• Tidak ada hasil yang ditemukan

Formula_perhitungan Cos Produksi

N/A
N/A
Protected

Academic year: 2021

Membagikan "Formula_perhitungan Cos Produksi"

Copied!
10
0
0

Teks penuh

(1)

%

Nilai

LEMPUNG KERING

35

0.35

0.74

LEMPUNG BASAH

35

0.35

0.74

TAHAN KERING

25

0.25

0.80

TANAH BASAH

25

0.25

0.80

TANAH & KERIKIL

20

0.20

0.83

KERIKIL KERING

12

0.12

0.89

KERIKIL BASAH

14

0.14

0.88

BATU KAPUR

60

0.60

0.63

BATU HASIL PELEDAKAN

60

0.60

0.63

PASIR KERING

15

0.15

0.87

PASIR BASAH

15

0.15

0.87

BATUAN SEDIMEN

40

0.40

0.71

COAL

20

0.20

PERSENTASE MENGEMBANG

JENIS TANAH

FAKTOR PEMUATAN

(2)

BUCKET CAPACITY

( Lcm )

A - Blade ( Lcm )

S - Blade ( lcm )

U - Blade ( Lcm )

( Lcm )

( Ton )

320

0.930

D 6 D

2.500

3.770

PS 120

2.500

6.000

375

2.640

D 6 H

3.180

3.890

D 7 G

2.900

4.200

5.800

D 7 H

3.890

5.160

8.340

D 8 N

4.660

11.700

VESELL CAPACITY

DUMP TRUCK

JENIS ALAT BERAT

BLADE CAPACITY

DOZER

TYPE

TYPE

TYPE

(3)

Km Km Km

a Bucket Capacity ( BC ) = 0.950 Lcm a Bucket Capacity ( BC ) = 1.800 Lcm a Bucket Capacity ( BC ) = 2.640 Lcm

b Bucket Faktor ( bf ) = 0.950 b Bucket Faktor ( bf ) = 0.950 b Bucket Faktor ( bf ) = 0.950

c. Cycle Time ( CT ) = 22.000 s c. Cycle Time ( CT ) = 22.000 s c. Cycle Time ( CT ) = 22.000 s

d. Corection Factor ( CF ) d. Corection Factor ( CF ) d. Corection Factor ( CF )

Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950

Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950

Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900

Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os

= 0.812 = 0.812 = 0.812

e. Swelling Factor ( sf ) = 0.200 Batubara e. Swelling Factor ( sf ) = 0.200 Batubara e. Swelling Factor ( sf ) = 0.200 Batubara

= = =

Vl = 119.955 Lcm / Jam Vl = 227.282 Lcm / Jam Vl = 333.347 Lcm / Jam

1 x Vl 1 x Vl 1 x Vl

Vb = --- Vb = --- Vb =

---1 + sf 1 + sf 1 + sf

= 99.962 Bcm / Jam = 189.402 Bcm / Jam = 277.790 Bcm / Jam

Ton = Vb x 1.25 Ton = Vb x 1.25 Ton = Vb x 1.25

= 124.953 Ton / Jam = 236.752 Ton / Jam = 347.237 Ton / Jam

a. Vessel Capacity ( VC ) = 20.000 MT a. Vessel Capacity ( VC ) = 20.000 MT a. Vessel Capacity ( VC ) = 20.000 MT

b. Bucket Capacity ( BC ) = 0.950 Lcm b. Bucket Capacity ( BC ) = 1.800 Lcm b. Bucket Capacity ( BC ) = 2.640 Lcm

c. Swelling faktor ( sf ) = 0.200 Batubara c. Swelling faktor ( sf ) = 0.200 Batubara c. Swelling faktor ( sf ) = 0.200 Batubara

Vl = BC Vl = BC Vl = BC = 0.950 Lcm = 1.800 Lcm = 2.640 Lcm 1 x Vl 1 x Vl 1 x Vl Vb = --- Vb = --- Vb = ---1+ sf 1+ sf 1+ sf = 0.792 Bcm = 1.500 Bcm = 2.200 Bcm

Ton = 1.250 Ton = Vb x 1.25 Ton = Vb x 1.25

= 0.990 Ton = 1.875 Ton = 2.750 Ton

d. Bucket Faktor ( bf ) = 0.950 d. Bucket Faktor ( bf ) = 0.950 d. Bucket Faktor ( bf ) = 0.950

e. Corection Faktor ( CF ) e. Corection Faktor ( CF ) e. Corection Faktor ( CF )

Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950

Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950

Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900

Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os

= 0.812 = 0.812 = 0.812

( JP ) = ( JP ) = ( JP ) =

= 26.192 Bucket = 13.823 Bucket = 9.425 Bucket

= 26.000 Bucket = 14.000 Bucket = 9.000 Bucket

f. Cycle Time Exsavator ( CT ) = 22.000 s f. Cycle Time Exsavator ( CT ) = 22.000 s f. Cycle Time Exsavator ( CT ) = 22.000 s

( wm ) = --- ( wm ) = --- ( wm ) =

---= 9.604 menit = 5.069 menit = 3.456 menit

g. Kecepatan mobil muatan = 45.000 Km / Jam g. Kecepatan mobil muatan = 45.000 Km / Jam g. Kecepatan mobil muatan = 45.000 Km / Jam

= 0.750 Km / menit = 0.750 Km / menit = 0.750 Km / menit

( wam ) = ( wam ) = ( wam ) =

= 6.667 menit = 6.667 menit = 6.667 menit

( wd ) = 1.500 menit ( wd ) = 1.500 menit ( wd ) = 1.500 menit

h. Kecepatan mobil kosong = 55.000 Km / jam h. Kecepatan mobil kosong = 55.000 Km / jam h. Kecepatan mobil kosong = 55.000 Km / jam

= 0.917 Km / menit = 0.917 Km / menit = 0.917 Km / menit

( wak ) = ( wak ) = ( wak ) =

= 5.455 menit = 5.455 menit = 5.455 menit

( wtm ) = 1.000 menit ( wtm ) = 1.000 menit ( wtm ) = 1.000 menit

= = =

= 24.225 menit = 19.690 menit = 18.077 menit

menit menit menit

= = =

menit menit menit

= 2.522 unit = 3.885 unit = 5.231 unit

= 3.000 unit = 4.000 unit = 5.000 unit

menit menit menit

= = =

menit menit menit

= 2.477 Rit / jam / 1 unit = 3.047 Rit / jam / 1 unit = 3.319 Rit / jam / 1 unit

= = =

= 6.248 = 11.838 = 17.362

= = =

= 49.536 Ton/Jam/1 unit = 60.945 Ton/Jam/1unit = 66.382 Ton/Jam/1 unit

= 124.953 Ton / jam = 236.752 Ton / jam = 347.237 Ton / jam

= 38.105 Bcm / Jam = 46.881 Bcm / Jam = 51.063 Bcm / Jam

Waktu angkut muatan

---Exsavator PC - 200 Dump Truck Jumlah Pengisian BC ( ton ) x bf x CF VC ---Kapasitas Produksi CT

