PAPARAN PUBLIK TAHUNAN
Jakarta, 7 Agustus 2017
Gedung Bursa Efek Indonesia
PT TOBA BARA SEJAHTRA Tbk
Disclaimer
These materials have been prepared by PT Toba Bara Sejahtra Tbk (the“Company”).
These materials may contain statements that constitute forward-looking statements. These statements include descriptions regarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results of operations and financial condition of the Company. These statements can be recognized by the use of words such as“expects,” “plan,” “will,” “estimates,” “projects,” “intends,” or words of similar meaning. Such forward-looking statements are not guarantees of future performance and involve risks and uncertainties, and actual results may differ from those in the forward-looking statements as a result of various factors and assumptions. The Company has no obligation and does not undertake to revise forward-looking statements to reflect future events or circumstances.
These materials are for information purposes only and do not constitute or form part of an offer, solicitation or invitation of any offer to buy or subscribe for any securities of the Company, in any jurisdiction, nor should it or any part of it form the basis of, or be relied upon in any connection with, any contract, commitment or investment decision whatsoever. Any decision to purchase or subscribe for any securities of the Company should be made after seeking appropriate professional advice.
3
Agenda Paparan Publik 2017
Kinerja Operasional 2 Profil Perseroan 4 Strategi Perseroan 3 Kinerja Keuangan 1 Kinerja Pemasaran 5 Proyek Listrik 6 Proyek Sulbagut-1 Proyek Sulut-3 i ii
Profil Perseroan
Tentang Perseroan
Kelistrikan
Lokasi : Gorontalo Utara, Gorontalo
(“GLP”) dan Minahasa Utara, Sulawesi Utara (“MCL”)
Kapasitas PLTU : Masing-masing 2x50 MW
Lokasi : Kutai Kartanegara, Kalimantan Timur
Total luas area : 7.087 Ha Lokasi konsesi saling
bersebelahan
Total cadangan : 147 juta ton (“JORC terakhir”)
Kalori : 4.700-5.900 GAR
Pertambangan
Lokasi : Kutai Kartanegara, Kalimantan Timur
Luas Lahan : Hak Guna Usaha 8.633 Ha (2.701 Ha tertanam)
Kapasitas Pabrik Kelapa Sawit : 30 ton Tandan Buah Segar (“TBS”) per jam
Perkebunan & Pabrik Kelapa Sawit
5
Kalimantan
Kalimantan Timur Gorontalo Sulawesi Utara Izin Usaha Budidaya Perkebunan, jatuh tempo 2036 Izin Usaha Perkebunan -Pengelohan (IUP-P)
Struktur Kepemilikan
Davit Togar Pandjaitan PT Bara Makmur Abadi PT Toba Sejahtra Roby Budi Prakoso PT Sinergi Sukses Utama 61,79% 10,00% 6,25% 5,10%PT Toba Bumi Energi
99,99% 99,99% 3,64% 51,00% 99,99% Publik 12,47% 90,00% 80,00% 0,75% 90,00% 99,60% Highland Strategic Holdings Pte. Ltd Izin Area Izin Usaha Pertambangan (“IUP-OP”) jatuh tempo Desember 2029 2.990 ha IUP-OP jatuh tempo Maret 2023 683 ha IUP-OP jatuh tempo Desember 2023 3.414 ha 8.633 ha (HGU) Power Purchase Agreement (“PPA”) dengan PLN selama 25 tahun ~65 ha PPA dengan PLN selama 25 tahun 30 - 40 ha Offtake (“take or pay”) oleh PLN selama 25 tahun Area yang telah
