Potensi Konsolidasi
Sumber Data
Aplikasi SIRUP
Transformasi Pengadaan
Aspek
Biaya Administrasi
Jumlah Paket Pengadaan
Harga Beli Pelaksanaan Ruang Lingkup Metode
Paradigma Lama
Tinggi BanyakTidak harga pasar
Klerikal
Kecil (fungsional)
Manual, sebagian elektronik
Paradigma Baru
Lebih Rendah
Sedikit
Mendekati harga pasar
Strategis
Luas (bagian dari strategi organisasi)
Lelang/Seleksi Pengadaan Langsung E-Purchasing Penunjukan Langsung 23,68% 50,38% 20,86% 5,08% 63,42% 21,50% 12,92% 2,15% vol_paket pagu_rup
Row Labels vol_paket pagu_rup
Lelang/Seleksi 1,034 882,132,607,823 Pengadaan Langsung 2,200 299,054,108,158 E-Purchasing 911 179,750,850,789 Penunjukan Langsung 222 29,944,681,955
Grand Total 4,367.00 1,390,882,248,725.00
Row Labels vol_paket pagu_rup
Lelang/Seleksi 23.68% 63.42% Pengadaan Langsung 50.38% 21.50% E-Purchasing 20.86% 12.92% Penunjukan Langsung 5.08% 2.15%
Rangking
SKPD
Pagu
SIRUP
2017
NO SKPD Sum of vol_paket Sum of pagu_rup 1 DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA TANGERANG 1383 637,465,689,605.00 2 DINAS PERUMAHAN DAN PERMUKIMAN KOTA TANGERANG 297 259,594,796,900.00 3 RUMAH SAKIT UMUM DAERAH KOTA TANGERANG 150 83,631,245,348.00 4 DINAS KESEHATAN KOTA TANGERANG 1025 77,379,776,272.00 5 DINAS PENDIDIKAN KOTA TANGERANG 31 53,836,505,868.00 6 DINAS PERHUBUNGAN KOTA TANGERANG 115 35,899,579,943.00 7 SEKERTARIAT DAERAH KOTA TANGERANG 49 27,498,956,820.00 8 DINAS LINGKUNGAN HIDUP KOTA TANGERANG 147 24,482,409,637.00 9 DINAS KEBUDAYAAN DAN PARIWISATA KOTA TANGERANG 104 17,068,940,090.00 10 DINAS KOMUNIKASI DAN INFORMATIKA KOTA TANGERANG 138 15,910,567,148.00
11 DINAS PERINDUSTRIAN DAN PERDAGANGAN KOTA TANGERANG 21 14,326,756,300.00
12 KECAMATAN PINANG KOTA TANGERANG 64 11,664,578,800.00
13 KECAMATAN CIPONDOH KOTA TANGERANG 69 10,391,801,000.00
14 DINAS KEPENDUDUKAN DAN PENCATATAN SIPIL KOTA TANGERANG 27 9,800,883,032.00 15 BADAN PERENCANAAN PEMBANGUNAN DAERAH KOTA TANGERANG 55 9,468,660,800.00 16 BADAN PENGELOLA KEUANGAN DAERAH KOTA TANGERANG 38 9,335,319,584.00
17 KECAMATAN KARANG TENGAH KOTA TANGERANG 64 9,233,095,658.00
18 KECAMATAN TANGERANG 55 8,621,069,185.00
19 DINAS PEMUDA DAN OLAHRAGA KOTA TANGERANG 40 7,496,825,220.00
20 KECAMATAN NEGLASARI KOTA TANGERANG 38 6,876,684,850.00
21 KECAMATAN LARANGAN KOTA TANGERANG 40 6,482,415,300.00
22 BADAN PENANGGULANGAN BENCANA DAERAH KOTA TANGERANG 20 6,046,166,360.00
23 KECAMATAN KARAWACI KOTA TANGERANG 54 5,893,190,950.00
24 KECAMATAN BENDA KOTA TANGERANG 39 4,724,215,000.00
25 KECAMATAN PERIUK KOTA TANGERANG 46 4,085,857,900.00
