STORAGE TANK

LINGKUP PENYAJIAN

DESIGN

FABRIKASI

KONSTRUKSI

INSPEKSI DAN PENGUJIAN

PEMELIHARAAN

(2)

DESIGN

STANDARD REFERENCE :

API 650 : METODA SATU KAKI

TEBAL MINIMUM t d = + CA METODA TITIK VARIABEL t 1d = 1.06 –

PADA UMUMNYA PERHITUNGAN DENGAN MENGGUNAKAN

METODA TITIK VARIABEL LEBIH EKONOMIS DARI METODA SATU KAKI , NAMUN PELAKSANAANNYA LEBIH RUMIT.

2.6 D ( H – 1 ) G S d

0.463 D H.G 2.6 H.G.D

H S d S d

(3)

MATERIAL

CATATA : 1. TERDAFTAR DALAM STANDARD ASTM , KECUALI G 40-21M , E 275 DAN E 355 10. HARUS NORMALIZED

2. HARUS SEMI KILLED ATAU KILLED 6. KANDUNGAN Mg 0.80 – 1.2 % UNTUK t > 0.75” 11. HARUS MEMILIKI KANDUNGAN CARBON 0.2 , Mg 1.6

KILLED AS ROLLED FINE GRAIN PRACTICE GROUP IV

KILLED , AS ROLLED FINE GRAIN PRACTICE

GROUP IVA

NORMALIZED , KILLED FINE GRAIN PRACTICE GROUP V

GROUP I GROUP II GROUP III GROUP IIIA

AS ROLLED AS ROLLED AS ROLLED . KILLED NORMALIZED , KILLED SEMI KILLED KILLED OR SEMIKILLED FINE GRAIN PRACTICE FINE GRAIN PRACTICE MATERIAL NOTE MATERIAL NOTE MATERIAL NOTE MATERIAL NOTE ASTM A 283 C 2 ASTM A 131 B 7 ASTM A 573 ASTM A 131 CS 10 A 285 C 2 A 36 2 , 6 A 516 A 573 10 A 131 A 2 G40.21M-260W G40-21M-260W 9 A 516 10 A 36 2 , 5 GRADE 41 5 , 8 GRADE 41 5 , 9 G40-21M-260W 9 ,10 GRADE 41 6 GRADE 41 5 , 9 , 10 , NORMALIZED OR

QUENCHED & TEMPERED KILLED , FINE GRAIN PRACT.

GROUP VI

ASTM A 573 ASTM A 662 C ASTM A 573 10 ASTM A 131 EH 36 A 516 A 573 11 A 516 10 A 633 C A 662 B G40-21M-300W 9 , 11 G40-21M-300W 9 , 10 A 633 D G40-21M-300W 9 G40-21M-350W 9 , 11 G40-21M-350W 9 , 10 A 537 I

G40-21M-350W 9 A 537 II 13 E 275 4 , 9 A 678 A

E 335 9 A 678 B 13

GRADE 44 5 , 9 A 737 B

A 841 12 , 13

(4)

Standard yang diacu

TANGKI TIMBUN

API 620 Adalah standard untuk desain dan konstruksi tangki timbun yang terbuat dari baja , yang dilas serta digunakan diatas permukaan tanah dan untuk operasi bertekanan rendah.

Konstruksi tangki ini silindris dan bersumbu tunggal.

API 650 Adalah standard untuk , material , desain , fabrikasi , pembangunan dan inspeksi serta pengujian tangki timbun yang berbentuk silindris vertikal dengan atau tanpa tutup , dioperasikan diatas permukaan tanah untuk menimbun minyak bumi dan bahan bakar lainnya , pada tekanan kerja yang mendekati tekanan atmosfir ( tekanan internal tidak melebihi berat tutup ) , ataupun tekanan yang lebih tinggi asalkan memenuhi persyaratan khusus . Standard ini hanya berlaku bagi tangki dengan pelat dasar tertopang seluruhnya secara merata , dan bagi tangki yang tidak didinginkan dan bersuhu kerja hingga 90°C ( 200°F ).

API 651 Adalah standard untuk perlindungan kathodik bagi tangki timbun petroleum yang dibangun diatas permukaan tanah .

API 653 Adalah standard untuk perbaikan , perubahan , dan rekonstruksi tangki timbun.

API 575 Adalah standard untuk inspeksi tangki timbun yang bertekanan rendah .

(5)

JENIS JENIS TANGKI TIMBUN

FIXED ROOF TANKS

FLOATING ROOF TANKS

SPHEROID &

HEMISPHEROID

SELF SUPPORTING RAFTER

COLUMN SUPPORTED

ROOF UMBRELLA ROOF DOME ROOF

PAN TYPE FLOATING

ROOF PONTOON TYPE

FLOATING ROOF

DOUBLE DECK FLOATING ROOF

SANDWICH TYPE

INTERNAL FL. R PAN TYPE INTERNAL FL.R

PLAIN

HEMISPHEROID

PLAIN SPHEROID NODED

HEMISPHEROID

NODED SPHEROID LARGE NODE D SPHEROID

(6)

Jenis jenis tangki timbun Jenis jenis tangki timbun

( lanjutan ) ( lanjutan )

TANGKI TIPE LAIN

OPEN ROOF TANK

FLOATING TANK

SPHERICAL TANK HOEIZONTAL TANK

BULLET TANK

DOUBLE WALL TANK

UNDER GROUND TANK

COBRA TANK

(7)

FABRIKASI FABRIKASI

FABRIKASI MELIPUTI :

a. PENENTUAN FABRIKATOR YANG BERKINERJA DAN BER REPUTASI BAIK ( ENGINEERING , MUTU , HARGA , DELIVERY DAN AFTER SALE SERVICE ) , SERTA BEBAN SHOPNYA TIDAK TERLALU TINGGI ( PENUH ) .

b. PERSETUJUAN TENTANG KETENTUAN ENGINEERING DELIVERABLES . JADWAL FABRIKASI , QA/QC , HOLDING TIME , INSPECTION VISIT , FINAL TEST , PRESHIPMENT INSPECTION , DLL.

c. PEMERIKSAAN BARANG ( RECEIVING INSPECTION , MATERIAL CERTIFICA TE , MATERIAL HANDLING , MATERIAL IDENTIFICATION , MARKING , DLL.

d. CUTTING DAN EDGE PREPERATION ( BEVEL PENETRANT TEST UNTUK PELAT TEBAL ≥ ¾ “ ) UNTUK PELAT SHELL DAN BOTTOM .

e. PENGEROLAN , PENGUKURAN DIMENSI , PEMOTONGAN DAN FABRIKASI STRUCTURAL STEEL DAN KOMPONEN TANGKI LAINNYA.

f. SIMULASI PERAKITAN RAFTER DAN DISMANTLING DAN KOREKSI PENYIM PANGAN UKURAN DAN NON CONFORMACE LAINNYA

g. PRESHIPMENT INSPECTION ( PRESERVATION , COLOUR CODING , IDENTI

FICATION , MARKING , TAGGING , HANDLING PROTECTION , DLL ).