ditanami: 2.701 ha Offtake (“take or pay”) oleh PLN selama 25 tahun Lain-lain Cadangan: 117 juta ton* Sumberdaya: 156 juta ton* Cadangan: 22 juta ton* Sumberdaya: 37 juta ton* Cadangan: 8 juta ton* Sumberdaya: 43 juta ton*
7
Perseroan memaksimalkan sinergi operasi tambang untuk biaya transportasi yang lebih efisien
Lokasi Konsesi Perseroan
Muara Jawa Muara Berau Muara Jawa Selat Makassar ~55 km (total ~120 km) Balikpapan Samarinda ~65 km
Kota besar Jetty Transhipment Point TMU – IM Hauling Road Kutai Energi TMU ABN IM Kota terdekat berjarak kurang dari 50 km Lokasi 3 tambang yang bersebelahan
Jarak yang dekat antara jetty dan
pengapalan Jarak pit ke jetty
terdekat 1-5 km dan terjauh 25 km ~5 km
IM jetty ABN jetty
TMU
IMABN
TMU
Overland & Barge Loading Jetty: Kecepatan loading
1.800 ton/jam CPP* berkapasitas
10 juta ton/tahun Jarak hauling yang
pendek < 5km
Jalan hauling
CPP* berkapasitas 6 juta
ton/tahun Conveyor menuju jetty
Jarak hauling yang pendek < 4km
Infrastruktur yang Terintegrasi
Konsesi TOBA
ROM stockpile 8
2015
2016
TOBA menerima penghargaan Finance
Asia’s 7th Company Most Committed to Paying Good Dividends
Penghargaan dan Sertifikasi
9 ABN menerima Penghargaan
Lingkungan Hidup PROPER Emas
ABN menerima KUKAR CSR Award
IM dan TMU menerima Penghargaan Lingkungan Hidup PROPER Biru
ABN menerima sertifikasi ISO 9001 Quality Management
TMU menerima sertifikasi ISO 14001, OHSAS 18001 dan ISO 9001
ABN menerima Penghargaan
Lingkungan Hidup PROPER Emas
IM dan TMU menerima
Penghargaan Lingkungan Hidup PROPER Hijau
ABN menerima Penghargaan
Lingkungan Hidup PROPER Emas 3 tahun berturut-turut
IM dan TMU menerima
Penghargaan Lingkungan Hidup PROPER Hijau
IM menerima sertifikasi ISO
14001, OHSAS 18001 dan ISO 9001
2017
ABN meraih Corporate Biodiversity Responsibility Achievement (CBRA) terkait
komitmen konservasi sumber daya alam di area ABN
ABN meraih penghargaan atas pencapaian 1.458.733 jam kerja dengan tidak ada
kecelakaan kerja yang
menimbulkan Free Lost
Time Injury
ABN menerima
Penghargaan dari Bea Cukai Kaltim sebagai Perusahaan Teladan
TMU menerima
Penghargaan Pratama dari Kementerian ESDM
Signing PPA
dengan PLN untuk Proyek Sulut-3
Signing Enginering Procurement Contract (EPC) dengan SEPC
untuk Proyek Sulbagut-1
Perolehan Kontrak Penting 2017
7 April 2 Mei 7 Juli 11 Juli 14 Juli
Signing Project Financing
untuk Proyek Sulbagut-1 dengan Bank Mandiri
Tercatat di BEI 6 Juli 2012
Jumlah Penawaran Saham 210.681.000 lembar saham atau 10,47%
Hasil IPO Rp 400.293.900.000
Kode Saham TOBA
Anchor Investor Baring Private Equity Asia (8% saat IPO)
Penawaran Umum Saham Perdana (IPO)
Informasi Penting
10
Pencapaian Financing
Date PLN untuk Proyek
Sulbagut-1
Signing Fasilitas Pinjaman
Transaksi Khusus dan Non-Cash
Strategi Perseroan
Strategi Keberlanjutan Usaha
Transformasi
• Akuisi tambang disekitar konsesi Perseroan
