Swadaya APBN APBD PROP APBD KAB APBDES JUMLAH
1. Pembuatan SPA Jambon, RT 01 200 m 120,000,000 120,000,000
- TPT Jambon, RT 01 250 m 100,000,000 100,000,000
- Paving Jalan Lingkungan Jambon, RT 01 100 m 75,000,000 75,000,000
2 Pembangunan SPA Jambon, RT 02 250 m 200,000,000 200,000,000
- Rehap Paving jln Lingkungan Jambon, RT 02 300 m 10,000,000 10,000,000
- Gapura Jambon RT 02 30,000,000 30,000,000
3 Pembuatan TPT Jambon RT 03 250 m 100,000,000 100,000,000
4 Pembuatan TPT Jambon RT 04 250 m 100,000,000 100,000,000
- Paving Jalan Lingkungan Jambon RT 04 150 m 50,000,000 50,000,000
- SPA Jambon RT 04 300 m 180,000,000 180,000,000
5 SPA dan TPT Jambon RT 05 25 m 13,750,000 13,750,000
- Gapura Jambon RT 05 28,000,000 28,000,000
- Pagar Lingkungan Jambon RT 05 2,500,000 2,500,000
6 Pavingisasi jalan lingkungan Jambon RT 06 2x180 m 36,000,000 36,000,000
- SPA Jambon RT 06 180 m 108,000,000 108,000,000
- TPT Jambon RT 06 180 m 72,000,000 72,000,000
Lokasi Dusun Volume Prakiraan biaya (dalam Rp.) Keteranga
n
RENCANA USULAN PEMBANGUNAN TAHUN 2017/2018
HASIL PEMBAHASAN PADA FORUM MUSYAWARAH RENCANA PEMBANGUNAN DESA (MUSRENBANGDES) DESA PEJAMBON KECAMATAN SUMBERREJO KABUPATEN NOJONEGORO
I BIDANG FISIK PRASARANA :
NO PROGRAM/PROYEK/KEGIATAN
7 Pembangunan SPA Jambon RT 07 350 m 210,000,000 210,000,000
- Paving Jalan Lingkungan Jambon RT 07 1.5x100 m 50,000,000 50,000,000
- SPA (Deker separuh) Jambon RT 07 100 m 5,000,000 5,000,000
8 Pembanguan SPA Jambon RT 08 250 m 162,000,000 162,000,000
- SPA (Deker separuh) Jambon RT 08 125 m 5,625,000 5,625,000
- Paving Jalan Lingkungan Jambon RT 08 150 m 150,000,000 150,000,000
9 Pembuatan Gorong-gorong Jambon RT 09 15,000,000 15,000,000
- SPA Jambon RT 09 2X300 m 300,000,000 300,000,000
10 Pembuatan TPT Jambon RT 10 100 m 40,000,000 40,000,000
- SPA Jambon RT 10 100 m 60,000,000 60,000,000
- Rehap Paving jln Lingkungan Jambon RT 10 100 m 10,000,000 10,000,000
11 Pembangunan TPT Jambon RT 11 300 m 90,000,000 90,000,000
- Rehap Paving Lingkungan Jambon RT 11 3,000,000 3,000,000
12 Pembangunan TPT Jambon RT 12 100 m 40,000,000 40,000,000
- SPA Jambon RT 12 100 m 60,000,000 60,000,000
- Rehap Paving jln Lingkungan Jambon RT 12 100 m 10,000,000 10,000,000
- Gapura Jambon RT 12 30,000,000 30,000,000
13 Pembangunan SPA Tanggungan RT 13 150 m 90,000,000 90,000,000
- TPT Tanggungan RT 13 150 m 60,000,000 60,000,000
- Rehap Paving jln Lingkungan Tanggungan RT 13 200 m 20,000,000 20,000,000
