• Tidak ada hasil yang ditemukan

Contoh laporan bisnis business proposal

N/A
N/A
Protected

Academic year: 2018

Membagikan "Contoh laporan bisnis business proposal"

Copied!
34
0
0

Teks penuh

(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)

Lampiran

Biaya Investasi Awal

Alternatif 1

Alternatif 2

Nama Peralatan

Jumlah

Harga Total

Bak Intermediet

2

112,000,000.00

Bak Penampungan Air Limbah

1

56,000,000.00

Bak Screen

1

15,000,000.00

Bak Koagulasi-Flokulasi

1

7,200,000.00

Bak Sedimentasi 1

2

56,800,000.00

Bak ekualisasi

1

56,000,000.00

Menara Pendingin

1

112,000,000.00

Kolam Aerasi

3

1,498,437,500.00

Bak Sedimentasi 2

1

168,750,000.00

Bak Koagulasi-Flokulasi 2

1

12,000,000.00

Bak Sedimentasi 3

1

75,000,000.00

Kolam Ikan

1

10,812,500.00

2,180,000,000.00

Tangki Bahan kimia 1

1

10,000,000.00

Tangki Bahan kimia 2

1

10,000,000.00

Tangki Bahan kimia 3

1

25,000,000.00

Tangki Bahan kimia 4

1

25,000,000.00

70,000,000.00

Pompa influen

3

20,000,000.00

Pompa feed chem. Treatment

2

20,000,000.00

Pompa Dosing kimia

4

10,000,000.00

Pompa Bak Cuci Unit

2

20,000,000.00

Pompa feed bio.treatment

1

20,000,000.00

Pompa Transfer air olahan

2

20,000,000.00

Agitator

3

10,000,000.00

Compresor

4

10,000,000.00

Blower

4

10,000,000.00

Belt press

1

60,000,000.00

200,000,000.00

Tenaga Kerja

50,000,000.00

Total Biaya Investasi Awal

2,500,000,000.00

Nama Peralatan

Jumlah

Harga Total

Bak Intermediet

2

112,000,000.00

Bak Penampungan Air Limbah

1

56,000,000.00

Bak Screen

1

15,000,000.00

Bak Koagulasi-Flokulasi

1

7,200,000.00

Bak Sedimentasi 1

2

56,800,000.00

Bak ekualisasi

1

56,000,000.00

Menara Pendingin

1

112,000,000.00

Kolam Aerasi

3

1,498,437,500.00

Bak Sedimentasi 2

1

168,750,000.00

Bak Koagulasi-Flokulasi 2

1

12,000,000.00

Bak Sedimentasi 3

1

75,000,000.00

Kolam Ikan

1

10,812,500.00

2,180,000,000.00

Tangki Bahan kimia 1

1

10,000,000.00

Tangki Bahan kimia 2

1

10,000,000.00

Tangki Bahan kimia 3

1

25,000,000.00

Tangki Bahan kimia 4

1

25,000,000.00

Tangki Filtrasi

2

140,000,000.00

210,000,000.00

Pompa influen

3

20,000,000.00

Pompa feed chem. Treatment

2

20,000,000.00

Pompa Dosing kimia

4

10,000,000.00

Pompa Bak Cuci Unit

2

20,000,000.00

Pompa feed bio.treatment

1

20,000,000.00

Pompa Transfer air olahan

2

20,000,000.00

Agitator

3

10,000,000.00

Compresor

4

10,000,000.00

Blower

4

10,000,000.00

Belt press

1

60,000,000.00

Media Biofilter

100

30,000,000.00

230,000,000.00

(17)

Balance Sheet

Unit Pengolahan

2,180,000,000.00

Pinjaman Awal

1,500,000,000.00

Tangki Bahan Kimia

70,000,000.00

Treatment Equipment

200,000,000.00

Tenaga Kerja

50,000,000.00

Modal Kerja

400,000,000.00

Owner Equity

1,400,000,000.00

Total Asset

2,900,000,000.00

Total

2,900,000,000.00

Alternatif 1

Passiva/Hutang

Asset

Balance Sheet

Aset = Liabilities + Equity

Asset

Liabillities

Unit Pengolahan

2,180,000,000.00

Pinjaman Awal

1,670,000,000.00

Tangki Bahan Kimia

210,000,000.00

Treatment Equipment

230,000,000.00

Tenaga Kerja

50,000,000.00

Modal Kerja

400,000,000.00

Owner Equity

1,400,000,000.00

Total Asset

3,070,000,000.00

Total

3,070,000,000.00

(18)

Total Margin Contribution

Biaya Listrik Rp/Hari

182,880.00

Debit Air yang sudah diolah

Bulan ke-2 (m3/Hari)

1800

Bahan Kimia Rp/Hari

8,295,000.00

Total Variabel Cost

(Rp/Hari)

8,477,880.00

Total Debit air bersih

(m3/Hari)

1800

Variabel Cost per 1 m3

air bersih (Rp)

4709.9

Harga Jual air (Rp/ m3 )

12000

TMC

7290.1

0.6075

60.72%

Margin Contribution Alternatif I

TMC = TR - TVC

Variabel Cost

Revenue

Rasio

Biaya Listrik Rp/Hari

224,880.00

Debit Air yang sudah diolah

Bulan ke-2 (m3/Hari)

