DIAGRAM SATU GARIS GARDU INDUK DENAI
200 kVA Trafo PS 20kV/380-220V LB CT 600/5 PMT 800A 16 kABUS 20 kV, 2000A, MODALEK
PMT 800A 16 kA PMT 800A 16 kA CT 800/5 PMT 800A 25 kA PMT 800A 25 kA PMT 800A 25 kA PMS 2000 A, 62,5 kA PMT 20kV, 2000A, 25 kA
BUS 20 kV, 2000A, MERLIN GERIN
PT 20 kV/√3/ 100V/√3 PT 20 kV/√3/ 100V/√3 CT 2000/5 Kopel BUS KANGURU DA-6 KOALA DA-5 KUS KUS DA-4 ANOA DA-3 TAPIR DA-2 PANDA DA-1 PT 150 kV/√3/100V/√3 PT150 kV/√3/100V/√3 LA : 10 kA LA : 10 kA
SEI ROTAN TAMORA
ACSR 2 × 240 mm2 ACSR 2 × 240 mm2
LINE
TRAP LINE TRAP
ES ES CT: 1200/1 A M = 1200/1 A P = 1200/1 A CT: 800/5 A M = 800/5 A P = 800/1 A PMT 1250A 31,5 kA PMT 3150A 31,5 kA PMS 1250 A, ... kA PMS 1250 A, ... kA PMS 1250 A, 31,5 kA PMS 1250 A, 31,5 kA PMT 3150A 31,5 kA CT: 150 – 300 /1 A PAUWELS TD2 60 MVA PT 20 BUS I BUS II LA 65 kA NGR: 12 ohm 1000 A CT : 2000/5 A INCOMIN PS BUSTIE PMT 2500 A CT 2000/5 A CT 600/5 CT 600/5 CT 800/5 CT 800/5 PMT 630 A PMT 630 A PMT 630 A PMT 630 A CT 600/5 A CT 600/5 A CT 600/5 A CT 600/5 A DN1 DN2 DN3 DN PMS 1250 A, 31,5 kA PMS 1250 A, 31,5 kA BUS I BUS II BUS 150 kV, 2000A
Lampiran 2
LAPORAN HASIL PENGUKURAN TAHANAN PENTANAHAN KAKI MENARA
GARDU INDUK : SEI ROTAN
SEGMENT
: SEI ROTAN-TEBING TINGGI
NO TOWER
HASIL UKUR PENTANAHAN KAKI TOWER (OHM)
LOKASI KETERANGAN 1 3.2 2.1 4.2 1.9 2 7.2 5.2 3.5 5.5 3 3.9 4.2 2.9 4.2 4 5.7 7.9 6.3 6.1 5 6.6 5.3 5.4 6.7 6 8.3 8.3 8.2 8.7 7 5.8 6.4 4.2 4.4 8 3 3.2 3.1 3.1 9 6.3 6.2 5.1 5.6 10 5.4 5.5 6.2 4.7 11 5.4 7.6 8.6 6.9 12 4.2 4.2 3.7 6.5 13 4.2 4.4 4.2 3.8
14 6.2 5.2 6.2 6.2 dipasang ground langsung di kaki D 15 7.1 7.2 6.2 6.9 16 4.3 3.4 2.9 3.6 17 7.2 7.2 7.3 6.5 18 6.3 6.3 6.3 6.2 19 7.3 7.4 7.3 7.4 20 8.4 8.3 7.8 8.2 21 8.3 8.5 8.3 8.5 22 8.8 8.4 8.2 7.3 23 9.7 9.8 9.3 9.2 24 7.5 7.4 7.5 7.2
25 8.6 6.4 7.5 7.3 dipasang ground langsung di kaki D 26 7.2 8.9 8.3 8.5
27 9.2 9.4 9.5 9.5 dipasang ground langsung di kaki D 28 8.2 8.4 8.8 8.6
29 5.8 7.8 6.5 6.9 30 8.2 8.1 8.8 8.1 31 7.3 8.3 8.2 8.2 32 8.8 8.7 9.7 9.7
33 5.5 5.9 5.2 5.2 dipasang ground langsung di kaki D 34 5.7 5.9 5.8 5.8 35 8.7 8.6 8.7 8.5 36 7.7 7.9 8.8 8.8 37 6.5 6.2 6.1 6..1 38 6.8 6.9 6.6 6.9 39 5.9 6 6.4 6.11 40 8.1 8.2 8.3 8.5 41 9.3 8.1 8.3 8.9 42 7.8 7.4 7.4 7.4
43 7.2 7.3 7.3 7.8 dipasang ground langsung di kaki D 44 8.4 8.4 8.7 8.5
45 8.8 8.9 8.3 8.5 46 6.8 7.3 7.3 7.2
Lanjutan Lampiran 2
NO TOWER
HASIL UKUR PENTANAHAN KAKI TOWER (OHM)
LOKASI KETERANGAN
51 8.2 7.2 7.6 7.6 dipasang ground langsung di kaki D 52 5.3 5.4 5.4 5.5 53 5.9 5.9 5.8 5.7 54 7.9 7.4 7.8 8.9 55 7.8 7.9 8.1 8.2 56 6.5 6.5 6.5 6.6 57 7.5 7.5 7.5 7.8 58 5.7 5.9 5.8 5.9
59 9.8 8.9 8.9 9.2 dipasang ground langsung di kaki B dan D 60 9.8 9.5 7.9 7.9 61 8.8 8.8 9.2 9.4 62 9.1 9.5 9.1 9.1 63 8.3 8.2 8.3 8.2 64 7.2 7.2 7.2 7.3 65 7.3 7.5 7.5 7.5 66 8.9 9.2 9 8.7 67 7.9 8.4 8.3 8.4 68 7.2 7.8 6.8 6.3 69 6.2 5.4 4.3 3.1 70 6.3 6.8 6.3 6.8 71 5.6 6.4 8.5 7.5 72 7.2 7.3 7.4 6.9