Matrik Plan Batubara Jarak Tambang - Stockpile

5

Jarak Tambang - Stockpile

Waktu muat

JP x CT

60.000

---BC x bf x 3600 x CF

Kecepatan mobil kosong

Waktu tunggu muatan

Cycle Time 1 Rit / 1 unit wm + wam + wd + wak + wtm Kecepatan mobil muatan

Waktu Dumping + atur posisi

Waktu angkut kosong ---Jarak Stockpile - Tambang

60.000

Cycle Time 1 Rit / 1 unit

Keserasian Unit ---Cycle Time 1 Rit / 1 unit

Waktu Muat ( wm )

Produktivitas 1 unit VC x Jumlah Rit / jam

Total Ritase Jlh Unit x Jml Rit / jam / 1 unit

Dalam 1 jam / 1 Unit

---BC x bf x 3600 x CF

Kapasitas Produksi ---CT

Matrik Plan Batubara Jarak Tambang - Stockpile

5 Exsavator PC - 300 BC ( ton ) x bf x CF JP x CT Waktu muat 60.000 Dump Truck VC Jumlah Pengisian

---Waktu Dumping + atur posisi

Jarak Stockpile - Tambang

Waktu angkut kosong ---Jarak Tambang - Stockpile

Waktu angkut muatan ---Kecepatan mobil muatan

Cycle Time 1 Rit / 1 unit

Keserasian Unit ---Waktu Muat ( wm ) Kecepatan mobil kosong

Waktu tunggu muatan

Cycle Time 1 Rit / 1 unit wm + wam + wd + wak + wtm

Total Ritase Jlh Unit x Jml Rit / jam / 1 unit

Produktivitas 1 unit VC x Jumlah Rit / jam

60.000

Dalam 1 jam / 1 Unit ---Cycle Time 1 Rit / 1 unit

BC x bf x 3600 x CF

Kapasitas Produksi ---CT

Matrik Plan Batubara Jarak Tambang - Stockpile

5 Exsavator PC - 400 BC ( ton ) x bf x CF JP x CT Waktu muat 60.000 Dump Truck VC Jumlah Pengisian

---Waktu Dumping + atur posisi

Jarak Stockpile - Tambang

Waktu angkut kosong ---Jarak Tambang - Stockpile

Waktu angkut muatan ---Kecepatan mobil muatan

Cycle Time 1 Rit / 1 unit

Keserasian Unit ---Waktu Muat ( wm ) Kecepatan mobil kosong

Waktu tunggu muatan

Cycle Time 1 Rit / 1 unit wm + wam + wd + wak + wtm

Total Ritase Jlh Unit x Jml Rit / jam / 1 unit

Produktivitas 1 unit VC x Jumlah Rit / jam

60.000

Dalam 1 jam / 1 Unit ---Cycle Time 1 Rit / 1 unit

(4)

Km Km Km

a Bucket Capacity ( BC ) = 0.950 Lcm a Bucket Capacity ( BC ) = 1.800 Lcm a Bucket Capacity ( BC ) = 2.640 Lcm

b Bucket Faktor ( bf ) = 0.900 b Bucket Faktor ( bf ) = 0.900 b Bucket Faktor ( bf ) = 0.900

c. Cycle Time ( CT ) = 22.000 s c. Cycle Time ( CT ) = 22.000 s c. Cycle Time ( CT ) = 22.000 s

d. Corection Factor ( CF ) d. Corection Factor ( CF ) d. Corection Factor ( CF )

Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950

Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950

Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900

Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os

= 0.812 = 0.812 = 0.812

e. Swelling Factor ( sf ) = 0.350 Lempung e. Swelling Factor ( sf ) = 0.350 Lempung e. Swelling Factor ( sf ) = 0.350 Lempung

= = =

Vl = 113.641 Lcm / Jam Vl = 215.320 Lcm / Jam Vl = 315.803 Lcm / Jam

1 x Vl 1 x Vl 1 x Vl

Vb = --- Vb = --- Vb =

---1 + sf 1 + sf 1 + sf

= 84.179 Bcm / Jam = 159.496 Bcm / Jam = 233.928 Bcm / Jam

Ton = Vb x 1.25 Ton = Vb x 1.25 Ton = Vb x 1.25

= 105.223 Ton / Jam = 199.370 Ton / Jam = 292.410 Ton / Jam

a. Vessel Capacity ( VC ) = 5.250 Lcm a. Vessel Capacity ( VC ) = 5.250 Lcm a. Vessel Capacity ( VC ) = 5.250 Lcm

b. Bucket Capacity ( BC ) = 0.950 Lcm b. Bucket Capacity ( BC ) = 1.800 Lcm b. Bucket Capacity ( BC ) = 2.640 Lcm

c. Swelling faktor ( sf ) = 0.350 Lempung c. Swelling faktor ( sf ) = 0.350 Lempung c. Swelling faktor ( sf ) = 0.350 Lempung

Vl = BC Vl = BC Vl = BC = 0.950 Lcm = 1.800 Lcm = 2.640 Lcm 1 x Vl 1 x Vl 1 x Vl Vb = --- Vb = --- Vb = ---1+ sf 1+ sf 1+ sf = 0.704 Bcm = 1.333 Bcm = 1.956 Bcm

Ton = Vb x 1.25 Ton = Vb x 1.25 Ton = Vb x 1.25

= 0.880 Ton = 1.667 Ton = 2.444 Ton

d. Bucket Faktor ( bf ) = 0.900 d. Bucket Faktor ( bf ) = 0.900 d. Bucket Faktor ( bf ) = 0.900

e. Corection Faktor ( CF ) e. Corection Faktor ( CF ) e. Corection Faktor ( CF )

Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950 Machine Availability ( ma ) = 0.950

Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950 Time Efficiency ( te ) = 0.950

Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900 Operator Skill ( os ) = 0.900

Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os Eff. Kerja = ma x te x os

= 0.812 = 0.812 = 0.812

( JP ) = ( JP ) = ( JP ) =

= 7.560 Bucket = 3.990 Bucket = 2.720 Bucket

= 8.000 Bucket = 4.000 Bucket = 3.000 Bucket

f. Cycle Time Exsavator ( CT ) = 22.000 s f. Cycle Time Exsavator ( CT ) = 22.000 s f. Cycle Time Exsavator ( CT ) = 22.000 s

( wm ) = --- ( wm ) = --- ( wm ) =

---= 2.772 menit = 1.463 menit = 0.997 menit

g. Kecepatan mobil muatan = 15.000 Km / Jam g. Kecepatan mobil muatan = 15.000 Km / Jam g. Kecepatan mobil muatan = 15.000 Km / Jam

= 0.250 Km / menit = 0.250 Km / menit = 0.250 Km / menit

( wam ) = ( wam ) = ( wam ) =

= 1.200 menit = 1.200 menit = 1.200 menit

( wd ) = 1.500 menit ( wd ) = 1.500 menit ( wd ) = 1.500 menit

h. Kecepatan mobil kosong = 30.000 Km / jam h. Kecepatan mobil kosong = 30.000 Km / jam h. Kecepatan mobil kosong = 30.000 Km / jam

= 0.500 Km / menit = 0.500 Km / menit = 0.500 Km / menit

( wak ) = ( wak ) = ( wak ) =

= 0.600 menit = 0.600 menit = 0.600 menit

( wtm ) = 1.000 menit ( wtm ) = 1.000 menit ( wtm ) = 1.000 menit

= = =

= 7.072 menit = 5.763 menit = 5.297 menit

menit menit menit

= = =

menit menit menit

= 2.551 unit = 3.939 unit = 5.311 unit

= 3.000 unit = 4.000 unit = 6.000 unit

menit menit menit

= = =

menit menit menit

= 8.484 Rit / jam / 1 unit = 10.411 Rit / jam / 1 unit = 11.326 Rit / jam / 1 unit

