A. PEKERJAAN PERSIAPAN
1 PEMBERSIHAN AWAL, & PERBAIKAN M2 26,00
2 KANTOR DIREKSI KEET, & GUDANG BAHAN M2 2,80
3 ADMINISTRASI,PELAPORAN, DOKUMENTASI, DLL LS 1,00
4 PENGUKURAN PEMASANGAN PAPAN BOUWPLANK M' 20,00
5 PEMBERSIHAN AKHIR LS 1,00
6 PAPAN NAMA PROYEK LS 1,00
7 PENGADAAN AIR KERJA LS 1,00
8 BIAYA TEBANG POHON LS 1,00
B. PEKERJAAN PEMBANGUNAN UKS
I PEKERJAAN GALIAN TANAH DAN TIMBUNAN
1 GALIAN TANAH PONDASI M3 4,32
2 URUGAN TANAH KEMBALI M3 1,08
3 MENGURUG TANAH DIBAWAH LANTAI M3 7,09
4 MENGURUNG PASIR DI BAWAH LANTAI M3 1,18
II PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN, PLESTERAN, DAN ACIAN
1.1 PASANG PONDASI BATU KARANG ad, 1:4 M3 4,32
1.2 PASANG DINDING BATAKO ad, 1:4 M2 57,98
1.4 PLESTERAN TEMBOK ad, 1 : 4 M2 90,45
1.5 ACIAN DINDING M2 90,45
2 PEKERJAAN PINTU DAN ACCESSORIES
2.1 PAS. KUSEN PINTU DAN VENTILASI 6/12 CM, KAYU KLS I M3 0,15
2.2 PASANG PINTU PANEL KAYU KLS I M2 3,08
2.3 PASANG JENDELA KACA, BINGKAI KAYU KLS I M2 1,95 2.4 PASANG VENTILASI JELUSI MATI KAYI KLS II M2 0,78
2.5 PASANG ENGSEL PINTU PSG 2,00
2.6 PASANG ENGSEL JENDELA PSG 3,00
2.7 PASANG GRENDEL PINTU BH 2,00
2.8 PASANG GRENDEL JENDELA BH 3,00
2.9 PASANG KUNCI TANAM 2 SLAAG BH 1,00
2.10 PASANG KAIT ANGIN PSG 3,00
3 PEKERJAAN ATAP, KUDA - KUDA, DAN PLAFOND 3.1 PEKERJAAN KUDA - KUDA
3.1.1 PASANG KUDA-KUDA BAJA RINGAN M3 45,90
3.2 PEKERJAAN ATAP, LISTPLANK
3.2.1 PASANG ATAP GALVALUME T= 0,30 MM M2 45,90
3.2.3 PASANG ATAP BUBUNGAN GALVALUME T= 0,30 MM M2 5,10
3.2.4 PASANG LISTPLANK GRC, UK 30/10 CM M' 27,80
3.3 PEKERJAAN PLAFOND PVC, & LIST PLAFOND PVC
3.3.1 PASANG PLAFOND MULTIBOARD + RANGKA ALLUMUNIUM 4x4 CM M2 40,50
3.3.2 PASANG LIST PLAFOND PVC T= 5 CM M' 40,50
4 PEKERJAAN LANTAI, DAN DINDING KERAMIK
4.1 BETON TUMBUK TBL = 6 CM, ad 1:3:6 M3 1,42
4.2 KERAMIK 40x40 CM M2 23,63
5 PEKERJAAN PENGECATAN DINDING, BETON, & LISTPLANG
5.1 PENGECATAN BIDANG - BIDANG DINDING DAN BETON SETARA ( JOTUN ) M2 130,95 5.2 PENGECATAN BIDANG KAYU/LISPLANK DENGAN CAT KAYU ( GLOTEKS ) M2 22,50 III PEKERJAAN STRUKTUR
1 BETON SLOOF 12 x 17 CM, ad 1:2:3
