How to design Activated sludge?

Designing an activated sludge system requires careful consideration of several factors to ensure efficient wastewater treatment. Here are the general steps involved in designing an activated sludge process:

Determine the Treatment Goals: Identify the specific treatment objectives and effluent quality requirements. This may include parameters such as biochemical oxygen demand (BOD), suspended solids (SS), nitrogen compounds, and phosphorus.

Estimate Wastewater Flow and Characteristics: Determine the average and peak wastewater flow rates as well as the influent wastewater characteristics, including BOD, SS, and nutrient concentrations. This data helps in sizing the treatment units and determining the process requirements.

Calculate the Aeration Tank Volume: The aeration tank is the core component of an activated sludge system. The tank volume depends on factors such as wastewater flow, BOD loading rate, and desired hydraulic retention time (HRT). HRT is typically around 6 to 8 hours, but it can vary depending on the treatment objectives.

Determine the Aeration System: Select the appropriate aeration system based on the oxygen requirements of the wastewater and the desired level of oxygen transfer efficiency. Aeration can be achieved through diffused air systems, mechanical surface aerators, or other oxygenation methods.

Sizing the Clarifier: The clarifier or secondary settling tank is used to separate the biomass (activated sludge) from the treated wastewater. The clarifier size is

(2)

determined based on the settleability characteristics of the sludge, the solids loading rate, and the desired sludge retention time (SRT).

Consider Nutrient Removal: If nitrogen and phosphorus removal are required, additional process units such as anoxic and aerobic zones, as well as tertiary treatment methods like biological or chemical phosphorus removal, may need to be incorporated into the design.

Develop a Sludge Management Plan: Determine the waste sludge production rate and plan for sludge wasting, stabilization, and disposal or further treatment. This may involve considering options such as anaerobic digestion, dewatering, or sludge drying.

Perform Hydraulic and Process Calculations: Calculate hydraulic flows, aeration requirements, sludge wasting rates, and other parameters using appropriate design equations and models. Consider safety factors and account for variations in influent characteristics.

Review and Optimization: Once the initial design is completed, review the design parameters, perform sensitivity analysis, and optimize the system based on the specific requirements and available resources.

Construction and Operation: Translate the design into construction plans, consider equipment selection, and monitor the system's performance during operation. Regular monitoring, control, and adjustments are essential to maintain effective treatment.

It's important to note that the design of an activated sludge system can be complex and site-specific. It is often recommended to involve wastewater treatment experts or

(3)

engineers experienced in designing activated sludge systems to ensure an effective and efficient design.

Referensi

Dokumen terkait

Keywords: Supercritical fluid extraction; Activated sludge; Quinone profile; Ubiquinones;

The results showed that: the greater the mass of biosorbent, the higher the adsorption efficiency of activated sludge to technical direct dyes, the longer the time given to

Telah dibuat sebuah rancang bangun sistem pengendalian suhu pada condenser plant fluidized bed reactor pengolahan oil sludge dengan menggunakan sensor termokopel

Proses penyisihan pasif logam berat dapat dilakukan dengan menggunakan dried activated sludge sebagai sorben.. Menurut penelitian yang dilakukan oleh Wu

Penelitian ini juga diharapkan dapat memberikan informasi secara ilmiah mengenai Moving Bed Biofilm Reactor (MBBR) pada proses aerobik-anoksik dalam menurunkan

Start-up of an Upflow Anaerobic Sludge Blanket Reactor Treating Low-Strength Wastewater Inoculated with Non-Granular Sludge.. International Refereed Journal of

Bacteria and fungi in the air near the activated sludge treatment plant were sampled from 3 hospitals in Udonthani Province using two sampler : Anderson six stages and open plate... Six

1 .2 Resea rc h O bj ective The overall object ive f this thesis is to implement the recent advanced models of arious unit proce se in act ivated sludge wastewater treatment plant