 Rp 943 Rp 289,357,758 Dump Truck (5) 306848.1 Rp 3,256 Rp 999,097,414 Bulldozer (5) 306848.1 Rp 4,600 Rp 1,411,501,260
Total Rp 2,788,328,685 Mandor 306848.1 Rp 533 Rp 163,488,667.68
Pekerja 306848.1 Rp 340 Rp 104,451,093 Dump Truck (5) 306848.1 Rp 3,256 Rp 999,097,414
Total Rp 1,267,037,175 Bahan tanah kompaksi (clay) 2828437.52 Rp 16,713 Rp 47,271,676,272
Mandor 2828437.52 Rp 887 Rp 2,508,824,080 Pekerja 2828437.52 Rp 2,833 Rp 8,012,963,494 Motor Grader (5) 2828437.52 Rp 18,473 Rp 52,249,726,307 Dump Truck (5) 2828437.52 Rp 38,000 Rp 107,480,625,760 Sheepsfoot Roller (5) 2828437.52 Rp 4,630 Rp 13,095,665,718
Total Rp 230,619,481,631
4 Perkerasan Lentur, tebal 80 cm 206152.40 Rp 1,000,000 Rp 206,152,400,000
Total Rp 206,152,400,000 Total Pekerjaan Taxiway Rp 440,827,247,490
Mandor 227708.7 Rp 288 Rp 65,580,106 Pekerja 227708.7 Rp 943 Rp 214,729,304 Dump Truck (5) 227708.7 Rp 3,256 Rp 741,419,527 Bulldozer (5) 227708.7 Rp 4,600 Rp 1,047,460,020
Total Rp 2,069,188,957 Mandor 227708.7 Rp 533 Rp 121,323,195.36
Pekerja 227708.7 Rp 340 Rp 77,512,041 Dump Truck (5) 227708.7 Rp 3,256 Rp 741,419,527
Total Rp 940,254,763 Bahan tanah kompaksi (clay) 3180331.5 Rp 16,713 Rp 53,152,880,360
Mandor 3180331.5 Rp 887 Rp 2,820,954,041 Pekerja 3180331.5 Rp 2,833 Rp 9,009,879,140 Motor Grader (5) 3180331.5 Rp 18,473 Rp 58,750,263,800 Dump Truck (5) 3180331.5 Rp 38,000 Rp 120,852,597,000 Sheepsfoot Roller (5) 3180331.5 Rp 4,630 Rp 14,724,934,845
Total Rp 259,311,509,184
4 PerkerasanKaku, tebal 48 cm 364333.92 Rp 500,000 Rp 182,166,960,000
Total Rp 182,166,960,000 Total Pekerjaan Apron Rp 444,487,912,904 TOTAL Rp 1,329,198,433,810 Pembulatan Rp 1,329,198,434,000 Overhead 10% Rp 132,919,843,400 Contigency 5% Rp 66,459,921,700 SUBTOTAL Rp 1,528,578,199,100 Pembulatan Rp 1,528,578,200,000 Stripping
1
2 Disposing Tanah Galian
(ke Pembuangan Sementara)
RANCANGAN ANGGARAN BIAYA
Total Biaya
Harga Satuan Jumlah
Jenis Pekerjaan
3 Kompaksi
Perkerasan
APRON
1 Stripping
2
(ke Pembuangan Sementara) Disposing Tanah Galian
Kompaksi 3
Perkerasan
Bahan/Peralatan/Upah Volume
No
RUNWAY
1 Stripping
2 Land Grading
Cut
Fill
3
(ke Pembuangan Sementara) Disposing Tanah Galian
Kompaksi 4
Perkerasan
TAXIWAY
Indra Susatyo_15003011
Bagja Munggaran_15003081
LAMPIRAN E
Layout Desain
LAMPIRAN F Perencanaan Drainase
Indra Susatyo_15003011
Bagja Munggaran_15003081
Perencanaan Sistem Drainase Runway
Perencanaan drainase runway direncanakan berada di sepanjang runway dan terbuat dari beton. Direncanakan drainase tersebut akan berbentuk segi empat agar tidak menghabiskan banyak ruang dalam prakteknya.
1. Data Perencanaan Drainase
Data curah hujan diambil dari tiga stasiun hujan yang dianggap berpengaruh pada lokasi yang akan dikaji dalam hal ini untuk perencanaan saluran drainase runway.
