• Tidak ada hasil yang ditemukan

Space Layout and Design Specifications

N/A
N/A
Agus Firhan Ali

Academic year: 2023

Membagikan " Space Layout and Design Specifications"

Copied!
34
0
0

Teks penuh

(1)

A A B

B

A A

B

B

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

SITEPLAN LANTAI 1

SC SC SITE PLAN LANTAI 2

(2)

A A

B B

D E

E C

F F

G G

H I H

1 1 2 2 3 3

4 5 5

6 6

7 8 8

9 9

10 10

D

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH LANTAI 1

SC

(3)

A A

B B

D E

E C

F F

G G

H I H

1 1 2 2 3 3

4 5 5

6 6

7 8 8

9 9

10 10

D

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH LANTAI 2

SC

(4)

±0,00

- 1,25 +4,00 +8,00 +12,50

+3,40 +7,40

PONDASI BATU KALI URUGAN TANAH SLOOF 25x30

BALOK UTAMA 30x50 RINGBALK 15X20

R. TAMU

±0.00

R. KELUARGA

±0.00 KM

+3.95

KAMAR +4.00

KAMAR +4.00

PLAFOND +3.40

PLAFOND +3.40 PLAFOND

+3.55

PLAFOND +7.55 PLAFOND

+7.40 PLAFOND

+7.55

DAK BETON T=12

- 1,65

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

POTONGAN A-A

SC

(5)

±0,00

- 1,25 +4,00 +8,00 +12,50

+3,40 +7,40

PONDASI BATU KALI URUGAN TANAH SLOOF 25x30

PLAFOND +3.40 PLAFOND

+7.55 PLAFOND

+7.40

R. KELUARGA

±0.00

KM -0.05 +2.00 AREA OLAHRAGA

+4.00 RINGBALK 15X20

-0.50

PLAFOND +7.55

- 1,65

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

POTONGAN B-B

SC

(6)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

TAMPAK DEPAN

SC

(7)

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

TAMPAK BELAKANG

SC

(8)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

TAMPAK SAMPING KIRI

SC

(9)

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

TAMPAK SAMPING KANAN

SC

(10)

F1 F2

F3 F4

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH FOOTPLAT

SC

(11)

C A B

KETERANGAN :

: PONDASI BATU BATA TEBAL 1 BATA

: PONDASI BATU KALI

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH PONDASI BATU KALI

SC

(12)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH SLOFT

SC

(13)

A A

D D

F F

H G

I I

B B

C E

1 1 2 2 3 3 4 5 5 6 6 7 7 8 8

9 10

11

C E

10 11

K1 K1

K1 K1

K1 K1

K1 K1 K1

K1 K1 K1 K1

K1 K1 K1

K1 K1 K1

K1 K1

KP KP

KP

KP KP

KP

KP

KP KP

KP KP

KP KP KP

KP KP

KP KP KP KP

KP

KP KP

K1 K1

K1 K1

K1

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH KOLOM LANTAI 1

SC

(14)

A A

B B

D E

E C

F F

G G

H I H

1 1 2 2 3 3

4 5 5

6 6

7 8 8

9 9

10 10

K1 K1

K1 K1 K1 K1

K1 K1 K1 K1

K1 K1 K1

K1 K1 K1 K1

K1 K1 K1 K1

K1 K1

KP KP

KP KP

KP KP

KP KP

KP

KP KP

KP KP

KP KP

D

KP KP

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH KOLOM LANTAI 2

SC

(15)

P1 J1 J1

J2 P2

P3

P3

P2

P3

BV1 BV1

BV1

P4

PG1 PG2

PG1 PG1

PG1 PG1 P3

P3 P2

P2

P2

P3 BV1

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH KUSEN LANTAI 1

SC SC DENAH KUSEN LANTAI 2

(16)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH KERAMIK LANTAI 1

SC SC DENAH KERAMIK LANTAI 2

(17)

12

30 50

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH PLAT BETON LT 2

SC

DETAIL PLAT BETON

SC

(18)

KETERANGAN :

: BALOK INDUK (30x50)

: BALOK ANAK (30x35)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH BALOK LANTAI 1

SC

(19)

KETERANGAN :

