• Tidak ada hasil yang ditemukan

M)) BBIID DAAN NG G PPEEN NG GEEM MBBAAN NG GAAN N KKAAW WAASSAAN N PPEER RM MU UKKIIM MAAN N

N/A
N/A
Protected

Academic year: 2019

Membagikan "M)) BBIID DAAN NG G PPEEN NG GEEM MBBAAN NG GAAN N KKAAW WAASSAAN N PPEER RM MU UKKIIM MAAN N"

Copied!
7
0
0

Teks penuh

(1)

R

SUUMMBBEERR DDAANNAA PPeenniillaaiiaann RReeaaddiinneessss CCrriitteerriiaa ((iissii ttaahhuunn ppaaddaa kkoolloomm yyaanngg tteerrsseeddiiaa))

K

1 A. PENGEMBANGAN KAWASAN PENANGANAN KAWASAN PERMUKIMAN KUMUH 2015

PERMUKIMAN PERKOTAAN 1 PENATAAN KAWASAN SOSIAL BUDAYA KEL. BATU URIP 1 KWS 2,000,000,000 - 400,000,000 200,000,000 2011 2012 2014 2014 2015

2. PENATAAN KAWASAN SOSIAL BUDAYA KEL. JUKUNG 1 KWS 2,000,000,000 400,000,000 200,000,000 2011 2012 2014 2014 2015

3. PENATAAN KAWASAN KUMUH KEL. LUBUK LINGGAU BARAT II 1 KWS 1,300,000,000 400,000,000 150,000,000 2011 2012 2014 2014 2015

4. PENATAAN KAWASAN KUMUH KEL. LUBUK LINGGAU TIMUR II 1 KWS 1,300,000,000 400,000,000 150,000,000 2011 2012 2014 2014 2015

B. PENGEMBANGAN KAWASAN 1. PEMBANGUNAN JALAN USAHA TANI LUBUK LINGGAU SELATAN II 1 KWS 1,500,000,000 400,000,000 150,000,000 2011 2012 2014 2014 2015

PERMUKIMAN PERDESAAN

2. PEMBANGUNAN JALAN USAHA TANI LUBUK LINGGAU UTARA II 1 KWS 1,500,000,000 400,000,000 150,000,000 2011 2012 2014 2014 2015

T

T OO TT AA LL 22001155 99,,660000,,000000,,000000 -- 22,,440000,,000000,,000000 11,,000000,,000000,,000000

2 A. PENGEMBANGAN KAWASAN 1) PENANGANAN KAWASAN PERMUKIMAN KUMUH 2016

PERMUKIMAN PERKOTAAN - PENANGANAN KAWASAN PERMUKIMAN KUMUH

LBK LINGGAU BARAT 2, LUBUK LINGGAU TIMUR 2, LUBUK LINGGAU BARAT 1, LUBUK LINGGAU UTARA 2

50,000,000,000 4,000,000,000 200,000,000 2011 2012 2015 2012 2016

2) PENYEDIAAN INFRASTRUKTUR PERMUKIMAN DI KAWASAN RSH - KEGIATAN PENYEDIAAN PSD BAGI KAWASAN RSH

LUBUK LINGGAU TIMUR 2 DAN

LUBUK LINGGAU BARAT 1 1 KWS

1,000,000,000 - 1,000,000,000 100,000,000 2011 2012 2015 2015 2016

- PEMBUATAN JALAN LINGKUNGAN 1,000,000,000 - - 100,000,000 2011 2012 2015 2015 2016

- KEGIATAN PENANGANAN KAWASAN PERKOTAAN - - 1,000,000,000 - 2011 2012 2015 2015 2016

B. PENGEMBANGAN KAWASAN 4) -PEMBANGUNAN INFR. KWS DI PERBATASAN & PULAU KECIL

TERLUAR KEL. AIR TEMAM BLOK 51 1 KWS 900,000,000 - - - 2011 2012 2015 2015

PERMUKIMAN PERDESAAN

T

T OO TT AA LL 22001166 5522,,990000,,000000,,000000 -- 66,,000000,,000000,,000000 440000,,000000,,000000

3 A PEMBINAAN TEKNIS 1) PENANGANAN KAWASAN PERMUKIMAN KUMUH LUBUK LINGGAU TIMUR II DESA MESAT SENI, MESAT JAYA 1 KWS 2017 1,200,000,000 - - 200,000,000 2011 2012 2016 2016 2017

