NO.
I BIAYA LANGSUNG PERSONIL
II BIAYA LANGSUNG NON PERSONIL
SUBTOTAL PPN 11 % TOTAL
PEMBULATAN
Banjarbaru, 2024
PT./CV. …...
…...
Direktur U R A I A N
49,543,257.50
499,936,507.50
450,393,250.00
Dinas Pekerjaan Umum Dan Penataan Ruang Provinsi Kalimantan Selatan Bidang Bina Marga
Terbilang :
TOTAL BIAYA (Rp)
405,409,250.00
44,984,000.00
499,936,000.00
HARGA PERKIRAAN SATUAN (HPS) REKAPITULASI KUANTITAS DAN HARGA
Konsultan Supervisi Pembangunan Jalan dan Jembatan Sungai Mandin Pilung
1.1 Tenaga Ahli
No. Volume Satuan Harga Satuan (Rp) Jumlah (Rp)
1 Team Leader (1) 6.00 OB 24,359,500.00 146,157,000.00 2 (1) 5.50 OB 21,521,500.00 118,368,250.00 3 Quality Engineer (1) 3.00 OB 18,447,000.00 55,341,000.00 4 (1) 2.00 OB 21,521,500.00 43,043,000.00
Sub Jumlah 1.1 = 16.50 362,909,250.00
1.2 Ass. Tenaga Ahli
No. Volume Satuan Harga Satuan (Rp) Jumlah (Rp)
1 Inspector (1) 5.50 OB 5,500,000.00 30,250,000.00 2 Surveyor (1) 3.50 OB 3,500,000.00 12,250,000.00
Sub Jumlah 1.2 = 9.00 42,500,000.00
1.3 Tenaga Pendukung
Volume Satuan Harga Satuan (Rp) Jumlah (Rp)
Sub Jumlah 1.3 = - -
405,409,250.00
JUMLAH BIAYA LANGSUNG PERSONIL
RINCIAN BIAYA LANGSUNG PERSONIL
Uraian Uraian
Uraian
Dinas Pekerjaan Umum Dan Penataan Ruang Provinsi Kalimantan Selatan Bidang Bina Marga Konsultan Supervisi Pembangunan Jalan dan Jembatan Sungai Mandin Pilung
Health Safety Environment (HSE) Engineer
Supervision Engineer Merangkap Quantity Engineer
2.1 Operasional Kantor
No. Volume Satuan Harga satuan Jumlah (Rp)
1. Sewa Komputer (PC/Laptop) (2) 12.00 BHBL 750,000.00 9,000,000.00 2. Sewa Printer A4 (Color) (1) 6.00 BHBL 350,000.00 2,100,000.00 3. Alat Tulis Kantor 6.00 BL 500,000.00 3,000,000.00 4. Biaya Komunikasi 6.00 BL 500,000.00 3,000,000.00 5 Sewa Drone 1.00 LS 1,500,000.00 1,500,000.00
24.00
18,600,000.00
2.2 Biaya Mess Perumahan
No. Volume Satuan Harga satuan Jumlah (Rp)
-
-
2.3 Biaya Transportasi
No. Volume Satuan Harga satuan Jumlah (Rp)
1. (6) 25.50 BHBL 700,000.00 17,850,000.00 Ahli dan Ass. Tenaga Ahli
25.50
17,850,000.00
2.4 Biaya Peralatan K3
No. Volume Satuan Harga satuan Jumlah (Rp)
1. Helm Safety 6.00 Unit 76,000.00 456,000.00 2. Rompi Safety 6.00 Unit 38,000.00 228,000.00 3. Sepatu Safety 6.00 Unit 300,000.00 1,800,000.00 4. Kotak P3K dan Perlengkapan 1.00 Unit 500,000.00 500,000.00
19.00
2,984,000.00
2.5 Biaya Laporan
No. Volume Satuan Harga satuan Jumlah (Rp)
1 Laporan RKK 3.00 Buku 75,000.00 225,000.00 2 Laporan Pendahuluan 3.00 Buku 125,000.00 375,000.00 3 Laporan Bulanan 18.00 Buku 100,000.00 1,800,000.00 4 Laporan Akhir 3.00 Buku 200,000.00 600,000.00 5 Laporan K3 3.00 Buku 100,000.00 300,000.00 6 Dokumentasi Video (Drone) 3.00 File 750,000.00 2,250,000.00
24.00
5,550,000.00
44,984,000.00
Sub Jumlah 2.1 =
Sub Jumlah 2.2 =
RINCIAN BIAYA LANGSUNG NON PERSONIL
Uraian
Dinas Pekerjaan Umum Dan Penataan Ruang Provinsi Kalimantan Selatan Bidang Bina Marga Konsultan Supervisi Pembangunan Jalan dan Jembatan Sungai Mandin Pilung
Uraian
Sub Jumlah 2.4 =
Sub Jumlah 2.5 = Uraian
Sewa Motor Untuk Ketua Tim, Tenaga
JUMLAH BIAYA LANGSUNG NON PERSONIL Uraian
Sub Jumlah 2.3 =
Uraian