26 BADAN PENDAPATAN DAERAH KOTA TANGERANG 23 3,878,192,047.00
27 DINAS KOPERASI DAN UKM KOTA TANGERANG 13 3,863,616,120.00
28 KECAMATAN JATIUWUNG KOTA TANGERANG 26 3,813,858,600.00
29 KECAMATAN CIBODAS KOTA TANGERANG 33 3,007,742,250.00
30 DINAS KETENAGAKERJAAN KOTA TANGERANG 19 2,906,239,188.00
31 DINAS SOSIAL KOTA TANGERANG 19 2,554,794,200.00
32 DINAS KETAHANAN PANGAN KOTA TANGERANG 27 2,328,747,904.00
33 DINAS PMPTSP KOTA TANGERANG 16 2,245,981,890.00
34 SEKERTARIAT DPRD KOTA TANGERANG 8 2,127,401,895.00
35 BADAN KEPEGAWAIAN DAN PENGEMBANGAN SUMBER DAYA MANUSIA 19 2,093,623,230.00 36 DINAS PERPUSTAKAAN DAN ARSIP DAERAH KOTA TANGERANG 21 1,831,186,571.00
37 DINAS PERTANAHAN KOTA_TANGERANG 9 974,606,460.00
38 DINAS PPPAPPKB KOTA TANGERANG 12 826,691,800.00
39 INSPEKTORAT KOTA TANGERANG 10 709,272,000.00
40 KECAMATAN BATUCEPER KOTA TANGERANG 2 404,900,000.00
41 PDAM TIRTA BENTENG 1 99,407,000.00
Pola Konsolidasi, al:
• Satu kontrak pelaksanaan / Kontrak Payung
Penggabungan Paket
Kontrak jangka panjang
• Hotmix, readymix, box culvert, paving block, sheet pile
Supply By Owner
• DB, EPC. dll
Kontrak Terintegrasi
Lelang Itemized
Implementasi
Konsolidasi
melalui
e-lelang
itemized
Kelebihan
– Biaya pemiliham menjadi lebih efisien
– Evaluasi kualifikasi dan pembuktian kualifikasi
menjadi lebih simple
– Evaluasi teknis jadi lebih valid
– Menghindari makelar/boker
Konsolidasi dg Lelang
Itemized
PPK
PPK
PPK
PPK
Pokja
ULP
PPK
PPK
PPK
PPK
RPP
Pemilihan
Belanja/
Kontrak
Data Lelang
Dinas FGH Kab. XYZ
Harga Satuan Total 1 Item 1 1,270 20,000 25,400,000 2 Item 2 2,540 35,000 88,900,000 3 Item 3 6,350 12,500 79,375,000 4 Item 4 3,810 56,000 213,360,000 5 Item 5 1,270 20,000 25,400,000 6 Item 6 1,270 32,100 40,767,000 7 Item 7 5,080 30,000 152,400,000 8 Item 8 10,160 17,500 177,800,000 9 Item 9 10,160 20,000 203,200,000 10 Item 10 13,970 44,500 621,665,000 11 Item 11 2,540 15,000 38,100,000 12 Item 12 2,540 16,200 41,148,000 13 Item 13 8,890 27,000 240,030,000 14 Item 14 3,810 30,000 114,300,000 15 Item 15 3,810 20,000 76,200,000 2,138,045,000 No Barang/Jasa Vol. Kebutuhan HPS
Lelang Biasa
Harga Satuan Total Harga Satuan Total Harga Satuan Total 1 Item 1 1,270 17,285 21,951,950 16,282 20,678,140 19,203 24,387,810 2 Item 2 2,540 28,493 72,372,220 29,170 74,091,800 33,586 85,308,440 3 Item 3 6,350 12,138 77,076,300 10,514 66,763,900 11,425 72,548,750 4 Item 4 3,810 47,512 181,020,720 54,613 208,075,530 51,268 195,331,080 5 Item 5 1,270 19,485 24,745,950 18,957 24,075,390 