PENGEMBANGAN KAWASAN PERMUKIMAN

T

(2)

4 A PEMBINAAN TEKNIS 1) PENANGANAN KAWASAN PERMUKIMAN KUMUH LUBUK LINGGAU TIMUR II DESA

MESAT SENI, MESAT JAYA 1 KWS 2018 1,200,000,000 - - 200,000,000 2011 2012 2017 2017 2018

PENGEMBANGAN KAWASAN PERMUKIMAN

T

T OO TT AA LL 22001188 11,,220000,,000000,,000000 -- -- 220000,,000000,,000000

5 A PEMBINAAN TEKNIS 1) PENANGANAN KAWASAN PERMUKIMAN KUMUH LUBUK LINGGAU BARAT 1 1 KWS 2019 2,000,000,000 - - 200,000,000 2011 2012 2017 2017 2018

T

(3)

R

1 A. PEMBANGUNANSPAM IKK PEMBANGUNAN SPAM IKK KAP. 200 L/DET KEL. ULAK SURUNG / BUKIT SULAP (KSN) 1 IKK 2015 20,000,000,000 6,000,000,000 25,000,000,000 600,000,000 16.000 SR 2014 2014 2015 RATEK

B. BANTUAN PROGRAM PENYEHATAN PDAM PDAM LUBUK LINGGAU 2,000,000,000

PEMBANGUNAN SPAM IKK KAP. 20 L/DET KEL. JUKUNG KEC. LUBUK LINGGAU

SELATAN I (KSN BUDAYA) 1 IKK 8,000,000,000 3,000,000,000 2,150,000,000 1600 SR 2013 2013 2015 RATEK PEMBANGUNAN SPAM IKK KAP. 20 L/DET KEL. BATU URIP KEC. LUBUK LINGGAU UTARA 2 (KSN BUDAYA) 1 IKK 8,000,000,000 3,000,000,000 1,630,000,000 1600 SR 2013 2013 2015 RATEK

C. PENINGKATAN SPAM IKK - OPTIMALISASI SPAM IKK KEL. JUKUNG KEC. LUBUK LINGGAU SELATAN I 1 KWS 2,500,000,000 1,000,000,000 1,000,000,000 - 2011 2014 2014 2015

- OPTIMALISASI SPAM IKK KEL. BATU URIP KEC. LUBUK LINGGAU UTARA 2 1 KWS 2,500,000,000 1,000,000,000 500,000,000 - 2011 2014 2014 2015 - OPTIMALISASI SPAM IKK TABA LESTARI & TABA REJO 1 KWS 2,000,000,000 1,000,000,000 1,000,000,000 1000 SR 2013 2013 2015 KONREG

T

TOOTTAALL 22001155 4455,,000000,,000000,,000000 1155,,000000,,000000,,000000 3311,,228800,,000000,,000000 660000,,000000,,000000

2 A. PEMBANGUNANSPAM IKK - PEMBANGUNAN SPAM IKK KAP. 200 L/DET KEL. ULAK SURUNG / BUKIT SULAP (KSN) 1 KWS 22001166 40,000,000,000 6,000,000,000 2,500,000,000 120,000,000 2013 2015 2015 2016

- PEMBANGUNAN SPAM IKK KAP. 20 L/DET KEL. BATU URIP KEC. LUBUK LINGGAU UTARA 2 (KSN BUDAYA) 1 KWS 10,110,000,000 3,000,000,000 1,630,000,000 220,000,000

B. PENINGKATAN SPAM IKK - OPTIMALISASI SPAM IKK KEL. JUKUNG KEC. LUBUK LINGGAU

SELATAN I (KSN BUDAYA) 1 KWS 2,000,000,000 1,000,000,000 1,000,000,000 20,000,000 - OPTIMALISASI SPAM IKK KEL. BATU URIP KEC. LUBUK LINGGAU UTARA 2 (KSN BUDAYA) 1 KWS 2,000,000,000 3,000,000,000 500,000,000 20,000,000 - OPTIMALISASI SPAM IKK KOTA LUBUK LINGGAU 1 IKK 2,000,000,000 1,100,000,000 30,000,000 - PEMBANGUNAN BOSTER PUMP KOTA LUBUK LINGGAU 2 Lokasi 2,570,000,000 300,000,000 60,000,000

