• Tidak ada hasil yang ditemukan

STUDIO PERANCANGAN ARSITEKTUR V

N/A
N/A
abel

Academic year: 2023

Membagikan "STUDIO PERANCANGAN ARSITEKTUR V"

Copied!
11
0
0

Teks penuh

(1)

4343,1

10.0

10.3

10.6

10.9 11.6

11.9 12.2

12.6 13.0

13.6 13.9

14.9 15.0 15.3

11.2

14.214.6

10.0

10.0

10.0

10.0 10.3 10.3

10.3

10.0 10.3

10.6

10.3

10.3

9.8 9.6 9.4 9.2

13.3

10.3

10.0 10.0

10.0

9.8 9.6 9.2

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

PASCAGHANA JAYATRI P., ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

F1E020001 ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

ELEVASI EKSISTING SKALA 1 : 2000

10083

9846

4367

9556

10527 7339

10948

D C

A B

A B

D C

(2)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU 10.0

10.3

10.6

10.9 11.6

11.9 12.2

12.6 13.0

11.2

10.0

10.0

10.0

10.0 10.3 10.3

10.3

10.0 10.3

10.6

10.3

10.3

9.8 9.6 9.4 9.2

13.3

10.0 10.0

+11.0

+8.6 +11.6

+12.6

+11.6 +11.6

+11.6 +11.6

+9.6

7973 6561 5400

3091126552295452019

10083

9846

4367

9556

10527 7339

10948

A B

D C

C D

1

2 3

A

4 5

6 B

A B

D C

A B C D

1

2 3

4 5

6

ELEVASI RENCANA

SKALA 1 : 2000

(3)

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

- 1.00 - 1.00 - 1.19 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00

110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00 180.00 200.00 210.00 220.00 230.00

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

- 1.00 - 1.00 - 1.19 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00

110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

- 1.00 - 1.00 - 1.19 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00

110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00 180.00 200.00 210.00 220.00 230.00

+10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3 +10.3 +10.0 +10.0 +10.0 +10.0 +10.3 +10.6 +10.9 +11.2 +11.6 +11.9 +12.2 +12.4 +12.6 +12.9

+10.0 +10.0

+10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3 +10.3 +10.0 +10.0 +10.0 +10.0 +10.3 +10.6 +10.6 +10.9 +10.9 +11.2 +11.2 +11.2 +10.9 +10.9

+10.0 +10.0

+10.0 +10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3 +10.6 +10.9 +10.9 +11.2 +11.6 +11.9 +11.9

+10.0

+10.0 +11.9

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

- 1.00 - 1.00 - 1.19 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00 - 1.00

110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00

+10.0 +10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3

+10.0

+10.0 +10.3 +10.3 +10.3 +10.3 +10.3 +10.3 +10.3 +10.3

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

PASCAGHANA JAYATRI P., ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

F1E020001 ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

POTONGAN A-A SKALA 1 : 1000

POTONGAN B-B SKALA 1 : 1000

POTONGAN C-C SKALA 1 : 1000

POTONGAN D-D SKALA 1 : 1000

(4)

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

+11.6 +8.6

110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00 180.00 200.00 210.00 220.00 230.00

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00 180.00 200.00 210.00 220.00 230.00

+10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3 +10.3 +10.0 +10.0 +10.0 +10.0 +10.3 +10.6 +10.9 +11.2 +11.6 +11.9 +12.2 +12.4 +12.6 +12.9

+10.0 +10.0

+10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3 +10.3 +10.0 +10.0 +10.0 +10.0 +10.3 +10.6 +10.6 +10.9 +10.9 +11.2 +11.2 +11.2 +10.9 +10.9

+10.0 +10.0

+10.0 +10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3 +10.6 +10.9 +10.9 +11.2 +11.6 +11.9 +11.9

+10.0

+10.0 +11.9

+ 5.00 + 6.00 + 7.00 + 8.00 + 9.00 + 10.00

Elevasi Eksisting Elevasi Rencana

Jarak 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00

+11.00 +12.00 +13.00 +14.00 +15.00

130.00 140.00 150.00 160.00 170.00

+10.0 +10.0 +10.0 +10.0 +10.0 +10.3 +10.3 +10.3

+10.0

+10.0 +10.3 +10.3 +10.3 +10.3 +10.3 +10.3 +10.3 +10.3

+11.6 +11.6 +11.6 +11.6 +11.6 +11.6 +8.6 +8.6 +8.6 +8.6 +8.6 +8.6 +11.6 +9.6 +9.6 +9.6 +11.6

