Pondasi Tapak Beton Type Bujursangkar
Project : Ruko Permata Juanda SurabayaClient : Mr Bunawan
Engineer Checked Approved
Name Lutfi Ari
Date 2/7/2018 17:23 Data Struktur : 1 Dimensi Kolom b = 400 mm h = 400 mm Type Kolom αs = 30 2 Dimensi Pondasi B = 2.40 m ha L = 2.40 m B = L ht = 0.40 m
3 Mutu Beton fc' = 20 Mpa ht
4 Mutu Baja fy' = 320 Mpa
5 Besi tulangan D = 19
(dipakai)
6 BJ Beton γc = 24 KN/m3
Data Tanah :
6 Daya dukung tanah = 105 Kpa
7 Berat tanah γt = 17.20 KN/m3
8 Tebal tanah diatas ha = 1.20 m
pondasi h
Data Beban :
9 Beban P ultimate Pult = 384 KN
10 Beban M ultimate Mult = 18.25 KNm
Result
Cek Status Pondasi :
Tegangan yang terjadi pada tanah = 104.82767
= 88.98566 σt
σmaks σmin
Kontrol gaya geser 1 arah Ø.Vc = 422.617
Vu = 168.620
Kontrol gaya geser 2 arah Ø.Vc = 1007.237
Vu = 508.641
Penulangan Pondasi
Pu Mu b Muka Tanah L L B B = L b < 105 OK! < 105 OK!
< 422.617 OK!
< 1007.237 OK!
Author : Lutfi Andrian, WS WEB :
E-mail :
CR 2011
www.kampustekniksipil.co.cc lutfi.andrian@rocketmail.com
SKEMA HITUNGAN PONDASI
Data : tebal fondasi (ht, d, ds), mutu bahan Mutu Bahan (Fc, Fy)
Beban (Pu, Mu)
Penentuan Dimensi Pondasi
Pult Mu,x Mu,y
σ = + + + q ≤
B x L 1/6 B x 1/6 B x
Menghitung tegangan tanah didasar fondasi
Pult Mu,x Mu,y
σmaks = + + + q ≤
B x L 1/6 B x 1/6 B x
Pult Mu,x Mu,y
σmin = - - + q ≤
B x L 1/6 B x 1/6 B x
Kontrol gaya geser 1 arah
σmaks + σa Vu = a x B 2 Dimana L - a x σmaks - σmin σa = σmin + L fc' Vc = x B x d 6
Daya dukung tanah (σt)
σt L2 L2 σt L2 L2 σt L2 L2
Syarat :
Vu ≤ Ø Vc dengan Ø = 0.75
Kontrol gaya geser 2 arah
σmaks +
Vu = B 2 - b + d h + d x
2 Dipilih nilai Vc terkecil dari :
2 fc' bo d Vc1 = 1 + x 6 αs d fc' bo d Vc2 = 2 + x bo 12 1 Vc3 = x fc' bo d 3 Syarat : Vu ≤ Ø Vc dengan Ø = 0.75
Hitung Penulangan Fondasi
1) ds = 75 + D + D/2
dimana
d = h - ds
2) σx = σmin + B - x x σmaks - σmin
σmaks - σx 3) Mu = 0.5 σx x 2 + x 2 3 Mu 4) K = , b = 1000 βc
Ø x b x d 2 382.5 x 0.85 x 600 + fy - 225 x β1 5) Kmaks = 600 + fy 2 2 x K 6) a' = 1 - 1 - d 0.85 x fc' 0.85 x fc' x a x b 7) As(1) = fy 8) fc' ≤ 31.36 Mpa maka 1.4 x b x d
As(2) ≥ Pilih "As" yang
fy terbesar fc' > 31.36 Mpa maka fc' x b x d As(3) = 4 fy 9) Jarak tulangan 0.25 x phi x D 2 s = S As terpilih Pilih "s" yang s ≤ 2 x ht terkecil s ≤ 450
Cek Kuat Dukung Fondasi
Syarat : Pult ≤ Pu
Notasi :
σ = Tegangan yang terjadi pada dasar fondasi ... σt = Daya dukung tanah ...
Pult = Beban axial terfaktor pada kolom... B,L = Panjang dan lebar fondasi
Mu,x = Momen terfaktor kolom searah sumbu X ... Mu,y = Momen terfaktor kolom searah sumbu Y ... q = Beban terbagi rata akibat beban sendiri fondasi
ditambah beban tanah diatas fondasi ...
ht = Tebal fondasi ≥ 150 mm
(lihat pasal 17.7 SNI 03-2847-2002) ha = Tebal tanah diatas fondasi ...
γc = Berat per volume beton ... γt = Berat per volume tanah ... Vu = Gaya geser pons terfaktor...
Vc = Gaya geser yang sanggup ditahan oleh beton...
Ø =
βc = Rasio dari sisi panjang terhadap sisi pendek pada kolom, daerah beban terpusat / atau daerah reaksi bo = Keliling penampang krisis dari fondasi ... αs = Suatu konstanta yang digunakan untuk menghitung
Vc , yang nilai tergantung pada letak fondasi,
40 = Kolom dalam
30 = Kolom tepi
20 = Kolom sudut
σmin = Tegangan tanah minimum ...