- PENGGANTIAN JARINGAN PIPA DISTRIBUSI UTAMA DIA 300 MM KOTA LUBUK LINGGAU 14200 mtr 21,671,670,800 2,000,000,000 850,000,000 70,000,000 2014

-PEMBUATAN BANGUNAN GROUND RUMAH POMPA INTAKE SUNGAI KELINGI, POMPA INTAKE DAN ACC

KOTA LUBUK LINGGAU 1 unit 1,000,000,000 600,000,000 180,000,000 10,000,000 2014

OPTIMALISASI JARINGAN PIPA TRANSMISI

INTAKE SUNGAI KESIE KOTA LUBUK LINGGAU 1000 mtr 2,200,000,000 500,000,000 100,000,000 10,000,000

T

TOOTTAALL 22001166 7788,,998811,,667700,,880000 2200,,667700,,000000,,000000 88,,116600,,000000,,000000 556600,,000000,,000000

3 A. PENINGKATAN SPAM IKK - OPTIMALISASI SPAM IKK KEL. JUKUNG KEC. LUBUK LINGGAU

SELATAN I 1 KWS 2017 2,500,000,000 1,000,000,000 1,000,000,000 2011 2016 2016 2017 - OPTIMALISASI SPAM IKK KEL. BATU URIP KEC. LUBUK LINGGAU UTARA 2 1 KWS 1,500,000,000 1,000,000,000 1,000,000,000 2011 2016 2016 2017

T

TOOTTAALL 22001177 44,,000000,,000000,,000000 22,,000000,,000000,,000000 22,,000000,,000000,,000000

4 A. PENINGKATAN SPAM IKK - OPTIMALISASI SPAM IKK IKK LUBUK KUPANG 1 KWS 2018 2,000,000,000 1,000,000,000 1,000,000,000 2011 2017 2017 2018

T

TOOTTAALL 22001188 22,,000000,,000000,,000000 11,,000000,,000000,,000000 11,,000000,,000000,,000000

--5 A. PENINGKATAN SPAM IKK - OPTIMALISASI SPAM IKK KEC. LUBUK LINGGAU UTARA 1 1 KWS 2019 2,000,000,000 1,000,000,000 1,000,000,000 2011 2018 2018 2019 T

TOOTTAALL 22001199 22,,000000,,000000,,000000 11,,000000,,000000,,000000 11,,000000,,000000,,000000 --

(4)

--R

SUUMMBBEERR DDAANNAA PPeenniillaaiiaann RReeaaddiinneessss CCrriitteerriiaa ((iissii ttaahhuunn ppaaddaa kkoolloomm yyaanngg tteerrsseeddiiaa))

Maassyyaarraakkaatt CCSSRR RRTTBBLL IInnddiikkaattoorr

A PEMBINAAN TEKNIS BANGUNAN GEDUNG 1 PENYUSUSNAN RISPK KOTA LUBUK LINGGAU 1 LAPORAN 2015 1,000,000,000

2 PENYUSUSAN RTBL KAWASAN STRATEGIS EKONOMI KEC. LUBUK LINGGAU TIMUR II 1 LAPORAN 2015 1,000,000,000 3 PENYUSUNAN RTBL KAWASAN STRATEGIS EKONOMI KEC. LUBUK LINGGAU BARAT II 1 LAPORAN 2015 1,000,000,000

4 PENYUSUNAN RTBL KAWASAN SOSIAL BUDAYA KEL. BATU URIP KEC. LUBUK LINGGAU UTARA II 1 LAPORAN

2015 1,000,000,000 5 PENYUSUNAN RTBL KAWASAN SOSIAL BUDAYA KEL. JUKUNG KEC. LUBUK LINGGAU SELATAN II 1 LAPORAN

2015 1,000,000,000 6 PENYUSUNAN RTBL KAWASAN STRATEGIS NASIONAL TNKS BUKIT SULAPKEL.. ULAK SURUNG KEC. LUBUK

LINGGAU UTARA II 1 LAPORAN 2015 1,000,000,000

B PENATAAN REVITALISASI KAWASAN 1 PENATAAN KAWASAN STRATEGIS EKONOMI KEC. LUBUK LINGGAU BARAT II KEL. PASAR PERMIRI 1 KWS 2015 1,000,000,000

