Environmental Monitoring Report

– Part 3

# Semiannual Report January – June 2019 June 2019

INO: West Kalimantan Power Grid Strengthening

Project

Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development Bank.

(2)

CURRENCY EQUIVALENTS

(as of 30 June 2019)

Currency unit – Indonesian rupiah (Rp) Rp1.00 = $ 0.0000708215

$1.00 = Rp 14,120

NOTE

(i) In this report, "$" refers to United States dollars

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

(3)

PT PLN (PERSERO) UIP KALBAGBAR

Jl. Letjend Suprapto No. 50 G, Pontianak Kalimantan Barat

West Kalimantan Power Grid Strengthening Project

Semi-Annual Environmental Monitoring Report

January to June 2019

ADB Loan No. 3015-INO

AFD Loan No. CID102401B

Submitted by:

PT PLN (Persero)

July 2019

(4)
(5)
(6)

4.h Occupational and Community Health and Safety Contractor’s Inspection Report

(7)
(8)
(9)
(10)
(11)
(12)

4.i Physical Cultural Resources Contractor’s Monthly Report

(13)

No PACKAGE LOCATION DESCRIPTION MAGNITUDE OF IMPACT ENVIRONMENTAL MONITORING AND MANAGEMENT EFFORT Project Package 6 : Design, Supply, Installation and Commissioning Of 150 Kv Overhead

West Kalimantan Power Grid Strengthening

PERIOD OF ENVIRONMENTAL MONITORING CONSTRUCTION PHASE PACKAGE 6

REPORT OF HEALTH SAFETY ENVIRONMENTAL (HSE) MONITORINGTransmission Line Tayan - Sanggau PERIOD MARCH 2019

ENVIRONMENTAL PARAMETERS IMPACT

PT. PLN (Persero )

l. Physical Cultural Resources Ditemukan, pada area tower 158 Desa

Palem Jaya Kecamatan Parindu ditemukan makam yang dikeramatkan atau dituakan oleh masyarakat setempat yang berdekatan dengan area tower

sesuai dengan arahan dokumen IEE ADB mengenai Physical Cultur Resources, Kontraktor melakukan Koordinasi dan diskusi dengan perangkat desa serta tokoh masyarakat setempat terkait dengan hal ini. Hasil dari koordinasi dan diskusi kontraktor dan masyarakat diminta untuk melakukan upacara adat (Mudas) sebelum melakukan pekerjaan didekat area tersebut. Hal ini sudah dilakukan kontraktro dan masyarakat pada bulan ini.

Sanggau 31 Maret 2019

Dibuat Oleh,

Dwi Agung Subroto Aris Pramudyo

HSE Enviro Project Manager

Disetujui Oleh,

Selama konstruksi / laporan setiap 1 bulan

(14)

APPENDIX 5

(15)

5.a Occupational and Community Health and Safety

(16)

INSTRUKSI KERJA

MEMANJAT TOWER / TIANG

NOMOR: 9.001/IK/TRS.00.003/KOMISI-PDKB PUSAT/2018

PT PLN (PERSERO) KANTOR PUSAT

KOMISI PDKB

(17)

5.b EMP Incorporation into Detailed Project Design UKL-UPL Document for Sanggau and Sekadau SS

(18)

PT. PLN (PERSERO)

UNIT INDUK PEMBANGUNAN X

Jl. MT Haryono No. 384 Balikpapan Kalimantan Timur 76114

LOKASI:

KABUPATEN SANGGAU

PROPINSI KALIMANTAN BARAT

SANGGAU 2015

UPAYA PENGELOLAAN LINGKUNGAN HIDUP DAN

UPAYA PEMANTAUAN LINGKUNGAN HIDUP

PEMBANGUNAN SUTT 150 KV TAYAN - SANGGAU

GI TAYAN DAN GI SANGGAU

(19)