σmaks = Tegangan tanah maksimum ...
σa = Tegangan tanah sejarak "a" dari tepi fondasi ... σx = Tegangan tanah sejarak "x" dari tepi fondasi ...
a = Jarak dari area bidang yang menerima tekanan keatas dari tanah (area keruntuhan)
fc' = Kuat tekan beton ... fy = Mutu beton ...
ds = decking
D = Diameter tulangan ...
a' = Tinggi blok tegangan beton teka persegi ekivalen
Mu = Momen yang terjadi padafondasi
K, Kmaks = Faktor momen pikul s = Jarak tulangan ...
As = Luas besi tulangan yang dibutuhkan ... Faktor keamanan = 0,7 (lihat SNI)
σmin
fc'
Pilih "As" yang
(Kpa) atau KN/m2 (Kpa) atau KN/m2 KN m KNm KNm (KN/m2) mm mm KN/m3 KN/m3 KN KN mm (Kpa) atau KN/m2 (Kpa) atau KN/m2 (Kpa) atau KN/m2 (Kpa) atau KN/m2 mm Mpa Mpa mm mm mm mm mm2
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Analisa
q = Berat Fondasi + Berat Tanah
= ht x γc + ha x γt
= 0.40 x 24 + 1.20 x 17.20
= 30.24 KN/m2
Cek Fondasi Terhadap Tegangan Izin Tanah Tegangan yang terjadi pada tanah
Pult Mult = + + q ≤ B x L 1/6 B x 384 18.25 = + + 30.24 ≤ 2.40 x 2.40 1/6 2.40 x 2.40 2 = 66.666667 + 7.921 + 30.24 = 104.828 ≤ 105 Save! Pult Mult = - + q ≤ B x L 1/6 B x 384 18.25 = - + 30.24 ≤ 2.40 x 2.40 1/6 2.40 x 2.40 2 = 66.666667 - 7.921 + 30.24 = 88.986 ≤ 105 Save!
Kontrol Tegangan Geser 1 Arah 0.40 ds = 75 + D/2 = 75 + 9.50 σmaks L2 σmin L2
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
= 85.00 mm d = ht - ds = 400 - 85.00 0.40 = 315.00 L = 2.40 a = B/2 - b/2 -= 1200 - 200 -2.40 = 685.00 mm = 0.685 m σa = σmin + B -= 88.986 + 2.40 -2.40 0.4 = 100.306 KN/m2
Gaya tekan ke atas dari tanah (Vu)
Vu = a x B x
0.4
= 0.685 x 2.40 x
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
0.40 0.315 0.685 fc' Ø.Vc = Ø x 6 20 = 0.75 x 6 0.315 = 422.617 KN 2.40 Ø.Vc = 422.617 > Vu
σmin σa σmaks
88.986 100.306 104.828
Kontrol Tegangan Geser 2 Arah (Geser Pons)
Dimensi Kolom, b = 400
h = 400
b + d = 400.00 + 315.00 = 715.00 mm
h + d = 400 + 315.00 = 715.00 mm
Gaya Tekan Ke Atas (Geser Pons)
Vu = B 2 - b + d x h + d x 104.828 + 88.986 = 2.40 2 - 0.715 x 0.715 x 2 = 508.64129 hk 400 = = = 1.000 Bk 400
Gaya geser yang dapat ditahan oleh beton (Ø.Vc)
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
bo = 2 x bk + d + hk + d
bo = 2 x 400 + 315.00 + 400 + 315.00
= 2860 mm
Gaya geser yang ditahan oleh beton
2 Vc1 = 1 + 0.158 0.40 2 Vc1 = 1 + 0.158 1.000 Vc1 = 2014473.641 N = 2014.474 KN 0.843 0.158 0.40 0.158 0.8425 αs Vc2 = 2 + bo 30 Vc2 = 2 + 0.315 2860 0.085 Vc2 = 1445114.832 N 2.40 = 1445.115 KN βc
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
1 Vc3 = x fc' bo 3 1 σmin Vc3 = x 20 2860 88.986 σmaks 3 104.828 = 1342982.427 N = 1342.982 KN Jadi Vc1 = 2014.474
Vc2 = 1445.115 Diambil yang terkecil
Vc3 = 1342.982
Vc = 1342.982 KN
Ø.Vc = 0.75 x 1342.982
= 1007.237 KN
Ø.Vc = 1007.237 > Vu = 508.641 ... Save!