- Gapura Tanggungan RT 13 30,000,000 30,000,000
14 Pembangunan TPT Tanggungan RT 14 500 m 200,000,000 200,000,000
- Pavingisasi jalan lingkungan Tanggungan RT 14 200 m 50,000,000 50,000,000
- SPA Tanggungan RT 14 100 m 60,000,000 60,000,000
15 Pembangunan TPT Tanggungan RT 15 150 m 350,000,000 350,000,000
- Gapura Tanggungan RT 15 30,000,000 30,000,000
16 Gorong-gorong Tanggungan RT 16 15,000,000 15,000,000
- Gapura Tanggungan RT 16 30,000,000 30,000,000
PJU Panel tenaga surya Tanggungan RT 16 3 ttk 15,000,000 15,000,000
17 Pembanguan SPA (RW.02) Tanggungan RT 16 100 m 60,000,000 60,000,000
- Tugu Batas desa Tanggungan RT 16 15,000,000 15,000,000
- Pembanguan SPA (RW.02) Tanggungan RT 16 170 m 102,000,000 102,000,000
- Rehap jembatan Tanggungan RT 16 15,000,000 15,000,000
JUT Tanggungan RT 14 300,000,000 300,000,000
Pengurukan Lapangan Tanggungan RT 14 50,000,000 50,000,000
18 Lantainisasi Rumah Sehat (LPMD) Pejambon 50,000,000 50,000,000
19 Pengurukan Lapangan (Krg Truna) Pejambon 500,000,000 500,000,000
- Pemb.Gedung dan sarpras olah raga Pejambon 800,000,000 800,000,000
20 Rehap Jembatan (RW 01) Dsn.Jambon 5x4 m x 3
ttk 45,000,000 45,000,000
0 0 0 1,300,000,000 4,052,875,000 5,352,875,000 JUMLAH SUB 1
Swadaya APBN APBD PROP APBD KAB APBDES JUMLAH
1 Budidaya Ikan Dsn.Jambon Rt.02 10,000,000 10,000,000
2 Pemanfaatan Pekarangan Rumah Warga Dsn.Jambon Rt.05 5,000,000 5,000,000
- Pengadaan Benih Sayuran dan Polibag Dsn.Jambon Rt.05 3,000,000 3,000,000
3 Budidaya Ayam Tanggungan RT 16 200 Ekor 10,000,000 10,000,000
4 Rehap Gedung (Bank Sampah) Dsn.Jambon 20,000,000 20,000,000
- Timbangan (Bank Sampah) Dsn.Jambon 1 unit 3,000,000 3,000,000
- Kendaraan Operasional (Bank Sampah) Dsn.Jambon 1 unit 35,000,000 35,000,000
- Alat Penggilingan Plastik Dsn.Jambon 250,000,000 250,000,000
- Gedung dan lahan pengolahan sampah
organik Dsn.Jambon 50,000,000 50,000,000
- Penguatan Modal usaha Dsn.Jambon 100,000,000 100,000,000
5 Gedung kantor UPKu Dsn.Jambon 1 lkl 50,000,000 50,000,000
- Peralatan Kantor UPKu Dsn.Jambon 1 pkt 10,000,000 10,000,000
- Gedung Outlet Produk UPKu Dsn.Jambon 1 lkl 50,000,000 50,000,000
- Penguatan Modal UPKu Dsn.Jambon 100,000,000 100,000,000
- Pelatihan Peningkatan SDM Dsn.Jambon 50,000,000 50,000,000
6 Leptop dan Printer KOPWAN Dsn.Jambon 1 Unit 7,000,000 7,000,000
I I BIDANG EKONOMI :
NO PROGRAM/PROYEK/KEGIATAN Lokasi Dusun Volume
Prakiraan biaya (dalam Rp.)
