FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
:
No. PAKET KONTRAK
:
NAMA PAKET
:
PROPINSI
:
ITEM PEMBAYARAN NO.
: 10.1 (1)
JENIS PEKERJAAN
: Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
% THD. BIAYA PROYEK : 0.11PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja
(L01)
Jam
378.0000
2,857.14
1,079,998.92
2.
Mandor
(L03)
Jam
75.6000
3,214.29
243,000.32
1,322,999.24
B.
BAHAN
1.
Camp. Aspal Panas
M3
10.7280
620,327.41
6,654,872.49
2.
Camp. Aspal Dingin
M3
10.7280
589,721.91
6,326,536.60
3.
Aspal Pengisian Retak
Liter
1,006.0000
2,814.72
2,831,606.56
4.
Bahan-bahan lainnya
LS
1.0000
6,310,000.00
6,310,000.00
22,123,015.66
C.
PERALATAN
1.
Motor Grader
(E13)
Jam
25.2000
144,230.72
3,634,614.17
2.
Flat Bed Truck (E11)
Jam
25.2000
75,927.86
1,913,382.19
3.
Air Compressor (E05)
Jam
25.2000
49,111.95
1,237,621.23
6,785,617.59
D.
Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C )
30,231,632.49
E.
Over Head and Profit :
10.0 % x D
3,023,163.25
F.
Harga Lump Sum : ( D + E )
33,254,795.74
G.
Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8
4,156,849.47
Analisa EI-1011
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
:
No. PAKET KONTRAK
:
NAMA PAKET
:
PROPINSI
:
ITEM PEMBAYARAN NO.
: 10.1 (2)
JENIS PEKERJAAN
: Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
% THD. BIAYA PROYEK : 0.06PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja
(L01)
Jam
126.0000
2,857.14
359,999.64
2.
Mandor
(L03)
Jam
25.2000
3,214.29
81,000.11
440,999.75
B.
BAHAN
1.
Lap.Pond.Agg.Kelas B
M3
44.7000
266,461.01
11,910,807.03
2.
Bahan-bahan lainnya
LS
1.0000
1,191,000.00
1,191,000.00
13,101,807.03
C.
PERALATAN
1.
Motor Grader
(E13)
Jam
12.6000
144,230.72
1,817,307.09
2.
Flat Bed Truck (E11)
Jam
12.6000
75,927.86
956,691.10
3.
Roller (E16)
Jam
12.6000
63,556.28
800,809.08
3,574,807.27
D.
Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C )
17,117,614.05
E.
Over Head and Profit :
10.0 % x D
1,711,761.40
F.
Harga Lump Sum : ( D + E )
18,829,375.45
G.
Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8
2,353,671.93
JUMLAH HARGA BAHAN
JUMLAH HARGA PERALATAN
Analisa EI-1012
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
:
No. PAKET KONTRAK
:
NAMA PAKET
:
PROPINSI
:
ITEM PEMBAYARAN NO.
: 10.1 (3)
JENIS PEKERJAAN
: Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
% THD. BIAYA PROYEK : 0.08PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja
(L01)
Jam
252.0000
2,857.14
719,999.28
2.
Mandor
(L03)
Jam
50.4000
3,214.29
162,000.22
881,999.50
B.
BAHAN
1.
Umum
LS
1.0000
12,436,127.00
12,436,127.00
12,436,127.00
C.
PERALATAN
1.
Motor Grader
(E13)
Jam
50.4000
144,230.72
7,269,228.35
2.
Dump Truck
(E08)
Jam
50.4000
64,325.45
3,242,002.65
10,511,231.00
D.
Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C )
23,829,357.50
E.
Over Head and Profit :
10.0 % x D
2,382,935.75
F.
Harga Lump Sum : ( D + E )
26,212,293.25
G.
Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8
3,276,536.66
Analisa EI-1013
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
:
No. PAKET KONTRAK
:
NAMA PAKET
:
PROPINSI
:
ITEM PEMBAYARAN NO.
: 10.1 (4)
JENIS PEKERJAAN
: Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
% THD. BIAYA PROYEK : 0.01PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja
(L01)
Jam
63.0000
2,857.14
179,999.82
2.
Mandor
(L03)
Jam
6.3000
3,214.29
20,250.03
200,249.85
B.
BAHAN
1.
Umum
LS
1.0000
3,066,971.30
3,066,971.30
3,066,971.30
C.
PERALATAN
1.
Flat Bed Truck (E11)
Jam
12.6000
75,927.86
956,691.10
956,691.10
D.
Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C )
4,223,912.24
E.
Over Head and Profit :
10.0 % x D
422,391.22
F.
Harga Lump Sum : ( D + E )
4,646,303.47
G.
Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8
580,787.93
Analisa EI-1014
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
:
No. PAKET KONTRAK
:
NAMA PAKET
:
PROPINSI
:
ITEM PEMBAYARAN NO.
: 10.1 (5)
JENIS PEKERJAAN
: Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
% THD. BIAYA PROYEK : 0.07PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja
(L01)
Jam
756.0000
2,857.14
2,159,997.84
2.
Mandor
(L03)
Jam
151.2000
3,214.29
486,000.65
2,645,998.49
B.
BAHAN
1.
Umum
LS
1.0000
8,280,038.65
8,280,038.65
8,280,038.65
C.
PERALATAN
1.
Flat Bed Truck (E11)
Jam
126.0000
75,927.86
9,566,910.97
9,566,910.97
D.
Jumlah harga Tenaga, Bahan dan Peralatan : ( A + B + C )
20,492,948.11
E.