T

T OO TT AA LL 22001155 66,,000000,,000000,,000000 -- 11,,000000,,000000,,000000

--3 AKKAMEMAWENWANIINASNGSAGKANKAN RATRUT KUAKUANUANGALLIITG TTATEASERSNRBNYBUUKYAAKAA HHIIJJAAUU YYAANNGG DUKUNGAN PSD RUANG TERBUKA HIJAU (RTH) Taman Silampari Kel. Air Kuti 1 KAWASAN 2016 1,500,000,000 400,000,000

2015 2016 DUKUNGAN PSD RUANG TERBUKA HIJAU (RTH) Taman Aspirasi Kel. Sumber Agung 1 KAWASAN 1,500,000,000

DuKUNGAN PSD RTH KAWASAN KUMUH Kel. Mesat Jaya 1 KAWASAN 1,000,000,000 Kel. Lubuklinggau ilir 1 KAWASAN 1,000,000,000 Kel. Muara Enim 1 KAWASAN 1,000,000,000 - Pembuatan Fire Hiydran Kawasan Kumuh 11 Kawasan Kumuh 55 Titik 275,000,000 DUKUNGAN PSD RTH KAWASAN INDUSTRI DAN PERGUDANGAN Kel. Air Kati 1 KAWASAN 3,000,000,000

B

PENINGKATAN KAWASAN PERMUKIMAN TRADISIONAL KOTA LUBUK LINGGAU 1 KAWASAN 1,500,000,000 100,000,000

2015 2016 Penyusunan RTBL Lubuklinggau Selatan I dan Selatan II KOTA LUBUK LINGGAU 1Laporan 800,000,000

Penyusunan RTBL Lubuklinggau Utara I dan Utara II KOTA LUBUK LINGGAU 1Laporan 800,000,000 Revitalisasi Kawasan Wisata Watervang Kelurahan Watervang 1KAWASAN 2,000,000,000 Revitalisasi Kawasan Wisata Bukit Sulap Kelurahan Ulak Surung 1KAWASAN 1,000,000,000

C PPEENNAATTAAAANN RREEVVIITTAALLIISSAASSII KKAAWWAASSAANN -- Dukungan PSD Taman Pemakaman Umum (TPU) Utara I Kec. Lubuklinggau Utara I 1 KAWASAN 1,500,000,000 300,000,000 500,000,000 2015 2016 P

PEEMMBBIINNAAAANN TTEEKKNNIISS BBAANNGGUUNNAANN GGEEDDUUNNGG - PEMERIKSAAN KEANDALAN BANGUNAN KOTA LUBUK LINGGAU 1 KAWASAN 200,000,000

T

T OO TT AA LL 22001166 1177,,007755,,000000,,000000 -- 770000,,000000,,000000 660000,,000000,,000000

3 AKAWASAN RUANG TERBUKA HIJAU YANG

MENINGKAT KUALITASNYA DUKUNGAN PSD RUANG TERBUKA HIJAU (RTH) KEC. LUBUK LINGGAU TIMUR II 1 KAWASAN 2017 1,500,000,000 400,000,000 2016 2016 2017 DUKUNGAN PSD RTH KAWASAN INDUSTRI DAN PERGUDANGAN KEC. LUBUK LINGGAU TIMUR II 1 KAWASAN

B

KAWASAN PERMUKIMAN TRADISIONAL DAN BERSEJARAH YANG MENINGKAT KUALITASNYA

PENINGKATAN KAWASAN PERMUKIMAN TRADISIONAL KEC. LUBUK LINGGAU TIMUR II 1 KAWASAN 1,500,000,000 100,000,000

2016 2016 2017 C PENATAAN REVITALISASI KAWASAN - REVITALISASI KAWASAN WISATA 1,500,000,000 300,000,000 500,000,000 2016 2016 2017

PEMBINAAN TEKNIS BANGUNAN GEDUNG - PEMERIKSAAN KEANDALAN BANGUNAN KEC. LUBUK LINGGAU TIMUR II 1 KAWASAN 200,000,000

T

(5)