18,488 23,479,760 6 Item 6 1,270 26,016 33,040,320 27,955 35,502,850 30,654 38,930,580 7 Item 7 5,080 25,381 128,935,480 25,459 129,331,720 25,899 131,566,920 8 Item 8 10,160 15,725 159,766,000 14,545 147,777,200 15,004 152,440,640 9 Item 9 10,160 17,257 175,331,120 17,683 179,659,280 19,098 194,035,680 10 Item 10 13,970 43,524 608,030,280 38,699 540,625,030 40,433 564,849,010 11 Item 11 2,540 12,658 32,151,320 14,243 36,177,220 12,624 32,064,960 12 Item 12 2,540 14,816 37,632,640 15,283 38,818,820 13,629 34,617,660 13 Item 13 8,890 22,375 198,913,750 25,109 223,219,010 23,131 205,634,590 14 Item 14 3,810 24,591 93,691,710 29,072 110,764,320 26,912 102,534,720 15 Item 15 3,810 17,184 65,471,040 19,244 73,319,640 19,597 74,664,570 1,910,130,800 1,908,879,850 1,932,395,170 PT. C No Barang/Jasa Vol. Kebutuhan PT. A PT. BLelang Itemized
Harga Satuan Harga Satuan Harga Satuan Harga Satuan Harga Satuan HargaSatuan Total Penyedia
1 Item 1 17,285 16,282 19,203 15,736 15,736 19,984,720 PT. E 2 Item 2 28,493 29,170 33,586 31,349 28,493 72,372,220 PT. A 3 Item 3 12,138 10,514 11,425 8,781 8,781 55,759,350 PT. E 4 Item 4 47,512 54,613 51,268 41,970 44,291 41,970 159,905,700 PT. D 5 Item 5 19,485 18,957 18,488 18,960 17,727 17,727 22,513,290 PT. E 6 Item 6 26,016 27,955 30,654 29,070 27,019 26,016 33,040,320 PT. A 7 Item 7 25,381 25,459 25,899 26,045 19,853 19,853 100,853,240 PT. E 8 Item 8 15,725 14,545 15,004 15,962 16,599 14,545 147,777,200 PT. B 9 Item 9 17,257 17,683 19,098 18,603 17,257 175,331,120 PT. A 10 Item 10 43,524 38,699 40,433 36,655 36,655 512,070,350 PT. D 11 Item 11 12,658 14,243 12,624 12,051 12,051 30,609,540 PT. D 12 Item 12 14,816 15,283 13,629 11,904 11,904 30,236,160 PT. D 13 Item 13 22,375 25,109 23,131 23,666 22,375 198,913,750 PT. A 14 Item 14 24,591 29,072 26,912 20,047 28,096 20,047 76,379,070 PT. D 15 Item 15 17,184 19,244 19,597 15,549 13,351 13,351 50,867,310 PT. E 1,686,613,340
PT. C PT. D PT. E Pememanga Lelang Itemized No Barang/Jasa
Dokumen
Lelang
Itemized
SPSE
SiRUP
Diskusi Permasalahan Kontrak
Alur Dokumen Kontrak
Persiapan• Menetapkan
Rancangan
Kontrak
Pelaksanaan Pemilihan• Perubahan
Rancangan
Kontrak (jika
ada)
Penandatanganan Kontrak• Finalisasi
Draft Kontrak
Bagian2
Kontrak
Pokok
Perjanjian
SSUK
SSKK
Dokumen lain
Pembukaan
• Judul, nomor, tanggal, kalimat
pembuka, para pihak, latar
belakang
Isi
• Pernyataan sepekat mengenai
obyek, menyetujui harga kontrak,
ungkapan mempunyai arti &
makna yg sama, terdiri dr bbrp
dokumen, hierarki, persetujuan