Over Head and Profit :
10.0 % x D
2,049,294.81
F.
Harga Lump Sum : ( D + E )
22,542,242.92
G.
Harga Lump Sum / bulan untuk 3 bulan pertama : F / 8
2,817,780.36
JUMLAH HARGA BAHAN
JUMLAH HARGA PERALATAN
Analisa EI-1015
ITEM PEMBAYARAN NO.
: 10.1 (1)
JENIS PEKERJAAN
: Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
DATA & ASUMSI
1
Jam kerja efektif per-hari
Tk
7.00
jam
2
Lebar Jalan Existing
Wr
4.50
Meter
3
Lebar Total Bahu Jalan Existing (Kiri + Kanan)
Ws
1.00
Meter
4
Tebal Campuran Aspal Panas/Dingin Rata-rata
t
0.04
Meter
5
Tebal Penetrasi Macadam Rata-rata
h
0.055
Meter
6
Aplikasi Aspal Pengisian Retak Rata-rata
Ar
1.50
Ltr/M2
Retak sedang
7
Panjang Jalan Proyek
Lp
14.90
Km
8
Prosentase permukaan yang perlu dipelihara (Wr < 6m)
Ap1
1.00
%
Thd. Total Luas9
Prosentase permukaan yang perlu dipelihara (Wr > 6m)
Ap2
2.00
%
Thd. Total Luas10
Total waktu penyelesaian proyek
Tp
360.00
Hari
11
Prosentase waktu pekerja utk pemeliharaan permukaan
Tpk
1.00
%
Thd. Total Waktu12
Prosentase waktu mandor utk pemeliharaan permukaan
Tmd
1.00
%
Thd. Total Waktu13
Prosentase waktu alat berat untuk pemeliharaan
Te
1.00
%
Thd. Total Waktu14
Jumlah Pekerja
3.00
regu kerja @ 5orang
Pk
15.00
orang
15
Jumlah Mandor
Md
3.00
orang
II.
PEKERJA
1
Kebutuhan Pekerja
= Pk x Tpk x Tp x Tk
(L01)
378.00
Jam
2
Kebutuhan Mandor
= Md x Tmd x Tp x Tk
(L03)
75.60
Jam
III.
BAHAN
1
Camp. Aspal Panas
= (Ap x t x Wr x Lp x 1000) x %
(EI-10B)10.73
M3
40%
2
Camp. Aspal Dingin
= (Ap x t x Wr x Lp x 1000) x %
(EI-10D)10.73
M3
40%
3
Penetrasi Macadam
= (Ap x h x Wr x Lp x 1000) x %
(EI-10C)7.38
M3
20%
4
Aspal Pengisi Retak = Ar x Ap x Wr x Lp x 1000
(EI-10E)1,006
Liter
5
Bahan-bahan lainnya (diasumsikan)
10.00
%
Thd.Biaya BahanIV.
ALAT
1
Motor Grader
= Te x Tp x Tk
(E13)
25.20
Jam
2
Flat Bed Truck
= Te x Tp x Tk
(E11)
25.20
Jam
3
ITEM PEMBAYARAN NO.
: 10.1 (2)
JENIS PEKERJAAN
: Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
DATA & ASUMSI
1
Jam kerja efektif per-hari
Tk
7.00
jam
2
Lebar Jalan Existing
Wr
4.50
Meter
3
Lebar Total Bahu Jalan Existing (Kiri + Kanan)
Ws
1.00
Meter
4
Tebal Agregat Base Kelas B untuk bahu jalan
t
0.15
Meter
5
Aplikasi Aspal Pengisian Retak
Ar
0.50
Ltr/M2
6
Panjang Jalan Proyek
Lp
14.90
Km
7
Prosentase permukaan bahu yang dipelihara (Ws < 3m)
As1
2.00
%
Thd. Total Luas8
Prosentase permukaan bahu yang dipelihara (Ws > 3m)
As2
4.00
%
Thd. Total Luas9
Total waktu penyelesaian proyek
Tp
360.00
Hari
10
Prosentase waktu pekerja utk pemeliharaan bahu jln
Tpk
0.50
%
Thd. Total Waktu11
Prosentase waktu mandor utk pemeliharaan bahu jln
Tmd
0.50
%
Thd. Total Waktu12
Prosentase waktu alat berat untuk pemeliharaan
Te
0.50
%
Thd. Total Waktu13
Jumlah Pekerja
2.00
regu kerja @ 5orang
Pk
10.00
orang
14
Jumlah Mandor
Md
2.00
orang
15
II.
PEKERJA
1
Kebutuhan Pekerja
= Pk x Tpk x Tp x Tk
(L01)
126.00
Jam
2
Kebutuhan Mandor
= Md x Tpk x Tp x Tk
(L03)
25.20
Jam
III.
BAHAN
1
Lap.Pond.Agr.Kls.B
= As x t x Ws x Lp x 1000
(EI-10A)44.70
M3
2
Bahan-bahan lainnya (diasumsikan)
10.00
%
Thd.Biaya BahanIV.
ALAT
1
Motor Grader
= Te x Tp x Tk
(E13)
12.60
Jam
2
Flat Bed Truck
= Te x Tp x Tk
(E11)
12.60
Jam
3
ITEM PEMBAYARAN NO.
