FORECAST ACTUAL VARIANCE

Maximum Demand (25th FEB' 2013) 815 MW 775 MW ‐4.94%

Maximum  Energy (25th FEB' 2013)       17.6 MW 15.2 GWh ‐13.64%

Maximum Demand (record high 28/06/11) 800 MW 830 MW 3.76%

Prepared by:

Electricity Market Operations

Electricity Supply & Market Regulations Dept.

Energy Commission Malaysia y

27‐Feb‐13

(2)

OPERATION

500MW

EAST COAST GRID GENERATION PROFILE ON 25th FEB' 2013

‐200

‐100 0 100 200 300 400 500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 HOUR

INSTALLED CAPACITY ON LINE CAPACITY

DEMAND OPERATING RESERVE

34614.6 33501.3 33898.9 33689.4 34353.4 35659.1 34888.3 35231.4 42230.1 46967.6 47073.5 46255.2 45547.9 47657.2 48131.5 48159.1 46842.3 44399.9 48491 47839.5 43901.4 41527.6 39190.6 39271.1 West Cost

WEST COAST GRID OPERATION

0 100 200 300 400 500 600 700 800 900 1000

1 2 3 6 8 9 10 11 12 13 1 1 16 1 18 19 20 21 22 23 2 MW

HOUR WEST COAST GRID GENERATION PROFILE ON 25th FEB' 2013

DEMAND OPERATING RESERVE

EAST COAST GRID

INSTALLED CAPACITY 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 ON LINE CAPACITY 47 62 62 62 62 62 62 86 211.5 199.5 199.5 199.5 199.5 199.5 196.5 199.5 184.5 184.5 181.5 196.5 196.5 161 101 52 DEMAND 186.7 184.71 177.45 180.56 182.35 191.56 185.87 207.3 256.15 262.51 261.49 253.62 252.44 267.08 262.69 265.01 251.79 250.22 262.73 264.53 254.69 242.27 221.74 207.72 OPERATING RESERVE -139.7 -122.71 -115.45 -118.56 -120.35 -129.56 -123.87 -121.3 -44.65 -63.01 -61.99 -54.12 -52.94 -67.58 -66.19 -65.51 -67.29 -65.72 -81.23 -68.03 -58.19 -81.27 -120.74 -155.72

East Cost 6003.33 7068.86 6530.84 7280.67 7571.98 7786.34 7605.12 10329.1 21174.2 22157.1 22412.2 22029.8 22105.1 22067.3 21841.4 20924.7 19122.3 19704.1 20211.3 19612.6 19918.4 16021.1 10859.6 5731.82

EAST COAST GRID

WEST COAST GRID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

INSTALLED CAPACITY 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 ON LINE CAPACITY 604.5 604.5 582.5 582.5 582.5 582.5 582.5 626.5 698 720 720 720 720 720 720 720 720 720 720 720 667 648 639.5 635 DEMAND 475.6 455.6 438.5 433.4 442 464.3 454.2 507.4 567 612.1 617.8 606.3 591.2 623.9 628.9 629.6 613.6 570.9 627.2 620 588.8 573.5 549.4 553.4 OPERATING RESERVE 128.9 148.9 144 149.1 140.5 118.2 128.3 119.1 131 107.9 102.2 113.7 128.8 96.1 91.1 90.4 106.4 149.1 92.8 100 78.2 74.5 90.1 81.6

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 

INSTALLED CAPACITY ON LINE CAPACITY

(3)

Daily Generation Mix Profile for 25th FEB' 2013

70.4%

8.6%

18.3%

2.7%

Gas

Hydro

Distillate

SREP

BIOMASS

30%

70%

Generation Mix Profile for 25th February 2013

Gas           11,052 MWh

Hydro              1,346 MWh Distillate              2,880 MWh

SREP                 431 MWh

DISTILLATE GAS HYDRO

SESB       1 ,275.20 MWh        1 ,923.70 MWh      1 ,322.00 MWh        ‐ MWh

IPP       1 ,605.00 MWh        9 ,128.40 MWh        24. 00 MWh        ‐ MWh

SREP                  ‐ MWh               ‐ MWh        ‐ MWh        431.40 MWh GENERATION MIX SESB‐IPP‐SREP 25th FEB' 2013

TOTAL       2 ,880.20 MWh          11,0 52.10 MWh      1 ,346.00 MWh        431.40 MWh

DISTILLATE GAS HYDRO BIOMASS

58%

SESB 8% 12% 8% 0%

60%

IPP 10% 58% 0% 0%

50%

SREP 0% 0% 0% 3%

TOTAL 100% 100% 100% 100%

40%

TOTALLY     15,709.70

DIST (IPP) 10%

DIST (SESB) 8%

SREP 3%

GAS (SESB) 12%

GAS (IPP) 58%

HYDRO (SESB) 8%

HYDRO (IPP) 0%

total 100%

0%

10%

20%

30%

SESB IPP SREP

8% 10%

0%

12%

0%

8%

0% 0%

0% 0% 3%

DISTILLATE GAS HYDRO BIOMASS

Referensi

Dokumen terkait

In order to achieve the maximum charging capacity, Supercapacitor Energy Storage has been use because it can receive charge efficiently compared to other energy

The wind energy is design by using wind flow from cooling tower while the solar energy is using solar panel to convert sunlight energy to electrical energy.. The main component

She received her Bachelor of Electronics Engineering (Computer Engineering) from Universiti Teknikal Malaysia, Melaka in 2008. The author then remains in the

Nomor : 27/052/II/2013/Dipenda Tanggal : 18-Feb-13 PA/KPA Kementerian/Lembaga/Pemerintah Daerah/Institusi Lainnya (K/L/D/I) Provinsi Sulawesi Barat.

13 2.~.~, ~ 13 \3 ~ ALBU M: Kakitangan dan pelajar Institut Biologi Tropika dan Pemuliharaan lBTP Universiti Malaysia Sabah UMS merai~n anak-anak yatim pada majlis penyerahan

Keyword: Photovoltaic system; Fuel Cell distribution system; power quality; voltage source inverters INTRODUCTION: In the current global energy scenario, importance of power

Specific conditions and peculiarities of the Tagal System in Sabah, Malaysia The target fish Malaysian red mahseer or kelah stays in • one deep pool of a river throughout its life

Improvement of Data Collection method implemented by Immigration Malaysia Feb 2008 Prepared By Research Division For Sabah Tourism Sabah : Visitor Arrivals by Nationality 2002 -