• Tidak ada hasil yang ditemukan

PDF Indarung IV Plant of PT Semen Equipment Effectivity (OEE)

N/A
N/A
Protected

Academic year: 2023

Membagikan "PDF Indarung IV Plant of PT Semen Equipment Effectivity (OEE)"

Copied!
12
0
0

Teks penuh

(1)

Skip to Main Content

3. Effectivity analysis of raw mill 4R1 and 4R2 using Overall

Equipment Effectivity (OEE) Method and Six Big Losses in Indarung IV Plant of PT Semen

Padang

by Prima Fithri

FILE

TIME SUBMITTED 16-JAN-2020 11:09AM (UTC+0700) SUBMISSION ID 1242497713

WORD COUNT 3646 CHARACTER COUNT 18651 D_AND_SIX_BIG_LOSSES_IN_INDARUNG_IV_PLANT_OF_PT_SEMEN_PA DANG.PDF (629.17K)

(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)

%

10

SIMILARITY INDEX

%

10

INTERNET SOURCES

%

PUBLICATIONS

%

0

STUDENT PAPERS

1 %

3

2 %

3

3 %

2

4 %

1

5 %

1

6 %

1

EXCLUDE QUOTES ON EXCLUDE

BIBLIOGRAPHY

ON

EXCLUDE MATCHES < 1%

3. Effectivity analysis of raw mill 4R1 and 4R2 using Overall Equipment Effectivity (OEE) Method and Six Big Losses in Indarung IV Plant of PT Semen Padang

ORIGINALITY REPORT

PRIMARY SOURCES

weighlabel.com

Internet Source

elar.usfeu.ru

Internet Source

www.tchulsberg.nl

Internet Source

id.123dok.com

Internet Source

aip.scitation.org

Internet Source

pertambangan.fst.uinjkt.ac.id

Internet Source

(12)

Referensi

Dokumen terkait

The scope of this study starts from the validation the productivity losses based on the current Overall Equipment Effectiveness at the Pointing Machine Line. Next, the OEE

Analisis Overall Equipment Effectiveness (OEE) dalam Meminimalisi Six Big Losses pada Mesin Produksi Dual Filters DD07.. Teknik Industri

Six Big Losses are causing these losses are: Losses due to damage to the equipment (Breakdown Losses), losses due to the installation of equipment (Set-up and Adjustment

Pengukuran efektifitas mesin injection molding dapat dilakukan dengan menggunakan metode Overall Equipment Effectiveness untuk mencegah terjadi 6 kerugian besar (Six Big

Measurement of the effectiveness of the injection molding machine can be accomplished by using the Overall Equipment Effectiveness to prevent it from occurring 6 big losses (Six

Untuk mengetahui tingkat keefektifan dari mesin penggulung Open Top Roller (OTR) maka dilakukan analisa dengan metode OEE (Overall Equipment Effectiveness), Six

Informasi yang dapat diperoleh adalah nilai Overall Equipment Effectiveness (OEE) pada bulan Januari 2017 sebesar 29,852%, artinya efektivitas penggunaan mesin exuder

Ini dapat mengurangi kelelahan, meningkatkan produktivitas, dan menurunkan risiko kecelakaan kerja SIMPULAN Berdasarkan analisis pengukuran Overall Equipment Effectiveness OEE pada