: 10.1 (3)
JENIS PEKERJAAN
: Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
DATA & ASUMSI
1
Jam kerja efektif per-hari
Tk
7.00
jam
2
Lebar Jalan Existing
Wr
4.50
Meter
3
Lebar Total Bahu Jalan Existing (Kiri + Kanan)
Ws
1.00
Meter
4
Lebar Saluran/Selokan Rata-rata
Wsd
0.60
Meter
5
Timbunan Pilihan diperlukan untuk selokan/sal.air
Vtp
220.00
M3/Km
6
Pas.Bt.Dgn.Mortar diperlukan untuk selokan/sal.air
Vpb
330.00
M3/Km
7
Panjang Jalan Proyek
Lp
14.90
Km
8
Prosentase saluran yang dipelihara (Wsd < 1m)
Ad1
0.50
%
Thd.Total Pjg.Jln9
Prosentase saluran yang dipelihara (Wsd > 1m)
Ad2
1.00
%
Thd.Total Pjg.Jln10
Total waktu penyelesaian proyek
Tp
360.00
Hari
11
Prosentase waktu pekerja utk pemeliharaan saluran air
Tpk
1.00
%
Thd. Total Waktu12
Prosentase waktu mandor utk pemeliharaan saluran air
Tmd
1.00
%
Thd. Total Waktu13
Prosentase waktu alat berat untuk pemeliharaan
Te
2.00
%
Thd. Total Waktu14
Jumlah Pekerja
2.00
regu kerja @ 5orang
Pk
10.00
orang
15
Jumlah Mandor
Md
2.00
orang
II.
PEKERJA
1
Kebutuhan Pekerja
= Pk x Tpk x Tp x Tk
(L01)
252.00
Jam
2
Kebutuhan Mandor
= Md x Tpk x Tp x Tk
(L03)
50.40
Jam
III.
BAHAN
1
Bahan Umum, antara lain :
a. Pasangan Batu Dgn. Mortar
= Ad x Lp x Vpb
(EI-22)24.59
M3
b. Bahan Timbunan Pilihan
= Ad x Lp x Vtp
(EI-323)16.39
M3
c. Bahan-bahan lainnya (diasumsikan)
10.00
%
Thd.Biaya BahanIV.
ALAT
1
Motor Grader
= Te x Tp x Tk
(E13)
50.40
Jam
2
ITEM PEMBAYARAN NO.
: 10.1 (4)
JENIS PEKERJAAN
: Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
DATA & ASUMSI
1
Jam kerja efektif per-hari
Tk
7.00
jam
2
Lebar Jalan Existing
Wr
4.50
Meter
3
Lebar Total Bahu Jalan Existing (Kiri + Kanan)
Ws
1.00
Meter
4
Lebar Saluran/Selokan Rata-rata
Wsd
0.60
Meter
5
Panjang Jalan Proyek
Lp
14.90
Km
6
Total waktu penyelesaian proyek
Tp
360.00
Hari
7
Prosentase waktu pekerja utk pemel. perlengk. jalan
Tpk
0.50
%
Thd. Total Waktu8
Prosentase waktu mandor utk pemel. perlengk. Jalan
Tmd
0.25
%
Thd. Total Waktu9
Prosentase waktu alat berat untuk pemeliharaan
Te
0.50
%
Thd. Total Waktu10
Jumlah Pekerja
1.00
regu kerja @ 5orang
Pk
5.00
orang
11
Jumlah Mandor
Md
1.00
orang
II.
PEKERJA
1
Kebutuhan Pekerja
= Pk x Tpk x Tp x Tk
(L01)
63.00
Jam
2
Kebutuhan Mandor
= Md x Tpk x Tp x Tk
(L03)
6.30
Jam
III.
BAHAN
1
Bahan Umum, antara lain :
a. Cat
2.00
kg per KM
(M42)
29.80
Kg
670,500.00
b. Semen
20.00
kg per KM
(M12)
298.00
Kg
164,175.65
b. Pasir
1.00
M3 per KM
(M01)
14.90
M3
698,810.00
c. Bahan-bahan lainnya (diasumsikan)
-
100.00
%
Thd.Biaya BahanIV.
ALAT
1
ITEM PEMBAYARAN NO.
: 10.1 (5)
JENIS PEKERJAAN
: Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN
: Lump Sum / Bulan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
DATA & ASUMSI
1
Jam kerja efektif per-hari
Tk
7.00
jam
2
Lebar Jalan Existing
Wr
4.50
Meter
3
Lebar Total Bahu Jalan Existing (Kiri + Kanan)
Ws
1.00
Meter
4
Rata-rata Jumlah Jembatan per Km panjang jalan
Kj
3.00
Buah
5
Rata-rata Bentang Jembatan
Lj
15.00
Meter
6
Rata-rata Lebar Jembatan
Wj
5.50
Meter
7
Panjang Jalan Proyek
Lp
14.90
Km
8
Total waktu penyelesaian proyek
Tp
360.00
Hari
9
Prosentase waktu pekerja utk pemeliharaan jembatan
Tpk
2.00
%
Thd. Total Waktu10
Prosentase waktu mandor utk pemeliharaan jembatan
Tmd
2.00
%
Thd. Total Waktu11
Prosentase waktu alat berat untuk pemel. jembatan
Te
5.00
%
Thd. Total Waktu12
Jumlah Pekerja
3.00
regu kerja @ 5orang
Pk
15.00
orang
13
Jumlah Mandor
Md
3.00
orang
II.
PEKERJA
1
Kebutuhan Pekerja
= Pk x Tpk x Tp x Tk
(L01)
756.00
Jam
2
Kebutuhan Mandor
= Md x Tpk x Tp x Tk
(L03)
151.20
Jam
III.