(8)

FABRIKASI ( LANJUTAN )

CARA MENYUSUN DAN MENGANGKUT PELAT YANG TELAH DIROL

EAGLE

CLAW

BALOK YANG MEMEILIKI

RADIUS TANGKI UNTUK TATAKAN PELAT LENGKUNG

CARA MENGANGKAT

PELAT LENGKUNG YANG

BENAR

(9)

PEMERIKSAAN SEWAKTU EDGE PREPARATION PELAT TEBAL

LAMINASI

CARA MENGECEK TINGKAT

LENGKUNGAN PELAT

FABRIKASI ( LANJUTAN )

MA AL

R R

1.5 M

(10)

Tank foundation Tank foundation

TANAH DIBAWAH TANGKI DIKLASIFIKASIKAN DALAM 3 JENIS ,YAKNI :

a) JENIS TANAH KERAS BERBATU

b) JENIS TANAH LUNAK DAN ATAU TANAH URUG c) JENIS TANAH LEMBEK , RAWA DAN ATAU GAMBUT

a) FONDASI TANGKI DIATAS TANAH KERAS BERBATU PERSIAPANNYA CUKUP DENGAN

MEBERSIHKAN TANAMAN DAN BEBATUAN DIATAS PERMUKAAN TANAH , KEMUDIAN MENGEROK TOP SOILNYA SEDALAM ± 30 CM ( GRUB BING )

DIBAWAH INI ADALAH TIPE FONDASI DIATAS TANAH KERAS

TANAH ASLI

SIR.TU.

( dipadatkan hingga 100%

CBR = California bearing ratio )

1 120

SAND BITUMENT MIX ( tidak

dipadatkan )

(11)

TANK FOUNDATION

( LANJUTAN-1 )

FONDASI TANGKI DIATAS TANAH LUNAK

TERDAPAT DUA JENIS PENYIAPAN TANAH SEBELUM FONDASI DIPASANG , YAKNI :

A) STABILISASI TANAH

B) PEMEBANAN AWAL ( PRELOADING )

A. STABILISASI TANAH

TURAP ( ANTI LONGSOR ) DEWATERING PUMP

ROAD ROLLER COMPACTOR

± 30 CM

(12)

TANK FOUNDATION TANK FOUNDATION

( LANJUTAN-2 )

FONDASI TANGKI DIATAS TANAH LUNAK

B. PEMBEBANAN AWAL

PROSES INI DAPAT BER LANGSUNG BERBULAN BULAN

15-20 m

DEWATERING

CAPILLARY

GROUND WATER

(13)

TANK FOUNDATION ( LANJUTAN-3 )

+

ARUS PAKSA

1 120

FONDASI TANGKI DIATAS RAWA / GAMBUT

CONCRETE PAD RECTIFIER

TIANG PANCANG ELEKTRODA

(14)

PEMASANGAN SISTIM DOUBLE BOTTOM

PEMASANGAN DOUBLE BOTTOM BARU DILAKSANAKAN APABILA KONDISI BOTTOM DAN SEBAGIAN DINDING SHELL SEBELAH BAWAH TELAH SEDEMIKIAN PARAH , SEHINGGA PENGGANTIAN AKAN LEBIH SULIT DIBANDING DENGAN PEMASANGAN BOTTOM BARU DIATASNYA . HAL INI AKAN SEDIKIT MENGURANGI VOLUME TANGKI , NAUM JIKA VOLUME YANG HILANG MASIH MERUPAKAN DEAD VOLUME , MAKA PRAKTIS TANGKI MASIH SEPERTI SEDIAKALA.

PELAT PENAMBAL DINDING

PELAT DASAR YANG BARU

KERANGKA LANDASAN ( BAJA STRUKTUR )

TANK BOTTOM TANK BOTTOM

120

PELAT PENAMBAL ANNULAR

PLATE

(15)

TANK BOTTOM ( LANJUTAN -1 ) PENGANGKATAN BOTTOM ( PANDANGAN SAMPING )

PENGANGKATAN TANK BOTTOM SANGAT MELELAHKAN DAN MEMAKAN WAKTU YANG LAMA DAN TENAGA YANG SANGTA BESAR , TERUTAMA UNTUK TANGKI DENGAN DIAMETER > 250 KAKI . PENGANGKATAN MELIBATKAN BERPULUH HYDRO JACK DAN RATUSAN BALOK PENYANGGA . KETINGGIAN PENGANGKATAN TERGANTUNG KEPERLUAN , MINIMUM 1 m .

HYDROJA CK

BALO K KAYU 1

m

(16)

TANK BOTTOM

TANK BOTTOM ( LANJUTAN-2 ) ( LANJUTAN-2 )

PENGANGKATAN BOTTOM ( PANDANGAN DEPAN )

PENGANGKATAN DILAKSANAKAN SETAHAP DEMI SETAHAP MENGGUNAKAN HYDROJEACK ATAU INFLATABLE AIR CUSHION DAN BERRATUS RATUS

BALOK KAYU PENGGANJAL .PENGANGKATAN SANGAT SULIT MENGINGAT

DIAMETER TANGKI YANG SANGAT BESAR DAN KETEBALAN PELAT BOTTOM

YANG HANYA ¼ “.

(17)

PENGANGKATAN PELAT BOTTOM DITENGAH PENGANGKATAN PELAT BOTTOM DITENGAH

POTONGAN PELAT BOTTOM

PERTAMA PADA TITIK YANG TELAH DITENTUKAN PELAT BOTTOM DIPO TONG SEGI EMPAT SELEBAR YANG DIKEHENDAKI . KEMUDIAN DIPA SANG SRTUKTUR T YANG CABANG KANAN KIRINYA DIPASANG KUPING

AN UNTUK PENGANGKATAN PELAT BOTTOM . SEMENTARA ITU PADA SISI PELAT BOTTOM TEPAT DIBA WAH KUPINGAN TADI DIPA

SANG LIFTING LUG . KEMU DIAN DENGAN DUA BUAH

TACKLE BLOCK PELAT BOT TOM DIANGKAT DAN DIBAWAHNYA DIPASANG BALOK

PENGGANJAL.

TANK BOTTOM

TANK BOTTOM ( LANJUTAN-3 )

(18)

KONSTRUKSI

HAL HAL YANG PENTING PADA SAAT KONSTRUKSI TANGKI

a) GANBAR TEHNIK BAIK UNTUK TANGKI MAUPUN FONDASINYA TELAH DISETUJUI OLEH PIHAK PEMILIK ( REVISI TERAKHIR ).

b) TENAGA PELAKSANA TELAH DITENTUKAN BEREDASARKAN : KEMENANGAN TENDER, REPUTASI YANG BAIK , KEMAMPUAN KERJA YANG PROFESSIONAL , TERBIASA DENGAN DELIVERY SESUAI JADWAL YANG TELAH DITENTUKAN , WORKMANSHIP SESUAI PERSYARATAN SPESIFIKASI DAN STANDARD YANG DIACU , DAN SISTIM KEAMANAN , KESEHATAN DAN KESELAMATAN KERJA YANG BAIK DAN TERBUKTI . c) TENAGA AKHLI KONSTRUKSI TANGKI YANG HANDAL DAN BERPENGALAMAN.