= = =

= 21.646 = 41.013 = 60.153

= = =

= 44.543 Lcm/Jam/1 unit = 54.660 Lcm/Jam/1unit = 59.462 Lcm/Jam/1unit

= 113.641 Lcm / jam = 215.320 Lcm / jam = 315.803 Lcm / jam

= 32.995 Bcm / Jam = 40.489 Bcm / Jam = 44.046 Bcm / Jam

Matrik Plan Batubara Matrik Plan Batubara Matrik Plan Batubara

Jarak Tambang - Disposal Jarak Tambang - Disposal Jarak Tambang - Disposal

0.3 0.3 0.3

Exsavator PC - 200 Exsavator PC - 300 Exsavator PC - 400

BC x bf x 3600 x CF BC x bf x 3600 x CF BC x bf x 3600 x CF

Kapasitas Produksi --- Kapasitas Produksi --- Kapasitas Produksi

---CT CT CT

Dump Truck Dump Truck Dump Truck

VC VC VC

Jumlah Pengisian --- Jumlah Pengisian --- Jumlah Pengisian

---BC ( Lcm ) x bf x CF BC ( Lcm ) x bf x CF BC ( Lcm ) x bf x CF

JP x CT JP x CT JP x CT

60.000

Jarak Tambang - Stockpile Jarak Tambang - Stockpile Jarak Tambang - Stockpile

Waktu muat Waktu muat Waktu muat

60.000 60.000

---Kecepatan mobil muatan Kecepatan mobil muatan Kecepatan mobil muatan

Waktu angkut muatan --- Waktu angkut muatan

---Waktu Dumping + atur posisi Waktu Dumping + atur posisi Waktu Dumping + atur posisi

Jarak Stockpile - Tambang Jarak Stockpile - Tambang

Waktu angkut muatan

Jarak Stockpile - Tambang

Waktu angkut kosong --- Waktu angkut kosong --- Waktu angkut kosong

---Kecepatan mobil kosong Kecepatan mobil kosong Kecepatan mobil kosong

Waktu tunggu muatan Waktu tunggu muatan Waktu tunggu muatan

Cycle Time 1 Rit / 1 unit wm + wam + wd + wak + wtm

Cycle Time 1 Rit / 1 unit Cycle Time 1 Rit / 1 unit Cycle Time 1 Rit / 1 unit

Cycle Time 1 Rit / 1 unit wm + wam + wd + wak + wtm Cycle Time 1 Rit / 1 unit wm + wam + wd + wak + wtm

Keserasian Unit

---Waktu Muat ( wm ) Waktu Muat ( wm ) Waktu Muat ( wm )

Keserasian Unit --- Keserasian Unit

---60.000 60.000 60.000

Dalam 1 jam / 1 Unit --- Dalam 1 jam / 1 Unit --- Dalam 1 jam / 1 Unit

---Cycle Time 1 Rit / 1 unit Cycle Time 1 Rit / 1 unit Cycle Time 1 Rit / 1 unit

Total Ritase Jlh Unit x Jml Rit / jam / 1 unit Total Ritase Jlh Unit x Jml Rit / jam / 1 unit Total Ritase Jlh Unit x Jml Rit / jam / 1 unit

Produktivitas 1 unit VC x Jumlah Rit / jam

(5)