BAHAN
1
Bahan Umum, antara lain :
a. Cat
0.33
kg per M' jembatan
(M42)
223.50
Kg
5,028,750.00
b. Semen
3.33
kg per M' jembatan
(M12)
2,235.00
Kg
1,231,317.38
b. Pasir
0.01157
M3 per M' jembatan
(M01)
7.76
M3
363,963.54
c. Bahan-bahan lainnya (diasumsikan)
-
25.00
%
Thd.Biaya BahanIV.
ALAT
1
Motor Grader
= Te x Tp x Tk
(E13)
126.00
Jam
2
ITEM PEMBAYARAN NO.
: 10.A
Analisa EI-10AJENIS PEKERJAAN
: Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN
: M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
ASUMSI
1
Menggunakan alat berat (cara mekanik)
2
Lokasi pekerjaan : setempat2 di sepanjang jalan
3
Kondisi existing jalan : sedang
4
Jarak rata-rata Base Camp ke lokasi pekerjaan
L
8.7
KM
5
Tebal lapis agregat padat
t
0.15
M
6
Faktor kembang material (Padat-Lepas)
Fk
1.20
-7
Jam kerja efektif per-hari
Tk
7.00
jam
8
Proporsi Campuran : - Agregat Kasar
Ak
35.00
%
Gradasi harus
- Agregat Halus
Ah
20.00
%
memenuhi
- Sirtu
St
45.00
%
Spesifikasi
II.
URUTAN KERJA
1
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
2
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan pekerja
3
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
4
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
BAHAN
- Agregat Kasar
= Ak x 1 M3 x Fk
M03
0.4200
M3
- Agregat Halus
= Ah x 1 M3 x Fk
M04
0.2400
M3
- Sirtu
= St x 1 M3 x Fk
M16
0.5400
M3
2.
ALAT
2.a.
WHEEL LOADER
(E15)
Kapasitas bucket
V
1.50
M3
Faktor bucket
Fb
0.90
-Faktor Efisiensi alat
Fa
0.83
-Waktu Siklus :
Ts1
- Mencampur
T1
1.50
menit
- Memuat dan lain-lain
T2
0.50
menit
Ts1
2.00
menit
Kap. Prod. / jam =
V x Fb x Fa x 60
Q1
28.01
M3
Fk x Ts1
Koefisien Alat / M3
= 1 : Q1
(E15)
0.0357
jam
2.b.
DUMP TRUCK
(E09)
Kapasitas bak
V
6.00
M3
Faktor Efisiensi alat
Fa
0.83
-Kecepatan rata-rata bermuatan
v1
45.00
KM/jam
Kecepatan rata-rata kosong
v2
60.00
KM/jam
Waktu Siklus : - Waktu memuat = V : Q1 x 60
T1
12.85
menit
- Waktu tempuh isi = (L : v1) x 60 menit
T2
11.63
menit
- Waktu tempuh kosong = (L : v2) x 60 menit
T3
8.73
menit
- Lain-lain (termasuk dumping setempat-setempat)
T4
30.00
menit
Ts2
63.21
menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.A
Analisa EI-10AJENIS PEKERJAAN
: Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
Kap. Prod. / jam =
V x Fa x 60
Q2
3.94
M3
Fk x Ts2
Koefisien Alat / M3
= 1 : Q2
(E09)
0.2539
jam
2.c.
PEDESTRIAN ROLLER
(E24)
Kecepatan rata-rata alat
v
2.50
KM/jam
Lebar efektif pemadatan
b
0.80
M
Jumlah lintasan
n
12.00
lintasan
Faktor Efisiensi alat
Fa
0.83
-Kap. Prod. / jam =
(v x 1000) x b x t x Fa
Q3
20.75
M3
n
Koefisien Alat / M3
= 1 : Q3
(E24)
0.0482
jam
2.d.
WATER TANK TRUCK
(E23)
Volume tanki air
V
4.00
M3
Kebutuhan air / M3 agregat padat
Wc
0.07
M3
Pengisian tanki / jam
n
1.00
kali
Faktor Efisiensi alat
Fa
0.83
-Kap. Prod. / jam =
V x n x Fa
Q4
47.43
M3
Wc
Koefisien Alat / M3
= 1 : Q4
(E23)
0.0211
jam
2.e.
ALAT BANTU
Lump SumDiperlukan :
- Kereta dorong
= 5 buah
- Sekop
= 5 buah
- Garpu
= 5 buah
3.
TENAGA
Produksi menentukan : WHEEL LOADER
Q1
28.01
M3/jam
Produksi agregat / hari = Tk x Q1
Qt
196.09
M3
Kebutuhan tenaga :
- Pekerja
P
15.00
orang
- Mandor
M
1.00
orang
Koefisien tenaga / M3 :
- Pekerja
= (Tk x P) : Qt
(L01)
0.5355
jam
- Mandor
= (Tk x M) : Qt
(L03)
0.0357
jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.A
Analisa EI-10AJENIS PEKERJAAN
: Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
4.
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp. ######## / M3.
6.
MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan :
. . . .
bulan
7.
VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan :
44.70 M3
ITEM PEMBAYARAN NO.