: RING BALK (15x20)

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH BALOK LANTAI 1

SC

(20)

PIPA PVC 2" PIPA PVC 2"PIPA PVC 2"PIPA PVC 2"

PIPA PVC 2"PIPA PVC 2"PIPA PVC 2"PIPA PVC 2" PIPA PVC 2"

PIPA PVC 2" PIPA PVC 2" PIPA PVC 2"

PIPA PVC 2"

PIPA PVC 2" PIPA PVC 2" PIPA PVC 2"

PIPA PVC 2"PIPA PVC 2"PIPA PVC 2"PIPA PVC 2"

PIPA PVC 2" PIPA PVC 2"PIPA PVC 2"PIPA PVC 2"

PIPA PVC 2"

PIPA PVC 2" PIPA PVC 2"

PIPA PVC 2" PIPA PVC 2" PIPA PVC 2"

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH INSTALASI AIR BERSIH LT1

SC SC DENAH INSTALASI AIR BERSIH LT2

(21)

PIPA PVC 4"PIPA PVC 4"PIPA PVC 4"PIPA PVC 4" PIPA PVC 4"PIPA PVC 4"

PIPA PVC 4" PIPA PVC 4" PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4"PIPA PVC 4"PIPA PVC 4" PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4" PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4"

PIPA PVC 4"

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH INSTALASI AIR KOTOR LT1

SC SC DENAH INSTALASI AIR KOTOR LT2

(22)

NOTASI

NO CODE KETERANGAN

01

04 05

SAKELAR GANDA STOP KONTAK

06 MCB

DOWNLIGHT

02 LAMPU VOID

03 LAMPU LED PLAFOND

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH INSTALASI LISTRIK LT1

SC

(23)

NOTASI

NO CODE KETERANGAN

01

04 05

SAKELAR GANDA STOP KONTAK

06 MCB

DOWNLIGHT

02 LAMPU VOID

03 LAMPU LED PLAFOND

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DENAH INSTALASI LISTRIK LT1

SC

(24)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DETAIL PONDASI BATU KALI A

SC

(25)

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DETAIL PONDASI BATU KALI B

SC

(26)

TIPE PONDASI

F1

B(cm)

80

h1(cm)

20

h2(cm) tb ta

tb ta

10

B

B

A

Ø12-12,5#

D13-12,5#

tb ta

K

K

15x30 cm

L

150 cm KETERANGAN :

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH FOOTPLAT A

SC

(27)

-1.00 M.T.A.S

h2 h1

LANTAI KERJA 5 cm1:3:5

PASIR DIPADATKAN 15 cm TANAH URUGAN DIPADATKAN

ta

tb

L

KOLOM 15x40

TIPE PONDASI

F1

B(cm)

80

h1(cm)

20

h2(cm) tb ta

10 D13-12,5# Ø12-12,5#

K

15x30cm

KETERANGAN : L

150 cm

B

8-15

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

POTONGAN FOOTPLAT A

SC

(28)

TIPE PONDASI

F2

B(cm)

100

h1(cm)

15

h2(cm) tb ta

10 D13-12,5# Ø12-12,5#

K

25x25 cm

L

150 cm KETERANGAN :

tb ta

B

B

C

tb ta K

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH FOOTPLAT B

SC

(29)

-1.00 M.T.A.S

h2 h1

LANTAI KERJA 5 cm1:3:5

PASIR DIPADATKAN 15 cm TANAH URUGAN DIPADATKAN

tb

L

KOLOM 15x40

B

8-15

ta

TIPE PONDASI

F2

B(cm)

100

h1(cm)

15

h2(cm) tb ta

10 D13-12,5# Ø12-12,5#

K

25x25cm

KETERANGAN : L

150 cm

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

POTONGAN FOOTPLAT B

SC

(30)

TIPE PONDASI

F3

B(cm)

100

h1(cm)

15

h2(cm) tb ta

10 D13-12,5# Ø12-12,5#

K

25x25 cm

L

150 cm KETERANGAN :

tb ta

B

B

C

tb ta K

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DENAH FOOTPLAT C

SC

(31)