Keteranga n
7 Pembangunan JITUT/JITDES
(GAPOKTAN) Ds.PeJambon 300 m 250,000,000 250,000,000
- JUT Ds.PeJambon 600 m 150,000,000 150,000,000
- Pembangunan Cekdam Ds.PeJambon 500,000,000 500,000,000
- Pompanisasi Ds.PeJambon 2 Unit 40,000,000 40,000,000
- Benih padi/kedelai/Bawang merah Ds.PeJambon 3 klpk 210,000,000 210,000,000
- Power Treser/combin Ds.PeJambon 1 Unit 200,000,000 200,000,000
- Pelatihan Peningkatan SDM Ds.PeJambon 3 klpk 1,500,000 1,500,000
- Sosialisasi Tanaman Organik Ds.PeJambon 3 klpk 1,500,000 1,500,000
- Operasional kelompok Ds.PeJambon 3 klpk 3,000,000 3,000,000
- Modal penguatan Ds.PeJambon 3 klpk 25,000,000 25,000,000
Gubuk pertemuan Ds.PeJambon 15,000,000 15,000,000
Pengadaan rumah Burung hantu Ds.PeJambon 5,000,000 5,000,000
Sekolah Lapang Ds.PeJambon 25,000,000 25,000,000
8 Pembuatan Depo Air isi ulang (BUMDES) Ds.PeJambon 1 Unit 50,000,000 50,000,000
- Operasional Pengurus Ds.PeJambon 4,800,000 4,800,000
9 Pembangunan Udit (HIPPA) BT I Kiri 500 m 350,000,000 350,000,000
- Pembangunan Udit (HIPPA) RT 9-12 500 m 350,000,000 350,000,000
- Pembangunan Udit (HIPPA) BL Kanan 500 m 350,000,000 350,000,000
- Pembangunan Udit (HIPPA) RT 09 200 m 150,000,000 150,000,000
- Study tour 3,000,000 3,000,000
10 Pelatihan Budi daya ulat sutra (LPMD) Ds.PeJambon 10,000,000 10,000,000
11 Budidaya Kroto (WAD) Ds.PeJambon 5,000,000 5,000,000
12 Pelatihan Wirausaha (LINMAS) Ds.PeJambon 2Pltn 20,000,000 20,000,000
13 Power Treser (POKMAS Jambon Jaya) Ds.PeJambon 1 Unit 70,000,000 70,000,000
- Modal penguatan Ds.PeJambon 25,000,000 25,000,000
- Study tour 5,000,000 5,000,000
JUMLAH SUB 2 0 0 950,000,000 1,955,000,000 666,800,000 3,571,800,000
Swadaya APBN APBD PROP APBD KAB APBDES JUMLAH
1 Rehap pos Jambon RT.02 1 Unit 5,000,000 5,000,000
- Pembelian Genset Jambon RT.02 1 Unit 3,000,000 3,000,000
- Pembanguna Pot bunga permanen Jambon RT.02 10 ttk 5,000,000 5,000,000
2 Pembelian Genset Jambon RT.03 1 Unit 3,000,000 3,000,000
- Pembanguna Pot bunga permanen Jambon RT.03 10 ttk 5,000,000 5,000,000
3 Pembelian Genset Jambon RT.06 1 Unit 3,000,000 3,000,000
- Pembanguna Pot bunga permanen Jambon RT.06 10 ttk 5,000,000 5,000,000
- Deker tempat sampah Jambon RT.06 10 bh 700,000 700,000
4 Pembelian Genset Jambon RT.07 1 Unit 3,000,000 3,000,000
5 Rehap Mushola Jambon RT.11 10,000,000 10,000,000
6 Pembanguna Pot bunga permanen Jambon RT.12 10 ttk 5,000,000 5,000,000
- Pembangunan Mushola Jambon RT.12 1 Unit 80,000,000 80,000,000
7 Pembelian Genset Jambon RT.13 1 Unit 3,000,000 3,000,000
- Speker aktif Jama'ah tahlil Jambon RT.13 1 Unit 1,500,000 1,500,000
8 Pembangunan Gedung (TPQ Sabilul Hikmah) Tanggungan RT 15 6x7 m 100,000,000 100,000,000
Pengadaan WIFI tiap RT RT 1-16 16 unit 48,000,000 48,000,000
9 Rehap Sumur gede Tanggungan RT 16 10,000,000 10,000,000
III. BIDANG PEMERINTAHAN DAN KEMASYARAKATAN :
NO PROGRAM/PROYEK/KEGIATAN Lokasi Dusun Volume
Prakiraan biaya (dalam Rp.)
