A BAC RE50LU丁 10N DECLAR:NG A FA:LURE OF BIDDiNG

RfsoLWoN NO.497,

S.

20t 6 (tNFRA)

WHEREAS,

in

compliance

with the

provisions

of

RA 9184,

the

lGlinga State University advertised

in

the

PhiIGEPS and KSU websites and posted at BAC Bulletin Board, and conspicuous place at the premises of the University,

the

lnvitation

to

Bid for the one-packaged deal Construction/Repair/Rehabilitation of Academic Buildings continuously

from

November 15, 2016

to

December

5,

2016

with the following

components, approved budget, and contract duration:

Confact No. Particulars Ved Budgetねr

the Contract(ABC)

Contract Duration KSU!B2016・

01・06

CONSTRUCT10NIREPAIRIREHABILITAT10N OF ACADEMIC

BU:LDINCS Php 15,811,163.26

1.Repar of cOr鰤 o威Room at CAF Bunding Len Wing 2041102.36 31 2.Repair of comfort R∞m atCAF Bu‖ ding Rlght wim 64,895,72 13 3.Repair of KSU Hioh School Laboratorv Bu‖ ding 1,556,612.28 85 4.Va10us Repatrs of Agricultural T∝ hnomy Building 817,815.53 68

5.Repair of CttE Building 1,479,691,19 89

6.Va‖ ous Repairs of CAF Laboralory Bu‖ ding 111631525,94 υ

7.Vanous Repalrs of CBAE Buildino 69,585,38

8,Vanous Repairs of cLA Bu‖ ding 145,373.40 25

9.Vadous Repairs of Foresw Bu‖ ding 797,849,09 72

lo.  Vanous Repairs at TECHVOC l Bullding 449,531.15 40 11.  Vanous Repalrs at TECHVOC 2 Building 363,694,72

12.  Construction of Engineettng Bu‖ ding―Phase lV 113101948.65 84 13.  ConstrLICtiOn of Rizal Campus Llbrary Buildino― Phase V 6,173,988.06 176

14。  ConstrLIC10n of HRM Building― Phase lV 1,213,549.79 67

WHEREAS, in response

to

the said advertisement, only Teckon Construction acquired a bid document on December 2,2016;

WHEREAS, during the Deadline of Submission and Opening of Bids at '10:00 AM on December 5,2A16, Mr.

Tolentino,

the bidde/s

staff, came running

to

submit their bid envelope at around 10:0/ AM at

the

KSU

Conference Hall, Admin. Bldg. in the presence of two observers from COA and Private Sector;

WHEREAS, as usual bidding procedure, the BAC Secretariat "stamped" received the bid envelope of Teckon Construction

with

10:07 AWDecember 5,2016 indicated time and date and recorded in

the

minutes

of

meeting, the bidde/s name, its representative and the time the late bid was submitted;

WHEREAS, the BAC moved for non-acceptance of the said bid envelope based on Section 25.6 of the 2016

IRR of R.A. 9184 and returned the same to Teckon Construction's Materials Engineer Venus Alfonso;

NOW, THEREFORE, We

the

members of the Bids and Awards Committee, exercising prudence, good faith and transparenry, hereby RESOLVE AS lT lS HEREBY RESOLVED:

to

declare

a

FAILURE

OF

BIDDING

far the

Construction/Repair/Rehabilitation

of

Academic Buildings as provided by Sedion 35.1 (a) of the 2016 IRR of RA. 91 84; and

to

recommend for approval by the President of the Kalinga State University

for

its re-bidding and the foregoing findings.

整 華 型 一 護

≒ 酸

(2)

Repub′lr οFめe劇つ′′lppinc

KALiNθ A STATE UNIVERS:TY BrDS ttDハ WAPDS COMM「 ff

NarοnalROaα Pυ

Ю々

0 3υ lanao7 Tabυ

Ory7 

Ю′

inga

,贅

"c httP/tuedu tt Fnla″ umalutt edu ph Co・l●d Noi∞17822る145

RE50LVEQ atthe Conference Halし Admin BId9′ KSU Main Campus′ Purok 6′ Bulanao′ Tabuk City′ Kalinga this Sth day of December,2016

THF θ′ DS ANDハ WARDS COM ′

7T[[:

Of1 0FFICIAL TRAVEL

ARSEN:AM.BAYONGAN Membet BAC

CPA′

DBM

Date approved: DECEMBER 2016

ll′1 0FFICllL TRAVEL