73 7.4 7.5 7.5 7.7 dipasang ground langsung di kaki B dan D 74 7.2 7.6 7.6 7.5
75 5.7 4.7 6.3 7.3 dipasang ground langsung di kaki B 76 4.7 7.3 6.3 5.7
77 11 6.4 8.4 9
78 4 6.6 5.6 5 dipasang ground langsung di kaki D 79 8.9 9 9 9.1 dipasang ground langsung di kaki C 80 7.4 6.2 7 6.6 dipasang ground langsung di kaki D
81 5.4 4.4 8 7
82 8 8 6 6
83 3.7 5.4 6.3 6 dipasang ground langsung di kaki D
84 6 6.4 4.4 6.2
85 7 4.8 5 7.2 dipasang ground langsung di kaki D 86 4.5 5.1 4.1 4.7
87 3.5 3.3 5 4.8 dipasang ground langsung di kaki D
88 9 8.5 9.5 9.3
89 5 2.2 5.2 5.2
90 5 4.6 3.3 4.3
91 7.9 8.4 7.8 8.2 92 5.8 5.6 5.8 3.6
93 2.4 3.6 3.2 4.8 dipasang ground langsung di kaki D 94 4.2 2.2 3.6 5.8
95 6.8 6.2 7.3 4.7 dipasang ground langsung di kaki D 96 3.9 4.8 4.4 5.6
97 3.4 6.4 5.8 4.9 dipasang ground langsung di kaki D 98 3.2 3.6 2.2 4.6 dipasang ground langsung di kaki D 99 3.6 8.4 8.5 7.6
Lanjutan Lampiran 2
NO TOWER
HASIL UKUR PENTANAHAN KAKI TOWER (OHM)
LOKASI KETERANGAN
101 4.8 5.8 5.6 5.7
102 6.5 6.2 5.7 6.2 dipasang ground langsung di kaki D 103 8.4 8.4 8.4 8.4
104 8.2 7.8 7.8 8.2 105 3.9 4.3 4.8 4.8 106 7.2 7.5 6.7 7.6 107 8.6 6.6 8.8 8.2
108 5.8 4.2 4.4 3.6 dipasang ground langsung di kaki D
109 7.4 7 5.4 3
110 4.8 7.6 8.4 8.4 dipasang ground langsung di kaki D 111 5.2 7.4 5.4 7.2 dipasang ground langsung di kaki D 112 8.2 8.4 8.4 8.2 dipasang ground langsung di kaki D 113 8.4 8.4 7.8 8.6 dipasang ground langsung di kaki D 114 8.4 7.9 8.6 8.8
115 7.6 6 5.6 6
116 6 6 4.8 6.2
117 6.2 5.2 6.2 6 dipasang ground langsung di kaki D 118 5.4 4.9 4.4 5.3
119 5.4 4.2 4.6 6 dipasang ground langsung di kaki D 120 5.2 9.8 8.6 8.4
121 3.5 4.5 3.8 4.2
122 3 4 3.2 3.8
123 3 3.5 3 3.5 dipasang ground langsung di kaki D 124 5.5 4.8 4.5 5.2
125 3.5 4 3.8 4.7 dipasang ground langsung di kaki D
126 6 5 5.2 5.8 127 5.8 6.4 6.2 6.6 128 9 9.2 7.8 7 129 5.8 5 8 7.3 130 7.5 8.8 5.2 5.5 131 8.2 7.8 7.6 9.4 132 6.8 6.2 6.3 6.3 133 6.4 6..6 6.5 6.1
134 5.8 5.2 5 5 dipasang ground langsung di kaki D
135 4.4 4.6 4 4.4
136 5.8 5.6 5 5.6
137 4.4 4 3.8 5.6 dipasang ground langsung di kaki D
138 5.6 6 4.4 5.2 139 6.5 7.3 6.8 6.9 140 6.6 6.9 7 6.7 141 7.8 7.6 7.2 7.8 142 6.4 6.8 6.2 7 143 3 3.4 2.8 3.6 144 8.2 8.4 8.1 8.2 145 8.5 8.2 7.3 7.9 146 5.5 5.6 5.8 5.5 147 6.4 6.2 6.2 6 148 3.2 4.2 4.6 4.4
rata-Lampiran 3
LAPORAN KONDISI (TRIP/LEPAS/MASUK) PMT 150 kV
TRANSMISI SEI ROTAN – TEBING TINGGI, Tahun 2005
GARDU INDUK : SEI ROTAN
SEGMENT
: SEI ROTAN-TEBING TINGGI
Bulan
Nama Gardu Induk (GI)
Uraian gangguan PADAM Indikasi yang muncul
Penyebab
Tindakan corrective Jlh. Gangguan
(kali)
Keterangan PMT TRIP Trip Normal
TGL PKL TGL PKL Menit kWH Annuciator Rele Januari