4 AKAWASAN RUANG TERBUKA HIJAU YANG MENINGKAT KUALITASNYA DUKUNGAN PSD RUANG TERBUKA HIJAU (RTH) KEC. LUBUK LINGGAU UTARA II 1 KAWASAN 2018 1,500,000,000 400,000,000

2017 2017 2018 DUKUNGAN PSD RTH KAWASAN INDUSTRI DAN PERGUDANGAN KEC. LUBUK LINGGAU UTARA II 1 KAWASAN

B

KAWASAN PERMUKIMAN TRADISIONAL DAN BERSEJARAH YANG MENINGKAT KUALITASNYA

PENINGKATAN KAWASAN PERMUKIMAN TRADISIONAL KEC. LUBUK LINGGAU UTARA II 1 KAWASAN 1,500,000,000 100,000,000

2017 2017 2018 C PENATAAN REVITALISASI KAWASAN - REVITALISASI KAWASAN WISATA 1,500,000,000 300,000,000 500,000,000 2017 2017 2018

PEMBINAAN TEKNIS BANGUNAN GEDUNG - PEMERIKSAAN KEANDALAN BANGUNAN KEC. LUBUK LINGGAU UTARA II 1 KAWASAN 200,000,000

T

T OO TT AA LL 22001188 44,,770000,,000000,,000000 -- 770000,,000000,,000000 660000,,000000,,000000

5 AKAWASAN RUANG TERBUKA HIJAU YANG MENINGKAT KUALITASNYA DUKUNGAN PSD RUANG TERBUKA HIJAU (RTH) KEC. LUBUK LINGGAU BARAT 1 1 KAWASAN 2018 1,500,000,000 400,000,000

2017 2017 2018

T

(6)

--R

SUUMMBBEERR DDAANNAA PPeenniillaaiiaann RReeaaddiinneessss Ckkoolloomm yyaanngg tteerrsseeddiiaa))Crriitteerriiaa ((iissii ttaahhuunn ppaaddaa K

Maassyyaarraakkaatt CCSSRR SSSSKK KKeessiiaappaann LLaahhaann DDEEDD D

INFRASTRUKTUR DRAINASE PERKOTAAN - PEMBANGUNAN SALURAN DRAINASE SUNGAI BUSUK JAWA KANAN SS JAWA KANAN SS 1 KOTA 2015 1,000,000,000 500,000,000 2012 2014 2014

- PEMBUATAN KOLAM RETENSI KELURAHAN SIMPANG PERIUK KEC. LUBUK LINGGAU SELATAN II 1 KOTA 2,000,000,000 100,000,000 2012 2014 2014 2015

- PEMBUATAN KOLAM RETENSI DANAU CINTA KEC. LUBUK LINGGAU BARAT I 1 KOTA 1,000,000,000 100,000,000 2012 2014 2014 2015

- OUTLINE PLAN DAN DED DRAINASE KOTA LUBUK LINGAU 1 PAKET 800,000,000 2012 2013 2013 PPSP

- PEMBANGUNAN TALUT SUNGAI KELINGI KAWASAN TNKS BKT.SULAP KEL. ULAK SURUNG 1 PAKET 3,000,000,000

INFRASTRUKTUR TEMPAT

PEMROSESAN AKHIR SAMPAH - PENAMBAHAN DUMP TRUK KOTA LUBUK LINGGAU 1 KOTA 600,000,000 600,000,000 2012 2014 2014 2015 - PENGADAAN BULDOZER KOTA LUBUK LINGGAU 1 KOTA 2,000,000,000

- PEMBANGUNAN TPST 3R KEL. PONOROGO DAN KEL. PETANANG ILIR KOTA LUBUK LINGGAU 1 UNIT 1,000,000,000 - 50,000,000 2012 2014 2014