1.1 BETON SLOOF 15 x 20 CM, (KELILING BANGUNAN)
1.1.1 PEMBESIAN KG 81,74
1.1.2 BEKISTING M2 7,20
1.1.3 BETON K-225 M3 0,54
2 BETON BALOK 12 x 17 CM, ad 1:2:3
2.1 BETON BALOK 15 x 20 CM, (KELILING BANGUNAN)
2.1.1 PEMBESIAN KG 81,74
2.1.2 BEKISTING M2 6,48
2.1.3 BETON K-225 M3 0,49
URAIAN PEKERJAAN
NO. ITEM PEKERJAAN SATUAN VOLUME
NO. ITEM PEKERJAAN SATUAN VOLUME 4 BETON KOLOM 12 x 12 CM, ad 1:2:3
4.1 BETON KOLOM 12 x 12 CM
4.1.1 PEMBESIAN KG 114,14
4.1.2 BEKISTING M2 6,19
4.1.3 BETON K-225 M3 0,37
IV PEKERJAAN MEKANIKAL ELEKTRIKAL 1 ELEKTRIKAL
1.1 PASANG TITIK INSTALASI TTK 2,00
1.2 PASANG LAMPU PHILIPS 18 WATT BH 2,00
1.3 PASANG PANEL MCB 3 PAS BH 1,00
1.4 PASANG SAKLAR GANDA (TANAM) SETARA (BROCO) BH 2,00 1.5 PASANG STOP KONTAK (TANAM) SETARA (BROCO) BH 2,00
1.6 PASANG TITIK AC TITIK 1,00
D. PEKERJAAN MOUBILER
1 MEJA KERJA 1/2 BIRO KAYU KLS II BH 1,00
2 KURSI SISWA BH 2,00
3 KURSI KERJA (KURSI RODA) BH 1,00
4 LEMARI KAYU, PINTU KACA (KAYU KLAS II) BH 1,00
5 TEMPAT TIDUR + KASUR 1 BADAN, UK = 80 cm x 200 cm x 700 cm ( BESI ) BH 1,00 6 KOTAK P3K TEMPERL DINDING 3 COMPONENTS ( UK = 30 cm x 35 cm x 12 cm ) + OBATBH 1,00 E. SISTEM MANAGEMEN KESELAMATAN KONSTRUKSI
1 PENYIAPAN RKK
1.1 PEMBUATAN DOKUMEN RENCANA SET 1,00
2 SOSIALISASI, PROMOSI DAN PELATIHAN
2.1 PAPAN INFORMASI K3 BH 1,00
3 ALAT PELINDUNG KERJA DAN PELINDUNG DIRI
3.1 TALI KESELAMATAN ( LIFE LINE ) LS 1,00
3.2 PEMBATAS AREA ( RESTRICTED AREA ) LS 1,00
3.3 TOPI PELINDUNG ( SAFETY HELMET ) BH 4,00
3.4 PELINDUNG MATA ( GOOGLES SPECTACLES ) PSNG 4,00
3.5 TAMENG MUKA ( FACE SHIELD ) BH 4,00
3.6 PELINDUNG PERNAPASAN DAN MULUT ( MASKER ) BH 4,00
3.7 SARUNG TANGAN ( SAFETY GLOVES ) PSNG 4,00
3.8 SEPATU KESELAMATAN ( SAFETY SHOES ) PSNG 4,00
3.9 ROMPI KESELAMATAN ( SAFETY VEST ) BH 4,00
4 ASURANSI DAN PERIZINAN
4.1 ASURANSI (JKK & JKM 0,15%) LS 0,0015
5 PERSONEL K3 KONSTRUKSI
5.1 AHLI KE KONSTRUKSI ORG 1,00
6 FASILITAS, SARANA DAN PRASARANA KESEHATAN
6.1 - PERALATAN P3K ( KOTAK P3K) LS 1,00
7 RAMBU-RAMBU YANG DIPERLUKAN
7.1 - RAMBU PETUNJUK BH 1,00
8 PENGENDALIAN RESIKO KESELAMATAN KONSTRUKSI
8.1 - BENDERA K3 BH 1,00