12,000.000

IDR

9,500.000

IDR

0.006

IDR

NUMBERS

SKILL

STATUS

BASIC

OT

HM UNIT

PREMI

THP

1

PC 400

EX - 001

0

operator

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-2

PC 400

EX - 002

0

operator

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-3

PC 300

EX - 003

2

operator

hire

IDR

1,250,000.000

IDR

-

168.162

IDR

2,017,942.500

IDR

6,535,885.000

2

IDR

6,535,885.000

1

DT NISSAN CWB 520 / HINO

DT - 001

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-2

DT NISSAN CWB 520 / HINO

DT - 002

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-3

DT NISSAN CWB 520 / HINO

DT - 003

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-4

DT NISSAN CWB 520 / HINO

DT - 004

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-5

DT NISSAN CWB 520 / HINO

DT - 005

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-6

DT NISSAN CWB 520 / HINO

DT - 006

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-7

DT NISSAN CWB 520 / HINO

DT - 007

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-8

DT NISSAN CWB 520 / HINO

DT - 008

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-9

DT NISSAN CWB 520 / HINO

DT - 009

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-10

DT NISSAN CWB 520 / HINO

DT - 010

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-11

DT NISSAN CWB 520 / HINO

DT - 011

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-12

DT NISSAN CWB 520 / HINO

DT - 012

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-13

DT NISSAN CWB 520 / HINO

DT - 013

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-14

DT NISSAN CWB 520 / HINO

DT - 014

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-15

DT NISSAN CWB 520 / HINO

DT - 015

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-16

DT NISSAN CWB 520 / HINO

DT - 016

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-17

DT NISSAN CWB 520 / HINO

DT - 017

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-18

DT NISSAN CWB 520 / HINO

DT - 018

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-19

DT NISSAN CWB 520 / HINO

DT - 019

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-20

DT NISSAN CWB 520 / HINO

DT - 020

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-21

DT NISSAN CWB 520 / HINO

DT - 021

0

driver

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-22

DT NISSAN CWB 520 / HINO

DT - 022

2

driver

hire

IDR

1,250,000.000

IDR

-

166.392

IDR

1,580,721.625

IDR

5,661,443.250

23

DT NISSAN CWB 520 / HINO

DT - 023

2

driver

hire

IDR

1,250,000.000

IDR

-

166.392

IDR

1,580,721.625

IDR

5,661,443.250

24

DT NISSAN CWB 520 / HINO

DT - 024

2

driver

hire

IDR

1,250,000.000

IDR

-

164.622

IDR

1,563,905.438

IDR

5,627,810.875

25

DT NISSAN CWB 520 / HINO

DT - 025

2

driver

hire

IDR

1,250,000.000

IDR

-

164.622

IDR

1,563,905.438

IDR

5,627,810.875

8

IDR

22,578,508.250

1

D 155 A

D - 001

0

operator

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-2

D 155 A

D - 002

0

operator

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-3

D 85 E SS

D - 003

2

operator

hire

IDR

1,250,000.000

IDR

-

161.081

IDR

1,932,976.500

IDR

6,365,953.000

2

IDR

6,365,953.000

1

PC 200

EX - 004

2

operator

hire

IDR

1,250,000.000

IDR

-

28.322

IDR

339,864.000

IDR

3,179,728.000

2

IDR

3,179,728.000

1

DT NISSAN CWA 540 / HINO

DT - 027

2

driver

hire

IDR

1,100,000.000

IDR

-

24.782

IDR

235,426.625

IDR

2,670,853.250

2

DT NISSAN CWA 540 / HINO

DT - 028

2

driver

hire

IDR

1,100,000.000

IDR

-

24.782

IDR

235,426.625

IDR

2,670,853.250

3

DT NISSAN CWA 540 / HINO

DT - 029

2

driver

hire

IDR

1,100,000.000

IDR

-

23.012

IDR

218,610.438

IDR

2,637,220.875

4

DT NISSAN CWA 540 / HINO

DT - 030

0

driver

hire

IDR

1,100,000.000

IDR

-

0.000

IDR

-

IDR

-5

DT NISSAN CWA 540 / HINO

DT - 031

0

driver

hire

IDR

1,100,000.000

IDR

-

0.000

IDR

-

IDR

-6

IDR

7,978,927.375

1

D 85 E SS

D - 004

2

operator

hire

IDR

1,250,000.000

IDR

-

17.701

IDR

212,415.000

IDR

2,924,830.000

2

PC 200

EX - 005

2

operator

hire

IDR

1,250,000.000

IDR

-

130.989

IDR

1,571,871.000

IDR

5,643,742.000

3

PC 200

EX - 006

0

operator

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-4

PC 200

EX - 007

0

operator

hire

IDR

1,250,000.000

IDR

-

0.000

IDR

-

IDR

-5

Motor Greder 705 A

GD - 01

2

operator

hire

IDR

1,250,000.000

IDR

-

150.461

IDR

1,805,527.500

IDR

6,111,055.000

6

IDR

14,679,627.000

1

Water Pump 6' inlet

Pump - 001

2

Mech

hire

IDR

2,500,000.000

IDR

-

230.116

IDR

-

IDR

5,000,000.000

2

Water Pump 6' inlet

Pump - 002

0

ass. mech

hire

IDR

1,600,000.000

IDR

-

0.000

IDR

-

IDR

-3

Water Pump 6' inlet

Pump - 003

0

ass. mech

hire

IDR

1,600,000.000

IDR

-

0.000

IDR

-

IDR

-4

Water Pump 3' inlet

Pump - 004

2

ass. mech

hire

IDR

1,600,000.000

IDR

-

230.116

IDR

-

IDR

3,200,000.000

5

Fuel Truck 5000 lt

FT - 001

0

driver

hire

IDR

1,800,000.000

IDR

-

0.000

IDR

-

IDR

-6

Fuel Truck 5000 lt

FT - 002

0

driver

hire

IDR

1,800,000.000

IDR

-

0.000

IDR

-

IDR

-7

Water Truck 5000 lt

WT - 001

0

driver

hire

IDR

1,800,000.000

IDR

-

0.000

IDR

-

IDR

-8

Water Truck 5000 lt

WT - 002

0

driver

hire

IDR

1,800,000.000

IDR

-

0.000

IDR

-

IDR

-9

Lighting Tower

LT - 001

1

Mech

hire

IDR

2,500,000.000

IDR

-

194.714

IDR

-

IDR

2,500,000.000

10

Lighting Tower

LT - 002

1

ass. mech

hire

IDR

1,600,000.000

IDR

-

194.714

IDR

-

IDR

1,600,000.000

11

Lighting Tower

LT - 003

0

ass. mech

hire

IDR

1,600,000.000

IDR

-

0.000

IDR

-

IDR

-12

Lighting Tower

LT - 004

0

ass. mech

hire

IDR

-

IDR

-

0.000

IDR

-

IDR

-13

Lighting Tower

LT - 005

0

ass. mech

hire

IDR

-

IDR

-

0.000

IDR

-

IDR

-14

Lighting Tower

LT - 006

0

ass. mech

hire

IDR

-

IDR

-

0.000

IDR

-

IDR

-15

Genset 100 KW

G - 001

1

Mech

hire

IDR

2,500,000.000

IDR

-

177.013

IDR

-

IDR

2,500,000.000

16

Genset 100 KW

G - 002

0

ass. mech

hire

IDR

1,600,000.000

IDR

-

0.000

IDR

-

IDR

-17

Genset 50 KW

G - 003

1

ass. mech

hire

IDR

1,600,000.000

IDR

-

177.013

IDR

-

IDR

1,600,000.000

18

Genset 50 KW

G - 004

0

ass. mech

hire

IDR

-

IDR

-

0.000

IDR

-

IDR

-19

Genset 10 KW

G - 005

1

ass. mech

hire

IDR

1,600,000.000

IDR

-

177.013

IDR

-

IDR

1,600,000.000

20

Bus Karyawan

BK - 001

1

driver

hire

IDR

1,800,000.000

IDR

-

-

IDR

-

IDR

1,800,000.000

21

Bus Karyawan

BK - 002

0

driver

hire

IDR

1,800,000.000

IDR

-

-

IDR

-

IDR

-22

Bus Karyawan

BK - 003

0

driver

hire

IDR

1,800,000.000

IDR

-

-

IDR

-

IDR

-23

Total Station

TS - 001

0

helper

hire

IDR

1,500,000.000

IDR

-

-

IDR

-

IDR

-24

Total Station

TS - 002

0

helper

hire

IDR

1,500,000.000

IDR

-

-

IDR

-

IDR

-25

Tangki Solar 20 ton

TSo - 001

2

Fuelman

hire

IDR

2,000,000.000

IDR

-

-

IDR

-

IDR

4,000,000.000

26

Tangki Solar 10 ton

Tso - 002

0

Fuelman

hire

IDR

2,000,000.000

IDR

-

-

IDR

-

IDR

-27

Tangki Solar 10 ton

Tso - 003

0

Fuelman

hire

IDR

-

IDR

-

-

IDR

-

IDR

-28

Light Vehicle 4 x 4

LV - 001

hire

IDR

-

-

IDR

-29

Light Vehicle 4 x 4

LV - 002

hire

IDR

-

-

IDR

-30

Light Vehicle 4 x 4

LV - 003

hire

IDR

-

-

IDR

-31

Light Vehicle 4 x 4

LV - 004

hire

IDR

-

-

IDR

-32

Light Vehicle 4 x 4

LV - 005

hire

IDR

-

-

IDR

-UNIT SUPPORTING

HAULING COAL

Sub Total

UNIT GENERAL

Sub Total

DOZING & RIPPING

Sub Total

LOADING COAL

Sub Total

Sub Total

REMUNERATION

LOADING OB

Sub Total

EMPLOYEE

PREMI OPERATOR ALAT BERAT / JAM

NO

UNIT

CODE

HAULING OB

PREMI DRIVER / JAM

OVERTIME

(6)