- BIAYA PERAWATAN & PEMELIHARAAN - - 50,000,000 2012 2014 2014 2015

- PENAMBAHAN ARM ROLL TRUCK KOTA LUBUK LINGGAU 1 KOTA 540,000,000 2012 2013 2013 RATEK

- PEMBANGUNAN FASILITAS PERLINDUNGAN LINGKUNGAN TPA

A. SUMUR PANTAU KEL. LUBUK BINJAI 1 PAKET 160,000,000 2012 2013 2013 2014 PPSP

B. BUFFER ZONE KEL. LUBUK BINJAI 1 PAKET 250,000,000 2012 2013 2013 2014 PPSP

INFRASTRUKTUR AIR LIMBAH - PEMBANGUNAN IPAL KOMUNAL RSH KEL. DURIAN RAMPAK KEL DURIAN RAMPAK 1 KAWASAN 1,500,000,000 2012 2014 2014 - PEMBANGUNAN SEPTIC TANK KOMUNAL KEL SIDOREJO 1 KAWASAN 800,000,000 400,000,000 2012 2014 2014 2015

- PEMBANGUNAN IPLT KEL. LUBUK BINJAI KEL. LUBUK BINJAI 1 PAKET 5,000,000,000 2012 2014 2014 PPSP

- PEMBANGUNAN SANIMAS REGULER KOTA LUBUK LINGGAU 4 PAKET 1,100,000,000 500,000,000

- PENGADAAN TRUCK TINJA KOTA LUBUK LINGGAU 2 UNIT - 500,000,000 2012 2013 2013 2014 RATEK

T

TOOTTAALL 22001155 1188,,220000,,000000,,000000 33,,114400,,000000,,000000 22,,221100,,000000,,000000

IINNFFRRAASSTTRRUUKKTTUURR AAIIRR LLIIMMBBAAHH - DED IPLT KOTA LUBUK LINGGAU 1 LAPORAN 22001166 500,000,000 - 2012 2015 PEMBANGUNAN IPAL PERUMAHAN PERUM GRIYA ASRI KEL. MUARA

ENIM 1 Lokasi 5,500,000,000 2014

- PEMBANGUNANAN MCK KEL. LUBUK LINGGAU ILIR 1 Lokasi 425,000,000

PEMBANGUNANAN MCK KEL. MESAT SENI 4 Lokasi 850,000,000 850,000,000 PEMBANGUNANAN MCK KEL. MUARA ENIM 1 Lokasi 425,000,000

PEMBANGUNANAN MCK KEL. PASAR PERMIRI 1 Lokasi 425,000,000 PEMBANGUNANAN MCK KEL. ULAK SURUNG 1 Lokasi 425,000,000

PEMBANGUNANAN MCK KEL. DEMPO 1 Lokasi 425,000,000

PEMBANGUNANAN MCK KEL. MESAT JAYA 1 Lokasi 425,000,000

PEMBANGUNAN IPAL KOTA LUBUKLINGGAU 26 Lokasi 11,050,000,000 552,500,000

IINNFFRRAASSTTRRUUKKTTUURR TTEEMMPPAATT - PENAMBAHAN BULLDOZER TPA LUBUK BINJAI 2 Unit 3,600,000,000 2012 2015 P

PEEMMRROOSSEESSAANN AAKKHHIIRR SSAAMMPPAAHH - PENAMBAHAN ARM ROLL TRUCK KOTA LUBUK LINGGAU 1 Unit 540,000,000 2012 2015 - PENGADAAN EXAVATOR TPA LUBUK BINJAI 2 Unit 3,600,000,000

- PENGADAAN CONTAINER SAMPAH KOTA LUBUK LINGGAU 1 Unit 75,000,000 - PENGADAAN MOTOR SAMPAH 11 KWSN KUMUH 33 Unit 660,000,000

PEMBANGUNAN TPST 3R KEL. LUBUK LINGGAU ILIR 1 Kawasan 850,000,000 425,000,000 - PENYUSUNAN OUTLINE PLAN PERSAMPAHAN KOTA LUBUK LINGGAU 1 LAPORAN 500,000,000

- PENYUSUNAN RAPERDA SANITASI KOTA LUBUK LINGGAU 1 Dokumen 250,000,000

- BIAYA PERAWATAN & PEMELIHARAAN - - 50,000,000 2012 2015 2016

IINNFFRRAASSTTRRUUKKTTUURR DDRRAAIINNAASSEE PPEERRKKOOTTAAAANN - PEMBANGUNAN TALUD SUNGAI MESAT

KEL. MESAT JAYA, MESAT SENI , MUARA ENIM , KARYA BAKTI ,

DEMPO

1 Kawasan 5,000,000,000 300,000,000 2012 2015 2015 2016

- PEMBANGUNAN TALUD SUNGAI KELINGI LINGGAU ILIR , ULAK SURUNG KEL. LBK LINGGAU ULU, LBK 1 Kawasan 10,000,000,000

- PEMBANGUNAN TALUD SUNGAI SETEKI KEL. PASAR PERMIRI 1 Kawasan 1,000,000,000

- PEMBUATAN KOLAM RETENSI DANAU CINTA KEL. KAYU ARA KEC. LBK LINGGAU BARAT 1 1 Kawasan 1,000,000,000 1,000,000,000 100,000,000