: 10.B
Analisa EI-10BJENIS PEKERJAAN
: Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
ASUMSI
1
Menggunakan alat berat (cara mekanik)
2
Lokasi pekerjaan : sepanjang jalan
3
Kondisi existing jalan : sedang
4
Jarak rata-rata Base Camp ke lokasi pekerjaan
L
8.7
KM
5
Tebal Lapis Hotmix padat
t
0.04
M
6
Jam kerja efektif per-hari
Tk
7.00
Jam
7
Faktor kehilanganmaterial :
- Agregat
Fh1
1.10
-- Aspal
Fh2
1.05
-8
Komposisi campuran AC :
- Coarse Agregat
CA
56.50
%
Gradasi harus-- Fine Agregat
FA
34.00
%
memenuhi-- Fraksi Filler
FF
3.00
%
Spesifikasi- Asphalt
minimum 5 %
As
6.50
%
9
Berat jenis bahan :
- AC
D1
2.30
ton / M3
- Coarse Agregat & Fine Agregat
D2
1.80
ton / M3
- Fraksi Filler
D3
2.00
ton / M3
- Asphalt
D4
1.00
ton / M3
II.
URUTAN KERJA
1
Wheel Loader memuat Agregat dan Aspal ke dalam
Cold Bin AMP
2
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan
3
Penghamparan dilaksanakan manual oleh pekerja
untuk keperluan penambalan/patching kecil2
dan dipadatkan dengan Pedestrian Roller
4
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparaan dengan menggunakan
Alat Bantu
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
BAHAN
1.a.
Agregat Kasar
= (CA x (D1 x tM3) x Fh1) : D2
(M03)
0.7941
M3
1.b.
Agregat Halus
= (FA x (D1 x tM3) x Fh1) : D2
(M04)
0.4779
M3
1.c.
Filler
= (FF x (D1 x tM3) x Fh1) : D3
(M05)
0.0380
M3
1.d.
Aspal
= (AS x (D1 x tM3) x Fh2) x 1000
(M10)
156.975
Kg
2.
ALAT
2.a.
WHEEL LOADER
(E15)
Kapasitas bucket
V
1.50
M3
Faktor bucket
Fb
0.90
-Faktor efisiensi alat
Fa
0.83
-Waktu Siklus
Ts1
- Muat
T1
1.50
menit
- Lain lain
T2
0.50
menit
Ts1
2.00
menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.B
Analisa EI-10BJENIS PEKERJAAN
: Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
Kap. Prod. / jam =
D2 x V x Fb x Fa x 60
Q1
657.68
M3
D1 x t x Ts1
Koefisien Alat/M3
= 1 : Q1
(E15)
0.0015
Jam
2.b.
ASPHALT MIXING PLANT (AMP)
(E01)
Kapasitas produksi
V
50.0
ton / Jam
Faktor Efisiensi alat
Fa
0.83
-Kap.Prod. / jam =
V x Fa
Q2
451.09
M2
D1 x t
Koefisien Alat/M3
= 1 : Q2
(E01)
0.0022
Jam
2.c.
GENERATORSET ( GENSET )
(E12)
Kap.Prod. / Jam = SAMA DENGAN AMP
Q3
451.09
M2
Koefisien Alat/M3
= 1 : Q3
(E12)
0.0022
Jam
2.d.
DUMP TRUCK (DT)
(E09)
Kapasitas bak
V
8.00
Ton
Faktor Efisiensi alat
Fa
0.83
-Kecepatan rata-rata bermuatan
v1
40.00
KM / Jam
Kecepatan rata-rata kosong
v2
50.00
KM / Jam
Kapasitas AMP / batch
Q2b
0.50
Ton
Waktu menyiapkan 1 batch AC
Tb
1.00
menit
Waktu Siklus
Ts2
- Mengisi Bak
= (V : Q2b) x Tb
T1
16.00
menit
- Angkut
= (L : v1) x 60 menit
T2
13.09
menit
- Tunggu + dump + Putar
T3
15.00
menit
- Kembali
= (L : v2) x 60 menit
T4
10.47
menit
Ts2
54.56
menit
Kap.Prod. / jam =
V x Fa x 60
Q4
3.17
M3
D1 x Ts2
Koefisien Alat/M3
= 1 : Q4
(E09)
0.3150
Jam
2.e.
ASPHALT FINISHER
(E02)
Kapasitas produksi
V
0.00
ton / jam
Faktor efisiensi alat
Fa
0.00
-Kap.Prod. / jam =
V x Fa
Q5
0.00
M3
D1
Koefisien Alat/M3
= 1 : Q5
(E02)
0.0000
Jam
2.f.
TANDEM ROLLER
(E17)
Kecepatan rata-rata alat
v
3.50
Km / Jam
Lebar efektif pemadatan
b
1.20
M
Jumlah lintasan
n
6.00
lintasan
Faktor Efisiensi alat
Fa
0.83
-Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.B
Analisa EI-10BJENIS PEKERJAAN
: Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
Kap. Prod. / jam =
(v x 1000) x b x t x Fa
Q6
23.24
M3
n
Koefisien Alat/M3
= 1 : Q6
(E17)
0.0430
Jam
2.g.
PNEUMATIC TIRE ROLLER
(E18)
Kecepatan rata-rata
v
5.00
KM / jam
Lebar efektif pemadatan
b
1.20
M
Jumlah lintasan
n
8.00
lintasan
Faktor Efisiensi alat
Fa
0.83
-Kap.Prod./jam =
(v x 1000) x b x t x Fa
Q7
24.90
M3
n
Koefisien Alat/M3
= 1 : Q7
(E18)
0.0402
Jam
2.h.
ALAT BANTU
diperlukan :
Lump Sum- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garpu = 4 buah
- Tongkat Kontrol ketebalan hanparan
3.
