3.0 KOS ITEM‐ITEM KERJA 3.8 ROADS & PAVING

BIL KETERANGAN KERJA UNIT

*PURATA KADAR HARGA  KERJA 

2008 2009

(RM) (RM) (RM)

A Kerbs

1 Construct and complete precast concrete  kerbs including all necessary works

M 33.67 38.25 36.00

B Pavers

1 Insitu concrete pavers Grade 20; 25mm  thick including base preparation, joints  and cutting

M2 30.00 30.00 30.00

2 Interlocking concrete block; 100mm thick  including all necessary works

M2 82.50 ‐ 83.00

3 Interlocking concrete block; 80mm thick  including all necessary works

M2 55.00 ‐ 55.00

C Road Works

1 Road sub‐grade preparation; in earth M2 3.75 ‐ 4.00

2 Road sub‐base ‐ 75mm thick granular  material

M2 2.00 ‐ 2.00

3 Road sub‐base ‐ compacted sand in  50mm thick

M2 3.50 4.00 4.00

4 Road sub‐base ‐ compacted sand in  100mm thick

M2 5.50 ‐ 6.00

5 Road sub‐base ‐ compacted sand in  200mm thick

M2 8.00 8.00 8.00

6 Roadbase ‐ 100mm thick crusher run M2 8.00 40.00 24.00

7 Roadbase ‐ 150mm thick crusher run M2 8.38 8.38 8.00

8 Roadbase ‐ 200mm thick crusher run M2 11.50 11.50 12.00

* Purata Keseluruhan (rounded up) yang ditetapkan 31

PURATA KADAR HARGA KERJA  BAGI TAHUN

(2)

3.0 KOS ITEM‐ITEM KERJA 3.8 ROADS & PAVING

BIL KETERANGAN KERJA UNIT

*PURATA KADAR HARGA  KERJA 

2008 2009

(RM) (RM) (RM)

PURATA KADAR HARGA KERJA  BAGI TAHUN

9 Roadbase ‐ 230mm thick crusher run M2 11.50 ‐ 12.00

10 Roadbase ‐ 350mm thick crusher run M2 21.00 22.00 22.00

11 Roadbase ‐ 300mm thick laterite M2 20.00 ‐ 20.00

12 Roadbase ‐ bitumen emulsion on  finished surface

M2 1.47 1.10 1.00

13 Road surfacing ‐ asphaltic concrete in  40mm thick

M2 17.75 16.50 17.00

14 Road surfacing ‐ asphaltic concrete in  50mm thick

M2 22.55 26.10 24.00

15 Road surfacing ‐ asphaltic concrete in  60mm thick

M2 17.88 15.50 17.00

16 Road surfacing ‐ asphaltic concrete in  75mm thick

M2 23.50 ‐ 24.00

17 Road surfacing ‐ asphaltic concrete in  100mm thick

M2 42.00 43.00 43.00

18 Road surfacing ‐ binder course in 50mm  thick

M2 8.58 2.15 5.00

19 Road surfacing ‐ binder course in 65mm  thick

M2 13.00 ‐ 13.00

20 Road surfacing ‐ wearing course in 40mm  thick

M2 12.00 ‐ 12.00

21 Road surfacing ‐ wearing course in 50mm  thick

M2 17.00 ‐ 17.00

* Purata Keseluruhan (rounded up) yang ditetapkan 32

(3)

3.0 KOS ITEM‐ITEM KERJA 3.8 ROADS & PAVING

BIL KETERANGAN KERJA UNIT

*PURATA KADAR HARGA  KERJA 

2008 2009

(RM) (RM) (RM)

PURATA KADAR HARGA KERJA  BAGI TAHUN

22 Road surfacing; prime coat including all  necessary works

M2 2.50 2.00 2.00

23 Road surfacing; tack coat including all  necessary works

M2 4.27 4.90 5.00

24 Road furniture; pavement markings ‐  continuous line; size 150mm wide

M 11.04 4.20 8.00

25 Road furniture; pavement markings ‐  letters and shapes

NO 150.00 ‐ 150.00

26 Road furniture; signages ‐ illuminated  complete with all necessary works

NO 250.00 250.00 250.00

* Purata Keseluruhan (rounded up) yang ditetapkan 33

Referensi

Dokumen terkait

The Action Plan could be managed through the World Bank Global Road Safety Facility, would support the ongoing UN collaboration activities, develop country level pilot

37 Tahun 2009 tentang Dosen dan Peraturan Mendiknas RI Nomor 47 Tahun 2009 tentang Sertifikasi Pendidik Untuk Dosen Proses penilaianan akhir portopolio dilakukan oleh asesor,

25 Kantor LH Broto Damaryanto Pengendali Dampak Lingkungan Pertama L Staf Kantor Lingkungan Hidup Kota Administrasi. Pusat

The road growing dynamics is constrained by two obvious costs: (a) The cost of having roads pass through existing urbanized areas, the denser an area, the more costly, (b) and the

Even though this archetype must be reputed proper and peculiar of residential areas, it points out how the urban road can be a rich scenario of a wide variety of social

e) Hitung dan gambarkan sudut yang didapat pada titik A dan B, perhitungan sudutnya dimulai dan sudut kompas pembidikan ke titik A dan B. f) Dari sudut yang didapat dan

Kota/Provinsi : Kota padang Sumatera Barat Tahun Data : Januari s.d Desember 20101. Jan Feb Mar Apr Mei Jun Jul Agus Sep Okt

Tabel SP-2. Kecamatan Jumlah RT Sendiri Bersama Umum Tidak Tempat Buang Air Besar Ada 1.. Buku Data Status Lingkungan Hidup Kabupaten Buleleng 2010. Tabel SP-3. Kecamatan