Environmental Monitoring Report

# Semiannual Report

July-December 2020

December 2020

INO: West Kalimantan Power Grid Strengthening

Project – Part 2

Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development

Bank.

(2)

CURRENCY EQUIVALENTS

(as of 31 December 2020)

Currency unit

Indonesian rupiah (Rp)

Rp1.00

=

$0. 0000712251

$1.00

=

Rp14,040

NOTE

(i)

In this report, "$" refers to US dollars.

This environmental monitoring report is a document of the borrower. The views expressed herein

do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may

be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian

Development Bank does not intend to make any judgments as to the legal or other status of any

territory or area.

(3)

APPENDIX 1

(4)

PROJECT ORGANIZATION CHART

Note:

TL : Transmission Line SS : Substation

(5)
(6)

2.a Vegetation Management

(7)

SISTEM MANAJEMEN K3

INSTRUKSI KERJA

PEMELIHARAAN ROW PADA SUTT 150kV DAN SUTET 275kV

NO. DUKUMEN

: SMK3/UP3B/IK/22.001

EDISI

: 00

REVISI

: 00

PT PLN (PERSERO)

UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN

KALIMANTAN BARAT

Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3 UP3B – KALBAR

(8)
(9)

PT PLN (Persero)

UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT

INSTRUKSI KERJA

PEMELIHARAAN ROW PADA SUTT 150kV DAN SUTET 275kV

Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3 UP3B – KALBAR

4. TANGGUNG JAWAB DAN WEWENANG

5.1.

Manager bertanggung jawab atas kebijakan dan pemenuhan peraturan yang

berlaku pada kegiatan pemeliharaan ROW yang di bawah wewenangnya.

5.2

Manager Bagian Penyaluran bertanggung jawab terhadap pemantauan dan

pengawasan terhadap pemeliharaan ROW pada jalur SUTT dan SUTET.

5.3.

Masing-masing Manager ULTG bertanggung jawab terhadap proses kegiatan

Inspeksi dan pemeliharaan ROW di masing-masing jalur SUTT yang menjadi

tanggung jawab area kerjanya.

5.4.

Supervisor Pemeliharaan TRAGI bertanggung jawab terhadap pengolahan

tehadap rekap data inspeksi dan pembersihan ROW.

5.5.

Supervisor K4 ULTG bertanggung terhadap Keselamatan dan Kesehatan Kerja

pada proses inpeksi dan pembersihan ROW.

5.6.

Pejabat

Pelaksana

Lingkungan

bertanggung

jawab

dan

memastikan

pembersihan ROW dilakukan tanpa menggunakan Herbisida dalam mengatasi

tumbuhan yang dapat mengganggu operasional instalasi penyaluran tenaga

listrik.

6. URAIAN PROSEDUR

6.1 Petugas Ground Patrol melaksanakan breafing dan gelar peralatan kerja bersama

koordinator Gardu Induk setiap minggunya di lokasi Gardu Induk masing-masing

jalur SUTT sebelum melaksanakan inspeksi.

6.2 Petugas Ground Patrol yang bertanggung jawab mengawasi beberapa buah tower

melaksanakan tugas memantau secara visual komponen dan lingkungan pada area

transmisi dengan menelusuri jalur transmisi dengan berjalan kaki dan hanya

dilakukan pemantauan dari bawah dan maksimal memanjat sampai dengan leg 1

bagian tower apabila diperlukan untuk melihat kondisi ROW yang tertutupi oleh

pohon.

6.3 Petugas Ground Patrol menggunakan aplikasi Srintami yang sudah terinstal pada

smartphone yang merupakan salah satu perangkat kerja untuk memasukan laporan

inspeksi.

6.4 Koordinator Petugas Ground Patrol melaporkan hasil inspeksi kepada koordinator

Gardu Induk dengan mengunggah hasil data inspeksi dari aplikasi Mobile Srintami

ke Server Srintami.

No. Dokumen SMK3/UP3B/IK/22.001

Edisi / Revisi 00 / 00 Berlaku Efektif 3 Maret 2020

(10)

2.b Increased Access

(11)

2.c Health and Safety

Anti-Climbing Devices (ACD) in T.10 Tiga Berkat Village, Bengkayang District.

(12)

2.d Avian Collisions Avian Collisions Report

(13)
(14)

APPENDIX 3

IMPLEMENTATION OF MITIGATION MEASURES

(15)

3.a Noise

(16)

PT PLN (Persero)

UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT

FORMULIR PEMANTAUAN LINGKUNGAN

No. Dokumen SMK3/UP3B/F/05.001

Edisi / Revisi 00 / 00 Berlaku Efektif 1 Juli 2019

Halaman 1 dari 1

Lokasi

: GITET DAN GI BENGKAYANG

Waktu : 3 NOVEMBER 2020

Cuaca : Cerah Berawan

No.