2800

Bahan Kimia Rp/Hari

9,677,500.00

Total Variabel Cost

(Rp/Hari)

9,902,380.00

Total Debit air bersih

(m3/Hari)

2800

Variabel Cost per 1 m3

air bersih (Rp)

3536.6

Harga Jual air (Rp/ m3 )

12000

TMC

8463.4

0.7053

70.53%

Margin Contribution Alternatif II

TMC = TR - TVC

Variabel Cost

Revenue

(19)

Cost Accounting

Alternatif 1

Fixed Cost

Kegiatan

Kebutuhan

air/m3/hari

Harga satuan air/m3

Biaya Air/hari

Biaya Total/Bulan

; 30 Hari

Cuci Unit

70

12,000.00

840,000.00

Produksi

20

12,000.00

240,000.00

Jumlah Kebutuhan air/hari

90

1,080,000.00

32,400,000.00

Tenaga Kerja

Jumlah

Gaji/bulan

Sub total

Operator Lapangan

3

2,500,000.00

7,500,000.00

Manager IPAL

1

5,000,000.00

5,000,000.00

Jumlah Total (Rp./bulan)

12,500,000.00

3,600,000.00

Total Fixed Cost

48,500,000.00

Fixed Cost Alternatif 1

Asumsi Biaya Perawatan Peralatan

Rp.120000/hari

Kebutuhan Cuci Unit dan Proses Produksi

(20)

Variabel Cost

1.

Kebutuhan Bahan Kimia

Jenis Bahan Kimia Dosis untuk 1 m3/Hari Harga satuan

(RP/ppm) Dosis (ppm) Sub total (Rp/hari) Dosis (ppm) Sub total Dosis (ppm) Sub total

Zeta ace C-504 16 147.5 48000 7,080,000.00 51600 7,611,000.00 49600 7,316,000.00 Kuriflok PA-322 0.4 800 1200 960,000.00 1290 1,032,000.00 1240 992,000.00 Kaporit 0.2 425 600 255,000.00 645 274,125.00 620 263,500.00

Harga Total Per hari (Rp/Hari)

8,295,000.00

8,917,125.00 8,571,500.00

Harga Total Per Bulan (Rp/Bulan) 248,850,000.00 267,513,750.00 257,145,000.00 Bulan ke-4

Kebutuhan Bahan Kimia Bulan ke-2 Bulan ke-3

Dosis (ppm) Sub total Dosis (ppm) Sub total Dosis (ppm) Sub total

53600 7906000 48000 7,080,000.00 48800 7,198,000.00 1340 1,072,000.00 1200 960,000.00 1220 976,000.00 670 284,750.00 600 255,000.00 610 259,250.00

9,262,750.00

8,295,000.00 8,433,250.00

277,882,500.00

248,850,000.00 252,997,500.00 Bulan ke-5 Bulan ke-6 Bulan ke-7

Dosis (ppm) Sub total Dosis (ppm) Sub total Dosis (ppm) Sub total

55280 8,153,800.00 56000 8,260,000.00 51600 7,611,000.00 1382 1,105,600.00 1400 1,120,000.00 1290 1,032,000.00 691 293,675.00 700 297,500.00 645 274,125.00

9,553,075.00

9,677,500.00 8,917,125.00

286,592,250.00

290,325,000.00 267,513,750.00 Bulan ke-8 Bulan ke-9 Bulan ke-10

Dosis (ppm) Sub total Dosis (ppm) Sub total Dosis (ppm) Sub total

48000 7,080,000.00 48800 7,198,000.00 49600 7,316,000.00 1200 960,000.00 1220 976,000.00 1240 992,000.00 600 255,000.00 610 259,250.00 620 263,500.00

8,295,000.00

8,433,250.00 8,571,500.00

248,850,000.00

252,997,500.00 257,145,000.00 Bulan ke-13

(21)

2.

Kebutuhan Listrik

Jenis Kebutuhan

Harga Listrik (Rp/Kwh)

Kebutuhan

Power(Kwh) Sub total (Rp/Hari) Kwh Subtotal Kwh Subtotal Kwh Subtotal Kwh Subtotal P.Bak Cuci Unit 1200 28.8 34,560.00 31.05 37,260.00 29.8 35,760.00 32.3 38,760.00 28.8 34,560.00

P.Feed Chemical Treatment 1200 18 21,600.00 20.25 24,300.00 19 22,800.00 21.5 25,800.00 18 21,600.00 P.Dosing Kimia 1200 12 14,400.00 14.25 17,100.00 13 15,600.00 15.5 18,600.00 12 14,400.00 Agitator 1200 18 21,600.00 20.25 24,300.00 19 22,800.00 21.5 25,800.00 18 21,600.00 P.Feed Biologi Treatment 1200 28.8 34,560.00 31.05 37,260.00 29.8 35,760.00 32.3 38,760.00 28.8 34,560.00 Blower Udara 1200 28.8 34,560.00 31.05 37,260.00 29.8 35,760.00 32.3 38,760.00 28.8 34,560.00 P. Transfer air Olahan 1200 18 21,600.00 20.25 24,300.00 19 22,800.00 21.5 25,800.00 18 21,600.00 Jumlah Kebutuhan Listrik/hari 182,880.00 168.15 201,780.00 159.4 191,280.00 176.9 212,280.00 152.4 182,880.00 Jumlah Kebutuhan Listrik/30 hari 5,486,400.00 6,053,400.00 5,738,400.00 6,368,400.00 5,486,400.00