12

IDR

23,800,000.000

1

Project Manager

PM

1

Pms

hire

IDR

12,000,000.000

IDR

-

0.000

IDR

-

IDR

12,000,000.000

2

HRD Superintendent

HS

1

Pms

hire

IDR

8,500,000.000

IDR

-

0.000

IDR

-

IDR

8,500,000.000

3

Prod Superintendent

SPT

0

Pms

hire

IDR

8,000,000.000

IDR

-

0.000

IDR

-

IDR

-4

Prod Supervisor

SPV

2

Pms

hire

IDR

5,500,000.000

IDR

-

0.000

IDR

-

IDR

11,000,000.000

5

Prod Foreman

FM

2

Pms

hire

IDR

3,000,000.000

IDR

-

0.000

IDR

-

IDR

6,000,000.000

6

Prod Admin

ADM

2

Pms

hire

IDR

2,750,000.000

IDR

-

0.000

IDR

-

IDR

5,500,000.000

7

Mine Plan

MP

1

Pms

hire

IDR

7,500,000.000

IDR

-

0.000

IDR

-

IDR

7,500,000.000

8

Senior Geologist

SG

0

Pms

hire

IDR

7,000,000.000

IDR

-

0.000

IDR

-

IDR

-9

Geologist

Geos

1

Pms

hire

IDR

4,500,000.000

IDR

-

0.000

IDR

-

IDR

4,500,000.000

10

Senior Surveyor

SS

0

Pms

hire

IDR

5,500,000.000

IDR

-

0.000

IDR

-

IDR

-11

Surveyor

Svy

1

Pms

hire

IDR

4,250,000.000

IDR

-

0.000

IDR

-

IDR

4,250,000.000

12

Helper Surveyor

HSvy

0

Local

hire

IDR

1,500,000.000

IDR

-

0.000

IDR

-

IDR

-13

Quality Controll

QC

0

Pms

hire

IDR

6,500,000.000

IDR

-

0.000

IDR

-

IDR

-14

Safety Officer

SO

3

Pms

hire

IDR

3,500,000.000

IDR

-

0.000

IDR

-

IDR

10,500,000.000

15

Logistic

Log

2

Pms / Local

hire

IDR

3,750,000.000

IDR

-

0.000

IDR

-

IDR

7,500,000.000

16

Mainhaul

MH

4

Local

hire

IDR

2,750,000.000

IDR

-

0.000

IDR

-

IDR

11,000,000.000

17

Checker OB

ChOB

2

Local

hire

IDR

1,500,000.000

IDR

-

0.000

IDR

-

IDR

3,000,000.000

18

Checker Hauling

ChB

2

Local

hire

IDR

1,500,000.000

IDR

-

0.000

IDR

-

IDR

3,000,000.000

19

Dumpman

DM

8

Local

hire

IDR

1,500,000.000

IDR

-

0.000

IDR

-

IDR

12,000,000.000

20

Trafic man

TM

4

Local

hire

IDR

1,500,000.000

IDR

-

0.000

IDR

-

IDR

6,000,000.000

21

Security Officer

SEO

8

Local

hire

IDR

1,750,000.000

IDR

-

0.000

IDR

-

IDR

14,000,000.000

44

IDR

126,250,000.000

82

IDR

211,368,628.625

Total Employee

Sub Total

MIDDLE UP STAFF & LOCAL

(7)

$

Rp

$

Rp

1

Penjualan Batubara

$

55.000

$

385,000.000

Rp

3,657,500,000.000

2

Biaya Operational Tambang

$

170,044.723

Rp

1,615,424,866.125

3

Biaya Haul Road

$

0.750

$

5,250.000

Rp

49,875,000.000

4

Biaya Operational Stockpile

$

2.500

$

17,500.000

Rp

166,250,000.000

5

Biaya Pembebasan Lahan

$

1.500

$

10,500.000

Rp

99,750,000.000

6

Biaya Perijinan

$

0.250

$

1,750.000

Rp

16,625,000.000

7

Tax 10 %

$

5.500

$

38,500.000

Rp

365,750,000.000

8

Fee Royalti

$

8.000

$

56,000.000

Rp

532,000,000.000

9

Comonity Development

$

0.500

$

3,500.000

Rp

33,250,000.000

10

Mine Management Service

$

-

$

-

Rp

-303,044.723

$

Rp

2,878,924,866.125

11

Overhead Cost

5.000%

$

15,152.236

Rp

143,946,243.306

318,196.959

$

Rp

3,022,871,109.431

KEUNTUNGAN

$

66,803.041

NO

KETERANGAN

ESTIMATED (

per Ton )

PEMASUKAN

634,628,890.569

Rp

Total Pengeluaran

BIAYA INVESTASI

GBE

JOB SITE - PPU

Total Biaya

9,500.000

Rp

Ton

SR

PENGELUARAN

1.000

$

BIAYA

7000.000

53846.154

1

Bcm

10

COAL

OB

(8)

53846.1538 Bcm

7000 MT

1 10

Lt / jam Harga / lt Biaya Harga / Jam Biaya

1 PC 400 EX - 001 0.000 233.928 0 0 IDR 7,200.00 IDR - IDR 475,000.00 IDR - IDR - OB 2 PC 400 EX - 002 0.000 233.928 0 0 IDR 7,200.00 IDR - IDR 475,000.00 IDR - IDR - OB 3 PC 300 EX - 003 336.324 159.496 53642.4151 32 IDR 7,200.00 IDR 77,488,992.000 IDR 380,000.00 IDR 127,803,025.000 IDR 205,292,017.000 OB

32.000

336.324 627.352 53642.415 IDR 77,488,992.000 IDR 205,292,017.000

1 DT NISSAN CWB 520 / HINO DT - 001 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 2 DT NISSAN CWB 520 / HINO DT - 002 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 3 DT NISSAN CWB 520 / HINO DT - 003 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 4 DT NISSAN CWB 520 / HINO DT - 004 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 5 DT NISSAN CWB 520 / HINO DT - 005 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 6 DT NISSAN CWB 520 / HINO DT - 006 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 7 DT NISSAN CWB 520 / HINO DT - 007 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 8 DT NISSAN CWB 520 / HINO DT - 008 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 9 DT NISSAN CWB 520 / HINO DT - 009 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 10 DT NISSAN CWB 520 / HINO DT - 010 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 11 DT NISSAN CWB 520 / HINO DT - 011 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 12 DT NISSAN CWB 520 / HINO DT - 012 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 13 DT NISSAN CWB 520 / HINO DT - 013 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 14 DT NISSAN CWB 520 / HINO DT - 014 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 15 DT NISSAN CWB 520 / HINO DT - 015 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 16 DT NISSAN CWB 520 / HINO DT - 016 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 17 DT NISSAN CWB 520 / HINO DT - 017 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 18 DT NISSAN CWB 520 / HINO DT - 018 0.000 44.046 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 19 DT NISSAN CWB 520 / HINO DT - 019 0.000 40.489 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 20 DT NISSAN CWB 520 / HINO DT - 020 0.000 40.489 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 21 DT NISSAN CWB 520 / HINO DT - 021 0.000 40.489 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading OB 22 DT NISSAN CWB 520 / HINO DT - 022 332.784 40.489 13473.940 13 IDR 7,200.00 IDR 31,148,535.600 IDR 180,000.00 IDR 59,901,030.000 IDR 91,049,565.600 Loading OB 23 DT NISSAN CWB 520 / HINO DT - 023 332.784 40.489 13473.940 13 IDR 7,200.00 IDR 31,148,535.600 IDR 180,000.00 IDR 59,901,030.000 IDR 91,049,565.600 Loading OB 24 DT NISSAN CWB 520 / HINO DT - 024 329.243 40.489 13330.600 13 IDR 7,200.00 IDR 30,817,168.200 IDR 180,000.00 IDR 59,263,785.000 IDR 90,080,953.200 Loading OB 25 DT NISSAN CWB 520 / HINO DT - 025 329.243 40.489 13330.600 13 IDR 7,200.00 IDR 30,817,168.200 IDR 180,000.00 IDR 59,263,785.000 IDR 90,080,953.200 Loading OB