Lokasi / Peralatan

Kebisingan

Keterangan

Hasil Ukur

(dB)

Max

(dB)

1

TRAFO 2 150 KV

62,7

85

BAY 150 KV

2

TRAFO 1 150 KV

62,3

85

BAY 150 KV

3

ANTARA TRAFO 1&2

66,2

85

BAY 150 KV

4

TENGAH SWITCHYARD

51,3

85

BAY 150 KV

5

REAKTOR 275 KV

13,4

85

TIDAK OPERASI (275 KV)

6

IBT 1 PHASA R

68,3

85

BAY 275 KV

7

IBT 1 PHASA S

69,4

85

BAY 275 KV

8

IBT 1 PHASA T

65,1

85

BAY 275 KV

9

IBT 2 PHASA R

67,3

85

BAY 275 KV

10

IBT 2 PHASA S

66,3

85

BAY 275 KV

11

IBT 2 PHASA T

66,5

85

BAY 275 KV

12

13

14

Pelaksana Pengukur

(17)

3.b Health and Safety

The availability of security post in 275 kV Bengkayang Substation (3 November 2020)

Fire Extinguisher in 275 kV Bengkayang Substation (3 November 2020)

Switchyard area 275 kV Bengkayang Substation (3 November 2020)

PPE in 275 kV Bengkayang Substation (3 November 2020)

(18)
(19)
(20)

4.b Health and Safety

Warning signs in tower T.35 Bengkayang – Ngabang 150kV TL (16 November 2020)

Tower has been equipped with anti-climbing devices in tower T.18 Bengkayang – Ngabang 150kV TL (16 November 2020)

(21)

4.c Avian Collisions

Avian Collisions Report

(22)
(23)
(24)
(25)
(26)

5.a Noise

(27)

PT PLN (Persero)

UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN SISTEM KALIMANTAN BARAT

FORMULIR PEMANTAUAN LINGKUNGAN

No. Dokumen SMK3/UP3B/F/05.001

Edisi / Revisi 00 / 00 Berlaku Efektif 1 Juli 2019

Halaman 1 dari 1

Lokasi

: GI NGABANG

Waktu : 3 NOVEMBER 2020

Cuaca : Mendung

No.

Lokasi / Peralatan

Kebisingan

Keterangan

Hasil Ukur

(dB)

Max

(dB)

1

Depan Lobby GI

38,4

85

BAY 150 KV

2

TRAFO 1 150 KV

59,7

85

BAY 150 KV

3

TRAFO 2 150 KV

50,4

85

Tidak Operasi

4

TENGAH SWITCYARD

46,9

85

BAY 150 KV

5

ARAH JALAN RAYA

73,4

85

Kondisi Jalanan Sedang

6

7

8

9

10

11

12

13

14

Pelaksana Pengukur

(28)

5.b Health and Safety

Warning sign in the switchyard of 150 kV Tayan Substation (12 November 2020)

Security office at the 150 kV Ngabang Substation (3 November 2020)

PPE for the visitors in 150 kV Ngabang Substation (3 November 2020)

Fire extinguishers in the switchyard area of 150 kV Tayan Substation (12 November 2020)

(29)

APPENDIX 6

THE MITIGATION IMPLEMENTATIONS OF

150 kV TAYAN EXTENSION, SANGGAU AND SEKADAU

SUBSTATIONS (CONSTRUCTION PHASE)

(30)
(31)

Attendance List of Toolbox Meeting for socializing the prohibition of herbicides use and burning vegetation and waste

(32)
(33)
(34)
(35)
(36)
(37)

The switchyard area with gravelling in Sanggau Substations (28 October 2020)

(38)

6.c Drainage

Drainage construction in the Sanggau Substation (20 September 2020)

(39)

6.d Water Quality Impacts

(40)

6.e Air Quality Impacts

The water spraying was conducted at the Sanggau SS construction site, since dust level is considered high (24 July 2020)

(41)

6.f Construction Waste Management

Organic and non-organic waste has already separated in Sanggau SS (16 September 2020)

Sekadau Final disposal facilities, in Sekadau-Sanggau street Km. 6, Sekadau Hilir Sub-district (20 September 2020)

(42)
(43)

Attendance List of Toolbox Meeting for socializing the prohibition of hunting and wood collection and cultural heritage

(44)
(45)
(46)
(47)

PPE usage for the workers in Sekadau SS (17 July

2020) First aid kit inspection (13 September 2020)

(48)
(49)
(50)
(51)

Emergency vehicle services by Contractor in Sanggau Substation

Provide Fire Extinguisher in Sanggau Substation (17 July 2020)

Fire Extingusher Inspection in Sekadau Substation (17 November 2020)

(52)

Safety sign around construction site in Sanggau substation (20 September 2020)

Referensi

Dokumen terkait

REPORT OF HEALTH SAFETY ENVIRONMENTAL (HSE) MONITORING Transmission Line Tayan - Sanggau PERIOD MARCH 2019.. ENVIRONMENTAL PARAMETERS

(RCCP) for the 150 kV Bengkayang – Ngabang - Tayang Transmission Line route. Total number of towers of the 150 kV Bengkayang-Ngabang-Tayang transmission line was 393 at that

This report for the period July to December 2017 states the social aspects of the implementation progress of the West Kalimantan Power Grid Strengthening Project. This report

Tidak bisa memindahkan hasil dan menarik kesimpulan untuk memecahkan masalah yang lain. Begitu mudah menjual kepada manager, bisa terjadi solusi

Berdasarkan nilai estimate, dapat dikatakan bahwa motivasi memiliki pengaruh positif pada perilaku pengelolaan keuangan keluarga namun tidak signifikan, artinya semakin

Meterai tempel yang digunakan untuk melakukan pembayaran Bea Meterai yang terutang atas Dokumen sebagaimana dimaksud dalam huruf b, dapat digunakan dengan nilai total Meterai

Keanggotaan adalah semua masyarakat desa yang memiliki kepentingan yang sama dalam berusaha, selain itu aparat pemerintah desa juga akan memfasilitasi, dan bisa juga