Hitungan Penulangan Fondasi
0.40 ds = 75 + 19 + = 103.500 mm ≈ 0.105 m 1.00 1.20 d = ht - ds = 0.40 - 0.105 = 0.295 m 0.40 0.295 = 295 mm 0.105 B h 2.40 x = -2 2 2400 400 x =
-Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
2 2
σmin σx σmaks x = 1000 mm
88.986 98.227 104.828 = 1 m
σx = σmin + B - x x σmaks - σmin B
σx = 88.986 + 2.40 - 1 x 104.828 - 88.986 2.40 ` = 98.227 KN/m3 σmaks - σx Mu = 0.5 σx x 2 + x 2 3 104.828 - 98.227 = 0.5 98.227 1 2 + 1 2 3 = 51.314 KNm Mu K = Ø x b x d 2 51313696.952 = 0.8 x 1000 x 295 2 = 0.737 Mpa
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
382.5 x 0.85 x 600 + fy - 225 x β1 Kmaks = 600 + fy 2 382.5 x 0.85 x 600 + 320 - 225 x 0.85 Kmaks = 600 + 320 2 = 5.599 Mpa K < Kmaks K = 0.737 < Kmaks = 5.599 ... OK! 2 x K a' = 1 - 1 - d 0.85 x fc' 2 x 0.737 = 1 - 1 - 295 0.85 x 20 = 13.080 mm 0.85 x fc' x a' x b As(1) = fy 0.85 x 20 x 13.080 x 1000 = 320 = 694.877 mm2 Jika fc' ≤ 31.36 Mpa maka 1.4 x b x d As ≥ ... (R.1) fy ... SNI 03-2847-2002 (Pasal 12.5.1)
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Jika fc' > 31.36 Mpa maka fc' x b x d As = ... (R.2) 4 fy ... SNI 03-2847-2002 (Pasal 12.5.1) fc' = 20 < 31.36
maka yang dipakai adalah pers ... (R.1)
1.4 x b x d fc' x As(2) = ... (R.1) As(2') = fy 4 1.4 x 1000 x 295 0 x = = 320 4 = 1290.625 mm2 ... As dipakai = #DIV/0! mm2
Dipilih yang terbesar dari As(1) dan As(2)... Sehingga,
As(1) = 694.877 mm2
As = 1290.625 mm2
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Jarak tulangan, 0.25 x phi x D 2 x S s = As 0.25 x 3.14 x 19 2 x 1000 = 1290.625 = 219.572 mm s ≤ 2 x ht ≤ 2 x 400 ≤ 800 s ≤ 450 mm
Dipilih (s) yang terkecil = 219.572 mm
Sheet No
1
Lutfi Date Date/time 2/7/2018 17:23 105 105 σt σtSheet No
1
Lutfi Date Date/time 2/7/2018 17:23 d 315.00 a x σmaks - σmin b 0.685 x 104.828 - 88.986 2.40 σmaks + σa 2 104.828 + 100.306 2Sheet No
1
Lutfi Date Date/time 2/7/2018 17:23 x B x d x 2.40 x 315.00 = 168.620 ... Save! = 0.715 m = 0.715 m σmaks + σmin 2Sheet No
1
Lutfi Date Date/time 2/7/2018 17:23 fc' bo d x 6 20 2860 315.00 x 6 d fc' bo d x 12 315.00 20 2860 315.00 x 12Sheet No
1
Lutfi Date Date/time 2/7/2018 17:23 d 315.00 9.5Sheet No
1
Lutfi Date Date/time 2/7/2018 17:23 fc' 20Sheet No
1
Lutfi Date Date/time 2/7/2018 17:23 b x d ... (R.2) fy 0 x 0 0 ... As tidak Dipakai!Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Cek Panjang Penyaluran Tegangan Tulangan
9 x fy x α β x γ x = c + Ktr 10 fc' db 9 x 320 x 1 1 x 0.8 x = 75 + 0 10 20 19 9 x 320 x 1 1 x 0.8 x = 10 20 2.5 = 391.544 mm > 300 mm ≈ 392 mm B Bk Panjang Tersedia (λt) = - - 75 2 2 2400 400 = - - 75 2 2 = 925 > 925 > 392 ... OK!
Kuat Dukung Fondasi
Pu = Ø x 0.85 x fc' x A
Panjang penyaluran tegangan (λd)
Panjang Tersedia (λt) Panjang penyaluran tegangan (λd) Program Hitung Pondasi Tapak
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
= 0.7 x 0.85 x 20 x 160000 = 1904000 N = 1904 KN Pu,k = 384 KN Pu = 1904 > Pu,k = 384 ... SKSNI 03-2847-2002
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Sheet No
2
Date Date/time 2/7/2018 17:23 λ db 1 19 1 19Sheet No
2
Date
Date/time 2/7/2018 17:23
Sheet No
2
Date
Sheet No
2
Date
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
2.40 2.40 D 19
-
219DETAIL PONDASI
Non Scale 400 D 19 - 219 400 295 105 2400POTONGAN 1-1
Program Hitung Pondasi TapakProgram Hitung Pondasi Tapak
Job No.
Part
Job Title Ref
Ruko Permata Juanda Surabaya Enginner
Client. Mr Bunawan File
Program Hitung Pondasi Tapak Program Hitung Pondasi Tapak
Non Scale SNI 03-2847-2002 (Pasal 17.4.3)
SNI 03-2847-2002 (Pasal 17.7)
Sheet No
3
Date
Sheet No
3
Date