d) PERALATAN DAN PERLENGKAPAN KERJA LAS YANG MEMADAI SESUAI STANDARD INTERNASIONAL , TERMASUK ALAT PEMADAM KEBAKARAN , GAS TESTER DAN PERLENGKAPAN PERSONIL UNTUK MEMASUKI TANGKI YANG MENGANDUNG GAS ( RESPIRATOR ,PERLENGKAPAN ANTI KERACUNAN DAN IRITASI , DLL ) .

e) ALAT PENGANGKAT , TRANSPORTASI BARANG DAN PERSONIL , PERANCAH , LAMPU PENERANGAN , SAFETY ROPE DAN GONDOLA , SAND BLASTER , DEWATERING PUMPS , COMPACTOR , CEMENT MIXER , PERALATAN PENGUJIAN DAN INSPEKSI , NDT EQUIP MENT DAN CONSUMABLES , DLL.

f) IJIN KERJA TERMASUK IJIN GALIAN , PENGURUGAN , PENDIRIAN BANGUNAN , TRANSPORTASI BAHAN GALIAN , BEBAS GAS , KERJA PANAS , DLL.

g) TEMPAT SANITASI PERSONIL YANG MEMADAI DAN BERDEKATAN DENGAN TANGKI

h) JIKA MEMUNGKINKAN SEBUAH MESIN ROL PELAT TERPASANG DIDEKAT LOKASI.

(19)

KONSTRUKSI ( LANJUTAN-1 )

LANGKAH LANGKAH KONSTRUKSI SECARA KRONOLOGIS:

1) Cek hasil soil test pada pondasi ( tingkat compaction dan jumlah titik ujinya ) . 2) Gelar bottom plate pada fondasi sesuai marking yang ada dengan overlap sesuai

ketentuan gambar dan standard API 650. ( yakinkan sebelah bawah pelat telah dilindungi dengan cat sejenis palstic asphalt atau taffcote ) .

3) Periksa kondisi mesin las , kalibrasi current outputnya dan sifat current stabilitynya, jika stabilitas tidak tetap , mesin las tidak boleh digunakan.

4) Periksa seluruh kabel las dan ground clampnya , jika cacat atau putus tidak boleh digunakan.

Periksa seluruh perlengkapan keselamatan personil juru dan operator las.

5) Periksa seluruh WPS yang akan digunakan apakah telah memiliki PQR pendukungnya

6) Jika semua persyaratan telah terpenuhi , pelaksanaan pengelasan pelat bottom dapat dimulai sesuai dengan sequence yang telah ditentukan oleh welding supervisor yang akhli dan berpengalaman , dengan c atatan seluruh welder telah memiliki Welder Performance Qualification Record ( WPQR ).

7) terlalu tinggi pelat harus direpair kembali , jika terdapat copper burnt harus segera 8) Periksa amplitudo gelombang pelat bottom setelah dilas , jika terdapat amplitudo 9) dipotong dan diganti pelat , setiap arc strike di uji PT dan direpair.

8) Mulai disusun pelat shell ring bawah secara hati hati menggunakan eagle claw dan

pengangkatan vertikal , perhatikan ukuran diameter tangki dan root gap antar pelat yang

uniform untuk menghindarkan terlalu sempit atau lebarnya weld gap.

(20)

KONSTRUKSI ( LANJUTAN -2 )

BEBRAPA KETENTUAN API 650 :

A-B UNTUK

PELAT ANNULAR HINGGA 1”

PELAT ANNULAR

TABEL KETEBALAN PELAT ANNULAR

TEBAL PELAT TEGANGAN UJI HIDROSTATIS PADA RING PERTAMA ( psi ) NOMINAL (inci ) ≤ 27.000 ≤ 30.000 ≤ 33.000 ≤

36.000

t ≤ 0.75 1 / 4 1 / 4 9 / 32 11 / 32

0.75 < t ≤ 1.00 1 / 4 9 / 32 3 / 8 7 / 16

1.0 < t ≤ 1.25 1 / 4 11 / 32 15 / 32 9 / 16

1.25 < t ≤ 1.50 5 / 16 7 / 16 9 / 16 11 / 16

1.50 < t ≤ 1.75 11 / 32 1 / 2 5 / 8 3 / 4

A B

A

B

A

B

(21)

SAMBUNGAN OVERLAP PELAT BOTTOM

TACK WELD

SINGLE WELDED FULL FILLET LAP JOINT SINGLE WELDED BUTT JOINT WITH BACKING STRIP

MIN. 5 t MAX. 2” MIN. 5t MAX 1”

KONSTRUKSI ( LANJUTAN – 3 )

t

T

t

T

DOUBLE FILLET LAP JOINT SINGLE FILLET LAP JOINT

(22)

KONSTRUKSI ( LANJUTAN – 4 )

BOTTOM TO SHELL JOINT

L

NOMINAL THICKNESS MINIMUM SIZE OF

OF SHELL PLATE FILLET WELD

mm inci mm inci

5 0.1875 5 3 / 16

> 5 ~ 20 > O.1875 ~ O.75 6 1 / 4

> 20 ~ 32 > 0.75 ~ 1.25 8 5 / 16

> 32 ~ 45 > 1.25 ~ 1.75 10 3 / 8

L

(23)

KETENTUAN SAMBUNGAN PELAT DINDING DAN ATAP

DALAM MIN. 5 t

DALAM

DALAM

1.75 t ≤ R ≤ 3 t 12 t

KONSTRUKSI ( LANJUTAN – 8 )

t

(24)

INSPECTION & TEST

INSPECTION & TEST ( LANJUTAN ) ( LANJUTAN ) LINGKUP TANGGUNG JAWAB TANK INSPECTION

A. ENGINEERING :

MEREVEW : KONTRAK , TECHNICAL DATA , TECHNICAL DRAWING , PURCHASE ORDER , MATERIAL CERTIFICATE, MANUAL , REFFERENCE BOOK ( STANDARD ) , REQUISITION SHEET , WORK PROCEDURE , CONSTRUCTION SCHEDULE , WPS / PQR ,DLL.

B. PROCUREMENT ( FABRICATION ) :

VENDOR LIST REVEW , VENDOR VISIT , PREFABRICATION MEETING , REVIEW ENGINEERING DELIVERABLES , REVIEW DOCUMENT PURCHASE , MATERIAL CERTIFICATE MATERIAL IDENTIFICATION , PURCHASE ORDER , MATERIAL HANDLING , FABRICATION SCHEDULE , DELIVERY TIME , MARKING , CUTTING , EDGE PREPARATION , STRUCTURAL STEEL FABRICATION , DIMENSION CHEK , SIMULATION ASSEMBLING & DISMANTLING , SUB FABRICATOR AND SUPPLIER VISIT , INHOUSE QA/QC PLAN , QC PROCEDURE , PRESERVATION PLAN ,

PRESHIPMENT INSPECTION , DLL.