Keteranga n
- Pembuatan Pathok cor batas TKD Tanggungan RT 16 5,000,000 5,000,000
10 Pondasi pagar SDN Pejambon Tanggungan RT 16 0.5x1x20 m 10,000,000 10,000,000
- Gapura SDN Tanggungan RT 16 30,000,000 30,000,000
- Pintu Gapura SDN Tanggungan RT 16 4X4 m 5,000,000 5,000,000
- Pembangunan Mushola SDN Tanggungan RT 16 4x5 m2 50,000,000 50,000,000
11 Sarana prasarana belajar(Meja Lipat) TK
PKK Tanggungan RT 16 20 bh 1,200,000 1,200,000
- Pagar TK PKK Pejambon Tanggungan RT 16 2x15 m 30,000,000 30,000,000
- Sarana prasarana belajar(Meja,almari)POS
PAUD Tanggungan RT 16 1 Set 1,875,000 1,875,000
- Sarana prasarana belajar(Meja,almari)KB Tanggungan RT 16 1 Set 750,000 750,000
12 Rehab gedung sekolah (MII Pejambon) Jambon RT.04 1 Pkt 25,000,000 25,000,000
- Pembuatan Taman (MII Pejambon) Jambon RT.04 1 Pkt 5,000,000 5,000,000
- Ruang Kelas Baru (MII Pejambon) Jambon RT.04 2 lkl 300,000,000 300,000,000
- Joglo Papan Nama MII Pejambon Jambon RT.04 1 Pkt 10,000,000 10,000,000
- Mebeler MII Pejambon Jambon RT.04 100 bh 110,000,000 110,000,000
- Kantin MII Pejambon Jambon RT.04 1 Unit 10,000,000 10,000,000
13 APE Luar untuk SPS. RA Jambon RT.04 2 Unit 5,000,000 5,000,000
- Gedung KB Jambon RT.04 1 lkl 50,000,000 50,000,000
- Rehab gedung. RA dan KB Jambon RT.04 2 Unit 17,000,000 17,000,000
- Tambahan Transport Guru.RA,KB,PP Jambon RT.04 5 Org 12,000,000 12,000,000
14 Pembangunan Gedung (TPQ Sabilul Hikmah) Tanggungan RT 15 6x7 m 100,000,000 100,000,000
15 Etalase (TPQ Nurul Hidayah) Jambon RT.03 1 bh 2,000,000 2,000,000
- Walles (TPQ Nurul Hidayah) Jambon RT.03 1 bh 3,000,000 3,000,000
16 Normalisasi Sumur Umum (WAD) Jambon RT.06 1 Bh 10,000,000 10,000,000
- Rehap Sumur gede (WAD) Tanggungan RT 16 1 Bh 10,000,000 10,000,000
17 Pagar Pembatas(Masjid At-taqwa) Jambon RT.04 145,000,000 145,000,000
- Granit (Masjid At-taqwa) Jambon RT.04 200,000,000 200,000,000
- Sound sistem (Masjid At-taqwa) Jambon RT.04 1 Set 50,000,000 50,000,000
- SPA (Masjid At-taqwa) Jambon RT.04 100,000,000 100,000,000
18 Almari dan Mebeler kantor PKK Jambon RT.12 10,000,000 10,000,000
- Leptop dan Almari Dasa Wisma Jambon RT.12 7,500,000 7,500,000
- APE Untuk Taman Posyandu Jambon RT.12 3 pos 5,000,000 5,000,000
- Alat Prasmanan PKK Jambon RT.12 1 Set 10,000,000 10,000,000
- Perangkat perawatan jenazah Jambon RT.12 10,000,000 10,000,000
Operasional Pengurus Posyandu Jambon RT.12 5,000,000 5,000,000
19 PHBI Jambon RT.05 5,000,000 5,000,000