TENAGA
Produksi menentukan : DUMP TRUCK
Q4
3.17
M3 / Jam
Produksi ATB / hari = Tk x Q4
Qt
22.22
M3
Kebutuhan tenaga :
- Pekerja
P
10.00
orang
- Mandor
M
2.00
orang
Koefisien Tenaga / M3 :
- Pekerja
= (Tk x P) / Qt
(L01)
3.1497
Jam
- Mandor
= (Tk x M) / Qt
(L03)
0.6299
Jam
4.
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
682,360.16/ M3.
6.
MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan :
. . . .
bulan
7.
VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan :
10.73 M3
ITEM PEMBAYARAN NO.
: 10.C
Analisa EI-10CJENIS PEKERJAAN
: Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
ASUMSI
1
Menggunakan alat berat (cara mekanik)
2
Lokasi pekerjaan : sepanjang jalan
3
Kondisi existing jalan : sedang
4
Jarak rata-rata Base Camp ke lokasi pekerjaan
L
8.73
KM
5
Tebal rata2 Lapen
t
0.055
M
6
Jam kerja efektif per-hari
Tk
7.00
Jam
7
Faktor kehilanganmaterial :
- Agregat
Fh1
1.10
-- Aspal
Fh2
1.05
-8
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
Ak
133.00
Kg/M2
Tabel 6.6.4.- Agregat Pengunci
Ap
25.00
Kg/M2
Tabel 6.6.4.- Aspal :
- Paska Agregat Pokok
As1
5.20
Kg/M2
Tabel 6.6.4.As2
94.55
Kg/M3
(As1 : t)9
Berat jenis bahan :
- Agregat
D1
1.80
ton / M3
- Aspal
D2
1.01
ton / M3
II.
URUTAN KERJA
1
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
2
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
3
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
4
Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
5
Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
BAHAN
1.a.
Agregat Kasar
= {(Ak/1000 : t M3) x Fh1} : D1
(M03)
1.4778
M3
1.b.
Agregat Pengunci
= {(Ap/1000 : t M3) x Fh1} : D1
(M04)
0.2778
M3
1.c.
Aspal
= {(As : t M3) x Fh2}
(M10)
99.2727
Kg
2.
ALAT
2.a.
WHEEL LOADER
(E15)
Kapasitas bucket
V
1.50
M3
Faktor bucket
Fb
0.90
-Faktor efisiensi alat
Fa
0.83
-Waktu Siklus
Ts1
- Memuat, menuang, kembali
T1
1.50
menit
- Menunggu, dan lain lain
T2
0.50
menit
Ts1
2.00
menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.C
Analisa EI-10CJENIS PEKERJAAN
: Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
Kap. Prod. / jam =
V x Fb x Fa x 60
Q1
28.01
M3
Ts1
Koefisien Alat/M3
= 1 : Q1
(E15)
0.0357
Jam
2.b.
DUMP TRUCK (DT)
(E09)
Kapasitas bak
V
6.00
M3
Faktor Efisiensi alat
Fa
0.83
-Kecepatan rata-rata bermuatan
v1
40.00
KM / Jam
Kecepatan rata-rata kosong
v2
50.00
KM / Jam
Waktu Siklus
Ts2
- Mengisi Bak = V : Q1 x 60
T1
12.85
menit
- Angkut
= (L : v1) x 60 menit
T2
13.09
menit
- Tunggu + dump + Putar
T3
15.00
menit
- Kembali
= (L : v2) x 60 menit
T4
10.47
menit
Ts2
51.41
menit
Kap.Prod. / jam =
V x Fa x 60
Q2
5.81
M3
Ts2
Koefisien Alat / M3 = 1 : Q2
= 1 : Q2
(E09)
0.1721
Jam
2.c.
THREE WHEEL ROLLER
(E16)
Kecepatan rata-rata alat
v
2.00
Km / Jam
Lebar efektif pemadatan
b
1.20
M
Jumlah lintasan
n
8.00
lintasan
Faktor Efisiensi alat
Fa
0.83
-Kap. Prod. / jam =
(v x 1000) x b x t x Fa
Q3
13.70
M3
n
Koefisien Alat / M3
= 1 : Q3
(E16)
0.0730
Jam
2.d.
ASPHALT SPRAYER
(E03)
Kapasitas alat
V
800.00
liter
Faktor efisiensi alat
Fa
0.83
-Waktu Siklus (termasuk proses pemanasan)
Ts3
2.00
Jam
Kap. Prod. / jam =
V x Fa x D2
Q4
3.55
M3
Ts3 x As2
Koefisien Alat / M3
= 1 : Q4
(E03)
0.2820
Jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.C
Analisa EI-10CJENIS PEKERJAAN
: Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
2.e. ALAT BANTU
diperlukan setiap :
75.00
M3 pekerjaan
Lump Sum- Kereta dorong
= 3 buah
- Sekop
= 5 buah
- Sapu
= 5 buah
- Sikat
= 3 buah
- Karung
= 5 buah
- Cerek Aspal
= 3 buah
- Kaleng Aspal
= 3 buah
3.
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Q1
28.01
M3/Jam
Produksi Lapen / hari = Q1 x Tk
Qt
196.09
M3
Kebutuhan tenaga :
- Pekerja
P
20.00
orang
- Mandor
M
2.00
orang
Koefisien Tenaga / M3 :
- Pekerja
= (Tk x P) / Qt
(L01)
0.7140
Jam
- Mandor
= (Tk x M) / Qt
(L03)
0.0714
Jam
4.
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
641,190.37/ M3.
6.
MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan :
. . . .
bulan
7.
VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan :
7.38 M3
ITEM PEMBAYARAN NO.