para pihak untuk melaksanakan
kewajiban masing-masing, jangka
waktu pelaksanaan pekerjaan,
efektif berlakunya Kontrak
Penutup
• menyetujui untuk melaksanakan
perjanjian, tandan tangan,
Hierarki
Dokumen Kontrak
Adendum Surat Perjanjian Pokok Perjanjian
Surat Penawaran beserta penawaran harga Syarat-syarat Khusus Kontrak
Syarat-syarat Umum Kontrak Spesifikasi Khusus
Spesifikasi Umum Gambar-gambar
Daftar kuantitas dan harga (apabila ada)
Dokumen lainnya : Jaminan, SPPBJ, BAHP, BAPP
Ketentuan Umum
Pelaksanaan Kontrak
Penyelesaian Kontrak
Perubahan Kontrak
Keadaan Kahar
Pengehentian & Pemutusan Kontrak
Hak dan Kewajiban Penyedia
Hak dan Kewajiban PPK
Personil dan/atau Peralatan Penyedia
Pembayaran kepada Penyedia
Pengawasan Mutu
Korespndensi
Wakil Sah Para Pihak Tanggal berlaku kontrak Jadwal pelaksanaan Pekerjaan Masa Pemeliharaan Umur Konstruksi Pedoman OP Pembayaran tagihan Pencairan jaminan Persetujuan Kepemilikan Dokumen Fasilitas Sumber Pembiayaan Pembayaran Uang Muka Pembayaran Prestasi Pekerjaan Penyesuaian harga Peristiwa kompensasi Denda Sanksi Penyelisihan Perselisihan
SSKK
Dokumen penawaran
Spesifikasi khusus
Spesifikasi Umum
Gambar-gambar
DKH
Jaminan-jaminan
SPPBJ
BAHP
BAPP
Dokumen Pengadaan dan Addendum
dll
Uang Muka
Pemb.
Tagihan
Kontrak KritisJenis
Kontrak
Peny. Harga Jadwal Fasilita sPemb.
Prestasi
Masa
Pemeli
haraan
Umur Konstruks i Peny. Sengketa Denda & Ganti RugiKONTRAK
PERMASALAHAN
KONTRAK
Addendum (Perubahan Kontrak)
Perpanjangan Waktu
Pemberian Kesempatan
Denda Keterlambatan
Pemutusan Kontrak
Daftar Hitam (Blacklist)
Barang/Jasa Tidak Sesuai
Penyesuaian Harga
Permasalahan Akhir Tahun
Perpanjangan
Waktu
Pemberian
Kesempatan
Perpanjangan Waktu VS
Pemberian Kesempatan
Perpanjangan
Waktu
Pemberian
Kesempatan
Penyebab
pekerjaan tambah;
perubahan disain;
keterlambatan yang
disebabkan oleh PPK;
masalah yang timbul di luar
kendali penyedia; dan/atau
keadaan kahar
Karena kesalahan Penyedia
tidak dapat menyelsaikan
pekerjaan 100% sesuai
dengan waktu pelaksanaan
kontrak.
Waktu Kontrak Bertambah
Bertambah
Waktu
Pelaksanaan
Kontrak
Bertambah
Tetap
Denda
Keterlambatan
Tidak ada
Ada: 1/1000 dari Nilai kontrak
Pemutusan Kontrak
JADWAL Tidak Terpenuhi Kahar Penghentian Kontrak KesalahanPenyedia Kontrak Kritis
Pemutusan Kontrak Terpenuhi Pekerjaan Selesai Pekerjaan Tidak Selesai Hasil Tidak dapat Ditunda Pemutusan Kontrak Hasil Dapat Ditunda Diperkirakan Tidak Selesai Pemutusan Kontrak Diperkirakan Selesai Masa Keterlambatan Pekerjaan Selesai Pekerjaan Tidak Selesai Pemutusan Kontrak