Debit Bulan ke-3 = 3225 m3/hari Debit Bulan ke-2= 3000 m3/hari

Kebutuhan Listrik per Hari Debit Bulan ke-4 = 3100 m3/hari Debit Bulan ke-5 = 3350 m3/hari Debit Bulan ke-6= 3000 m3/hari

Kwh Subtotal Kwh Subtotal Kwh Subtotal Kwh Subtotal Kwh Subtotal Kwh Subtotal Kwh Subtotal

29.3 35,160.00 33.35 40,020.00 33.8 40,560.00 31.05 37,260.00 28.8 34,560.00 29.3 35,160.00 29.8 35,760.00

18.5 22,200.00 22.55 27,060.00 23 27,600.00 20.25 24,300.00 18 21,600.00 18.5 22,200.00 19 22,800.00 12.5 15,000.00 16.55 19,860.00 17 20,400.00 14.25 17,100.00 12 14,400.00 12.5 15,000.00 13 15,600.00 18.5 22,200.00 22.55 27,060.00 23 27,600.00 20.25 24,300.00 18 21,600.00 18.5 22,200.00 19 22,800.00 29.3 35,160.00 33.35 40,020.00 33.8 40,560.00 31.05 37,260.00 28.8 34,560.00 29.3 35,160.00 29.8 35,760.00 29.3 35,160.00 33.35 40,020.00 33.8 40,560.00 31.05 37,260.00 28.8 34,560.00 29.3 35,160.00 29.8 35,760.00 18.5 22,200.00 22.55 27,060.00 23 27,600.00 20.25 24,300.00 18 21,600.00 18.5 22,200.00 19 22,800.00 155.9 187,080.00 184.25 221,100.00 187.4 224,880.00 168.15 201,780.00 152.4 182,880.00 155.9 187,080.00 159.4 191,280.00

5,612,400.00

6,633,000.00 6,746,400.00 6,053,400.00 5,486,400.00 5,612,400.00 5,738,400.00

Debit Bulan ke-13 = 3100 m3/hari Debit Bulan ke-12 = 3050 m3/hari

Debit Bulan ke-11 = 3000 m3/hari Debit Bulan ke-10 = 3225 m3/hari

Debit Bulan ke-9= 3500 m3/s Debit Bulan ke-8 = 3455 m3/hari

(22)

Income

Kebutuhan Air hasil Olahan Yang dapat

di Reuse Harga jual air/m3

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Air Pengolahan Yang dapat di Reuse diasumsikan 60% dari debit air limbah

yang masuk

12000 1800 21600000 1935 23,220,000.00 1860 22,320,000.00 2010 24,120,000.00 1800 21,600,000.00

Total Per Bulan 648000000 696,600,000.00 669,600,000.00 723,600,000.00 648,000,000.00

Bulan 2 Bulan ke-3 Bulan ke-4 Bulan ke-5 Bulan ke-6

Rata-rata Debit Air yang direuse m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata Debit Air yang direuse

m3/hari

Subtotal (Rp/hari)

1830 21,960,000.00 2073 24,876,000.00 2100 25,200,000.00 1935 23,220,000.00 1800 21,600,000.00 1830 21,960,000.00 1860 22,320,000.00

658,800,000.00

746,280,000.00 756,000,000.00 696,600,000.00 648,000,000.00 658,800,000.00 669,600,000.00 Bulan ke-7 Bulan ke-8 Bulan ke-9 Bulan ke-10 Bulan ke-11 Bulan ke-12 Bulan ke-13

Bulan 1

Bulan 2

Bulan 3

Bulan 4

Bulan 5

Bulan 6

Air yang diolah (m3/hari)

-

3,000.00

3,225.00 3,100.00 3,350.00 3,000.00

Air yang dapat direuse

-

1,800.00

1,935.00

1,860.00

2,010.00

1,800.00

Harga beli / m3

12,000.00

12,000.00

12,000.00

12,000.00

12,000.00

12,000.00

Pendapatan per hari

-

21,600,000.00

23,220,000.00

22,320,000.00

24,120,000.00

21,600,000.00

Total Pendapatan per bulan

-

648,000,000.00

696,600,000.00

669,600,000.00

723,600,000.00

648,000,000.00

Bulan 7

Bulan 8

Bulan 9

Bulan 10

Bulan 11

Bulan 12

Bulan 13

3,050.00 3,455.00 3,500.00 3,225.00 3,000.00 3,050.00

3100

1,830.00

2,073.00

2,100.00

1,935.00

1,800.00

1,830.00

1860

12,000.00

12,000.00

12,000.00

12,000.00

12,000.00

12,000.00

12,000.00

21,960,000.00

24,876,000.00

25,200,000.00

23,220,000.00

21,600,000.00

21,960,000.00

22,320,000.00

658,800,000.00

(23)

Alternatif 2

Fixed Cost

Kegiatan

Kebutuhan

air/m3/hari

Harga satuan air/m3

Biaya Air/hari

Biaya

Total/Bulan ; 30

Hari

Cuci Unit

200.00

12,000.00

2,400,000.00

Produksi

20.00

12,000.00

240,000.00

Jumlah Kebutuhan air/hari

90.00

2,640,000.00

79,200,000.00

Tenaga Kerja

Jumlah

Gaji/bulan

Sub total

Operator Lapangan

3

2,500,000.00

7,500,000.00

Manager IPAL

1

5,000,000.00

5,000,000.00

Jumlah Total (Rp./bulan)

12,500,000.00

4,500,000.00

Total Fixed Cost

96,200,000.00

Fixed Cost Alternatif 2

Kebutuhan Cuci Unit dan Proses Produksi

Kebutuhan Tenaga Kerja

(24)

Variable Cost

1.