13

1324.054 1076.253 53609.0797 IDR 123,931,407.600 IDR 362,261,037.600

1 D 155 A D - 001 0.000 259.259 0 0 IDR 7,200.00 IDR - IDR 650,000.00 IDR - IDR - Dozing 2 D 155 A D - 002 0.000 259.259 0 0 IDR 7,200.00 IDR - IDR 650,000.00 IDR - IDR - Dozing 3 D 85 E SS D - 003 322.163 166.667 53693.7917 30 IDR 7,200.00 IDR 69,587,154.000 IDR 375,000.00 IDR 120,811,031.250 IDR 190,398,185.250 Dozing

10.000

322.163 685.185 53693.792 IDR 69,587,154.000 IDR 190,398,185.250

1 PC 200 EX - 004 56.644 124.953 7077.81866 22 IDR 7,200.00 IDR 8,972,409.600 IDR 260,000.00 IDR 14,727,440.000 IDR 23,699,849.600 Coal

56.644 124.953 7077.81866 IDR 8,972,409.600 IDR 23,699,849.600

1 DT NISSAN CWA 540 / HINO DT - 027 49.564 49.536 2455.173 13 IDR 7,200.00 IDR 4,639,143.600 IDR 180,000.00 IDR 8,921,430.000 IDR 13,560,573.600 Loading Coal 2 DT NISSAN CWA 540 / HINO DT - 028 49.564 49.536 2455.173 13 IDR 7,200.00 IDR 4,639,143.600 IDR 180,000.00 IDR 8,921,430.000 IDR 13,560,573.600 Loading Coal 3 DT NISSAN CWA 540 / HINO DT - 029 46.023 49.536 2279.804 13 IDR 7,200.00 IDR 4,307,776.200 IDR 180,000.00 IDR 8,284,185.000 IDR 12,591,961.200 Loading Coal 4 DT NISSAN CWA 540 / HINO DT - 030 0.000 49.536 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading Coal 5 DT NISSAN CWA 540 / HINO DT - 031 0.000 49.536 0.000 0 IDR 7,200.00 IDR - IDR 180,000.00 IDR - IDR - Loading Coal

13

145.150 247.680 7190.15009 IDR 13,586,063.400 IDR 39,713,108.400

1 D 85 E SS D - 004 35.403 30 IDR 7,200.00 IDR 7,646,940.000 IDR 400,000.00 IDR 14,161,000.000 IDR 21,807,940.000 General

2 PC 200 EX - 005 261.979 22 IDR 7,200.00 IDR 41,497,394.400 IDR 275,000.00 IDR 72,044,087.500 IDR 113,541,481.900 General

3 PC 200 EX - 006 0.000 0 IDR 7,200.00 IDR - IDR 275,000.00 IDR - IDR - General 4 PC 200 EX - 007 0.000 0 IDR 7,200.00 IDR - IDR 275,000.00 IDR - IDR - General 5 Motor Greder 705 A GD - 01 300.921 23 IDR 7,200.00 IDR 49,832,559.000 IDR 300,000.00 IDR 90,276,375.000 IDR 140,108,934.000 General

25

598.302 IDR 98,976,893.400 IDR 275,458,355.900

1 Water Pump 6' inlet Pump - 001 230.116 10 IDR 7,200.00 IDR 16,568,370.000 IDR 75,000.00 IDR 17,258,718.750 IDR 33,827,088.750 PIT 2 Water Pump 6' inlet Pump - 002 0.000 0 IDR 7,200.00 IDR - IDR 75,000.00 IDR - IDR - PIT 3 Water Pump 6' inlet Pump - 003 0.000 0 IDR 7,200.00 IDR - IDR 75,000.00 IDR - IDR - PIT 4 Water Pump 3' inlet Pump - 004 230.116 5 IDR 7,200.00 IDR 8,284,185.000 IDR 40,000.00 IDR 9,204,650.000 IDR 17,488,835.000 PIT

5 Fuel Truck 5000 lt FT - 001 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Fuel

6 Fuel Truck 5000 lt FT - 002 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Fuel

7 Water Truck 5000 lt WT - 001 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Water

8 Water Truck 5000 lt WT - 002 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Water

9 Lighting Tower LT - 001 194.714 5 IDR 7,200.00 IDR 7,009,695.000 IDR 7,500,000.000 IDR 14,509,695.000 Lighting

10 Lighting Tower LT - 002 194.714 5 IDR 7,200.00 IDR 7,009,695.000 IDR 7,500,000.000 IDR 14,509,695.000 Lighting

11 Lighting Tower LT - 003 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Lighting

12 Lighting Tower LT - 004 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Lighting

13 Lighting Tower LT - 005 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Lighting

14 Lighting Tower LT - 006 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Lighting

15 Genset 100 KW G - 001 177.013 6 IDR 7,200.00 IDR 7,646,940.000 IDR 7,500,000.000 IDR 15,146,940.000 Genset

16 Genset 100 KW G - 002 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Genset

17 Genset 50 KW G - 003 177.013 4 IDR 7,200.00 IDR 5,097,960.000 IDR 5,000,000.000 IDR 10,097,960.000 Genset

18 Genset 50 KW G - 004 0.000 0 IDR 7,200.00 IDR - IDR - IDR - Genset

19 Genset 10 KW G - 005 177.013 3 IDR 7,200.00 IDR 3,823,470.000 IDR 2,500,000.000 IDR 6,323,470.000 Genset

20 Bus Karyawan BK - 001 600 IDR 7,200.00 IDR 4,320,000.000 IDR 15,000,000.000 IDR 19,320,000.000 Transport

21 Bus Karyawan BK - 002 0 IDR 7,200.00 IDR - IDR - IDR - Transport

22 Bus Karyawan BK - 003 0 IDR 7,200.00 IDR - IDR - IDR - Transport

23 Total Station TS - 001 IDR - IDR - Survey

24 Total Station TS - 002 IDR - IDR - Survey

25 Tangki Solar 20 ton TSo - 001 IDR 8,000,000.000 IDR 8,000,000.000 Fuel

26 Tangki Solar 10 ton Tso - 002 IDR - IDR - Fuel

27 Tangki Solar 10 ton Tso - 003 IDR - IDR - Fuel

28 Light Vehicle 4 x 4 LV - 001 400 IDR 7,200.00 IDR 2,880,000.000 IDR 12,500,000.000 IDR 15,380,000.000 Transport

29 Light Vehicle 4 x 4 LV - 002 400 IDR 7,200.00 IDR 2,880,000.000 IDR 12,500,000.000 IDR 15,380,000.000 Transport

30 Light Vehicle 4 x 4 LV - 003 0 IDR 7,200.00 IDR - IDR - IDR - Transport

31 Light Vehicle 4 x 4 LV - 004 0 IDR 7,200.00 IDR - IDR - IDR - Transport

32 Light Vehicle 4 x 4 LV - 005 0 IDR 7,200.00 IDR - IDR - IDR - Transport

5.43

1380.698 IDR 65,520,315.000 IDR 169,983,683.750

lt / bcm lt / ton Unit / Bcm Unit / Ton

a. Loading OB 0.201 3827.046

b. Hauling OB 0.321 6757.457

c. Dozing & Ripping 0.060 3546.000

d. Loading Coal 0.176 3348.468 e. Hauling Coal 0.262 5523.266 f. Unit General 0.279 5135.085 g. Unit Supporting 0.166 3168.830 h. Salary 3940.326 i. Meal 1719.721 j. Office 279.629

k. Over Head Cost 372.839

l. APD 186.420 1.026 0.439 IDR 28,933.354 IDR 8,871.734 3.05 USD USD 0.93 23.69 IDR 24.29 IDR Grand Total