- Keg.kebrsihan Lingkungan Jambon RT.05 5,000,000 5,000,000
20 Pagar Pembatas(Masjid Al- Huda) Tanggungan RT 14 50,000,000 50,000,000
- Pembelian Genset Tanggungan RT 14 3,000,000 3,000,000
- Rehap Masjid Tanggungan RT 14 100,000,000 100,000,000
- Sound sistem Tanggungan RT 14 1 Set 50,000,000 50,000,000
19 Pembangunan POSKAMLING Tiap RT
(LINMAS) Ds.PeJambon 128,000,000 128,000,000
- Alat Drum Band (LINMAS) Ds.PeJambon 1set 50,000,000 50,000,000
- Dahrim (LINMAS) Ds.PeJambon 1 Plton 3,100,000 3,100,000
20 Sedekah Bumi/Grebek Desa (LKBD) Ds.PeJambon 50,000,000 50,000,000
- Napak Tilas Sejarah Desa (LKBD) Ds.PeJambon 20,000,000 20,000,000
- Study Kegiatan (LKBD) Ds.PeJambon 30,000,000 30,000,000
- Operasional Kegiatan (LKBD) Ds.PeJambon 15,000,000 15,000,000
- Gamelan (LKBD) Ds.PeJambon 1set 200,000,000 200,000,000
21 Fasilitas Kantor (BPD) Ds.PeJambon 100,000,000 100,000,000
22 Pembangunan/Rehap Kantor Desa
(PEMDES) Ds.PeJambon 6x20 m 500,000,000 500,000,000
- Seragam PDH LINMAS Perangkat Desa Ds.PeJambon 9 org 4,500,000 4,500,000
- Pesangon Purna Tugas Perangkat Desa X masa kerjaDs.PeJambon 2,000,000 2,000,000 ./ Tahun
23 Operasional Kegiatan KIM Akses jaya Ds.PeJambon 1 klpk 10,000,000 10,000,000
- Bener Informasi Ds.PeJambon 4 bh 4,800,000 4,800,000
24 Pelatihan penguatan kelembagaan (LPMD) Ds.PeJambon 3,000,000 3,000,000
25 Pelatihan penguatan organisasi Kepemudaan (KRT)Ds.PeJambon 100,000,000 100,000,000
26 Pengadaan mebeler (TPQ Al-Fattah) Ds.PeJambon 20 bh 2,000,000 2,000,000
- Pembangunan pagar Ds.PeJambon 40,000,000 40,000,000
- Perbaikan tempat wudlu Ds.PeJambon 10,000,000 10,000,000
27 Pengadaan mebeler (Posyandu) Ds.PeJambon 3 set 5,000,000 5,000,000
- Tikar lipat Ds.PeJambon 9 lbr 750,000 750,000
- Pengadaan APE Ds.PeJambon 3 set 2,025,000,000 2,025,000,000
28 Pengembangan Bangunan (PONKESDES) Ds.PeJambon 24 m2 108,000,000 108,000,000
- Pagar PONKESDES Ds.PeJambon 12 m 21,600,000 21,600,000
- Mebeler Posyandu Ds.PeJambon 10 set 7,500,000 7,500,000
- Pemeliharaan Gedung PONKESDES Ds.PeJambon 7,000,000 7,000,000
- Ambulan Desa Ds.PeJambon 1 Unit 100,000,000 100,000,000
29 Perbaikan Gedung PERPUSDES Ds.PeJambon 10,000,000 10,000,000
Opersional Pengurus Ds.PeJambon 3 Org 5,500,000 5,500,000
30 Pembangunan Taman Desa Ds.PeJambon 100,000,000 100,000,000
JUMLAH SUB 3 0 0 0 100,000,000 5,411,275,000 5,511,275,000
JUMLAH SUB 1-3 0 0 950,000,000 3,355,000,000 10,130,950,000 14,435,950,000
Pejambon 11 Januari 2017 KEPALA DESA PEJAMBON
ABD. ROKHMAN