Kebutuhan Bahan Kimia

Dosis

(ppm)

Sub total

(Rp/hari)

Dosis

(ppm)

Sub total

Dosis

(ppm)

Sub total

Dosis

(ppm)

Sub total

400

48000

7080000

51600

7611000

49600

7316000

10

1200

960000

1290

1032000

1240

992000

5

600

255000

645

274125

620

263500

0

8295000

8917125

8571500

248,850,000.00

267,513,750.00

257,145,000.00

Bulan ke-4

Bulan ke-2

Bulan ke-3

Dosis

(ppm) Sub total

Dosis

(ppm) Sub total

Dosis

(ppm) Sub total

53600 7906000 48000 7080000 48800 7198000

1340 1072000 1200 960000 1220 976000

670 284750 600 255000 610 259250

9262750 8295000 8433250

277,882,500.00

248,850,000.00

Bulan ke-5 Bulan ke-6 Bulan ke-7

Dosis

(ppm) Sub total

Dosis

(ppm) Sub total

Dosis

(ppm) Sub total

55280 8153800 56000 8260000 51600 7611000

1382 1105600 1400 1120000 1290 1032000

691 293675 700 297500 645 274125

9553075 9677500 8917125

286,592,250.00

290,325,000.00 267,513,750.00

Bulan ke-8 Bulan ke-9 Bulan ke-10

Dosis

(ppm)

Sub total

Dosis

(ppm)

Sub total

Dosis

(ppm)

Sub total

48000

7080000

48800

7198000

49600

7316000

1200

960000

1220

976000

1240

992000

600

255000

610

259250

620

263500

8295000

8433250

8571500

248,850,000.00

252,997,500.00

257,145,000.00

Bulan ke-13

(25)

2.

Kebutuhan Listrik

Jenis Kebutuhan

Kebutuh

an

Power(K

wh)

Harga

Listrik

(Rp/Kwh)

Sub total

(Rp/Hari)

Kwh

Subtotal

Kwh

Subtotal

Kwh

Subtotal

P.Bak Cuci Unit

28.8

1200

28.8

34560

31.05

37260

29.8

35760

P.Feed Chemical Treatme

18

1200

18

21600

20.25

24300

19

22800

P.Dosing Kimia

12

1200

12

14400

14.25

17100

13

15600

Agitator

18

1200

18

21600

20.25

24300

19

22800

P.Feed Biologi Treatme28.8

1200

28.8

34560

31.05

37260

29.8

35760

Blower Udara

28.8

1200

28.8

34560

31.05

37260

29.8

35760

P. Transfer air Olahan

18

1200

18

21600

20.25

24300

19

22800

Jumlah Kebutuhan Listrik/hari

0

152.4

182880

168.15

201780

159.4

191280

Jumlah Kebutuhan Listrik/30 hari

0

5486400

6053400

5738400

Kebutuhan Listrik per Hari (debit = 3000) Bulan ke-1

Debit Bulan ke-2= 3000 m3/hari

Debit Bulan ke-3 = 3225 m3/hari

Debit Bulan ke-4 = 3100 m3/hari

Kwh Subtotal Kwh Subtotal Kwh Subtotal

32.3 38760 28.8 34560 29.3 35160

21.5 25800 18 21600 18.5 22200

15.5 18600 12 14400 12.5 15000

21.5 25800 18 21600 18.5 22200

32.3 38760 28.8 34560 29.3 35160

32.3 38760 28.8 34560 29.3 35160

21.5 25800 18 21600 18.5 22200

176.9 212280 152.4 182880 155.9 187080

6368400 5486400 5612400

Debit Bulan ke-6= 3000 m3/hari

Debit Bulan ke-5 = 3350 m3/hari Debit Bulan ke-7 = 3050 m3/hari

Kwh Subtotal Kwh Subtotal Kwh Subtotal

33.35 40020 33.8 40560 31.05 37260

22.55 27060 23 27600 20.25 24300

16.55 19860 17 20400 14.25 17100

22.55 27060 23 27600 20.25 24300

33.35 40020 33.8 40560 31.05 37260

33.35 40020 33.8 40560 31.05 37260

22.55 27060 23 27600 20.25 24300

184.25 221100 187.4 224880 168.15 201780

6633000 6746400 6053400

Debit Bulan ke-9= 3500 m3/s

Debit Bulan ke-8 = 3455 m3/hari Debit Bulan ke-10 = 3225 m3/hari

Kwh

Subtotal

Kwh

Subtotal

Kwh

Subtotal

28.8

34560

29.3

35160

29.8

35760

18

21600

18.5

22200

19

22800

12

14400

12.5

15000

13

15600

18

21600

18.5

22200

19

22800

28.8

34560

29.3

35160

29.8

35760

28.8

34560

29.3

35160

29.8

35760

18

21600

18.5

22200

19

22800

152.4

182880

155.9

187080

159.4

191280

5486400

5612400

5738400

(26)

