T ECHNICAL S PECIFICATIONS

Dalam dokumen Philippine Bidding Documents (Halaman 67-72)

Technical Specifications

ITEM

Specification

Statement of

Compliance

1 UNIT

BASIC HYDRAULIC SYSTEM TRAINING EQUIPMENT

a. 2 units - 1x 4/2-way hand lever valve

b. 1 unit - 1x 4/3/-way hand lever valve re circulating mid-position c. 1 unit - 1x pressure relief valve /Pressure sequence valve d. 1 unit - 1x Pressure relief valve, piloted

e. 1 unit - 1x 3-way pressure reducing valve f. 1 unit - 1x 2-way flow control valve g. 1 unit - 1x non return valve, de-lockable

h. 1 unit - 1x Diaphragm accumulator with shut- off valve i. 2 units - 1x hydraulic motor

j. 2 units - 1x double acting cylinder, 16/10/200 k. 1 unit - 1x weight

l. 1 unit - 1x non return valve 0.1 Mpa m. 1 unit - 1x non return valve 0.5 Mpa n. 1 unit - 1x flow control valve

o. 1 unit - 1x One-way flow control valve p. 1 unit - 1x Shut-off valve

q. 1 unit - 7x Branch tee r. 2 units - Pressure gauge

s. 1 unit 2/2 way stem actual valve t. 1 unit shut-off counter balancing valve NECESSARY ACCESSORIES:

a. Aluminum profile 1100x700mm

b. 10 hose line with quick release coupling (600mm) c. 10 hose line with quick release coupling (1000mm) d. 10 hose line with quick release coupling (1500mm) e. measuring case

f. pressure relief unit

Hydraulic power unit:

Double pump with one motor can be integrate into lean line workplace system Pump design: double external gear pump

Number of pumps: 2

Actuation: Manual via ON/OFF switch Operating pressure:6 Mpa (60bar) Oil tank capacity: 401

Duty cycle: 100%

Dimension: 700x320x550mm (W x D x H) Weight: 65 kg

Bidders must state here either "Comply" or "Not Comply" against each of the individual parameters of each specification stating the corresponding Performance parameter of the equipment offered.

Statements of "Comply"

or “Not Comply” must be supported by evidence in a Bidders Bid and cross- referenced to that evidence. Evidence shall be in the form of compliance issued by the manufacturer, samples, brochures, independent test data etc., as appropriate. A statement that is not supported by

evidence or is

subsequently found to be contradicted by the evidence presented will render the Bid under evaluation liable for rejection. A statement either in the Bidders statement of compliance or the supporting evidence that is found to be false either during Bid Evaluation, post- qualification or the execution of the Contract may be regarded as fraudulent and render Bidder or supplier liable for prosecution subject to the provisions of ITB Clause 3.1 (a.2) and/or GCC Clause 2.1(a.2)

Power unit with AC current motor single phase Nominal voltage: 230V, nominal power rating:1.1 KW, frequency: 60hz, delivery rate at nominal speed: 2x3.8 1/min at 1350 rpm

Protective cover for weight:

TRAINING AIM:

Learning about valves and devices

Function and application of various valves and devices Measuring variables such as pressure, flow and time Calculating surface ratio, force, output and speed Physical fundamentals of hydraulics

Applying basic hydraulic equations Using symbols according to DIN/ISO 1219 Drawing displacement-step diagrams Drawing hydraulic circuits

Constructing and commissioning control system, including trouble shooting RECOMMENDED TRAINING MEDIA:

Textbook hydraulics, Basic level WBT Fundamentals of hydraulics

Design and simulation program, FluidSIM/Hydraulics Transparency set hydraulics

Video Hydraulics, Basic level Transparent models, Hydraulics Workbook Hydraulic, Basic level OTHER REQUIREMENTS:

1. Ten (10) years warranty on service and two (2) years guarantee on all parts.

2. Commissioning of the machine including training for faculty.

3. Regular monthly maintenance and inspection for the first two (2) years 4. The supplier must have existing offices for last 5 years.

5. The supplier must have distributed/supplied machine tools for the last 10 years in 5 or different agencies having no problem in the requirements.