C. CONSTRUCTION ( TANK ERECTION ) :

SITE PREPARATION CHECK , CONSTRUCTION SCHEDULE , CONSTRUCTION DRAWING REVIEW , QA / QC PLAN , SOIL INVESTIGATION REPORT CHECK , SOIL STABILIZATION CHECK , PILING PLAN AND EXECUTION CHECK , TANK PAD COMPACTION REPORT CHECK , FOUNDATION DRAWING CHECK , DIMENSION CHECK , BOTTOM PLATE LAYING CHECK ( MARKING , IDENTIFICATION , PLATE MAPPING ) , NON CONFORMANCE CHECK , WELDER PERFORMANCE QUALIFICATION TEST , WELD MAP , SHELL PLATE ERECTION SEQUENCE , DIMENSION CHECK ( WELD GAP, PLUMBNESS , ROUNDNESS) , CLAMPING AND TACK WELDING CHECK , WELDING EQUIPMENT AND CONSUMABLES CHECK , FIRST RING WELDING MAP AND SEQUENCE CHECK , DIMENSION CHECK , RADIOFRAFI AS PER STANDARD REQUIREMENT , OTHER NDT , ROOF COMPONENT LAYDOWN , TACK AND WELD CHECK , DIMENSION CHECK , ROOF COMPONENT INSTALLATION ( SEAL / DRAIN / BREATHER VALVE , MANHOL E , SAMPLING HATCH , DLL ) , WELD QUALITY TEST ,SECOND AND OTHER RING INSTALLATION / CLAMP /A ND WELD , DIMENSION CHECK ( WELD GAP , ROUNDNESS ), WELD NDT , CORRECTIVE ACTIONS , TANK SHELL COMPONNET INSTALLATION , GROUNDING , ROOF INSTALLATION , TANK APPENDAGES ISTALLATION CHECK , HYDROTEST PROCEDURE CHECK , FILLING CHECK , SETTLEMENT MONITOR , DIMENSION CHECK , NON CONFORMANCE & CORRETION CHECK , TANK STRAPPING MONITOR , DEWATERING MONITOR , PAINT PREPARATION CHECK , PAINTING MONITOR , PAINT THICKNESS CHECK , CATHODIC PROTEC1TION INSTALLATION MONITOR AND CHECK , DLL .

(25)

INSPECTION & TEST

( LANJUTAN )

BOTTOM LEAK TEST

UDARA BER CARA PENGUJIAN

TEKANAN BOTTOM PLATE TANGKI YANG PA

LING MURAH DAN PRAKTIS

CARA PENGU

JIAN YANG BER AIR RISIKO TERJA DI KARAT CE LAH AKIBAT KE BERADAAN

AIR DIBAWAH

BOCOR

(26)

INSPECTION & TEST

( LANJUTAN )

TANK HYDROSTATIC DAN PNEUMATIC TEST

UDARA BERTEKANAN

AIR SABUN BUIH BERARTI

BOCOR.

TEKANAN DIBAWAH BERAT TUTUP TANGKI BOCOR

AIR DITURUN KAN HINGGA 1 KAKI DIBAWAH KEBOCORAN

UNTUK REPAIR

KOMPRESOR 1 KAKI

(27)

PNEUMATIC TEST PELAT PENGUAT ( REINFORCING PAD )

TEKANAN PNEUMATIS YANG DIPERLUKAN SE BESAR 100 kPa

LUBANG TELTALE SE TELAH PENGUJIAN TI DAK BOLEH DITUTUP UNTUK MENGETAHUI JIKA ADA KEBOCORAN UNTUK MENCEGAH MA SUKNYA AIR HUJAN CU KUP DITUTUP DENGAN GEMUK ( GREASE ) SAJA .

INSPECTION & TEST ( LANJUTAN )

Gas bertekanan ( udara , N2, helium )

Lubang teltale

(28)

INSPECTION & TEST ( LANJUTAN ) PENGUKURAN KEBUNDARAN TANGKI

JARI JARI TANGKI

SUMBU TANGKI

PENGUKUARN KEBUNDARAN TANGKI DIMULAI DARI SEKITAR 0.3 M DARI DASAR TANGKI , DAN INI MERUPAKAN DASAR PENGUKURAN KEBUNDARAN TANGKI SELANJUTNYA . DISARANKAN UNTUK MEMBUAT MAAL ( CETAKAN ) KEBUNDARAN YANG TERBUAT DARI BAJA SIKU YANG DILENGKUNG KAN UNTUK DIGUNAKAN SEBAGAI REFERENSI PEMASANGAN PELAT PELAT RING BERIKUTNYA.

TOLERANSI UKURAN DIAMETER TANGKI

0.3 m

DIAMETER TANGKI TOLERANSI JARI JARI m ( kaki ) mm ( in.)

12 ( 40 ) + 13 ( ½ )

12 ( 40 ) ~ 45 ( 150 ) + 19 ( ¾ )

45 ( 150 ) ~ < 75 ( 250 ) + 25 ( 1 )

≥ 74 ( 250 ) + 32 ( 1 ¼ )

(29)

Inspeksi & pengujian

KETENTUAN INSPEKSI DAN PENGUJIAN

1) INSPEKSI DILAKSANAKAN SELAMA PERSIAPAN , PELAKANAAN DAN PASKA KONSTRUKSI ( ERRECTION )

2) INSPEKTOR HARUS QUALIFIED SEBAGAI TANK DAN WELDING INSPECTOR 3) INSPECTOR HARUS DILENGKAPI DENGAN PERALATAN KESELAMATAN

PERSONIL , INSPECTION EQUIPMENT , INSPECTION TOOL , GAGES , DAN PRECISSION METER .

4) INSPEKSI HARUS DILENGKAPI DENGAN GAMBAR TEHNIK , MATERIAL DOCUMENT , WPS , HASIL PENGUJIAN SOIL , DLL.

5) INSPEKSI HARUS BEBAS UNTUK MENGAKSES KEMANAPUN S EHUBUNGAN DENGAN PEKERJAANNYA MEMERIKSA DAN MENGUJI TANGKI YANG TELAH SIAP DIKONSTRUKSI .

6) KHUSUSNYA UNTUK SETTLEMENT TEST DAN STRAPPING , INSPEKSI DIBANTU OLEH PIHAK CIVIL ENGINEER ( TOPOGRAFI ) DAN PIHAK METEROLOGI.

7) DALAM HAL KESELAMATAN KERJA INSPEKSI DIBANTU OLEH PIHAK LK3

ATAU SAFETY OFFICER.

(30)

INSPEKSI DAN PENGUJIAN INSPEKSI DAN PENGUJIAN

( LANJUTAN -1 )

KETIDAK BUNDARAN

UNDER TOLERANCE

TANK DIAMETER ( ft ) RADIUS TOLERANCE (In)

OVER TOLERANCE

< 40 ± 1 / 2 40 ~ < 150 ± 3 / 4 150 ~ < 250 ± 1

> 250 ± 1 1/4

(31)

INSPEKSI & TEST ( LANJUTAN -2 )

PLUMBNESS

MAKS . h / 200

h

(32)

PEAKING & BANDING

BANDING

MAKS. 1/2"

DILIHAT PADA BIDANG HORISONTAL

PEAKING MAKS. 1/2”

DILIHAT PADA BIDANG VERTIKAL

INSPECTION & TEST

INSPECTION & TEST ( LANJUTAN

– 3 )

(33)

KONSTRUKSI ( LANJUTAN – 5 )

KETENTUAN BUKAAN ( OPENING ) PADA SHELL

JARAK MINIMAL 8 t ATAU ½ “ , PILIH YANG TERKECIL

DAERAH YANG DISEDIAKAN

UNTUK PELAT PENGUAT RADIOGRAFI

r

D

1.5 D

1.5 D

(34)

KONSTRUKSI ( LANJUTAN – 6 )

KETENTUAN BUKAAN

JARAK MINIMUM 8 t SISI LAS

DAERAH YANG DISEDIAKAN

PELAT PENGUAT UNTUK

RADIOGRAFI

r

D

1.5 D 1.5 D

Do

(35)

KONSTRUKSI ( LANJUTAN – 7 )

KETENTUAN JARAK LAS MAN HOLE

t

MIN. 8 t ATAU 10”

t

6” MIN. 8 t ATAU 10”

t

t

t MIN.2.5 t ATAU 3”

PELAT SISIPAN YANG DIPERTEBAL

MANHOLE

(36)

TANK SETTLEMENT

GRAFIK PENURUNAN LOKAL

1 2

3 4

5 6

7 8

9

10 14

11 12

13 15

16 17

18 19

20 21

22 23 PENURUNAN MAKS.