Income

Kebutuhan Air

hasil Olahan Yang

dapat di Reuse

Harga

jual

air/m3

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal

(Rp/hari)

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal (Rp/hari)

Air Pengolahan

Yang dapat di

Reuse diasumsikan

80% dari debit air

limbah yang masuk

12000

0

0

2400

28800000

2580

30960000

2480

29760000

Total Per Bulan

0

864000000

928800000

892800000

Bulan 1

Bulan 2

Bulan 3

Bulan 4

Rata-rata Debit Air yang direuse m3/hari Subtotal (Rp/hari) Rata-rata Debit Air yang direuse m3/hari Subtotal (Rp/hari) Rata-rata Debit Air yang direuse m3/hari Subtotal (Rp/hari)

2680 32160000 2400 28800000 2440 29280000

964800000 864000000 878400000

Bulan 6 Bulan 7

Bulan 5 Rata-rata Debit Air yang direuse m3/hari Subtotal (Rp/hari) Rata-rata Debit Air yang direuse m3/hari Subtotal (Rp/hari) Rata-rata Debit Air yang direuse m3/hari Subtotal (Rp/hari)

2764 33168000 2800 33600000 2580 30960000

995040000 1008000000 928800000

Bulan 8 Bulan 9 Bulan 10

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal (Rp/hari)

Rata-rata

Debit Air

yang

direuse

m3/hari

Subtotal (Rp/hari)

2400

28800000

2440

29280000

2480

29760000

864000000

878400000

892800000

(27)

Cash Flow

Alternatif 1

Bulan 1

Bulan 2

Bulan 3

Bulan 4

Bulan 5

Bulan 6

CASH OUT

-2,500,000,000.00

-2,939,086,400.00

-2,749,403,550.00

-2,500,436,950.00

-2,299,837,850.00

-2,015,324,250.00

Investasi Awal

2,500,000,000.00

-Unit Pengolahan

2,180,000,000.00

-

-Tangki Bahan Kimia

70,000,000.00

-

-Treatment Equipment

200,000,000.00

-

-Tenaga Kerja

50,000,000.00

-

-Fixed Cost

-

184,750,000.00

184,750,000.00

184,750,000.00

184,750,000.00

184,750,000.00

Kebutuhan Cuci Alat

-

32,400,000.00

32,400,000.00

32,400,000.00

32,400,000.00

32,400,000.00

Kebutuhan Tenaga Kerja

-

12,500,000.00

12,500,000.00

12,500,000.00

12,500,000.00

12,500,000.00

Biaya Perawatan Peralatan

-

3,600,000.00

3,600,000.00

3,600,000.00

3,600,000.00

3,600,000.00

Biaya Cicilan

136,250,000.00

136,250,000.00

136,250,000.00

136,250,000.00

136,250,000.00

Variabel Cost

-

254,336,400.00

273,567,150.00

262,883,400.00

284,250,900.00

254,336,400.00

Kebutuhan Bahan Kimia

-

248,850,000.00

267,513,750.00

257,145,000.00

277,882,500.00

248,850,000.00

Kebutuhan Listrik

-

5,486,400.00

6,053,400.00

5,738,400.00

6,368,400.00

5,486,400.00

CASH IN

-Penjualan Air bersih

-

648,000,000.00

696,600,000.00

669,600,000.00

723,600,000.00

648,000,000.00

(28)

Bulan 7

Bulan 8

Bulan 9

Bulan 10

Bulan 11

Bulan 12

Bulan 13

-1,555,674,250.00

-1,374,849,500.00 -1,110,390,900.00

-812,708,050.00

-555,194,450.00

-350,554,350.00

-139,387,751.00

184,750,000.00

184,750,000.00

184,750,000.00

184,750,000.00

184,750,000.00

184,750,000.00

184,750,001.00

32,400,000.00

32,400,000.00

32,400,000.00

32,400,000.00

32,400,000.00

32,400,000.00

32,400,000.00

12,500,000.00

12,500,000.00

12,500,000.00

12,500,000.00

12,500,000.00

12,500,000.00

12,500,000.00

3,600,000.00

3,600,000.00

3,600,000.00

3,600,000.00

3,600,000.00

3,600,000.00

3,600,000.00

136,250,000.00

136,250,000.00

136,250,000.00

136,250,000.00

136,250,000.00

136,250,000.00

136,250,001.00

258,609,900.00

293,225,250.00

297,071,400.00

273,567,150.00

254,336,400.00

258,609,900.00

262,883,400.00

252,997,500.00

286,592,250.00

290,325,000.00

267,513,750.00

248,850,000.00

252,997,500.00

257,145,000.00

5,612,400.00

6,633,000.00

6,746,400.00

6,053,400.00

5,486,400.00

5,612,400.00

5,738,400.00

658,800,000.00

746,280,000.00

756,000,000.00

696,600,000.00

648,000,000.00

658,800,000.00

669,600,000.00

(29)

Alternatif 2

Bulan 1

Bulan 2

Bulan 3

Bulan 4

Bulan 5

Bulan 6

CASH OUT

(2,670,000,000.00)

(3,172,228,066.67)