A M A N
Februari Maret April Mei Juni JuliAgustus S.Rotan Pht.arah TT 31 17.55 31 17.55
Dist.relay zone 1 phase T
Diduga surja petir
Di GI S.Rotan Reclose sukses. Di GIT.Tinggi pht arah S.Rotan trip, indikasi.Dist,Rly zone 1 phase T. Pada saat gangguan cuaca hujan
September S.Rotan Pht.arah TT 04 16.50 04 16.50 Main protect. AR in progess Dist.relay zone 1 phase S. Autoreclose sukses bekerja di kedua sisi, pada saat kejadia cuaca hujan dan petir.
T.Tinggi Pht.arah SR 16.50 Dist.relay
zone 1 phase S
Oktober S.Rotan Pht.arah TT 02 04.15 02 04.15 Main protect. AR in progess
Dist.relay zone 1 phase S
Diduga ada isolator yang flashover akibat surja petir
Autoreclose sukses bekerja di kedua sisi T.Tinggi Pht.arah SR Dist.relay zone 1 pahse S November
A M A N
DesemberLampiran 4
LAPORAN KONDISI (TRIP/LEPAS/MASUK) PMT 150 kV
TRANSMISI SEI ROTAN - TEBING TINGGI, Tahun 2006
GARDU INDUK : SEI ROTAN
SEGMENT
: SEI ROTAN-TEBING TINGGI
Bulan
Nama Gardu Induk (GI)
Uraian gangguan PADAM Indikasi yang muncul
Penyebab
Tindakan corrective Jlh. Ganggua
n (kali)
Keterangan PMT TRIP Trip Normal
TGL PKL TGL PKL Menit kWH Annuciator Rele Januari
A M A N
Februari Maret April
Mei S.Rotan Pht.arah TT 01 15.57 01 16.02 5
Main protec, AR inprogess TP fail Dist. Relay zone 1phase T Di duga terjadi flashover pd isolator, Pht 150 kV SR-TT Merubah settingan scame distance relay dari PUTT (02) menjadi Basic Scame (00)
T.Tinggi Pht.arah SR 16.04 6
Juni A M A N Juli S.Rotan Pht.arah TT 10 03.29 10 03.29
Main protec, AR in progess
Dist.zone
1 phase T Reclose sukses di
kedua sisi T.Tinggi Pht.arah SR Main protec, AR in progess Dist.zone 1 phase T Agustus
A M A N
SeptemberOktober S.Rotan Pht.arah TT 01 16.42 01 16.42
Dist.zone 1 phase T S.Rotan Pht.arah TT 19 13.45 19 13.45 Dist.zone 1 phase T
November S.Rotan Pht.arah TT 19 00.52 19 00.52
Dist.zone 1 phase S Tgl 3 s/d 6 Des 2006 dilakukan penggantian isolator yang flashover di TW 60,70,73,137 penghantar S.Rotan – T.Tinggi Reclose sukses bekerja
S.Rotan Pht.arah TT 01.58 02.01 Dist.zone
1 phase R,S
Desember S.Rotan Pht.arah TT 20 05.02 19 05.16 Distance Protection Dist.zone 1 phase R,S,T Di GI TT rele bekerja Dist.zone 1 dan zone 2 phase R,S,T.Pada saat gangguan cuaca hujan dan petir
Lampiran 5
LAPORAN KONDISI (TRIP/LEPAS/MASUK) PMT 150 kV
TRANSMISI SEI ROTAN - TEBING TINGGI, Tahun 2007
GARDU INDUK : SEI ROTAN
SEGMENT
: SEI ROTAN-TEBING TINGGI
Bulan
Uraian Kejadian Proses
Pemulihan
kWh.PADAM Idikator Annuciator
Muncul
Rele yang
bekerja Penyebab Kejadian
Hasil Pemeriksaan PMT Trip/Lepas/Tidak Beban Sebelum Kejadian ADA TIDAK
ADA
Indikasi muncul/ kode rele Kondisi TGL PKL kV Amp MW MVAR PMT TGL PKL Menit Jlh.kWH
Januari
A M A N
FebruariMaret 15 08.14 145 320 80 -8 15 18.00 406 1.218.000 - - - HAR 5 tahun, pembersihan isolator - April