: 10.D
Analisa EI-10DJENIS PEKERJAAN
: Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
ASUMSI
1
Menggunakan buruh dan alat (semi mekanik)
2
Lokasi pekerjaan : sepanjang jalan
3
Jarak rata-rata Base camp ke lokasi pekerjaan
L
8.7
KM
4
Jam kerja efektif per-hari
Tk
7.00
jam
5
Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum
Sa
19.00
MM
Spec. 6.5.2 (2)- Kadar Aspal terhadap berat total campuran
As
4.50
%
Tabel 6.5.3 (1)- Tebal nominal padat
t
0.04
M
Tabel 6.5.3 (1)6
Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil)
D1
2.01
Ton/M3
- Aspal (diambil)
D2
1.00
Ton/M3
- Agregat (diambil)
D3
1.60
Ton/M3
II.
URUTAN KERJA
1
Agregat dan Aspal dicampur di dalam Pengaduk
Beton Mekanis (Concrete Mixer)
2
Campuran dibawa ke lokasi pekerjaan dengan
menggunakan Dump Truck
3
Pekerja membuat/merapikan lubang patching/galian,
campuran dihampar manual dengan alat bantu
4
Hamparan dipadatkan dengan Pedestrian Roller
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
BAHAN
1.a.
Agregat Halus
= {(100% - As) x 1M3 x D1} : D3
(M04)
1.1997
M3
1.b.
Aspal Emulsi
= {As x 1M3 x D1} x 1000
(M31)
90.4500
Kg
2.
ALAT
2.a.
CONCRETE MIXER
(E06)
Kapasitas Alat
V
500.00
liter
Faktor Efisiensi Alat
Fa
0.83
-Waktu siklus :
(T1 + T2 + T3 + T4)
Ts1
- Memuat
T1
5.00
menit
- Mengaduk
T2
3.50
menit
- Menuang
T3
3.00
menit
- Tunggu, dll.
T4
2.00
menit
Ts1
13.50
menit
Kap. Prod. / jam =
V x Fa x 60
Q1
1.844
M3
1000 x Ts1
Koefisien Alat / M3
= 1 : Q1
(E06)
0.5422
jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.D
Analisa EI-10DJENIS PEKERJAAN
: Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN
: M3
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
2.b.
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
v
2.50
KM/jam
Lebar efektif pemadatan
b
0.65
M
Jumlah lintasan
n
12.00
lintasan
Faktor Efisiensi alat
Fa
0.83
-Kap. Prod. / jam =
(v x 1000) x b x t x Fa
Q2
4.50
M3
n
Koefisien Alat / M3
= 1 : Q2
0.2224
jam
2.c.
DUMP TRUCK (DT)
(E09)
Kapasitas bak
V
6.00
M3
Faktor Efisiensi alat
Fa
0.83
-Kecepatan rata-rata bermuatan
v1
40.00
KM / Jam
Kecepatan rata-rata kosong
v2
50.00
KM / Jam
Kapasitas molen
Q1b
0.42
M3
Waktu menyiapkan 1 molen campuran
Tb
13.50
menit
Waktu Siklus
Ts2
- Mengisi Bak
= (V : Q2b) x Tb
T1
195.18
menit
- Angkut
= (L : v1) x 60 menit
T2
13.09
menit
- Tunggu + dump + Putar
T3
10.00
menit
- Kembali
= (L : v2) x 60 menit
T4
10.47
menit
Ts2
228.74
menit
Kap.Prod. / jam =
V x Fa x 60
Q3
0.65
M3
Melayani 1 buahD1 x Ts2
molenKoefisien Alat / M3
= 1 : Q3
(E09)
1.5387
Jam
2.d.
ALAT BANTU
Diperlukan :
- Sekop
= 3 buah
- Sapu
= 4 buah
- Alat Perata
= 3 buah
- Gerobak Dorong
= 2 buah
3.
TENAGA
Produksi menentukan (Produksi Concrete Mixer)
Q1
1.844
M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1
Qt
12.91
M3
Kebutuhan tenaga :
- Mandor
M
1.00
orang
- Pekerja
P
12.00
orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt
(L03)
0.5422
jam
- Pekerja = (Tk x P) : Qt
(L01)
6.5060
jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.D
Analisa EI-10DJENIS PEKERJAAN
: Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN
: 10.D
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
4.
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
648,694.10/ M3
6.
MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan :
. . . .
bulan
7.
VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan :
10.73 M3
ITEM PEMBAYARAN NO.
: 10.E
Analisa EI-10EJENIS PEKERJAAN
: Aspal Pengisian Retak
SATUAN PEMBAYARAN
: LITER
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
I.
ASUMSI
1
Menggunakan alat berat (cara mekanik)
2
Lokasi pekerjaan : sepanjang jalan
3
Jarak rata-rata Base Camp ke lokasi pekerjaan
L
8.7
KM
4
Jam kerja efektif per-hari
Tk
7.00
Jam
5
Faktor kehilangan bahan
Fh
1.10
-6
Komposisi campuran :
- Aspal AC - 10 atau AC - 20
As
87.00
%
100 bagian- Minyak Fluk / Pencair
K
13.00
%
15 bagian7
Berat jenis bahan :
- Aspal AC - 10 atau AC - 20
D1
1.03
Kg / Ltr
- Minyak Fluk / Pencair
D2
0.80
Kg / Ltr
8
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
II.
URUTAN KERJA
1
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
2
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
3
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
4
Angkutan Aspal dan Minyak tanah menggunakan
Dump Truck
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Pc
1.10
liter
campuranAspal
= As x Pc x D1 : 100
(M10)
0.99
Kg
Kerosene
= K x Pc : 100
(M11)
0.14
liter
2.