III

DAFTAR TABEL

NOMOR TEKS TABEL HAL

Tabel 1-1 Susunan Tim Studi UKL-UPL SUTT 150 kV Tayan-Sanggau 1-1

Tabel 2-1 Lokasi SUTT 150 kV Tayan - Sanggau, GI Tayan dan GI Sanggau

2-1

Tabel 2-2 Tipe Tower pada SUTT 150 kV Tayan - Sanggau, GI Tayan dan GI Sanggau

2-5

Tabel 2-3 Rekapitulasi Tower 150 kV Tayan - Sanggau 2-6

Tabel 2-4 Nilai Jarak Bebas Minimum Vertikal Tiap Obyek 2-10

Tabel 2-5 Jarak Bebas Minimum Horizontal Dari Sumbu Vertikal 2-10

Tabel 2-6 Jumlah Tenaga Kerja Yang diperlukan 2-23

Tabel 2-7 Jenis dan Tipe Peralatan Yang digunakan 2-25

Tabel 2-8 Jenis Peralatan dan Bahan Yang digunakan 2-26

Tabel 2-9 Curah Hujan di Wilayah Sekitar SUTT 150 kV Tayan - Sanggau

2-34

Tabel 2-10 Hasil Pengukuran Suhu Udara dan Kelembaban Udara di Wilayah Studi

2-34

Tabel 2-11 Hasil Pengukuran Kualitas Udara dan Kebisingan di Wilayah Studi

2-35

Tabel 2-12 Hasil Pengukuran Medan Magnet dan Medan Listrik di Wilayah Studi

2-36

Tabel 2-13 Ambang Batas Pajanan Medan Listrik dan Medan Magnet 50/60 Hz

2-36

Tabel 2-14 Ketinggian Lokasi Tower SUTT 150 kV Tayan - Sanggau 2-40

Tabel 2-15 Ringkasan Hasil Pemboran 2-48

Tabel 2-16 Ringkasan Nilai SPT pada masing-masing Titik Bor 2-49

(20)

IV

NOMOR TEKS TABEL HAL

Tabel 2-18 Kelas Tanah Berdasarkan Nilai Daya Dukung yang diizinkan

2-55

Tabel 2-19 Jumlah Kelas Tanah dan Jumlah Tipe Pondasi Tower Berdasarkan Sondir

2-55

Tabel 2-20 Ringkasan Hasil Uji Tanah 2-56

Tabel 2-21 Hasil Pengujian Kualitas Air Sungai di Areal Studi 2-61

Tabel 2-22 Hasil Pengujian Kualitas Air Tanah DI Areal Studi 2-62

Tabel 2-23 Wilayah Administrasi Lokasi SUTT 150 kV Tayan – Sanggau, GI Tayan dan GI Sanggau

2-65

Tabel 2-24 Penduduk Kabupaten Sanggau Berdasarkan Golongan Umur dan Jenis Kelamin

2-66

Tabel 2-25 Jumlah Penduduk Berdasarkan Jenis Kelamin, Sex Ratio, Jumlah Desa, dan Kepadatan di Kecamatan Studi

2-66

Tabel 2-26 Penduduk Berdasarkan Jenis Kelamin dan Ratio Kelamin Kecamatan Tayan Hilir Per Desa

2-67

Tabel 2-27 Penduduk di Kecamatan Tayan Hulu Berdasarkan Jenis Kelamin, Ratio, dan Kepadatan Per Desa

2-67

Tabel 2-28 Penduduk Kecamatan Tayan Hulu Berdasarkan Kelompok Umur

2-68

Tabel 2-29 Jumlah Pencari Pekerjaan Berdasarkan Bulan dan Jenis Kelamin

2-69

Tabel 2-30 Penduduk Berumur 15 Tahun Ke Atas Yang Bekerja Menurut Tingkat Pendidikan Yang ditamatkan di Kabupaten Sanggau

2-69

Tabel 2-31 Penduduk Berumur 15 Tahun Ke Atas Yang Bekerja Menurut Lapangan Usaha Utama di Kabupaten Sanggau

2-70

Tabel 2-32 Penduduk Berumur 15 Tahun Keatas Yang Bekerja Menurut Lapangan Usaha di Kecamatan Tayan Hulu

2-70

Tabel 2-33 Banyaknya Sarana Pendidikan di Kecamatan Studi 2-71

Tabel 2-34 Banyaknya Sarana Pendidikan di Kecamatan Tanya Hilir Menurut Desa

(21)

