RESOLU丁 10N RECOMMENDING AWARD OF CONTRACTAND HOPE APPROVAL
ffOr■3Cs With>Phρ 50000.00 and=≦ P力
ρ
7′θ θαθ
00。00'BAC Resolution No. 0」
し
Series of 2020
WHEREAS, the Kalinga State University (KSU) seeks
to
attain economy and efficiency in all aspects of its curement (AMP), specifically:consistent with Rule XVI of
the 20,l6 Revised lmplementing Rules and Regulations (R-|RR) of Republic Act (RA) No.9184;
WHEREAS, in order to determine whether the bidder
.in..rn.d
complies with and is responsive to all the'
requirements and conditions stated in the RFQ, the BAC, with the assistance of the Technical Working Group tlWG), has undertaken the following Post Qualification proceedings, as applicable:1. The BAC has determined whether KSU is entering into a contract with a capable Supplier, Consultant, or Contractor by requiring the submission of applicable eligibility, technical and financial documents with reference
to
Appendix A of Annex H,2016 R-lRR of RA 9184 of the Documentary Requirement for AMP.2. The winning bidder was verified, validated and asceftained
that it is not
includedin
anyovernment "blacklist."
3- The use
of
other means for verification and validation, such as lnternet and other research methods, of the bidder's documents, was resofted to by the BA?TWG.4 丁
he BA―
G conducted a site inspection ofthe bidderis place ofbusiness and/or pla∩ t/ねctor光 where applicablet I
5. The BAC/TWG tested sarnples for compliance with specifications and performance levels, as well as aftersales and/or maintenance capabilities, where applicablet I
6. The BA?TWG inquired aboutthe
bidder's performancein
relationwith
other contracts/transactions.
t I
7. The BAC has verified, validatedrequired fina ncial requirement once this project is awarded.
and ascertalned the bid price proposal to ensure sustenance of operating cash
of the bidder and, the flow of the transaction,
NOW THEREFORE, wr: the Members of the BAC, hereby RESOLVE AS lT HEREBY RESOLVED:todeclarethe concemed bidder, indicated
at the
Abstractof
Sealed Quotation, as post qualified, and to recommendforapprovalbythe KSU President of an award.Concurred by the BIDS AND AWARDS COMMITTEE:
ARSEN:AM.BAYONGAN
MemberU,WACAS
Nl BAC nsnbrs drall b o0 a "W dulf lW of asstgnmenl unlil issrcnF- of I'loliF- ol Award by llp HOPE in udq lo finpleb the antire prodlrenent fo@s al tle earliesl possibb f,me . S..don 38 d ti. IRR of RA 918t1
Republic of
the
Philippines閣 N 釘 A■
National Highwayr Purok 6′ Bulanao′ Tabuk Cit"Ka‖
nga 3800
0rrCE OF THE UNMPStt pRESIDENT
To the Bids and Awards Committee:
Action
of
HOPEon
&AC ResolutionNo.
Seriesof
2020 Recqnmending AwardBy the povver vested in me by the lGlinga State University Board of Regents, I hereby:
sed on the foregoing:
Glculated and Responsive Bid (LCRB) or
[] )ec
t6, 2Ot 6 RiRR of RA 9/5a: Singh Calcuhted and Responsive Bid (SCRB) or Single.
Rated and Responsive Bid (SRRB)..l tsecrion
i7.3, 2016 R-iRR of RA91H:
Contnct Approval by Higher Authority.[
] DISAPPROVE the attached Resolution of the BAC due to the follorving Reservation Clauses:[
] Secrion 4l {a), RA 9/84
there is prima facie evidence of collusion between appropriate public officers or emptoyees of the Procuring Entity, or between the BAC and any of the bidders, or the coliusion is between or among the bidders themselves, or between a bioder and a thirdpartry, including any act which restricts, suppresses or nullifies or tends to restrict, suppress or
nulli!
co,.npetition;[
] Secrion 4l (U. RA 9184: the BAC faihd to follow bidding procedures.[
] Secrion 4l (c), RAil A:
any ytstifiable and reasonable ground where the award of contract lrrill not redound to tne benefit cf the government:[
] the physical and economic conditions have signi,ricantly changed so as to render the project no longer economically, financially, or technicatly feasible.[
] the project is no ionger necessary.[
] the source of funds for the project has been withheld or reduced through no fault of the Kalinga State University.issued at KSU Main Campus, Nat Purok 6, Bulanao, Tabuk City, Kalinga, Phiiippines.
sid e
nt
T.
S∪C Pr
Enclosure
:
BAC Resolution■www.ksuedu.Ph■ k¶mailoksu.edu̲ph口 α闘フ8226145■
Datel
′ ′