Network Scheduling :
Precedence Diagram
•
In AOA and precedence
diagramming, the activities are
PDM Logical Relationship
• The left side of the PDM node is designed the
“start side” and the right side is designed the “finished side”.
• Because of the importance of the side, PDM uses
arrowheads to identify the direction of relationship.
• Precedence diagramming allows more flexibility in modeling relationship than AOA diagramming. AOA diagramming allow only one kind of logical relationship : a preceding activity must be
complete before any succeeding activity can begin.
• The four logical relationship used by PDM are :