• Tidak ada hasil yang ditemukan

ANALISIS PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE (STUDI KASUS PADA BANGUNAN PERKANTORAN 31 LANTAI) | Lesmana | Jurnal Dimensi Pratama Teknik Sipil 2998 5590 1 SM

N/A
N/A
Protected

Academic year: 2017

Membagikan "ANALISIS PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE (STUDI KASUS PADA BANGUNAN PERKANTORAN 31 LANTAI) | Lesmana | Jurnal Dimensi Pratama Teknik Sipil 2998 5590 1 SM"

Copied!
7
0
0

Teks penuh

Loading

Gambar

Tabel 2. Perhitungan Baseline Productivity Pekerjaan Pondasi Bored Pile
Tabel 3. Variabel Bebas dan Terikat pada Persamaan Multiple Regression
Tabel 5. Nilai Model Coefficient, Expected Unit  Rate, dan Disruption Index

Referensi

Dokumen terkait

Cadastre information belongs to base map of land, so much so that in this study the first step is georefrencing the Quick bird satellite images by accurate GPS spots that

Data from synoptic stations were used to specify which stations in terms of location ( x,y) have the highest precipitation rate and better potential for

Setelah membaca teks, siswa mampu menjelaskan sikap yang bisa dicontoh dari Bung Tomo dengan terinci.. Setelah berdiskusi, siswa mampu memberikan pendapat mengenai ditetapkannya

The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XL-3/W4, 2016 EuroCOW 2016, the European Calibration and Orientation

In this paper, different feature detection as well as float and binary description methods will be compared taking the example of aerial nadir, MM panoramic

[r]

Since the resolution of the nighttime light remote sensing data is very coarse and also exists the phenomenon of lighting overflow, the clipping area includes not

A revised Evaporative Stress Index (RESI) was also used to assess the likelihood of the occurrence of drought and to create drought hazard maps.. Finally, a combined