Lampiran Nota Dinas Rencana Kebutuhan Nomor : B/ 60 /VI/2017/Sipropam Tanggal : 8 Juni 2017
PPn PPh 21 PPh 22 PPh 23
1 3073.994.003 LAYANAN PERKANTORAN 15,200,000 15,200,000 4,800,000 1,300,000 6,100,000 9,100,000 40.1
521811.BX PERALATAN / PERLENGKAPAN KANTOR SIE PROPAM 15,200,000 15,200,000 4,800,000 1,300,000 6,100,000 9,100,000 40.1
2 3088.005.003 PENEGAKAN KODE ETIK PROFESI
521119.DC > PEMERIKSAAN / PEMBERKASAN TERHADAP DUGAAN PELANGGARAN KODE ETIK PROFESI 15,000,000 15,000,000 - - - 15,000,000 - BIAYA PEMERIKSAAN SAMPAI PEMBERKASAN 8,000,000 8,000,000 - - - 8,000,000 - PELAKSANAAN SIDANG TINGKAT KEWILAYAHAN 7,000,000 7,000,000 - - - 7,000,000
-3 3089.002.003 PEMBINAAN PENGAMANAN POLRI 6,100,000 6,100,000 - - - 6,100,000
-521119.GM - BIAYA PENYELIDIKAN PAMINAL DITINGKAT KEWILAYAHAN 6,100,000 6,100,000 - - - 6,100,000
-4 3090.002.003 KEGIATAN PEMBINAAN PROVOST 13,000,000 13,000,000 - - - 13,000,000 -521119.DE - PEMERIKSAAN TATA TERTIB DAN DISIPLIN 13,000,000 13,000,000 - - - 13,000,000
-5 3128.994.003 PELAKSANAAN HARKAMTIBMAS
521119.FT KEGIATAN PROPAM 29,380,000 29,380,000 12,615,000 - 12,615,000 16,765,000 42.9
- SIDANG KODE ETIK 10,320,000 - - - - - a. PENYIDIKAN / PEMBERKASAN KKEP 3,000,000 - - - - - b. PERANGKAT SIDANG KKEP 5,800,000 - - - - - c. LAPORAN HASIL SIDANG KKEP 1,520,000 - - - - -
- OPS GAKTIBPLIN 8,460,000 8,460,000 2,535,000 - 2,535,000 5,925,000 30.0
a. UANG SAKU (9 ORG X 4 HR X 6 GIAT) 3,240,000 3,240,000 1,280,000 - 1,280,000 1,960,000 39.5 b. UANG MAKAN (9 ORG X 4 HR X 6 GIAT) 4,320,000 4,320,000 960,000 - 960,000 3,360,000 22.2 c. LAPORAN HASIL GIAT 900,000 900,000 295,000 - 295,000 605,000 32.8
- SIDANG DISIPLIN 10,600,000 20,920,000 10,080,000 - 10,080,000 10,840,000 48.2
a. PENYIDIKAN / PEMBERKASAN (5 GIAT X Rp. 470.000) 2,400,000 4,150,000 1,800,000 - 1,800,000 2,350,000 43.4 b. PERANGKAT SIDANG (11 ORG X 5 GIAT X Rp. 1.484.000) 6,800,000 14,300,000 6,880,000 - 6,880,000 7,420,000 48.1 c. LAPORAN SIDANG (5 GIAT X Rp. 214.000) 1,400,000 2,470,000 1,400,000 - 1,400,000 1,070,000 56.7
78,680,000
78,680,000 17,415,000 1,300,000 18,715,000 59,965,000 23.8 - - -
- - - - - - - - -78,680,000
78,680,000 17,415,000 1,300,000 18,715,000 59,965,000 23.8 - - - -JUMLAH TOTAL
SISA PAGU % PAJAK NOMOR NPWP
JUMLAH ANGGARAN RM JUMLAH ANGGARAN PNBP
RINCIAN RENCANA KEBUTUHAN
SIPROPAM BULAN JUNI 2017
NO KODE URAIAN PAGU AWAL MENJADI
REALISASI S.D BULAN
LALU
BULAN INI REALISASI S.D BULAN INI