Dalam hal ini ketiga stasiun hujan tersebut adalah: Stasiun Hujan Pakumbahan (no.
stasiun = 20), Stasiun Hujan Kadipaten (21), dan Stasiun Hujan Majalengka (41). Data curah hujan yang diambil merupakan curah hujan hujan harian maksimum dalam satu tahun tertentu selama 10 tahun dari 1979 sampai dengan tahun 1988.
Tabel 28 Curah Hujan Maksimum 3 Stasiun dalam 10 Tahun
Pakumbahan Kadipaten Majalengka
1979 94 65 98
1980 145 56 115
1981 128 150 122
1982 140 105 90
1983 77 91 90
1984 135 79 110
1985 64 99 115
1986 68 98 115
1987 69 102 131
1988 71 105 150
Ch Maksimum (mm) Tahun
Sumber : Badan Meteorologi dan Geofisika
2. Penentuan Curah Hujan Regional
Penentuan curah hujan regional dilakukan dengan metode rata‐rata, yaitu menjumlahkan curah hujan maksimum harian dari setiap stasiun hujan pada tahun tertentu dibagi dengan jumlah stasiun hujan. Hasil perhitungan penentuan hujan regional terdapat pada Tabel 29.
Contoh perhitungan Ch regional rata‐rata tahun 1979:
mm
stasiun
majalengka Ch
kadipaten Ch
pakumbahan rata Ch
rata Ch
86 3
98 65 94
3
=
+
= +
+
= +
−
Tabel 29 Curah Hujan Regional dengan Metode Rata‐rata Ch rata‐rata Pakumbahan Kadipaten Majalengka (mm)
1979 94 65 98 86
1980 145 56 115 105
1981 128 150 122 133
1982 140 105 90 112
1983 77 91 90 86
1984 135 79 110 108
1985 64 99 115 93
1986 68 98 115 94
1987 69 102 131 101
1988 71 105 150 109
Ch Maksimum (mm) Tahun
3. Analisis Hidrologi
Setelah pengumpulan data curah hujan dan penentuan curah hujan regional, dilakukan analisis harga ekstrim curah hujan untuk mendapatkan curah hujan rencana . Metode yang digunakan untuk analisis harga ekstrim adalah dengan metode Distribusi Normal, Log Normal, Gumbel dan Distribusi Log Pearson III.
Tabel 30 Perhitungan Curah Hujan
Tahun CH (mm) (x‐xrata)^2 logx (logx‐logx rata)^2 (logx‐logx rata)^3
1979 86 285.610 1.93281 0.00556 ‐0.00041
1980 105 7.654 2.02257 0.00023 0.00000
1981 133 946.588 2.12494 0.01382 0.00163
1982 112 82.810 2.04792 0.00164 0.00007
1983 86 274.454 1.93450 0.00531 ‐0.00039
1984 108 29.521 2.03342 0.00068 0.00002
1985 93 98.010 1.96692 0.00164 ‐0.00007
1986 94 79.210 1.97159 0.00128 ‐0.00005
1987 101 3.610 2.00289 0.00002 0.00000
1988 109 37.210 2.03610 0.00083 0.00002
∑ 1,025.67 1,844.68 20.07365 0.03101 0.00082
X
Rata‐rata102.57 2.01
102 , 567
10 667 ,
1025 =
=
= ∑
− N
X
rata rataX
2 , 007
10 074 , log 20
log = ∑ = =
− N
X
rata rataX
( )
317 , 9 14
678 , 1844 1
2
=
− =
= ∑ − −
N x
Sx x
rata rata( )
059 , 9 0 007 , 2 1
log log log
2
=
− =
= ∑ − −
N x x x
S
rata rataIndra Susatyo_15003011
Bagja Munggaran_15003081
Tabel 31 Perhitungan Distribusi Normal
m P(weibull) Tr Kt Xtr