(2,829,686,883.33)

(2,411,661,950.00)

(2,051,004,516.67)

(1,588,432,583.33)

Investasi Awal

2,670,000,000.00

Unit Pengolahan

2,180,000,000.00

Tangki Bahan Kimia

210,000,000.00

Treatment Equipment

230,000,000.00

Tenaga Kerja

50,000,000.00

Fixed Cost

247,891,666.67

247,891,666.67

247,891,666.67

247,891,666.67

247,891,666.67

Kebutuhan Cuci Alat

79,200,000.00

79,200,000.00

79,200,000.00

79,200,000.00

79,200,000.00

Kebutuhan Tenaga Kerja

12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00

Biaya Perawatan Peralatan

4,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

Biaya Cicilan

151,691,666.67

151,691,666.67

151,691,666.67

151,691,666.67

151,691,666.67

Variabel Cost

254,336,400.00

273,567,150.00

262,883,400.00

284,250,900.00

254,336,400.00

Kebutuhan Bahan Kimia

248,850,000.00

267,513,750.00

257,145,000.00

277,882,500.00

248,850,000.00

Kebutuhan Listrik

5,486,400.00

6,053,400.00

5,738,400.00

6,368,400.00

5,486,400.00

CASH IN

Penjualan Air bersih

864,000,000.00

928,800,000.00 892,800,000.00 964,800,000.00 864,000,000.00

(30)

Bulan 7

Bulan 8

Bulan 9

Bulan 10

Bulan 11

Bulan 12

Bulan 13

(1,230,934,150.00)

(893,651,066.67)

(443,574,133.33)

42,967,050.00

469,538,983.33

827,037,416.67

1,194,662,350.00

247,891,666.67

247,891,666.67

247,891,666.67

247,891,666.67

247,891,666.67

247,891,666.67

247,891,666.67

79,200,000.00

79,200,000.00

79,200,000.00

79,200,000.00

79,200,000.00

79,200,000.00

79,200,000.00

12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

4,500,000.00

151,691,666.67

151,691,666.67

151,691,666.67

151,691,666.67

151,691,666.67

151,691,666.67

151,691,666.67

258,609,900.00

293,225,250.00

297,071,400.00

273,567,150.00

254,336,400.00

258,609,900.00

262,883,400.00

252,997,500.00

286,592,250.00

290,325,000.00

267,513,750.00

248,850,000.00

252,997,500.00

257,145,000.00

5,612,400.00

6,633,000.00

6,746,400.00

6,053,400.00

5,486,400.00

5,612,400.00

5,738,400.00

878,400,000.00 995,040,000.00 1,008,000,000.00 928,800,000.00 864,000,000.00 878,400,000.00 892,800,000.00

(352,534,150.00)

(31)

Break Even Point

Alternatif 1

Revenue

Variabel Cost

Total Fixed Cost

Total Cost

1 2 3 4 5 6 7 8 9 10 11 12 13

Air yang diolah (m3/hari) - 3000 3225 3100 3350 3000 3050 3455 3500 3225 3000 3050 3100

Air yang dapat direuse - 1800 1935 1860 2010 1800 1830 2073 2100 1935 1800 1830 1860

Harga beli / m3 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Pendapatan per hari 0.00 21,600,000.00 23,220,000.00 22,320,000.00 24,120,000.00 21,600,000.00 21,960,000.00 24,876,000.00 25,200,000.00 23,220,000.00 21,600,000.00 21,960,000.00 22,320,000.00

Total Revenue per bulan 0.00 648,000,000.00 696,600,000.00 669,600,000.00 723,600,000.00 648,000,000.00 658,800,000.00 746,280,000.00 756,000,000.00 696,600,000.00 648,000,000.00 658,800,000.00 669,600,000.00

Akumulasi Revenue - 648,000,000.00 1,344,600,000.00 2,014,200,000.00 2,737,800,000.00 3,385,800,000.00 4,044,600,000.00 4,790,880,000.00 5,546,880,000.00 6,243,480,000.00 6,891,480,000.00 7,550,280,000.00 8,219,880,000.00

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Kebutuhan Bahan Kimia - 248,850,000.00 267,513,750.00 257,145,000.00 277,882,500.00 248,850,000.00 252,997,500.00 286,592,250.00 290,325,000.00 267,513,750.00 248,850,000.00 252,997,500.00 257,145,000.00

Kebutuhan Listrik - 5,486,400.00 6,053,400.00 5,738,400.00 6,368,400.00 5,486,400.00 5,612,400.00 6,633,000.00 6,746,400.00 6,053,400.00 5,486,400.00 5,612,400.00 5,738,400.00

Total Variabel cost 254,336,400.00 273,567,150.00 262,883,400.00 284,250,900.00 254,336,400.00 258,609,900.00 293,225,250.00 297,071,400.00 273,567,150.00 254,336,400.00 258,609,900.00 262,883,400.00

Akumulasi Variabel Cost 254,336,400.00 527,903,550.00 790,786,950.00 1,075,037,850.00 1,329,374,250.00 1,587,984,150.00 1,881,209,400.00 2,178,280,800.00 2,451,847,950.00 2,706,184,350.00 2,964,794,250.00 3,227,677,650.00

Bulan 1 Bulan 2 Bulan 3 ` Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Investasi Awal