• Akuisi tambang untuk mendukung proyek listrik Perseroan
• Partisipasi aktif tender IPP PLN • Evaluasi pengembangan energi terbarukan • Identifikasi partner strategis berpengalaman • Ekspansi kapasitas
proyek listrik Perseroan
Coal Mine • Optimalisasi existing mine plan • Optimalisasi infrastructure sharing • Manajemen biaya • Diversifikasi pelanggan • Partisipasi aktif CSR Strategi Perseroan
Integrated
Energy
Company
Fossil Fuel andRenewables Power Present Future Inisiatif Perseroan
Coal
Mining
Company
Kinerja Keuangan
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 1H17 US$ 98,5/t US$ 62,5/ton US$ 50,1/ton US$ 72,5/ton US$ 66,6/ton US$ 54,8/ton US$ 45,4/ton US$ 66,0/t US$ 80,6/t (US$)
Source : Global Coal
Pergerakan Average Selling Price (ASP)
14
Newcastle (NEWC) Index & ASP
Rata-rata NEWC Index naik 22,2% dari US$ 66,0/ton di 2016 menjadi US$ 80,6/ton di 1H17
ASP naik sebesar 26,2% dari US$ 45,4/ton di 2016 menjadi US$ 57,3/ton di 1H17
NEWC Index ASP Rata-rata NEWC Index US$ 128,8/t US$ 41,5/ton US$ 72,4/t US$ 65,5/ton US$ 121,1/t US$ 91,3/ton US$ 96,9/t US$ 85,3/t US$ 63,7/ton US$ 70,8/t US$ 59,2/t US$ 57,3/ton
15
Volume Penjualan, NEWC Index & ASP
(juta ton dan US$/ton)
Penjualan, Beban Pokok Penjualan dan Marjin Laba Bruto (US$ juta dan %)
EBITDA/ton dan Marjin EBITDA
(US$/ton dan %) Kenaikan ASP per ton berdampak positif
pada marjin laba bruto dan marjin EBITDA
Dampak Kenaikan ASP terhadap Marjin Laba
3,3 3,1 2,2 62,7 50,9 80,6 57,3 45,4 57,3 1H15 1H16 1H17 Volume Penjualan NEWC Index ASP 9,0 7,2 12,9 15,6% 15,8% 22,2% 1H15 1H16 1H17 EBITDA/ton Marjin EBITDA 190,8 139,0 127,9 154,7 110,9 91,2 18,9% 20,2% 28,6% 1H15 1H16 1H17 Penjualan Beban Pokok Penjualan Marjin Laba Bruto
Pencapaian Konsolidasi 2017
Operasional 1H16 1H17 Perubahan Volume Produksi 2,8 2,3 -17,9% Volume Penjualan 3,1 2,2 -29,0% Stripping Ratio 13,1 14,0 6,9% Penjualan 139,0 127,9 -8,0% EBITDA* 22,0 28,4 29,1%Laba Tahun Berjalan 9,3 14,6 57,0%
Keuangan 1H16 1H17 Perubahan
Catatan: angka diaudit
(*) EBITDA = Laba bruto– beban penjualan dan pemasaran dan beban umum dan administrasi + depresiasi dan amortisasi
45,4
16
NEWC Index 50,9 80,6 58,3%
Harga Jual Rata-Rata (ASP) 57,3 26,2%
Juta ton Juta ton x US$/ton US$/ton US$ Juta US$ Juta US$ Juta
FOB Cash Cost US$/ton 34,9 38,8 11,2%
15,8%
Marjin EBITDA 22,2%
Marjin Laba Bruto
Rasio Keuangan 2015 2016
28,6% 20,2%
17
Neraca Konsolidasi
Posisi tingkat hutang berada pada kondisi yang sehat dengan rata-rata net debt to
EBITDA di 0,3x Neraca Konsolidasi
US$ juta
Catatan: angka diaudit,
(*) Pinjaman berbunga = hutang bank + sewa pembiayaan (**) EBITDA = berdasarkan angka 12 bulan terakhir
Posisi Hutang Bersih
US$ juta Net Debt to EBITDA** 0,4x 0,6x 0,4x 0,2x 0,3x 276,3 Total Aset 261,6 5,6% Pinjaman Berbunga* 51,3 61,3 19,5% Total Liabilitas 113,8 120,8 6,1% Nilai Ekuitas 147,7 155,5 5,2% Des‘16 Jun ‘17
∆
Kas dan Setara Kas 37,6 49,5 31,6%