Resume Total Biaya Operasional

SAMARINDA, 8 April 2010

DWI NUGROHO ST

1,615,424,866.125 IDR

Double Rit

Single rit to Contractor with no coal hauling Single rit to Contractor with coal hauling

92,250,000.000 IDR 15,000,000.000 IDR 190,398,185.250 IDR 23,699,849.600 IDR 20,000,000.000 IDR 39,713,108.400 IDR 275,458,355.900 IDR 169,983,683.750 IDR 211,368,628.625 IDR 10,000,000.000 IDR Biaya Operasional Solar Biaya Produksi Activity 205,292,017.000 IDR 362,261,037.600 IDR

COST OPERASIONAL PRUDUKSI

GBE

JOB - SITE PPU

Sub Total 1246.168 IDR 14,727,440.00 Sub Total 3221.628 IDR 120,811,031.25 Sub Total 10762.360 IDR 127,803,025.00

Hauling OB

Loading Coal

Sub Total 17212.696 IDR 238,329,630.00 Dozing & Ripping

TARGET PRODUKSI OB TARGET PRODUKSI COAL SR

BAHAN BAKAR SOLAR SEWA ALAT

BIAYA PRODUKSI Produksi

Bcm NO

Hauling Coal

Sub Total 1886.953 IDR 26,127,045.00 UNIT KODE Jam kerja Prod'ty

Bcm/jam

Loading OB

KETERANGAN

Unit Supporting

Sub Total 8895.215 IDR 104,463,368.750 Unit General

(9)

1 PERIODE PRODUKSI ( HARI KERJA ) : 30 Hari Total = 21.000 Hari

2 TARGET OVERBURDENT ( OB ) : 53846.1538 Bcm / bln SR = 1 : 10

3 TARGET COAL : 7000 MT / bln Jam kerja = 20 jam / hari

4 JUMLAH JAM KERJA : 600 Jam / bln Jam krj / bln = 416.500 jam / bln

5 JARAK PIT - STOCKPILE : 0.3 Km

6 Number of Day : = 30 Day

Number of Holiday : = 0 Day

MOHH : 600 Hrs

7 Jumlah yang tersedia dalam satu bulan

Reguler : 21 X 20 = 420 Hrs

Friday : 5 X 19 = 95 Hrs

Sunday : 4 X 20 = 80 Hrs

= 595 Hrs

8 Rain & Slippery : = 25 % ( estimasi )

9 Efisiensi waktu : = 95 %

10 Effisiensi jam kerja : 70 X 595 = 416.500 Hrs

11 Effective working day : 70 X 30 = 21.000 Day

JARAK PRODUKTIVITAS PRODUKSI

( % ) ( Jam ) ( % ) ( Jam ) ( % ) ( Jam ) ( % ) ( Jam ) ( meter ) ( Bcm / jam ) ( Bcm )

1 PC 400 EX - 001 85 354.025 10 41.650 5 20.825 0 0.000 300 233.928 0.000 OB

2 PC 400 EX - 002 85 354.025 10 41.650 5 20.825 0 0.000 300 233.928 0.000 OB

3 PC 300 EX - 003 85 354.025 10 41.650 5 20.825 95 336.324 300 159.496 53642.415 OB

53642.415

1 DT NISSAN CWB 520 / HINO DT - 001 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

2 DT NISSAN CWB 520 / HINO DT - 002 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

3 DT NISSAN CWB 520 / HINO DT - 003 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

4 DT NISSAN CWB 520 / HINO DT - 004 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

5 DT NISSAN CWB 520 / HINO DT - 005 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

6 DT NISSAN CWB 520 / HINO DT - 006 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

7 DT NISSAN CWB 520 / HINO DT - 007 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

8 DT NISSAN CWB 520 / HINO DT - 008 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

9 DT NISSAN CWB 520 / HINO DT - 009 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

10 DT NISSAN CWB 520 / HINO DT - 010 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

11 DT NISSAN CWB 520 / HINO DT - 011 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

12 DT NISSAN CWB 520 / HINO DT - 012 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

13 DT NISSAN CWB 520 / HINO DT - 013 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

14 DT NISSAN CWB 520 / HINO DT - 014 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

15 DT NISSAN CWB 520 / HINO DT - 015 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

16 DT NISSAN CWB 520 / HINO DT - 016 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

17 DT NISSAN CWB 520 / HINO DT - 017 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

18 DT NISSAN CWB 520 / HINO DT - 018 85 354.025 10 35.403 5 17.701 0 0.000 300 44.046 0.000 Loading OB

19 DT NISSAN CWB 520 / HINO DT - 019 85 354.025 10 35.403 5 17.701 0 0.000 300 40.489 0.000 Loading OB

20 DT NISSAN CWB 520 / HINO DT - 020 85 354.025 10 35.403 5 17.701 0 0.000 300 40.489 0.000 Loading OB

21 DT NISSAN CWB 520 / HINO DT - 021 85 354.025 10 35.403 5 17.701 0 0.000 300 40.489 0.000 Loading OB

22 DT NISSAN CWB 520 / HINO DT - 022 85 354.025 10 35.403 5 17.701 94 332.784 300 40.489 13473.940 Loading OB

23 DT NISSAN CWB 520 / HINO DT - 023 85 354.025 10 35.403 5 17.701 94 332.784 300 40.489 13473.940 Loading OB

24 DT NISSAN CWB 520 / HINO DT - 024 85 354.025 10 35.403 5 17.701 93 329.243 300 40.489 13330.600 Loading OB

25 DT NISSAN CWB 520 / HINO DT - 025 85 354.025 10 35.403 5 17.701 93 329.243 300 40.489 13330.600 Loading OB

53609.080 1 D 155 A D - 001 85 354.025 10 35.403 5 17.701 0 0.000 35 259.259 0.000 Dozing 2 D 155 A D - 002 85 354.025 10 35.403 5 17.701 0 0.000 35 259.259 0.000 Dozing 3 D 85 E SS D - 003 85 354.025 10 35.403 5 17.701 91 322.163 35 166.667 53693.792 Dozing 53693.792 Note : Shift Siang

Jam Kerja 10 jam / hari Jam : 07.00 - 18.00 WITA 19.00 - 6.00 WITA

Jam Istirahat 1 jam / hari Jam : 12.00 - 13.00 WITA 0.00 1.00 WITA

PERENCANAAN ALAT BERAT UNTUK 53.800 Bcm OVER BURDENT

NO UNIT CODE MA TARGET BREAK DOWN STANDBY UTILIZATION TOTAL PRODUKSI KETERANGAN

Dibuat Oleh :

UNIT LOADING

UNIT HAULING

(10)