PADA TITIK 10

PENURUNAN MINIMUM PADA TITIK 21

PENURUNAN LOKAL SEBENARNYA

KEMIRINGAN MENYELURUH

U .9 U.10 U.11 U.21

GARIS DATUM UNTUK PENURUNAN YANG DIATUR GARIS DATUM UNTUK PENURUNA BERSIH

23 TITIK PEMANTAUAN PENURUNAN YANG BERJARAK SAMA KELILING TANGKI (

D )

U.12

Ui = penurunan luar bidangpada titik “ i “ (+) apabila diatas kurva cos.

(-) apabila dibawah kurva cos.

Misal.: U11 = ( + ) U13 = ( - )

Defleksi luar bidang pada titik “ i “ adalah Si = Ui – ( ½ Ui + ½ Ui + 1 ) , misalnya S 11 = U 11 ( ½ U 10 + ½ U 12 )

U 13

(37)

B R R R R

5 10 15 20 25 30 35 40 45 50

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

R

R

R

R R

TANK SETTLEMENT

( LANJUTAN-1 )

BATAS PENURUNAN LOKAL PADA DASAR TANGKI

B = KEDALAMAN PERBAIKAN ATAU PEMERIK PELENGKUNG SAAN TELITI HARUS DILAK AN ATAU PE SANAKAN APABILA KEDA NURUNAN , LAMAN PELENGKUNGAN dalam inci . ATAU PENURUNAN TERLE TAK DIATAS GARIS INI

DEPRESI PELENGKUNGAN

(38)

PENGUKURAN PENURUNAN TANGKI

DINDING

JARAK MAKSIMUM ANTAR TANGKI

TITIK PENGUKURAN SEKE PENURUNAN R = LEBAR DA LILING TANGKI = 32 KAKI SISI DINDING ERAH PENU DAN PALING SEDIKIT 8 TI RUNAN TIK . PENGUKURAN MELIN B = KEDALAMAN TANG PALING SEDIKIT 4 DAERAH PE

BUAH , JARAK ANTAR TITIK DASAR NURUNAN

PENGUKURAN HARUS SAMA. TANGKI

TANK SETTLEMENT

( LANJUTAN-2 )

B

R

(39)

TANK SETTLEMENT

( LANJUTAN-3 )

PENURUNAN SISI DINDING

PENURUNAN SISI DINDING BENTUK LAIN.

R = RADIUS LINGKARAN YANG MELIPUTI DAERAH LENGKU NGAN.

B = KETINGGIAN LENGKUNGAN ATAU KEDALAMAN DEKUKAN

PENURUNAN DASAR DEKAT DINDING

B

R

B B R R

R < 2R

R R R

R R

R

(40)

TANK MAINTENANCE

PENGANGKATAN TANGKI

DINDING TANGKI DASAR TANGKI PENGANGKATAN TANGKI MEMAKAN

WAKTU YANG SANGAT LAMA DAN SA

NGAT SULIT DAN BERBAHAYA PELAK SANAANNYA , OLEH KARENANYA KON

HYDROJACK LUBANG YANG DISI FONDASI TANGKI HARUS SANGAT DIGALI DIPING DIPERHATIKAN KHUSUS TENTANG KE BALOK KAYU GIR FONDASI PADATANNYA ( TIDAK BOLEH KURANG

DARI 100% CBR. )

SEBELUM MENAMBAH PENGISIAN TANG KI DENGAN AIR , PERHATIKAN DENGAN

DINDING TANGKI DASAR TANGKI SEKSAMA BAHWA SETTLEMENT TELAH TETAP PALING TIDAK SELAMA 24 JAM.

LUBANG YANG

INFLATABLE AIR BACK

DIGALI DIPING GIR FONDASI BALOK KAYU

(41)

TANK MAINTENANCE ( LANJUTAN-1 )

A

B

C

A . BUKA ROOF PLATE YANG BUCKLING ( KEMPOT ) DENGAN OXY CUTTER , KEMUDIAN RATAKAN PELAT TERTEKUK TERSEBUT DAN SIAPKAN UNTUK

DIPASANG ULANG .

B. PERIKSA RAFTER COMPONENT , APA ADA YANG BENGKOK ,KALAU ADA SUPAYA DIPOTONG , DILURUSKAN DAN DIPASANG ULANG

C. KOREKSI SEGNMEN TOP CURB ANGLE YANG BENGKOK / RUSAK DENGAN

MELENGKUNGKANNYA KEMBALI SESUAI RADIUS TANGKI DAN MEMASANGNYA KEMBALI DITEMPATNYA

SEMULA.

CATATAN : HATI HATI JANGAN SAMPAI RAFTER TERPOTONG

SEWANTU MEMOTONG PELAT ROOF DENGAN OXY CUTTER.

PERBAIKAN ROOF

(42)

TANK MAINTENANE

( LANJUTAN-2 )

PERBAIKAN PELAT DINDING PELAT SHELL YANG

BERMASALAH DIPOTONG MENGGUNAKAN

SISTIM

WINDOW CUT. POTONGAN PELAT DI ROLL ULANG DENGAN RADIUS YANG BENAR DAN DIPASANG KEMBALI . LA JUR LAS PERBAIKAN , JIKA DIKEHEN DAKI DAPAT DIGERINDA FLUSH ( RA TA DE NGAN PERMUKAAN PELAT

PIPA PENYANGGA ROOF YANG DIPAUT KAN PADA TOP CURB ANGLE

ANGLE YANG DILENGKUNGKAN SESUAI

RADIUS TANGKI

(43)

TANK MAINTENANCE ( LANJUTAN -3 )

SUPPORT BRACKET UNTUK PIPA PENYANGGA SUPPORT BRACKET

SUPPORTING PIPE

TOP CURB TOP COURSE

ANGLE

(44)

PENGECATAN

PENGECATAN ( LANJUTAN -1 )

PENGECATAN TANGKI BARU

CARA MENGUJI DAYA LEKAT SUATU LAPISAN CAT DAPAT DIGUNAKAN STANDARD BRITISH SEBAGAI BERIKUT :

LAPISAN CAT DIGORES DENGAN PISAU KHUSUS ATAU CUTTER SEHINGGA MENGENAI PERMUKAAN PE

LAT . GORESAN TERSEBUT BERUPA SEGI EMPAT SAMA SISI DENGAN PANJANG SISI 1” . SEDI EMPAT

TERSEBUT DIBAGI DALAM 10 BAGIAN YANG SAMA DENGAN CARA MENGGORESKAN CUTTER HINGGA

MENGENAI PERMUKAAN PELAT . SELANJUTNYA TEMPELKAN MASTIC TAPE DAN DIPUKUL PUKUL UN

TUK MELEKATKANNYA BENAR BENAR . SETELAH ITU MASTIK DISENTAKKAN HIINGGA LEPAS DARI PER

MUKAAN PELAT . TINGGI RENDAHNYA DAYA LEKAT CAT TERGANTUNG PADA SEDIKIT BANYAKNYA POTO

NGAN CAT YANG MELEKAT PADA MASTIC TAPE TERSEBUT. MAKIN SEDIKIT POTONGAN CAT , MAKIN TING

GI DAYA LEKAT CAT .