58,0 54,4 51,3 47,9 61,3 40,7 31,1 37,6 37,1 49,5 K2 2016 K3 2016 K4 2016 K1 2017 K2 2017 Pinjaman Berbunga Kas dan Setara Kas
Belanja Modal dan Realisasi
Realisasi Belanja Modal hingga Juni 2017
18 Realisasi belanja modal 1H17 : US$ 5,3 juta terkait kegiatan
tambang dari rencana 2017 : US$ 60 – 65 juta (termasuk investasi pada proyek listrik)
Uang muka perolehan aset 75% Eksplorasi dan pembebasan lahan 15% Kendaraan 4% Mesin dan alat berat 3% Conveyor 2% Peralatan kantor 1%
Kinerja Operasional
Pencapaian Produksi
20
Rencana produksi full year 2017 sesuai mine plan
Penerapan mine plan mengutamakan produksi untuk menjaga cadangan batubara dan tetap menghasilkan marjin per ton tertentu
Optimalisasi kinerja melalui implementasi joint mine plan antara tim operasional dengan tim kontraktor dan infrastructure sharing antar entitas anak
0,8 2,0 4,1 5,2 5,6 6,5 6,1 5,5 2,3 2,5 - 3,0 11,9x 10,5x 9,9x 12,6x 14,9x 13,4x 13,3x 12,3x 12,9x 14,0x 13,0x - 13,5x 0 2 4 6 8 10 12 2008 2009 2010 2011 2012 2013 2014 2015 2016 1H17 Guidance
ABN IM TMU Stripping Ratio (x)
8,1 1H 2017 J ut a T on
13,8x 12,8x 12,6x 13,7x 14,3x 12,0x - 13,0x 0.0x 0.2x 0.4x 0.6x 0.8x 1.0x 1.2x 1.4x 0.0 0.1 0.1 0.2 0.2 0.3 K2 2016 K3 2016 K4 2016 K1 2017 K2 2017 Guidance
TMU IM ABN SR (Consolidated)
Perkembangan Produksi Secara Kuartal
Produksi dan SR (Kuartalan) Juta ton dan x
21
Produksi kuartalan 1H17 < guidance karena faktor cuaca dengan curah hujan tinggi Perseroan mentargetkan normalisasi produksi di 2H17
Kuartalan 2017 Normalisasi produksi hingga K4 2017 1,25 - 1,50 1,3 1,4 1,4 1,1 1,2
Automation di CPP ABN
Aktivitas Operasional
22
Pembukaan Pit baru di TMU
Penerapan Otomasi Pengendalian Perintah pada operasional CPP untuk mengurangi human
error dan manual work
Pembukaan Pit baru untuk peningkatan produksi
23
Tujuan:
Meningkatkan nilai tambah usaha perkebunan kelapa sawit melalui hilirisasi
Manfaat Lainnya:
Dapat menampung tandan buah segar yang dihasilkan masyarakat sekitar PKU
Kapasitas:
PKS : 30 ton tandan buah segar per jam
Dapat ditingkatkan menjadi 60 ton tandan buah segar per jam
Pabrik Kelapa Sawit
Pabrik Kelapa Sawit (PKS) di PKU
Main Building
Vertical Sterilizer
Mill Office & CPO Storage Tank
Strategi Perseroan untuk meningkatkan kualitas hidup masyarakat wilayah setempat dicapai melalui pemberdayaan 4 pilar utama:
Pendidikan Program
Pengembangan PAUD Program Fasilitas Bis
Sekolah di sekitar Lingkungan Tambang Program Pemberian
Beasiswa bagi Siswa Berprestasi
Pendirian Sekolah Sepak Bola bagi pelajar
Kesehatan
Program Pemeriksaan Dokter dan
Pengobatan Gratis dan sarana Puskesmas Program Pemberian
Pelayanan Kesehatan/ Posyandu bagi Balita, Lansia dan Ibu Hamil Program Pemberian Makanan Tambahan Program Penyuluhan Kesehatan Ekonomi Program Pengembangan Budidaya Ternak Ikan Lele dan Nila Program Pemeliharaan Sapi dan Pengembangbiakan Kambing Peranakan Etawa Program Pembinaan Kelompok Usaha Bersama (KUB)