ALAT
2.a.
APHALT SPRAYER
(E03)
Kapasitas alat
V
800.00
liter
Faktor Efisiensi Alat
Fa
0.83
-Waktu Siklus (termasuk proses pemanasan)
Ts
2.00
Jam
Kap.Prod. / jam =
V x Fa
Q1
332.00
liter
Ts
Koefisien Alat / Ltr
= 1 : Q1
(E03)
0.0030
Jam
2.b.
AIR COMPRESOR
(E05)
Kapasitas Alat --->> diambil
V
400.00
M2 / Jam
Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi)
Ap
0.80
liter / M2
Kap. Prod. / jam =
(V x Ap)
Q2
320.00
liter
Koefisien Alat / Ltr
= 1 : Q2
(E05)
0.0031
Jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO.
: 10.E
Analisa EI-10EJENIS PEKERJAAN
: Aspal Pengisian Retak
SATUAN PEMBAYARAN
: LITER
Lanjutan
No.
U R A I A N
KODE
KOEF.
SATUAN
KETERANGAN
2.c.
DUMP TRUCK (DT)
(E08)
Sebagai alat pengangkut bahan dilokasi pekerjaan
Dump Truck melayani alat Asphalt Sprayer.
Kap.Prod. / jam = sama dengan Asphalt Sprayer
Q3
332.00
liter
Koefisien Alat / Ltr
= 1 : Q3
(E08)
0.0030
Jam
3.
TENAGA
Produksi menentukan : ASPHALT SPRAYER
Q1
332.00
liter
Produksi / hari = Tk x Q1
Qt
2,324.00
liter
Kebutuhan tenaga :
- Pekerja
P
10.00
orang
- Mandor
M
1.00
orang
Koefisien Tenaga / Ltr :
- Pekerja
= (Tk x P) / Qt
(L01)
0.0301
Jam
- Mandor
= (Tk x M) / Qt
(L03)
0.0030
Jam
4.
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
3,096.19 / Liter
6.
MASA PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan :
. . . .
bulan
7.
VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan :
1,006.00 Liter
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : NAMA PAKET : PROP / KAB / KODYA :
MATA PEMBAYARAN NO. : 10.A PERKIRAAN VOL. PEK. : 44.70 JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk - TOTAL HARGA (Rp.) : 13,101,887.74 SATUAN PEMBAYARAN : M3 Pek. MinorPek. Rutin % THD. BIAYA PROYEK : 0.05
PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja Biasa
(L01)
jam
0.5355
2,857.14
1,529.93
2.
Mandor
(L03)
jam
0.0357
3,214.29
114.74
1,644.67
B.
BAHAN
1.
Agregat Kasar (M03)
(M03)
M3
0.4200
195,729.69
82,206.47
2.
Agregat Halus (M04)
(M04)
M3
0.2400
170,591.70
40,942.01
3.
Sirtu
(M16)
M3
0.5400
193,500.00
104,490.00
227,638.48
C.
PERALATAN
1.
Wheel Loader
(E15)
jam
0.0357
138,838.39
4,956.30
2.
Dump Truck
(E09)
jam
0.2539
114,572.90
29,084.83
3.
Pedestrian Roller (E24)
jam
0.0482
29,793.52
1,435.83
4.
Water Tanker
(E23)
jam
0.0211
75,927.86
1,600.89
5.
Alat Bantu
Ls
1.0000
100.00
100.00
37,177.85
D.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
266,461.01
E.
OVERHEAD & PROFIT
10.0 % x D
26,646.10
F.
HARGA SATUAN PEKERJAAN ( D + E )
293,107.11
Note: 1
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-10A
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : NAMA PAKET : PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 10.B PERKIRAAN VOL. PEK. : 10.73 JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin TOTAL HARGA (Rp.) : 7,320,359.74 SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.03
PERKIRAAN
HARGA
JUMLAH
NO.
KOMPONEN
SATUAN KUANTITAS
SATUAN
HARGA
(Rp.)
(Rp.)
A.
TENAGA
1.
Pekerja Biasa
(L01)
Jam
3.1497
2,857.14
8,999.00
2.
Mandor
(L03)
Jam
0.6299
3,214.29
2,024.78
11,023.79
B.
BAHAN
1.
Agregat Kasar
(M03)
M3
0.7941
195,729.69
155,436.56
2.
Agregat Halus
(M04)
M3
0.4779
170,591.70
81,523.88
3
Filler
(M05)
M3
0.0380
550.00
20.87
4
Aspal
(M10)
Kg
156.9750
2,086.63
327,548.43
564,529.74
C.
PERALATAN
1.
Wheel Loader
(E15)
Jam
0.0015
138,838.39
211.10
2.
AMP
(E01)
Jam
0.0022
1,194,442.80
2,647.92
3.
Genset
(E12)
Jam
0.0022
114,265.22
253.31
4.
Dump Truck
(E09)
Jam
0.3150
114,572.90
36,086.51
5.
Asp. Finisher
(E02)
Jam
0.0000
76,010.49
0.00
6.
Tandem Roller
(E17)
Jam
0.0430
63,556.28
2,734.78
7
P. Tyre Roller
(E18)
Jam
0.0402
72,243.92
2,901.36
8
Alat Bantu
Ls
1.0000
150.00
150.00
44,773.88
D.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
620,327.41
E.
OVERHEAD & PROFIT
10.0 % x D
62,032.74
F.
HARGA SATUAN PEKERJAAN ( D + E )
682,360.16
Note: 1
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-10B