• Tidak ada hasil yang ditemukan

BAC Resolution No. 0」 し

N/A
N/A
Protected

Academic year: 2023

Membagikan "BAC Resolution No. 0」 し"

Copied!
2
0
0

Teks penuh

(1)

Repub′ic οfthe phi′ρρines

ML′ N6■

57■

7E UN′ VEPS耐

BrDg l‖ , 1り lR,S ̀0‖ ‖ r77FF

Ⅳationa′ High way′ Purοk 6′ Bu′anaο ′Tabu々 〔′ty′ κa′nga Ntt htト/bttu納

 

昴 計prOCuttmmtse面

̲¨

蜘 劇uph CP眈 09177744185

A BA⊂

RESOLU丁 10N RECOMMENDING AWARD OF CONTRACTAND HOPE APPROVAL

ffOr■3Cs With>Phρ  50000.00 and=≦ P力

ρ

7′

θ θαθ

00。00'

BAC Resolution No.  0」

Series of 2020

WHEREAS, the Kalinga State University (KSU) seeks

to

attain economy and efficiency in all aspects of its curement (AMP), specifically:

consistent with Rule XVI of

the 20,l6 Revised lmplementing Rules and Regulations (R-|RR) of Republic Act (RA) No.9184;

WHEREAS, in order to determine whether the bidder

.in..rn.d

complies with and is responsive to all the

'

requirements and conditions stated in the RFQ, the BAC, with the assistance of the Technical Working Group tlWG), has undertaken the following Post Qualification proceedings, as applicable:

1. The BAC has determined whether KSU is entering into a contract with a capable Supplier, Consultant, or Contractor by requiring the submission of applicable eligibility, technical and financial documents with reference

to

Appendix A of Annex H,2016 R-lRR of RA 9184 of the Documentary Requirement for AMP.

2. The winning bidder was verified, validated and asceftained

that it is not

included

in

any

overnment "blacklist."

3- The use

of

other means for verification and validation, such as lnternet and other research methods, of the bidder's documents, was resofted to by the BA?TWG.

4 丁

he BA―

G conducted a site inspection ofthe bidderis place ofbusiness and/or pla∩ t/ねctor光 where applicable

t I

5. The BAC/TWG tested sarnples for compliance with specifications and performance levels, as well as aftersales and/or maintenance capabilities, where applicable

t I

6. The BA?TWG inquired about

the

bidder's performance

in

relation

with

other contracts/

transactions.

t I

7. The BAC has verified, validated

required fina ncial requirement once this project is awarded.

and ascertalned the bid price proposal to ensure sustenance of operating cash

of the bidder and, the flow of the transaction,

NOW THEREFORE, wr: the Members of the BAC, hereby RESOLVE AS lT HEREBY RESOLVED:todeclarethe concemed bidder, indicated

at the

Abstract

of

Sealed Quotation, as post qualified, and to recommendforapprovalbythe KSU President of an award.

Concurred by the BIDS AND AWARDS COMMITTEE:

ARSEN:AM.BAYONGAN

Member

U,WACAS

Nl BAC nsnbrs drall b o0 a "W dulf lW of asstgnmenl unlil issrcnF- of I'loliF- ol Award by llp HOPE in udq lo finpleb the antire prodlrenent fo@s al tle earliesl possibb f,me . S..don 38 d ti. IRR of RA 918t1

(2)

Republic of

the

Philippines

閣 N 釘 A■

National Highwayr Purok 6′ Bulanao′ Tabuk Cit"Ka‖

nga 3800

0rrCE OF THE UNMPStt pRESIDENT

To the Bids and Awards Committee:

Action

of

HOPE

on

&AC Resolution

No.

Series

of

2020 Recqnmending Award

By the povver vested in me by the lGlinga State University Board of Regents, I hereby:

sed on the foregoing:

Glculated and Responsive Bid (LCRB) or

[] )ec

t6, 2Ot 6 RiRR of RA 9/5a: Singh Calcuhted and Responsive Bid (SCRB) or Single

.

Rated and Responsive Bid (SRRB).

.l tsecrion

i7.3, 2016 R-iRR of RA

91H:

Contnct Approval by Higher Authority.

[

] DISAPPROVE the attached Resolution of the BAC due to the follorving Reservation Clauses:

[

] Secrion 4l {a), RA 9

/84

there is prima facie evidence of collusion between appropriate public officers or emptoyees of the Procuring Entity, or between the BAC and any of the bidders, or the coliusion is between or among the bidders themselves, or between a bioder and a third

partry, including any act which restricts, suppresses or nullifies or tends to restrict, suppress or

nulli!

co,.npetition;

[

] Secrion 4l (U. RA 9184: the BAC faihd to follow bidding procedures.

[

] Secrion 4l (c), RA

il A:

any ytstifiable and reasonable ground where the award of contract lrrill not redound to tne benefit cf the government:

[

] the physical and economic conditions have signi,ricantly changed so as to render the project no longer economically, financially, or technicatly feasible.

[

] the project is no ionger necessary.

[

] the source of funds for the project has been withheld or reduced through no fault of the Kalinga State University.

issued at KSU Main Campus, Nat Purok 6, Bulanao, Tabuk City, Kalinga, Phiiippines.

sid e

nt

T.

S∪C Pr

Enclosure

:

BAC Resolution

www.ksuedu.Ph■ mailoksu.edu̲ph口 α闘フ8226145■

Datel

 

Referensi

Dokumen terkait