(45)

BAHAN CAT DAN TEBAL FILM KERING ( DFT ) , µ

PENGECATAN

PENGECATAN TANGKI BARU

LINGKUNGAN PRIMER INTERMEDIATE COTE TOP COTE

BERDEBU EPOXY AMINE EPOXY AMINE , 40 EPOXY AMINE .40 RED LEAD , 50

INDUSTRI ORGANIC ZINC VENYL HEAVY DUTY VENYL HEAVY 75 75 DUTY ,75

LAUT / PANTAI ZINC SILICON HEAVY DUTY EPOXY HEAVY DUTY EPOXY

75 100 100

TIDAK CORROSIVE RED LEAD ALKYD ENAMEL ,40 ALKYD ENAMEL,40

ALKYD , 50

(46)

PENGECATAN

PENGECATAN ( LANJUTAN -2 ) ( LANJUTAN -2 )

HAL HAL YANG PENTING DLAM PENGECATAN TANGKI HAL HAL YANG PENTING DLAM PENGECATAN TANGKI

BAHAN CAT BIASANYA TERDIRI DARI PRIMER , INTERMEDIATE COTE DAN TOP COTE

PILIH MEREK CAT YANG PALING BAIK SIFATNYA DALAM IKLIM TROPIS DAN YANG HARGANYA CUKUP WAJAR.

SIAPKAN PERALATAN SAND BLASTING , GONDOLA , SISTIM TALI KESELAMATAN , PELINDUNG CUACA , KOMPRESSOR BERTEKANAN 100 psi YANG DILENGKAPI DENGAN AIR FILTER / DRIER . ( JENIS KOMPRESSOR TERGANTUNG KEBERADAAN SUMBER TENAGA ) .

PERALATAN KESELAMATAN PERSONIL LENGKAP DAN BERFUNGSI DENGAN BAIK .

MEMPELAJARI KONDISI CUACA DAN MUSIM YANG COCOK UNTUK PENYEMPROTAN CAT ( KEMARAU , CERAH , TIDAK BERANGIN , KELEMBABAN DIBAWAH 80% RELATIF, SUHU METAL TIDAK LEBIH

RENDAH DARI 32 °C ).

PENYIAPAN PERMUKAAN DENGAN SAND ATAU GRIT BLAST , DENGAN TEKANAN ANGIN 100 psi ( 140

~ 575 m³ / h VOLUME UDARA )

SAND BLASTER HARUS MAMPU BEKERJA TERUS MENERUS SELAMA 30 HINGGA 40 MENIT TANPA MENGISI ABRASSIVE ( PASIR ) .

PILIH ABRASSIVE SEPERTI : PASIR BESI , OKSIDA ALUMINIUM , ATAU ALUMINIUM SILICAT.

TINGKAT KEBERSIHAN PERMUKAAN SEBAIKNYA SETINGKAT DENGAN NEAR WHITE ( SIS 055 900 Sa 2

½ ( SSPC SP-10 ) .

PENGECAT HARUS AKHLI DAN BERPENGALAMAN DAN HARUS SELALU DIAWASI OLEH FOREMAN PENGECATAN.

KETEBALAN DAN KELEKATAN CAT DAPAT DILIHAT PADA TAMPILAN LAIN.

(47)

UJI HYDROSTATIS SEKALIGUS UJI PENURUNAN TANGKI

NOMOR TINGGI MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINNGU 6 MINGGU 7

RING AIR m

PERMUKAAN AIR DITURUNKAN

PENURUNAN DASAR TANGKI

TERJADI PENURUNAN MENDADAK

TANK HYDROSTATIC TEST

4 2 6 8 10 1214 16 18202224

1234 56789 10 1112

mm

30 10 20

N 1

2

6 3 7

8

40 60 80 50

70 90 100

(48)

TANK HYDROTEST

TANK HYDROTEST ( LANJUTAN-1 ( LANJUTAN-1 ) )

PROSEDUR HYDROTEST

1. AIR YANG DIGUNAKAN DAPAT BERUPA : AIR ASIN , AIR TAWAR , ATAU PRODUK CAIR YANG

TERSEDIA . UNTUK TANGKI AUSTENITIC STAINLESS STEEL , AIR UJI HYDROSTATIC HARUS TERLEBIH DAHULU DIPERIKSA DILABORATORIUM UNTUK MENGETAHUI KANDUNGAN CHLORIDE ( TIDAK BOLEH MELEBIHI 50 ppm ) KARENA AKAN MENYEBABKAN STRESS CORROSION CRACKING .

2. PENGISIAN TANGKI HARUS DILAKSANAKAN PERLAHAN LAHAN ( PALING CEPAT 1 RING PER 24 JAM ) .

3. SELAMA PENGISIAN , PENURUNAN TANGKI TERUS DIPANTAU . TITIK PENGUKURAN PALING SEDIKIT 8 BUAH . PENGISIAN DILAKSANAKAN RING DEMI RING ,DIMANA PADA AKHIR PENGISIAN SETIAP RING , PENURUNAN TANGKI TERUS DIPANTAU .

4. PENGISIAN BERIKUTNYA BARU DAPAT DILAKSANAKAN APABILA PENURUNAN TELAH BERHENTI PALING CEPAT SELAMA 24 JAM . INSTRUKSI PENGISIAN HARUS DATANG DARI INSPEKTOR TANGKI SETELAH DIA PUAS DENGAN TERHENTINYA PENURUNAN..

5. JIKA PADA SUATU SAAT TIBA TIBA PENURUNAN TERJADI SECARA CEPAT DAN DRASTIS , MAKA SEGERA PENGISIAN DIHENTIKAN DAN SELANJUTNYA ISI TANGKI DIKURANGI HINGGA PENURUNAN TANGKI TERHENTI .

6. PENGISIAN KEMUDIAN DAPAT DILAKUKAN KEMBALI MANAKALA PEMBACAAN PENURUNAN TELAH DATAR / TETAP .

7. APABILA TERJADI KEBOCORAN DISUATU SAMBUNGAN LAS , MAKA PENGISIAN DIHENTIKAN DAN ISI TANGKI DITARIK KEMBALI HINGGA PERMUKAAN BERADA 1 KAKI DIBAWAH LOKASI KEBOCORAN.