Unit Pengolahan 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 Tangki Bahan Kimia 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 70,000,000.00 Treatment Equipment 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 200,000,000.00 Tenaga Kerja 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00

Fixed Cost

Kebutuhan Cuci Alat 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 32,400,000.00 Kebutuhan Tenaga Kerja 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 Biaya Perawatan Peralatan 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 3,600,000.00 Biaya Cicilan 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00 136,250,000.00

Total Fixed Cost 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Total Fixed Cost 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00 2,684,750,000.00

Total Akumulasi Variabel Cost 254,336,400.00 527,903,550.00 790,786,950.00 1,075,037,850.00 1,329,374,250.00 1,587,984,150.00 1,881,209,400.00 2,178,280,800.00 2,451,847,950.00 2,706,184,350.00 2,964,794,250.00 3,227,677,650.00

(32)

Alternatif 2

Revenue

Variabel Cost

Total Fixed Cost

Total Cost

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Air yang diolah (m3/hari) - 3000 3225 3100 3350 3000 3050 3455 3500 3225 3000 3050 3100

Air yang dapat direuse 2400 2580 2480 2680 2400 2440 2764 2800 2580 2400 2440 2480

Harga beli / m3 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Pendapatan per hari 28,800,000.00 30,960,000.00 29,760,000.00 32,160,000.00 28,800,000.00 29,280,000.00 33,168,000.00 33,600,000.00 30,960,000.00 28,800,000.00 29,280,000.00 29,760,000.00

Total Revenue per bulan 0 864,000,000.00 928,800,000.00 892,800,000.00 964,800,000.00 864,000,000.00 878,400,000.00 995,040,000.00 1,008,000,000.00 928,800,000.00 864,000,000.00 878,400,000.00 892,800,000.00

Akumulasi Revenue 0 864,000,000.00 1,792,800,000.00 2,685,600,000.00 3,650,400,000.00 4,514,400,000.00 5,392,800,000.00 6,387,840,000.00 7,395,840,000.00 8,324,640,000.00 9,188,640,000.00 10,067,040,000.00 10,959,840,000.00

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Kebutuhan Bahan Kimia 248,850,000.00 267,513,750.00 257,145,000.00 277,882,500.00 248,850,000.00 252,997,500.00 286,592,250.00 290,325,000.00 267,513,750.00 248,850,000.00 252,997,500.00 257,145,000.00

Kebutuhan Listrik 5,486,400.00 6,053,400.00 5,738,400.00 6,368,400.00 5,486,400.00 5,612,400.00 6,633,000.00 6,746,400.00 6,053,400.00 5,486,400.00 5,612,400.00 5,738,400.00

Total Variabel cost 254,336,400.00 273,567,150.00 262,883,400.00 284,250,900.00 254,336,400.00 258,609,900.00 293,225,250.00 297,071,400.00 273,567,150.00 254,336,400.00 258,609,900.00 262,883,400.00

Akumulasi Variabel Cost 254,336,400.00 527,903,550.00 790,786,950.00 1,075,037,850.00 1,329,374,250.00 1,587,984,150.00 1,881,209,400.00 2,178,280,800.00 2,451,847,950.00 2,706,184,350.00 2,964,794,250.00 3,227,677,650.00

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Investasi Awal 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 2,670,000,000.00 Unit Pengolahan 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 2,180,000,000.00 Tangki Bahan Kimia 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 210,000,000.00 Treatment Equipment 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 230,000,000.00 Tenaga Kerja 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00 50,000,000.00

Fixed Cost

Kebutuhan Cuci Alat 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 79,200,000.00 Kebutuhan Tenaga Kerja 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 12,500,000.00 Biaya Perawatan Peralatan 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 4,500,000.00 Biaya Cicilan 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67 151,691,666.67

Total Fixed Cost 2,766,200,000.00 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11 Bulan 12 Bulan 13 Total Fixed Cost 2,766,200,000.00 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67 2,917,891,666.67

Total Akumulasi Variabel Cost - 254,336,400.00 527,903,550.00 790,786,950.00 1,075,037,850.00 1,329,374,250.00 1,587,984,150.00 1,881,209,400.00 2,178,280,800.00 2,451,847,950.00 2,706,184,350.00 2,964,794,250.00 3,227,677,650.00

(33)

NPV (Net Present Value), IRR

Alternatif1

Alternatif 2

Total Cost (VC + FC)

Income

Total

Total NPV

Discount Rate

Bulan 0

2,500,000,000

0

-2,500,000,000

(2,500,000,000.00)

9%/12

Bulan 1

439,086,400

648,000,000

208,913,600

207,367,639.36

0.9926

Bulan 2

458,317,150

696,600,000

238,282,850

234,756,263.82

0.9852

Bulan 3

447,633,400

669,600,000

221,966,600

217,038,941.48

0.9778

Bulan 4

469,000,900

723,600,000

254,599,100

247,113,886.46

0.9706

Bulan 5

439,086,400

648,000,000

208,913,600

201,246,470.88

0.9633

Bulan 6

443,359,900

658,800,000

215,440,100

206,003,823.62

0.9562

Bulan 7

477,975,250

746,280,000

268,304,750

254,621,207.75

0.949

Bulan 8

481,821,400

756,000,000

274,178,600

258,276,241.20

0.942

Bulan 9

458,317,150

696,600,000

238,282,850

222,794,464.75

0.935

Bulan 10

439,086,400

648,000,000

208,913,600

193,871,820.80

0.928

Bulan 11

443,359,900

658,800,000

215,440,100

198,441,876.11

0.9211

Bulan 12

447,633,400

669,600,000

221,966,600

202,921,865.72

0.9142

144,454,501.95

IRR

2%

Total Cost

Income

Total (A+B)