6. Reconditioned machine are not acceptable 7. DIN ISO 1219

ALEXANDER DR. DELA PAZ, Ed.D. RAUL R. BERNALDEZ ENGR. PEDRO CUSTODIO Dean of CIT-End User TWG TWG

Technical Specifications

ITEM

Specification

Statement of

Compliance

1 UNIT

ELECTRO-HYDRAULIC SYSTEM TRAINING EQUIPMENT a. 1 unit - 1x signal input electrical

b. 1 unit - 1x indicator unit and distributor ,electrical c. 1 unit - 2x relay, three fold

d. 1 unit - 2x limit switch, electrical, left actuated e. 2 units - 2x limit switch, electrical, right actuated f. 2 units - 1x 4/2-way solenoid valve

g. 2 units - 1x 4/3-way solenoid valve with closed mid-position h. 1 unit - 1x non return valve , de-lockable

i. 1 unit - 2x Pressure relief valve/ Pressure sequence valve j. 1 unit - 1x 2-way flow control valve

k. 2 units - 1x double acting cylinder, 16/10/200 l. 2 units - 1x hydraulic motor

m. 1 unit - 1x one-way flow control valve n. 1 unit - 1x non return valve 0.1 Mpa o. 1 unit - 1x non-return valve 0.5 Mpa p. 2 units - 3x pressure gauge

q. 1 unit - 8x branch tee r. 1 unit - 1x weight

s. 1 unit - 1x diaphragm accumulator with shut of block t. 1 unit - 1x emergency OFF push button electrical u. 2 units - 1x proximity switch, inductive

v. 2 units - 1x proximity switch, capacitive w. 2 units - 1x proximity switch, optical x. 2 units - 1x pressure switch

y. 1 unit - 1x Time relay

z. 1 unit - 1x Preset counter, electrical, incrementing aa. 1 unit - 1x indicator unit and distributor, electrical NECESSARY ACCESSORIES:

Aluminum profile 1100 x 700mm

10 hose line with quick release coupling (600mm) 10 hose line with quick release coupling (1000mm) 10 hose line with quick release coupling (1500mm) measuring case

Pressure relief unit

Table top power supply/ power supply unit for the mounting frame Cable set, universal with 4 mm safety plugs

Hydraulic power unit:

Double pump with one motor can be integrate into lean line workplace system Pump design: double external gear pump

Bidders must state here either "Comply" or "Not Comply" against each of the individual parameters of each specification stating the corresponding Performance parameter of the equipment offered.

Statements of "Comply"

or “Not Comply” must be supported by evidence in a Bidders Bid and cross- referenced to that evidence. Evidence shall be in the form of compliance issued by the manufacturer, samples, brochures, independent test data etc., as appropriate. A statement that is not supported by

evidence or is

subsequently found to be contradicted by the evidence presented will render the Bid under evaluation liable for rejection. A statement either in the Bidders statement of compliance or the supporting evidence that is found to be false either during Bid Evaluation, post- qualification or the execution of the Contract may be regarded as fraudulent and render Bidder or supplier liable for prosecution subject to the provisions of ITB Clause 3.1 (a.2) and/or GCC Clause 2.1(a.2)

Actuation: Manual via ON/OFF switch Operating pressure:6 Mpa (60bar) Oil tank capacity: 401

Duty cycle: 100%

Dimension: 700x320x550mm (W x D x H) Weight: 65 kg

Power unit with AC current motor single phase Nominal voltage: 230V, nominal power rating:1.1 KW, frequency: 60hz, delivery rate at nominal speed: 2x3.8 1/min at 1350 rpm

Protective cover for weight:

TRAINING AIMS:

Learning about valves and devices and their function Learning about electrical components

Using symbols according to DIN/ ISO 1219 Drawing displacement-step diagrams

Drawing electrical and hydraulic circuits diagrams

Constructing and commissioning control system, including trouble shooting

Basic Hydraulic circuits

RECOMMENDED TRAINING MEDIA:

Design simulation program, FluidSIM / Hydraulics Textbook Electro-hydraulics, basic level

Transparency set, Fundamentals of Electro hydraulics DVD Electro-pneumatics/ Electro hydraulic

Fundamentals of Electro hydraulics Workbook Electro-hydraulics,Basic level OTHER REQUIREMENTS:

1. Ten (10) years warranty on service and two (2) years guarantee on all parts.

2. Commissioning of the machine including training for faculty.

3. Wiring and other items needed to connect and operate the machine to the BSU power source.

4. Regular monthly maintenance and inspection for the first two (2) years 5. The supplier must have existing offices for last 5 years.

6. The supplier must have distributed/supplied machine tools for the last 10 years in 5 or different agencies having no problem in the requirements.

7. Reconditioned machine are not acceptable 8. DIN ISO 1219