- PEMBANGUNAN SALURAN DRAINASE SUNGAI BUSUK JAWA KANAN SS KEL. JAWA KANAN SS 1 Kawasan 500,000,000

T

(7)

3 INFRASTRUKTUR DRAINASE PERKOTAAN - DRAINASE PERKOTAAN KEC LUBUK LINGGAU TIMUR 2 1 KOTA 2017 2,000,000,000 200,000,000 2012 2016 2016 2017

INFRASTRUKTUR AIR LIMBAH - PEMBANGUNAN SISTEM PENGOLAH AIR LIMBAH TERPUSAT SKALA KOTA/KAWASAN KEC LUBUK LINGGAU TIMUR 2 1 PAKET 1,500,000,000 2012 2014 2014 PPSP

T

TOOTTAALL 22001177 33,,550000,,000000,,000000 -- 220000,,000000,,000000

4 INFRASTRUKTUR DRAINASE PERKOTAAN - DRAINASE PERKOTAAN KEC LUBUK LINGGAU UTARA 2 1 KOTA 2018 2,000,000,000 200,000,000 2012 2017 2017 2018

INFRASTRUKTUR AIR LIMBAH - PEMBANGUNAN SISTEM PENGOLAH AIR LIMBAH TERPUSAT SKALA KOTA/KAWASAN KEC LUBUK LINGGAU UTARA 2 1 PAKET 1,500,000,000 2012 2014 2014 PPSP

T

TOOTTAALL 22001188 33,,550000,,000000,,000000 -- 220000,,000000,,000000

5 INFRASTRUKTUR DRAINASE PERKOTAAN - DRAINASE PERKOTAAN KEC LUBUK LINGGAU BARAT 1 1 KOTA 2019 2,000,000,000 200,000,000 2012 2017 2017 2018

INFRASTRUKTUR AIR LIMBAH - PEMBANGUNAN SISTEM PENGOLAH AIR LIMBAH TERPUSAT SKALA KOTA/KAWASAN KEC LUBUK LINGGAU BARAT 1 1 PAKET 1,500,000,000 2012 2014 2014 PPSP

T

Referensi

Dokumen terkait

Kecemasan diri yang sifatnya abstrak akan sulit jika divisualkan secara langsung tanpa ditampilkan secara simbolik. Maka dari itu ungkapan secara simbolik digunakan

(1) Perpanjangan studi bagi mahasiswa program magister yang belum dapat menyelssaikan belajarnya dalam kurun waktu 2 (dua) tahun akademik atau 4 (empat) semester sebagaimana

dilihat dari data hasil matering selama 1 tahun di tahun 2015, dimana data yang dihasilkan dari data 1 bulan dari januari sampai desember 2015, untuk nilai temperatur

Berdasarkan hasil pembahasan yang telah Berdasarkan hasil pembahasan yang telah dipaparkan pada bab sebelumnya mengenai pembentukan model estimasi inflasi dengan menggunakan

Dari sisi pengeluaran, pada Triwulan II-2017, pertumbuhan tertinggi terjadi pada komponen konsumsi LNPRT yang tumbuh sebesar 7,41 persen, kemudian diikuti oleh

Laporan Akhir ini dimaksudkan untuk memenuhi salah satu persyaratan dalam menyelesaikan studi pada program Diploma III Politeknik Negeri Sriwijaya Palembang yang berjudul

Pada bab ini penulis akan diberikan gambaran mengenai keadaan CV Tripa Duta Nusantara Palembang, antara lain sejarah singkat perusahaan, struktur organisasi

Berdasarkan hasil plot tersebut yang di overlay dengan type curve Ganesh Thakur, maka dapat dilihat bahwa hasil plot berhimpitan dengan type curve nomor 2,