1 PERIODE PRODUKSI ( HARI KERJA ) : 30 Hari Total = 21.000 Hari

2 TARGET OVERBURDENT ( OB ) : 53846.1538 Bcm / bln SR = 1 : 10

3 TARGET COAL : 7000 MT / bln Jam kerja = 20 jam / hari

4 JUMLAH JAM KERJA : 600 Jam / bln Jam krj / bln = 416.500 jam / bln

5 JARAK PIT - STOCKPILE : 5 Km

6 Number of Day : = 30 Day

Number of Holiday : = 0 Day

MOHH : 600 Hrs

7 Jumlah yang tersedia dalam satu bulan

Reguler : 21 X 20 = 420 Hrs

Friday : 5 X 19 = 95 Hrs

Sunday : 4 X 20 = 80 Hrs

= 595 Hrs

8 Rain & Slippery : = 25 % ( estimasi )

9 Efisiensi waktu : = 95 %

10 Effisiensi jam kerja : 70 X 595 = 416.500 Hrs

11 Effective working day : 70 X 30 = 21.000 Day

JARAK PRODUKTIVITAS PRODUKSI

( % ) ( Jam ) ( % ) ( Jam ) ( % ) ( Jam ) ( % ) ( Jam ) ( meter ) ( Ton / jam ) ( Ton )

1 PC 200 EX - 004 85 354.025 10 41.650 5 20.825 16 56.644 5000 124.953 7077.819 Coal

7077.819

1 DT NISSAN CWA 540 / HINO DT - 027 85 354.025 10 35.403 5 17.701 14 49.564 5000 49.536 2455.173 Loading Coal

2 DT NISSAN CWA 540 / HINO DT - 028 85 354.025 10 35.403 5 17.701 14 49.564 5000 49.536 2455.173 Loading Coal

3 DT NISSAN CWA 540 / HINO DT - 029 85 354.025 10 35.403 5 17.701 13 46.023 5000 49.536 2279.804 Loading Coal

4 DT NISSAN CWA 540 / HINO DT - 030 85 354.025 10 35.403 5 17.701 0 0.000 5000 49.536 0.000 Loading Coal

5 DT NISSAN CWA 540 / HINO DT - 031 85 354.025 10 35.403 5 17.701 0 0.000 5000 49.536 0.000 Loading Coal

7190.150

1 D 85 E SS D - 004 85 354.025 10 35.403 5 17.701 10 35.403 General

2 PC 200 EX - 005 85 354.025 10 35.403 5 17.701 74 261.979 General

3 PC 200 EX - 006 85 354.025 10 35.403 5 17.701 0 0.000 General

4 PC 200 EX - 007 85 354.025 10 35.403 5 17.701 0 0.000 General

5 Motor Greder 705 A GD - 01 85 354.025 10 35.403 5 17.701 85 300.921 General

0.000

1 Water Pump 6' inlet Pump - 001 85 354.025 10 35.403 5 17.701 65 230.116 PIT

2 Water Pump 6' inlet Pump - 002 85 354.025 10 35.403 5 17.701 0 0.000 PIT

3 Water Pump 6' inlet Pump - 003 85 354.025 10 35.403 5 17.701 0 0.000 PIT

4 Water Pump 3' inlet Pump - 004 85 354.025 10 35.403 5 17.701 65 230.116 PIT

5 Fuel Truck 5000 lt FT - 001 85 354.025 10 35.403 5 17.701 0 0.000 Fuel

6 Fuel Truck 5000 lt FT - 002 85 354.025 10 35.403 5 17.701 0 0.000 Fuel

7 Water Truck 5000 lt WT - 001 85 354.025 10 35.403 5 17.701 0 0.000 Water

8 Water Truck 5000 lt WT - 002 85 354.025 10 35.403 5 17.701 0 0.000 Water

9 Lighting Tower LT - 001 85 354.025 10 35.403 5 17.701 55 194.714 Lighting

10 Lighting Tower LT - 002 85 354.025 10 35.403 5 17.701 55 194.714 Lighting

11 Lighting Tower LT - 003 85 354.025 10 35.403 5 17.701 0 0.000 Lighting

12 Lighting Tower LT - 004 85 354.025 10 35.403 5 17.701 0 0.000 Lighting

13 Lighting Tower LT - 005 85 354.025 10 35.403 5 17.701 0 0.000 Lighting

14 Lighting Tower LT - 006 85 354.025 10 35.403 5 17.701 0 0.000 Lighting

15 Genset 100 KW G - 001 85 354.025 10 35.403 5 17.701 50 177.013 Genset

16 Genset 100 KW G - 002 85 354.025 10 35.403 5 17.701 0 0.000 Genset

17 Genset 50 KW G - 003 85 354.025 10 35.403 5 17.701 50 177.013 Genset

18 Genset 50 KW G - 004 85 354.025 10 35.403 5 17.701 0 0.000 Genset

19 Genset 10 KW G - 005 85 354.025 10 35.403 5 17.701 50 177.013 Genset

20 Bus Karyawan BK - 001 Transport

21 Bus Karyawan BK - 002 Transport

22 Bus Karyawan BK - 003 Transport

23 Total Station TS - 001 Survey

24 Total Station TS - 002 Survey

25 Tangki Solar 20 ton TSo - 001 Fuel

26 Tangki Solar 10 ton Tso - 002 Fuel

27 Tangki Solar 10 ton Tso - 003 Fuel

28 Light Vehicle 4 x 4 LV - 001 Transport

29 Light Vehicle 4 x 4 LV - 002 Transport

30 Light Vehicle 4 x 4 LV - 003 Transport

31 Light Vehicle 4 x 4 LV - 004 Transport

32 Light Vehicle 4 x 4 LV - 005 Transport

Note :

Shift Siang

Jam Kerja 20 jam / hari Jam : 07.00 - 18.00 WITA 19.00 6.00 WITA

Jam Istirahat 2 jam / hari Jam : 12.00 - 13.00 WITA 0.00 1.00 WITA

NO UNIT CODE

PERENCANAAN ALAT BERAT UNTUK 7.000 MT BATUBARA

Dibuat Oleh : UNIT LOADING UNIT HAULING UNIT GENERAL UNIT SUPPORTING KETERANGAN

MA TARGET BREAK DOWN TOTAL

PRODUKSI

Referensi

Dokumen terkait

Pernyataan bersama ini mempunyai kekuatan pelaksanaan seperti putusan hakim dalam perkara perdata dan pelaksanaannya dijalankan dengan surat paksa yang mempunyai kekuatan hukum

Dalam perkara ini Terdakwa melanggar Pasal 372 KUHP dan diancam dengan pidana penjara paling lama 4 (empat) tahun karena Terdakwa telah melakukan tindak pidana

Capain kinerja sasaran peningkatan kesejahteraan dan tertib administrasi pegawai rata-rata dengan capaian 94,5% (sangat baik) capaian tersebut diukur dari 6 (enam)

serat-serat biasanya bersatu menjadi lembaran atau berkas, dan membrana selnya berlekatan satu sama lain pada banyak titik sehingga kekuatan yang terbentuk dalam

Analisis rasio solvabilitas dilakukan guna mengetahui kemampuan perusahaan untuk memenuhi segala kewajiban keuangannya apabila perusahaan tersebut di likuidaasi. Hal

Berdasarkan hasil uji t menunjukkan bahwa lama penyimpanan polen memberikan pengaruh yang sangat nyata pada viabilitas polen, presentase bunga menjadi buah,

Nilai rata-rata jumlah akar tunas pisang Kepok pada umur 12 MST pada media kontrol tidak berbeda nyata dengan jumlah akar pada media yang mengandung ancymidol 2

Pikiran dan budaya tidak dapat dipisahkan dan saling konstitutif, studi tentang bagaimana psikologis dan kecenderungan perilaku berakar dalam budaya mempengaruhi penanaman