SETELAH DIKERINGKAN , KEBOCORAN DIPERBAIKI SESUAI WPS DAN DIUJI KEBOCORANNYA .

MANAKALA TERBUKTI TELAH BAIK , PENGISIAN DILANJUTKAN SAMPAI MENCAPAI TOP CURB ANGLE.

(49)

TANK STRAPPING

TANK STRAPPING ADALAH PENGUKURAN ISI TANGKI DARI SETIAP cm TINGGI TANGKI. STRAPPING

DIMAKSUDKAN UNTUK MENGGUNAKAN TANGKI SEBAGAI ALAT UKUR UNTUK TRANSAKSI ( EXPORT MAUPUN IMPORT ).

PELAKSANAANNYA SEWAKTU ISI AIR UJI DIDALAM TANGKI PENUH MENCAPAI TOP CURB ANGLE.

TOP CURB ANGLE

DIUKUR ISI DARI KETINGGIAN 1 cm DEMI 1 cm. MISAL NYA ISI 1 cm DIA WALI DARI KELI LING PADA KETING GIAN TERSEBUT, MISALNYA Л D = Y cm MAKA D = Y /3.14 cm ISI = ¼ X 3.14

( Y / 3.14 ) ² X 1

= 0.08 Y² cm³.

ISI 1CM BERIKUTNYA AKAN BERBEDA KARE NA Л D NYA JUGA BER BEDA.

DAFTAR ISI SETIAP cm TINGGI TANGKI DISEBUT TANK TABLE FLOATER PAD

Tank Hydrotest ( lanjutan-2 )

FLOATING PAD

(50)

TANK CATHODIC PROTECTION

TANK CATHODIC PROTECTION

SACRIFICIAL ANODE ( ANODA YANG DIKORBANKAN ) IMPRESSED CURRENT ( ARUS YANG DIPAKSAKAN )

PADA PRINSIPNYA CATHODIC PROTECTION ADALAH MEBANJIRI TANGKI DENGAN ELEKTRON SEHINGGA TANGKI TIDAK AKAN BERKARAT AKIBAT KEBERADAAN KATHODA LAIN.

PADA PRINSIPNYA CATHODIC PROTECTION MERUPAKAN SARANA PEM BANTU UNTUK MELINDUNGI TANGKI DARI SERANGAN KARAT , SARANA PELINDUNG KARAT YANG UTAMA ADALAH LAPISAN CAT PADA PERMU KAAN SEBELAH BAWAH PELAT DASAR TANGKI .

CATHODIC PROTECTION DIANGGAP MEMADAI MANAKALA BEDA POTENSI

ANTARA TANGKI DAN TANAH = - 0.85 Volt

(51)

SACRIFICIAL ANODE

BAHAN SACRIFICIAL ANODE ADA KARENANYA DISE LAH MAGNESIUM YANG LEBIH ANO BUT ANODA DIKOR DIC DIBANDING BAJA , SEHINGGA BANKAN , DAN DA MELEPASKAN ELEKTRON PELIN RI WAKTU KEWAK DUNG BAJA , NAMUN SEKALIGUS TU ARUS DIGAN AKAN HABIS TERMAKAN KARAT TI KARENA HABIS

TERKONSUMSI

CAD WELD

e - e - e –

GALVANIC ANODE ANODE BACKFILL

TANK CATH. PROTECTION

( LANJUTAN-1 )

(52)

IMPRESSED CURRENT

RECTIFIER

JUNCTION BOX

CAD WELD

ARUS YANG DIPAKSAKAN

CATHODIC PROTECTION

( LANJUTAN-2 )

ANODE

+ _

BAHAN ANODE

IMPRESSED CUR

RENT ADALAH : GRAFIT , BAJA ,

HIGH SILICON CAST IRON , ATAU CAMPURAN METAL OXIDE DENGAN

TITANIUM

(53)

SUSUNAN ANODE

MEMBRANE HORIZONTAL ANODE VERTICAL ANODE

CATHODIC PROTECTION

( LANJUTAN-3 )

RECTIFIER

(54)

INSPECTION & TEST INSPECTION & TEST

( LANJUTAN ) ( LANJUTAN )

LINGKUP TANGGUNG JAWAB TANK INSPECTION

A. ENGINEERING :

MEREVEW : KONTRAK , TECHNICAL DATA , TECHNICAL DRAWING , PURCHASE ORDER , MATERIAL CERTIFICATE, MANUAL , REFFERENCE BOOK ( STANDARD ) , REQUISITION SHEET , WORK PROCEDURE , CONSTRUCTION SCHEDULE , WPS / PQR ,DLL.

B. PROCUREMENT ( FABRICATION ) :

VENDOR LIST REVEW , VENDOR VISIT , PREFABRICATION MEETING , REVIEW ENGINEERING DELIVERABLES , REVIEW DOCUMENT PURCHASE , MATERIAL CERTIFICATE MATERIAL IDENTIFICATION , PURCHASE ORDER , MATERIAL HANDLING , FABRICATION SCHEDULE , DELIVERY TIME , MARKING , CUTTING , EDGE PREPARATION , STRUCTURAL STEEL FABRICATION , DIMENSION CHEK , SIMULATION ASSEMBLING & DISMANTLING , SUB FABRICATOR AND SUPPLIER VISIT , INHOUSE QA/QC PLAN , QC PROCEDURE , PRESERVATION PLAN , PRESHIPMENT INSPECTION , DLL.

C. CONSTRUCTION ( TANK ERECTION ) :

SITE PREPARATION CHECK , CONSTRUCTION SCHEDULE , CONSTRUCTION DRAWING REVIEW , QA / QC PLAN , SOIL INVESTIGATION REPORT CHECK , SOIL STABILIZATION CHECK , PILING PLAN AND EXECUTION CHECK , TANK PAD COMPACTION REPORT CHECK , FOUNDATION DRAWING CHECK , DIMENSION CHECK , BOTTOM PLATE LAYING CHECK ( MARKING , IDENTIFICATION , PLATE MAPPING ) , NON CONFORMANCE CHECK , WELDER PERFORMANCE QUALIFICATION TEST , WELD MAP , SHELL PLATE ERECTION SEQUENCE , DIMENSION CHECK ( WELD GAP, PLUMBNESS , ROUNDNESS) , CLAMPING AND TACK WELDING CHECK , WELDING EQUIPMENT AND CONSUMABLES CHECK , FIRST RING WELDING MAP AND SEQUENCE CHECK , DIMENSION CHECK , RADIOFRAFI AS PER STANDARD REQUIREMENT , OTHER NDT , ROOF COMPONENT LAYDOWN , TACK AND WELD CHECK , DIMENSION CHECK , ROOF COMPONENT INSTALLATION ( SEAL / DRAIN / BREATHER VALVE , MANHOL E , SAMPLING HATCH , DLL ) , WELD QUALITY TEST ,SECOND AND OTHER RING INSTALLATION / CLAMP /A ND WELD , DIMENSION CHECK ( WELD GAP , ROUNDNESS ), WELD NDT , CORRECTIVE ACTIONS , TANK SHELL COMPONNET INSTALLATION , GROUNDING , ROOF INSTALLATION , TANK APPENDAGES ISTALLATION CHECK , HYDROTEST PROCEDURE CHECK , FILLING CHECK , SETTLEMENT MONITOR , DIMENSION CHECK , NON CONFORMANCE & CORRETION CHECK , TANK STRAPPING MONITOR , DEWATERING MONITOR , PAINT PREPARATION CHECK , PAINTING MONITOR , PAINT THICKNESS CHECK , CATHODIC PROTEC1TION INSTALLATION MONITOR AND CHECK , DLL .