V

NOMOR TEKS TABEL HAL

Tabel 2-35 Banyaknya Sarana Pendidikan di Kecamatan Tayan Hulu 2-72

Tabel 2-36 Banyaknya Murid dan Guru di Kecamatan Studi 2-72

Tabel 2-37 Banyaknya Murid dan Guru di Kecamatan Tayan Hilir Tahun 2012

2-73

Tabel 2-38 Banyaknya Murid dan Guru di Kecamatan Tayan Hulu 2-73

Tabel 2-39 Banyaknya Sarana Ibadah di Kecamatan Tayan Hilir Berdasarkan Desa

2-74

Tabel 2-40 Banyaknya Sarana Kesehatan Pemerintah di Kecamatan Studi

2-75

Tabel 2-41 Banyaknya Sarana Kesehatan di Kecamatan Tayan Hilir 2-75

Tabel 2-42 Banyaknya Sarana Kesehatan di Kecamatan Tayan Hulu 2-75

Tabel 2-43 Banyaknya Tenaga Kesehatan di Kecamatan Studi 2-76

Tabel 2-44 Banyaknya Tenaga Medis di Kecamatan Tayan Hilir 2-76

Tabel 2-45 Banyaknya Tenaga Medis di Kecamatan Tayan Hulu 2-76

Tabel 2-46 10 Penyakit Terbanyak Kabupaten Sanggau 2-77

Tabel 3-1 Matriks Dampak Lingkungan Hidup Akibat Kegiatan Pembangunan SUTT 150 kV Tayan - Sanggau, GI Tayan dan GI Sanggau

3-3

Tabel 3-2 Matriks UKL-UPL Kegiatan Pembangunan SUTT 150 kV Tayan - Sanggau, GI Tayan dan GI Sanggau

(22)
(23)
(24)

APPENDIX 6

(25)

6.a EHS Awareness

(26)
(27)
(28)

6.b Secondary Containment

(29)

6.c Waste Management

(30)
(31)

Dokumen ini tidak dapat digandakan tanpa izin tertulis dari WMK3

PROSEDUR

PENGELOLAAN LIMBAH PADAT

NO. DOKUMEN

: SMK3/UP3B/M/13

EDISI

: 00

REVISI

: 03

TANGGAL

: 3 J uni 2019

PT. PLN (PERSERO)

UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN

SISTEM KALIMANTAN BARAT

(32)

6.d Natural vegetation Regrowth

(33)

6.e Vegetation Growth in Drainage System

(34)

6.f Temporary Drainage Channel

The length had been added to the temporary drainage channel and sediment trap towards southeast of the Sanggau SS

(35)

6.g Sediment Trap

(36)
(37)

GI Sekadau

Analisa lereng galian untuk pembuatan elevasi datar Gardu induk Sekadau

Diketahui GI sekadau dibangun di areal berbukit sehingga dibutuhkan cut & fill untuk membuat lahan datar Switch yard dan gedung kontrol

(38)

Data tanah :

(39)

Hasil perhitungan nya

(40)

6.i Preventing Land Slide

The use of turap in T.208 Lape Village, Package 6

(41)

6.j PT Krakatau Engineering provide a SOP related to Soil Stockpiles and Rehabilitation Activities

(42)
(43)

6.k Mapping Study of Forestry Function areas towards the Location of 150 kV Tayan – Sanggau Transmission Line

(44)
(45)

6.l SOP on the use of Tripod System provided by PT Krakatau Engineering

(46)
(47)
(48)
(49)

Referensi

Dokumen terkait

(RCCP) for the 150 kV Bengkayang – Ngabang - Tayang Transmission Line route. Total number of towers of the 150 kV Bengkayang-Ngabang-Tayang transmission line was 393 at that

dalam basis set dan upper bound dari jumlah test untuk memastikan bahwa setiap statement. dieksekusi paling tidak

Tidak bisa memindahkan hasil dan menarik kesimpulan untuk memecahkan masalah yang lain. Begitu mudah menjual kepada manager, bisa terjadi solusi

Diagram konteks dibuat untuk menggambarkan sumber serta tujuan data yang akan di proses atau dengan kata lain diagram tersebut digunakan untuk menggambarkan

Perbedaan hasil penelitian ini dengan hipotesis yang dikemukakan mendorong timbulnya pemikiran bahwa tidak terdapatnya perbedaan kadar IgE total pada penderita

Penelitian ini merupakan penelitian kuantitatif yang dilakukan untuk mengetahui apakah ada hubungan antara persepsi dukungan organisasi dan budaya organisasi dengan

Suplemen makanan dalam negeri adalah suplemen makanan yang dibuat dan dikemas oleh industri di dalam negeri meliputi suplemen makanan tanpa lisensi, suplemen makanan

Dengan kemajuan teknologi informasi dan komunikasi, terkhusus pada pembelajaran yang bukan ahli menyebabkan katinggalan teknologi, sehingga para dosen berpikir proses belajar