-1.00 M.T.A.S

h2 h1

LANTAI KERJA 5 cm1:3:5

PASIR DIPADATKAN 15 cm TANAH URUGAN DIPADATKAN

tb

L

KOLOM 15x40

B

8-15

ta

TIPE PONDASI

F3

B(cm)

100

h1(cm)

15

h2(cm) tb ta

10 D13-12,5# Ø12-12,5#

K

25x25cm

KETERANGAN : L

250 cm

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

POTONGAN FOOTPLAT C

SC

(32)

BALOK A DAERAH

PENGHANCURAN

15 % 15 %

20 % 20 %

DAERAH PENGURAIAN

DAERAH PENGENDAPAN -0.700

MA 3 %

3 %

-1.150

75

100

50

225

-0.300

-1.685 -1.835

-2.570 -0.670 -0.575

DARI CLOSED KM/WC

KE PERESAPAN HANDLE Ø16 MM

PLAT BETON BERTULANG 1PC : 2PS : 3KR PIPA PVC Ø 4 "

PIPA GALVANIS Ø 1,5 "

200

POTONGAN A

SKALA 1 : 20

BALOK A

SKALA 1 : 10 2 Ø 12

2 Ø 12

SK Ø 8 ( TUMPUAN = LAPANGAN )

PAS. BATA TRASRAAM 1PC : 3PS PAS. BATU KOSONG PASIR PADAT

1. POTONGAN A 2. DETAIL BALOK A

125

300

LUBANG FACES -0.700

MA LUBANG UDARA

PIPA GALVANIS Ø 1,5 "

200

PAS. BATA TRASRAAM 1PC : 3PS PAS. BATU KOSONG PASIR PADAT

-0.300

-0.900

-2.120

-2.570 HANDLE Ø16 MM

PLAT BETON BERTULANG 1PC : 2PS : 3KR

HANDLE Ø16 MM PLAT BETON BERTULANG 1PC : 2PS : 3KR

Ø12-150

Ø12-150 2Ø12

2Ø12

Ø12-150

Ø12-150

C

2 Ø 12 Ø 12-150 Ø 12-150

50

1 % 1 %

A B

KE PERESAPAN DARI CLOSED WC

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

DETAIL DAN POTONGAN SEPTICTANK

SC DETAIL DAN POTONGAN

RESAPAN

SC

(33)

SKALA

DETAIL KOLOM ( K1 )

1 : 25 SKALA

DETAIL BALOK INDUK (BI)

1 : 25 SKALA

DETAIL BALOK ANAK (BA))

1 : 25

SKALA

DETAIL RINGBALK (RB)

1 : 25 SKALA

DETAIL SLOOF (S)

1 : 25

Hal .../...

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE LJDB

DETAIL TULANGAN

SC

(34)

Hal .../...

C A T A T A N

KONSULTAN PERENCANA : MENGETAHUI : DIPERIKSA : TAHUN ANGGARAN

SUMBER DANA ...

PEKERJAAN :

LOKASI : KEGIATAN :

Scale To fit

MKIE 2 4 6 10 12 14 LJDB

EKSTERIOR

SC

Referensi

Dokumen terkait

Important aspect in waterfront city is considering community’s needs (needs) , obeying the obtain regulation of space design (right) , and the meaning of that space design

In this project,will SILVACO EDA tool will be used to design the layout and schematic of folded cascade operational amplifier (Op-Amp).. Both of them must be

The objective of this project is to design and develop the cooperative space-time coding for wireless sensor network and to compare the performance of cooperative space-time

Concepts raised in this residential interior design space located at South Jakarta are "Warm interior Space", with translation of elegant and cozy.. Elegant because it is

From the literature study done in this document it was concluded that for the project, Muther’s Systematic Layout Planning Procedure will be used, as it focuses on the flow of materials

Copyright© 2020 Design Case, LLC Design Fort Project Guide PROJECT OVERVIEW: Dream, design, and build a unique space just for you with the right tools, materials, and vibe to get

With the help of the integration of regional culture research, the guide design of underground space of urban subway will build an artistic space landscape, extract regional cultural

The project will be accomplished through the following steps: • Design constraints specifications are specified in collaboration with representatives of "Kazakhstan Aviation Industry"