1 0.091 11.000 1.313 121.368
2 0.182 5.500 0.886 115.251
3 0.273 3.667 0.468 109.264
4 0.364 2.750 0.211 105.580
5 0.455 2.200 0.056 103.370
6 0.545 1.833 ‐0.392 96.961
7 0.636 1.571 ‐1.007 88.151
8 0.727 1.375 ‐1.468 81.544
9 0.818 1.222 ‐1.827 76.405
10 0.909 1.100 ‐2.115 72.294
Distribusi Normal
Contoh perhitungan distribusi normal Untuk data (m) ke 1:
- 0 , 09091
1 10
1 ) 1
( =
= +
= + n Weilbull m
P
- 11
09091 , 0
1
1 = =
= P
Tr
- Cs untuk normal =0 - Kt=1,313
- Xtr = R
rata−
rata+ KtSx = 102 , 567 + 1 , 313 × 14 , 317 = 121 , 368 mm Tabel 32 Perhitungan Distribusi Log Normal
m P(weibull) Tr Kt Xtr
1 0.091 11.000 1.313 121.465
2 0.182 5.500 0.886 114.649
3 0.273 3.667 0.468 108.348
4 0.364 2.750 0.211 104.646
5 0.455 2.200 0.056 102.485
6 0.545 1.833 ‐0.392 96.467
7 0.636 1.571 ‐1.007 88.769
8 0.727 1.375 ‐1.468 83.401
9 0.818 1.222 ‐1.827 79.452
10 0.909 1.100 ‐2.115 76.427
Distribusi Log Normal
Contoh perhitungan distribusi log normal untuk data (m) ke 1:
- 0 , 09091
1 10
1 ) 1
( =
= +
= + n Weilbull m
P
- 11
09091 , 0
1
1 = =
= P
Tr
- Cs untuk log normal =0
- Kt=1,313
- log Xtr = log R
rata−
rata+ Kt × S log x = 2 , 007 + 1 , 313 × 0 , 059 = 2 , 084 mm - Xtr = 121 , 465 mm
Tabel 33 Perhitungan Distribusi Gumbel
m P(weibull) Tr Kt Xtr
1 0.091 11.000 1.383 122.373
2 0.182 5.500 0.803 114.058
3 0.273 3.667 0.442 108.900
4 0.364 2.750 0.169 104.989
5 0.455 2.200 ‐0.060 101.712
6 0.545 1.833 ‐0.265 98.775
7 0.636 1.571 ‐0.459 95.992
8 0.727 1.375 ‐0.655 93.196
9 0.818 1.222 ‐0.866 90.163
10 0.909 1.100 ‐1.133 86.353
Distribusi Gumbell
Contoh perhitungan distribusi Gumbel untuk data (m) ke 1:
- 0 , 09091
1 10
1 ) 1
( =
= +
= + n Weilbull m
P
- 11
09091 , 0
1
1 = =
= P
Tr
- Kt
⎭ ⎬
⎫
⎩ ⎨
⎧ ⎥
⎦
⎢ ⎤
⎣
⎡ ⎟
⎠
⎜ ⎞
⎝
⎛ + −
−
= 6 0 , 5772 ln ln 1 Tr
Tr
π
1 , 383
1 11 ln 11 ln 5772 ,
6 0 =
⎭ ⎬
⎫
⎩ ⎨
⎧ ⎥
⎦
⎢ ⎤
⎣
⎡ ⎟
⎠
⎜ ⎞
⎝
⎛ + −
−
= π
- Xtr = R
rata−
rata+ Kt × Sx = 102 , 567 + 1 , 383 × 14 , 317 = 122 , 373 mm Tabel 34 Perhitungan Distribusi Log Pearson
m P(weibull) Tr Kt Xtr
1 0.091 11.000 1.366 122.341
2 0.182 5.500 0.855 114.171
3 0.273 3.667 0.404 107.424
4 0.364 2.750 0.130 103.520
5 0.455 2.200 0.033 102.159
6 0.545 1.833 ‐0.399 96.375
7 0.636 1.571 ‐0.878 90.328
8 0.727 1.375 ‐1.238 86.044
9 0.818 1.222 ‐1.517 82.852
10 0.909 1.100 ‐1.741 80.385
Distribusi Log Pearson
Contoh perhitungan distribusi Log Pearson untuk data (m) ke 1:
- 0 , 09091
1 10
1 ) 1
( =
= +
= + n Weilbull m
P
Indra Susatyo_15003011
Bagja Munggaran_15003081
- 11 09091 , 0
1
1 = =
= P
Tr
- Cs = 0 , 566
) 317 , 14 ( 8 9
00982 , 0 10 )
)(
2 )(
1 (
) log
(log
3 3
log 3
× =
×
= ×
−
−
∑ − −
x rata rata