+11.6 +11.6

+11.0 +11.0 +11.0 +11.6 +11.6 +11.6 +11.6 +12.6

+11.6

+11.6 +11.6 +11.6 +11.6 +11.6 +11.6 +11.6 +11.6 +12.6 +12.6 +12.6 +12.6 +12.6 +12.6

+11.6 +11.6 +11.6 +8.6

+11.6

+11.6 +8.6 +8.6 +8.6 +8.6 +11.6 +11.6 +11.6 +11.6 +11.6 +11.6

+11.6 +11.6 +11.6 +11.0

+11.6

+11.6 +11.0 +11.0 +11.0 +11.0 +11.0 +11.0 +11.0 +11.0 +11.0 +11.6

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

POTONGAN A-A SKALA 1 : 1000

POTONGAN B-B SKALA 1 : 1000

POTONGAN C-C SKALA 1 : 1000

POTONGAN D-D SKALA 1 : 1000

(5)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

PASCAGHANA JAYATRI P., ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

F1E020001 ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU DENAH RENCANA PARKIR OUTDOOR

SKALA 1 : 400

3

6

9 4

5

7

8 2 1

1880 350 600

3040 600

785 745 530 600 530 530 600 530

300 300 600

500 500 60

A B C D F G

ASPAL PLANT BARRIER BARE CONCRETE

PEDESTARIAN PAVING GRID

B

B A

A

C

C

KEYPLAN

(6)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU POT - B

SKALA 1:25

TELLFORD LAMA LEVELING LAPEN LAPIS ASPAL

TRASRAM

SALURAN DRAINASE METAL GRILL

KERB BETON 20X30

TELLFORD LAMA LEVELING LAPEN

LAPIS ASPAL

TRASRAM

SALURAN DRAINASE METAL GRILL

PAS. BATA MERAH

TELLFORD LAMA LEVELING LAPEN

LAPIS ASPAL

TRASRAM

SALURAN DRAINASE METAL GRILL

PAS. BATA MERAH

POT - A SKALA 1:25

POT - C SKALA 1:25

KERB BETON 20X30

+0.60

+0.00 -0.10 -0.15

-0.60

-0.85 -0.23 +0.30

+0.00 -0.10 -0.15

-0.60

-0.85 -0.23

+0.40

+0.00 -0.10 -0.15

-0.60

-0.85 -0.23

60

40 40

10 10

10 20 100 20 10

40 10

30

(7)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

PASCAGHANA JAYATRI P., ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

F1E020001 ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

A B C D E F G H

A B C D E F G

1 2

3

4

5

6

7

8

9

416155711211439418653

280 539 223 2500 250 429 1075

280 539 223 2500 250 429

B B

303585

4118

A

A

DENAH KOLAM RENANG SKALA 1 : 400

+0.5 +0.5

+0.5

+0.5

+0.5

+0.5

+0.5 +0.5 +0.5 +0.5

+0.00 +0.00

+0.00

+0.00

+0.00

+0.00

+0.00 +0.00

+0.00

+0.00

-0.20

-1.30

-2.00

+0.5 +0.5

+0.5

+0.00 +0.00

-0.20

PAS. GRANIT CREAM

WOOD DECKING BAMBOO BUNGALOW

POOL 1 - 1.3M

POOL 2 - 2M

BARE CONCRETE CREAM

KEYPLAN

(8)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

A B C D E F G

280 539 223 2500 250 429

-2.00 -1.00 -0.80 -0.40 0.00 +0.5

-0.20 +0.5 +0.5 +0.5

-2.00 -1.00 -0.80 -0.40 +0.5

-0.20 0.00

-1.30 -1.00

-0.80-0.40

+0.5

-0.20 0.00

TOP WATER TOP WATER TOP WATER

1 2

3 4

5 6

7 8

9

-0.20 +0.50

653 418 1439 1121 1557 416 585 303

-1.30

-1.00 -0.80

-0.40

-0.20

PLAT BETON 10CM PONDASI BATU KALI

TANAH URUG PASIR URUG

PAS. BATAKO

POTONGAN B-B SKALA 1 : 400 POTONGAN A-A SKALA 1 : 400

(9)