(55)

INSPECTION & TEST

( LANJUTAN )

BOTTOM LEAK TEST

UDARA BER CARA PENGUJIAN TEKANAN BOTTOM PLATE

TANGKI YANG PA

LING MURAH DAN PRAKTIS

CARA PENGU

JIAN YANG BER AIR RISIKO TERJA DI KARAT CE

LAH AKIBAT K E BERADAAN

AIR DIBAWAH

BOCOR

(56)

INSPECTION & TEST INSPECTION & TEST

( LANJUTAN ) ( LANJUTAN )

TANK HYDROSTATIC DAN PNEUMATIC TEST

UDARA BERTEKANAN

AIR SABUN BUIH BERARTI

BOCOR.

TEKANAN DIBAWAH BERAT TUTUP TANGKI BOCOR

AIR DITURUN KAN HINGGA 1 KAKI DIBAWAH KEBOCORAN

UNTUK REPAIR

KOMPRESOR 1 KAKI

(57)

INSPECTION & TEST INSPECTION & TEST

( LANJUTAN )

PNEUMATIC TEST PELAT PENGUAT ( REINFORCING PAD )

TEKANAN PNEUMATIS YANG DIPERLUKAN SE BESAR 100 kPa

LUBANG TELTALE SE TELAH PENGUJIAN TI DAK BOLEH DITUTUP UNTUK MENGETAHUI JIKA ADA KEBOCORAN UNTUK MENCEGAH MA SUKNYA AIR HUJAN CU KUP DITUTUP DENGAN GEMUK ( GREASE ) SAJA .

Gas bertekanan ( udara , N2, helium )

Lubang teltale

(58)

INSPECTION & TEST ( LANJUTAN )

PENGUKURAN KEBUNDARAN TANGKI JARI JARI TANGKI

SUMBU TANGKI

PENGUKUARN KEBUNDARAN TANGKI DIMULAI DARI SEKITAR 0.3 M DARI DASAR TANGKI , DAN INI MERUPAKAN DASAR PENGUKURAN KEBUNDARAN TANGKI SELANJUTNYA . DISARANKAN UNTUK MEMBUAT MAAL ( CETAKAN ) KEBUNDARAN YANG TERBUAT DARI BAJA SIKU YANG DILENGKUNG KAN UNTUK DIGUNAKAN SEBAGAI REFERENSI PEMASANGAN PELAT PELAT RING BERIKUTNYA.

TOLERANSI UKURAN DIAMETER TANGKI

0.3 m

DIAMETER TANGKI TOLERANSI JARI JARI m ( kaki ) mm ( in.)

12 ( 40 ) + 13 ( ½ )

12 ( 40 ) ~ 45 ( 150 ) + 19 ( ¾ )

45 ( 150 ) ~ < 75 ( 250 ) + 25 ( 1 )

≥ 74 ( 250 ) + 32 ( 1 ¼ )

(59)

TANK MAINTENANCE-2 TANK MAINTENANCE-2

SAFE ENTRY SAFE ENTRY

KELENGKAPAN KESELAMATAN PERSONIL UNTUK MEMASUKI TANGKI

APABILA SESEORANG PERSONIL AKAN MEMASUKI UNTUK PERTAMA KALINYA KEDALAM TANGKI YANG TELAH DIOPERASIKAN , MAKA DIA HARUS DILENGKAPI DENGAN PER ALATAN KESELAMATAN PERSONIL DIMANA PINGGANGNYA DIIKAT DE NGAN TALI KESELAMATAN YANG SELAMA DIA BERADA DIDALAM TANGKI ,TALI TERSEBUT DIPEGANG OLEH KAWANNYA DARI LUAR TANG KI, YANG SIAP UNTUK MENARIKNYA MANAKALA TALI TERSEBUT DITA RIK DARI DALAM SECARA DIHEN TAKKAN.

IKAT

PINGGANG DAN TALI

KESELAMATAN

SEPATU BOOT KARET PANJANG

HINGGA BAJU OVERALL

LENGAN PANJANG WARNA PUTIH SARUNG

TANGAN KARET , PANJANG HINGGA KESIKU WARNA PUTIH

BOTOL OKSIGEN PENYELAM UKURAN BESAR MANOMET

ER

SENTER EXPLSION PROOF

TOPI KESELAMATAN WARNA PUTIH

TOPENG GAS

(60)

TANK MAINTENANCE-2

( LANJUTAN-1 ) PERBAIKAN DASAR TANGKI

APABILA KEBOCORAN DASAR TANGKI TELAH DILOKALISIR UNTUK MEMOTONG NYA PELAT DIBOR MENGGUNAKAN BOR EXPLOSION PROOF SAMPAI PELAT YANG BERMA SALAH TERLEPAS . BOR DIMAKSUDKAN UNTUK MENGHINDARKAN PEKERJAAN API.

BOCO R

LUBANG BOR TANAH YANG

TERCEMAR PELAT

DASAR

(61)

TANK MAINTENANCE-2

( LANJUTAN-2 )

GR OU T

PERBAIKAN DASAR TANGKI

BOCOR MATA BOR

TANAH TERCEMAR TANAH DIKERUK

GAS ARGON

SEMENTARA DILAS GAS

ARGON DILAIRKAN TERUS

DIGROUT

(62)

TANK TANK

MAINTENANCE-2

MAINTENANCE-2

( LANJUTAN-3 )

AIR

PEMOTONGAN PELAT DASAR TANGKI

BRANDER ARGON ATAU CO2 POTONG

TANAH TERCEMAR HYDRO CARBON

GERINDA POTONG

TANAH TERCEMAR HYDRO CARBON

Gambar

GRAFIK PENURUNAN LOKAL

Referensi

Dokumen terkait

Dapur tinggi terbuat dari susunan batu tahan api yang diperkuat dengan tiang-tiang baja, Dalam dapur tinggi akan terjadi proses reduksi bijih besi menjadi besi

senyawa senyawa antioksidan yang berasal dari ekstrak buah mahkota dewa yang teradsorpsi pada permukaan sampel baja API 5L grade, senyawa senyawa antioksidan

Jalan kereta api, yaitu jalur yang terdiri atas rangkaian petak jalan rel dimana jalan rel adalah satu kesatuan konstruksi yang terbuat dari baja, beton, atau konstruksi

Proses pembubutan adalah proses pengikisan atau pemotongan benda kerja yang dilakukan dengan memutar benda kerja dan pisau pahat yang terbuat dari baja akan mengikis permukaan

Bearing terbuat dari baja karbon rendah, sehingga salah satu proses pengerasan yang cocok adalah dengan cara plasma nitriding.. Dalam penelitian ini permukaan