• Tidak ada hasil yang ditemukan

WAHYU WIDOYO 6 Agustus 2004

N/A
N/A
Protected

Academic year: 2017

Membagikan "WAHYU WIDOYO 6 Agustus 2004"

Copied!
2
0
0

Teks penuh

(1)

1

AN ALI SI S LI N T ASAN RU T E AN GK OT A

SEBAGAI DASAR PEN I N GK AT AN PELAY AN AN

LI N T ASAN RU T E AN GK OT A DI K AWASAN

SI M PAN G LI M A SEM ARAN G

TESIS

Diajukan Dalam Rangka Memenuhi Persyaratan

Progam Studi Magister Perencanaan Pembangunan Wilayah dan Kota

Oleh :

WAHYU WIDOYO L4D002136

MAGISTER PERENCANAAN PEMBANGUNAN WILAYAH DAN KOTA PROGRAM PASCA SARJANA

UNIVERSITAS DIPONEGORO SEMARANG

(2)

2

Abstract

Simpang Lima Semarang is a CBD of Semarang City, its location that is very strategic and various land use and road link system having form of radial ring, make this area as a knot of movement, attraction and production of high intensity trafflic flow.

The problim is policy of Semarang City Government using of structure of route link of public transportation having the form of radial and service orientation of route line of public transportation centered in the central area of trade and service, so that there is a route line hourding of public transportation.

Its effects are that there is an area which hasn't been served by public transportation system, the area of trade center and service is made into of focal point of public transportation and the way of public transportation in picking up or dropping off the passengers.

In the link of radial ring road, an alternative route line of public transportation is needed to serve the place arounds the area in connecting to the area center or another areas therefore, it is needed a structure of route link having the form of radial modification, namely by adding the route link connecting inter sub activity center and also between sub activity center dand CBD. Thus the route line orientation is not centered to CBD anymore, but there is also enough route line having spatial orientation circled of connects inter sub activity center directly.

Based on the result of research and analysis wich have been performed, it can be concluded that, the need of public transportation in the urban area is highly needed as an alternative transportation means to support daily activities (working, shopping, going to school, etc), and and alternative route line, mean while the service of public transportation line is less.

In order to increase the service of route line of urban transportation and overcome the existing problem in the area of Simpang Lima Semarang, it is needed an alternative route with changes of urban transportation route line of C.06. in destination of Johar – Tugu Suharto in accordance with the analysis of an alternative route line, namely Thamrin, Seteran, Brumbungan, Ki Mangun Sarkoro, A. Yani and Simpang Lima.

Key words : The service of route line of urban transportation

Recommendation

1. The route line of public transportation passing through main roads in the area of Simpang Lima, gives the priority to the public transportation with bigger capacity. 2. It is still needed and addition of road light in an alternative route line, namely Seteran,

Brumbungan, S. Sutoyo (Kp. Kali) and Ki Mangun Sarkoro.

3. The addition of new route in the area of Simpang Lima will increase new problems. 4. It is needed a special place to pick up or drop off the passenggers in the center area of

Referensi

Dokumen terkait

Saya akan mencari cara yang cepat untuk lebih mudah memahami rumus-rumus

HASIL DAN PEMBAHASAN Berdasarkan hasil dari prosedur penelitian yang dilakukan menghasilkan sebuah produk VPN Server yang dapat diakses menggunakan Jaringan internet,

Adapun tujuan yang hendak dicapai dalam penelitian ini adalah untuk mengetahui bagaimanakah kondisi sosial ekonomi orang tua siswa Scholars English Club di SD Angkasa

Di zaman modern ini, transportasi adalah bagian yang tidak dapat dipisahkan dari kegiatan manusia sehari-hari. Namun, jumlah kendaraan bermotor meningkat pesat, dari sepeda

3. Isi form untuk memperoleh Kode Pembayaran. Pastikan NO SBMPTN, NISN, Tanggal Lahir, dan Nama Sesuai dengan data yang diisikan ketika mendaftar SBMPTN 2017..

Based on the research findings and data analysis in the previous chapter, it can be concluded that there is positive significant relationship (the correlation

Based on the results of the research that has been carried out, it can be concluded that all stages of research and development have been carried out properly and resulted in a