A BAC RE50LU丁 10N DECLAR:NG A FA:LURE OF BIDDiNG
RfsoLWoN NO.497,
S.20t 6 (tNFRA)
WHEREAS,
in
compliancewith the
provisionsof
RA 9184,the
lGlinga State University advertisedin
thePhiIGEPS and KSU websites and posted at BAC Bulletin Board, and conspicuous place at the premises of the University,
the
lnvitationto
Bid for the one-packaged deal Construction/Repair/Rehabilitation of Academic Buildings continuouslyfrom
November 15, 2016to
December5,
2016with the following
components, approved budget, and contract duration:Confact No. Particulars pЮVed Budgetねr
the Contract(ABC)
Contract Duration KSU!B2016・
01・06
CONSTRUCT10NIREPAIRIREHABILITAT10N OF ACADEMIC
BU:LDINCS Php 15,811,163.26
1.Repar of cOr鰤 o威Room at CAF Bunding Len Wing 2041102.36 31 2.Repair of comfort R∞m atCAF Bu‖ ding Rlght wim 64,895,72 13 3.Repair of KSU Hioh School Laboratorv Bu‖ ding 1,556,612.28 85 4.Va10us Repatrs of Agricultural T∝ hnomy Building 817,815.53 68
5.Repair of CttE Building 1,479,691,19 89
6.Va‖ ous Repairs of CAF Laboralory Bu‖ ding 111631525,94 ハυ●●
7.Vanous Repalrs of CBAE Buildino 69,585,38
n v
8,Vanous Repairs of cLA Bu‖ ding 145,373.40 25
9.Vadous Repairs of Foresw Bu‖ ding 797,849,09 72
lo. Vanous Repairs at TECHVOC l Bullding 449,531.15 40 11. Vanous Repalrs at TECHVOC 2 Building 363,694,72
12. Construction of Engineettng Bu‖ ding―Phase lV 113101948.65 84 13. ConstrLICtiOn of Rizal Campus Llbrary Buildino― Phase V 6,173,988.06 176
14。 ConstrLIC10n of HRM Building― Phase lV 1,213,549.79 67
WHEREAS, in response
to
the said advertisement, only Teckon Construction acquired a bid document on December 2,2016;WHEREAS, during the Deadline of Submission and Opening of Bids at '10:00 AM on December 5,2A16, Mr.
Tolentino,
the bidde/s
staff, came runningto
submit their bid envelope at around 10:0/ AM atthe
KSUConference Hall, Admin. Bldg. in the presence of two observers from COA and Private Sector;
WHEREAS, as usual bidding procedure, the BAC Secretariat "stamped" received the bid envelope of Teckon Construction
with
10:07 AWDecember 5,2016 indicated time and date and recorded inthe
minutesof
meeting, the bidde/s name, its representative and the time the late bid was submitted;WHEREAS, the BAC moved for non-acceptance of the said bid envelope based on Section 25.6 of the 2016
IRR of R.A. 9184 and returned the same to Teckon Construction's Materials Engineer Venus Alfonso;
NOW, THEREFORE, We
the
members of the Bids and Awards Committee, exercising prudence, good faith and transparenry, hereby RESOLVE AS lT lS HEREBY RESOLVED:to
declarea
FAILUREOF
BIDDINGfar the
Construction/Repair/Rehabilitationof
Academic Buildings as provided by Sedion 35.1 (a) of the 2016 IRR of RA. 91 84; andto
recommend for approval by the President of the Kalinga State Universityfor
its re-bidding and the foregoing findings.5b EO E uく
∞
整 華 型 一 護
≒ 酸
∪く
Repub′lr οFめe劇つ′′lppinc
KALiNθ A STATE UNIVERS:TY BrDS ttDハ WAPDS COMM「 ff
NarοnalROaα Pυ
Ю々
0 3υ lanao7 Tabυ々
Ory7Ю′
inga,贅
"c httP/tuedu tt Fnla″ 笙umalutt edu ph Co・l●d Noi∞17822る145
RE50LVEQ atthe Conference Halし Admin BId9′ KSU Main Campus′ Purok 6′ Bulanao′ Tabuk City′ Kalinga this Sth day of December,2016
THF θ′ DS ANDハ WARDS COM ′
7T[[:Of1 0FFICIAL TRAVEL
ARSEN:AM.BAYONGAN Membet BAC
CPA′
DBM
Date approved: DECEMBER 2016
ll′1 0FFICllL TRAVEL
JOHNJOHN C.VENUS MembettBAC MembeL 8AC
RFELI″ π