Total NPV

Discount Rate

Bulan 0

2,670,000,000.00

(2,670,000,000.00)

9%/12

(34)

Annual Worth Analysis & Benefit Cost Analysis

Alternatif 1

Alternatif 2

Bulan

Modal

Biaya

Income

Discount rate

Modal+Biaya

NPV(Modal+Biaya)

NPV(Income)

0

2,500,000,000

0

0

1

2,500,000,000

2,500,000,000.00

-1

0

439,086,400

648,000,000

0.9926

439,086,400

435,837,160.64

643,204,800.00

2

0

458,317,150

696,600,000

0.9852

458,317,150

451,534,056.18

686,290,320.00

3

0

447,633,400

669,600,000

0.9778

447,633,400

437,695,938.52

654,734,880.00

4

0

469,000,900

723,600,000

0.9706

469,000,900

455,212,273.54

702,326,160.00

5

0

439,086,400

648,000,000

0.9633

439,086,400

422,971,929.12

624,218,400.00

6

0

443,359,900

658,800,000

0.9562

443,359,900

423,940,736.38

629,944,560.00

7

0

477,975,250

746,280,000

0.949

477,975,250

453,598,512.25

708,219,720.00

8

0

481,821,400

756,000,000

0.942

481,821,400

453,875,758.80

712,152,000.00

9

0

458,317,150

696,600,000

0.935

458,317,150

428,526,535.25

651,321,000.00

10

0

439,086,400

648,000,000

0.928

439,086,400

407,472,179.20

601,344,000.00

11

0

443,359,900

658,800,000

0.9211

443,359,900

408,378,803.89

606,820,680.00

12

0

447,633,400

669,600,000

0.9142

447,633,400

409,226,454.28

612,148,320.00

7,688,270,338.05

7,832,724,840.00

Annual Worth

144,454,501.95

Benefit Cost

1.018788947

Bulan

Modal

Biaya

Income

Discount rate

Modal+Biaya

NPV(Modal+Biaya)

NPV(Income)

0

2,670,000,000.00

0

0

1

2,670,000,000

2,670,000,000.00

-1

0

502,228,066.67

864,000,000.00

0.9926

502,228,067

498,511,578.97

857,606,400.00

2

0

521,458,816.67

928,800,000.00

0.9852

521,458,817

513,741,226.18

915,053,760.00

3

0

510,775,066.67

892,800,000.00

0.9778

510,775,067

499,435,860.19

872,979,840.00

4

0

532,142,566.67

964,800,000.00

0.9706

532,142,567

516,497,575.21

936,434,880.00

5

0

502,228,066.67

864,000,000.00

0.9633

502,228,067

483,796,296.62

832,291,200.00

6

0

506,501,566.67

878,400,000.00

0.9562

506,501,567

484,316,798.05

839,926,080.00

7

0

541,116,916.67

995,040,000.00

0.949

541,116,917

513,519,953.92

944,292,960.00

8

0

544,963,066.67

1,008,000,000.00

0.942

544,963,067

513,355,208.80

949,536,000.00

9

0

521,458,816.67

928,800,000.00

0.935

521,458,817

487,563,993.58

868,428,000.00

10

0

502,228,066.67

864,000,000.00

0.928

502,228,067

466,067,645.87

801,792,000.00

11

0

506,501,566.67

878,400,000.00

0.9211

506,501,567

466,538,593.06

809,094,240.00

12

0

510,775,066.67

892,800,000.00

0.9142

510,775,067

466,950,565.95

816,197,760.00

8,580,295,296.38

10,443,633,120.00

Referensi

Dokumen terkait

Dengan desain tempat yang nyaman, kami berusaha agar client yang datang ke tempat desain tempat yang nyaman, kami berusaha agar client yang datang ke tempat

Karena Produk “Jelly Hitz” merupakan produk baru yang ada di pasaran, maka kami menetapkan strategi penetapan harga yang efektif dalam tahap perkenalan ini, yaitu dengan

Nugget tahu merupakan suatu jenis makanan yang kami buat dengan memberikan variasi rasa dan bentuk yang unik serta baru. Produk kami ini bertujuan

Nugget tahu merupakan suatu jenis makanan yang kami buat dengan memberikan variasi rasa dan bentuk yang unik serta baru.. Produk kami ini bertujuan

Uraikan strategi atau jenis kegiatan organisasi yang akan dilakukan tahap demi

Siklus dalam usaha budidaya lobster ini mempunyai keuntungan yang sangat besar bagi usaha ini dikarenakan pembelian bibit untuk budidaya lobster hanya dilakukan

Diperkirakan omset usaha nasi goreng yang saya akan bangun dalam 2 – 3 bulan akan mecapai sama dengan omset nasi goreng yang sudah beroperasi

Diperkirakan omset usaha nasi goreng yang saya akan bangun dalam 2 – 3 bulan akan mecapai sama dengan omset nasi goreng yang sudah beroperasi