A M A N
Mei Juni 30 03.09 155 270 68 4 - - - - Mekanik fasa S, macet -Cuaca mendung macet,
dugaan surja petir -
Juli 9 08.03 150 320 80 8 9 15.06 - - - Perbaikan mekanik PMT di
GI S.Rotan
- Agustus
A M A N
September 10 08.31 150 240 60 12 10 10.22 111 111.000 - - - Penggantian timer relay discrepancy
- Oktober 01 18.00 148 230 58 12 01 18.06 - - - Ada jumperan konduktor
ang putus - November 11 19.05 100 290 72 8 11 19.10 5 - - RY – Z1 Ф B main protect, AR inprogress , recloser bekerja - - - Desember
A M A N
Lampiran 6
LAPORAN KONDISI (TRIP/LEPAS/MASUK) PMT 150 kV
TRANSMISI SEI ROTAN - TEBING TINGGI, Tahun 2008
GARDU INDUK : SEI ROTAN
SEGMENT
: SEI ROTAN-TEBING TINGGI
Bulan
Uraian Kegiatan Proses
Pemulihan
kWh.PADAM Idikator Annuciator
Muncul
Rele yang bekerja
Penyebab Kejadian
Hasil Pemeriksaan PMT Trip/Lepas/Tidak Beban Sebelum Kejadian ADA TIDAK
ADA
Indikasi muncul/ kode rele Kondisi TGL PKL kV Amp MW MVAR PMT TGL PKL Menit Jlh.kWH
Januari 14 10.49 151 335 84 12 14 14.09 190 149125 - - - Perbaikan kabel -
Februari A M A N Maret 18 13.34 150 228 72 -16 18 13.53 19 18955 - Main protec, TP fail Distance zone 1 Ø B,C. A/R inprogress, MFRF Cuaca di S.Rotan/ hujan petir -
April 29 11.17 151 335 84 12 29 11.22 5 7000 - - - Test SCADA -
Mei A M A N
Juni 11 16.42 149 320 80 12 - - - Main
protection
- Cuaca hujan petir - Juli A M A N Agustus 22 23 25 27 28 29 09.35 08.13 10.16 08.30 09.20 08.00 150 147 149 148 150 150 480 390 290 270 385 415 120 98 72 68 96 104 8 4 14 16 16 8 22 23 25 27 28 29 16.19 16.19 16.45 15.34 16.04 16.35 404 486 389 433 404 465 671758 656585 390785 404988 538806 192975 - - - - - - - - - - - - - - - - - - Penambahan isolator Penambahan isolator Penambahan isolator Penambahan isolator Penambahan isolator Penambahan isolator - - - - - - September 21 09.14 148 495 124 4 21 16.14 420 720186 - - - Penggantian isolator - Oktober A M A N
November 7 08.52 150 370 92 12 7 10.57 123 157651 - - - Perbaikan Pans Bus-2 -
Lampiran 7
LAPORAN KONDISI (TRIP/LEPAS/MASUK) PMT 150 kV
TRANSMISI SEI ROTAN - TEBING TINGGI, Tahun 2009
GARDU INDUK : SEI ROTAN
SEGMENT
: SEI ROTAN-TEBING TINGGI
Bulan
Uraian Kegiatan Proses
Pemulihan kWh.PADAM Idikator Annuciator Muncul Rele yang bekerja Penyebab Kejadian Hasil Pemeriksaan PMT Trip/Lepas/Tidak Beban Sebelum Kejadian ADA TIDAK
ADA
Indikasi muncul/ kode
rele Kondisi TGL PKL kV Amp MW MVAR PMT TGL PKL Menit Jlh.kWH
Januari
A M A N
Februari 10 07.59 150 130 32 4 10 13.58 479 215789 - - - HAR (Pemeliharaan tahunan) - Maret
A M A N
April Mei Juni JuliAgustus 26 10.08 149 225 56 14 26 10.53 45 34799 - - - Melepas cup line trap - September 7 8 09.35 10.32 149 148 112 305 28 76 4 12 7 8 16.22 15.05 407 316 156669 329236 - - - - - - Pemasangan LA di tower 25 & 75 Pemasangan LA di tower 112 & 133 - - Oktober