Komitmen Sosial Untuk Meningkatkan
Kesejahteraan Masyarakat
Lingkungan Program Penghijauan dan Pengembangan Kampung Hijau Program Pengelolaan Sampah Program normalisasi dan pembersihan paritKinerja Pemasaran
96% 63% 71% 77% 4% 37% 29% 23% Traders End-users 30 40 50 60 70 80 90 100 110 120 2014 2015 2016 1H17 NEWC ASP
Kenaikan ASP 1H17 vs ASP 2016 > kenaikan NEWC karena perolehan harga kontrak yang baik selama 2H16
Pergerakan ASP terhadap Indeks Acuan
20
US$/ton
Selama 2014-2015, spread antara indeks NEWC dan ASP turun karena optimalisasi pemasaran di harga fixed kepada pelanggan premium di Jepang, Korea, Taiwan dan Malaysia
Sebagian besar penjualan 2016 telah ditentukan secara fixed pada semester pertama, kenaikan indeks NEWC dalam 2 bulan terakhir yang di luar prediksi pasar tidak terefleksikan dalam ASP 2016
Diversifikasi Pasar Tujuan Ekspor
27
Fokus penjualan diutamakan pada negara tujuan ekspor yang menunjukkan permintaan yang stabil seperti Korea,Thailand, Taiwan dan Jepang
Diversifikasi pasar selain Tiongkok tetap menjadi highlight pada tahun 2017
Persentase Tujuan Ekspor 2017 Fokus Tujuan Ekspor 1H15 – 1H17
10% 7% 5% 30% 26% 31% 4% 10% 24% 18% 6% 11% 6% 6% 7% 1H15 1H16 1H17
Tiongkok Korea Thailand Taiwan Japan
30,8% 23,6% 11,4% 7,9% 7,0% 5,5% 3,8% 3,4% 2,9% 2,0% 1,7% .00 .200 .400 .600 Korea Thailand Taiwan Malaysia Japan Tiongkok India Vietnam Hong Kong Bangladesh Lainnya Juta ton
28
1H15 dan 1H16, secara konsisten kontribusi penjualan terbesar : produk 5600 GAR Di 1H17 kontribusi penjualan terbesar : produk 4800 - 5200 GAR
Persentase Komposisi Produk 1H17 Komposisi Produk 1H15 – 1H17
Komposisi Produk berdasarkan Nilai Kalori
32% 36% 23% 39% 30% 11% 0% 10% 10% 29% 24% 56% 1H15 1H16 1H17 5600 HS 5600 RS 5800 Lainnya 24,8% 23,4% 22,3% 11,4% 10,0% 7,0% 1,1% .00 .200 .400 .600 4800 & 5000 5600 HS 5200 5600 RS 5800 5900 LS Lainnya Juta Ton
Proyek Listrik
Proyek Sulbagut-1
31
Gambaran Umum Proyek Sulbagut-1
Lokasi Proyek :
Gorontalo
Utara
Proyek Sulbagut-1 adalah bagian dari Program 35
G
W
• 2 x 50 MW Kapasitas Net • Build-Own-Operate-Transfer (BOOT) Skema Kontrak • PC Boiler dengan FGD Tipe Boiler • 25 Tahun Masa Kontrak • MID 2020 Target COD • SEPC EPC • USD 210-220 juta Nilai Proyek
32
Pencapaian Financial Close
Izin Prinsip Pembebasan Lahan Persetujuan Tarif Kontrak EPC Perjanjian Pembiayaan Resepsi Financal Close Dihadiri Direksi PLN Pencapaian Financing Date PLN, 14 Juli 2017
33
2017
2020
Site Preparation2018
2019
KonstruksiTahapan setelah Financial Close
Commercial Operation Date (COD) Commissioning
Proyek Sulut-3
35
Lokasi Proyek :
Minahasa
Utara
Proyek Sulut-3 adalah bagian dari Program 35
G
W
• 2 x 50 MW Kapasitas Net • Build-Own-Operate-Transfer (BOOT) Skema Kontrak • CFB Tipe Boiler • 25 Tahun Masa Kontrak • 33 bulan setelah Commencement of Work Target COD • Sinohydro EPC • USD 205-215 juta Nilai Proyek
36
Signing PPA Proyek Sulut-3
Signing PPA Proyek Sulut-3,
7 April 2017