316 2560 316

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

PASCAGHANA JAYATRI P., ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

F1E020001 ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

1

A B C D E F G

2 3

4

5

6 7 8

189,5 182,9 1280 1280 182,9 189,5

65,9182,9574376574182,9 41,1

2560

1524

LANTAI LAP. BASKET

BETON BERTULANG

TIANG BASKET BAJA RABATAN BETON

TANAH URUG

A A

+0.50 +0.50 +0.50 +0.50

+0.50

DENAH LAPANGAN BASKET SKALA 1 : 400

POTONGAN A-A SKALA 1 : 400

KEYPLAN

(10)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU

B

B A

C

A

C

PAVING BLOCK

ASPAL

BARE CONCRETE GRID

BARE CONCRETE

200

6973

2463

200 500

300

220

DENAH RENCANA PERKERASAN SKALA 1 : 400

(11)

UNIVERSITAS MATARAM FAKULTAS TEKNIK PROGRAM STUDI ARSITEKTUR

ZAEDAR GAZALBA, ST., MT.

PASCAGHANA JAYATRI P., ST., MT.

NAMA MAHASISWA

NIM PEKERJAAN

F1E020001 ABEL FAHREZA HARIS STUDIO PERANCANGAN

ARSITEKTUR V MATA KULIAH

DOSEN PENGAMPU POT - A

SKALA 1:25

POT - B SKALA 1:25

POT - C SKALA 1:25

200 50

+0.30 +0.00 -0.20

-0.65

-1.20

+0.30 +0.00

+0.25

+0.00

-0.10

ASPAL DINDING PAS. BATA MERAH PAVING BLOCK

245 35

+0.30 +0.00 -0.20

-0.65

-1.20

PERKERASAN CONCRETE SQUERE KERB BETON 20X30

+0.30 +0.00 -0.20

-0.65

PAS. PAVING BLOCK

250

PASIR URUG PAS. BATA MERAH

BETON 15X20

PONDASI BATU KALI

PONDASI BATU KALI BETON 15X20

PASIR URUG

TANAH URUG

TANAH URUG

LEVELING LAPEN TELLFORD LAMA

+0.30 +0.00

+0.20

+0.00 +0.00

+0.30 PONDASI BATU KALI

PASIR URUG TANAH URUG PAS. BATA MERAH

BETON 15X20

Referensi

Dokumen terkait

Tugas untuk joint studio disusun dengan mempertimbangkan materi yang telah dikuasai oleh mahasiswa setelah sekian semester mengikuti program pendidikan pada

Memang tidak mudah untuk melaksanakan studio arsitektur yang ideal,apalagi melibatkan tutor- tutor praktisi/professional dalam proses belajar mengajar.Ada kendala honor yang

Kerja Praktik yang penulis lakukan di Giraffe Studio membuat penulis belajar mengenai langkah-langkah, tantangan, serta tips dalam proyek renovasi arsitektur.. Kata

Dalam STUPA 8.31 ini, Tema `Melampaui` Ekologi Menuju Arsitektur Untuk Kebaikan dan Kehidupan adalah sebuah usaha untuk mempelajari Kondisi kekinian sebuah ekosistem yang

Semua teman – teman satu Studio Tugas Akhir Semester A TA 2010/2011 Departemen Arsitektur, Fakultas Teknik, Universitas Sumatera Utara, terutama kepada Nurkumala sari, Agus

- Mahasiswa Arsitektur UNPAR, UPI dan UNIKOM memiliki tingkat kehadiran yang tinggi dikarenakan terdapat penambahan fungsi dan adanya batasan waktu penggunaan

Dampak dari kualitas fisik studio sebagai tempat belajar utama pendidikan arsitektur menjadi isu penting yang harus diperhatikan untuk mencapai lingkungan belajar yang

Penerapan Kualitas Akustik pada Ruang Kelas Studio Arsitektur Studi Kasus: Kelas Studio Gambar Laboratorium Teknik 2, Institut Teknologi Sumatera Verza Dillano Gharata 1*, Widi Dwi