BAC Reso!ution No. 00フ Series of2020
WHEREAS,the Kalinga State∪ niverJty(KSU)seeks to attain economy and efFcienヮ in a‖ aspects of ls
「
∝
U窃
"′
p概
昴ッ
ЮЮ
ttTЮ
anAlttm語でMahod J階
∝wemm ttMら ,∝
睛dレ
consistent with Rule XVl of the 201 6 Revised lrnplerllenting Rules and Re9ulations(RlRR)ofRepubic Act(RA)No 9184,
WHRtts携
劇Л
:ち鴻婦聰零器翼 1:T比 腑 1写 ぷ比 鷲 ij::r糧 躙』 W機 ど Q
WHEREAS′ in order to deterrnine vvhetherthe bldder concerned cOmplles with and ls responsive to a‖ the requirements and conditions stated in the RFQ′ the BAC′ 1/vith the asslstance of the Technical Working Group (nA/G), has undertaken the following Post Qualification proceedings, as applicable 1. The BAC has determined wh
Consultant, or Contractor by requiring the submission
of
applicable eligibility, technical and inanclal documents vvlth refere∩ ce ttt Appendlx A of Annex H′ 2016R― IRR of RA 9184 oftheDocumentary Requirement for AMp.
govern ment'blacklist.'
tl3.
methods, of the bidder's documqnts, was resorted to bythe BA?TWG.
4. The BA?TWG con br pla actoッ ′
where applicable
A BAC RE50LUT:ON RECOMⅣ IEND:NG AWARD OFCONTRAσ AND HOPE APPROVAL
ffor■3Cs with>Pルρ5αOθθ.oo and:≦ P力p7′OθのOθO.Oo,
i I
5. The BA?TWG tested samples foras aftersales and/or maintenance capabilities, where aoolicable.
ア.The BAC haζ ヽ′enned′ valdated required flnancial requirement once this project is awarded.
and ascertained the to ensure sustenance
bid price proposal of operating cash
of the bidder and. the flow of the transaction,
NOW THEREFORE′ we the lνlembers ofthe BAC′ hereby RESOLVE AS:T HEREBY RE50LVEDito dec!are the concerned biddett hdicaled ar theハbstract οf seared Ouοfatiot as post qualined′ and t。
reCOmFnendforapprovalbytheKSUPresidentofanaward。
器 寛蹴 志 I冠 1思 7[∝ 2脚
d電邸拙 型 θ 露 ぽ 酬 a剛 珈 抑 敵 Q
Concurred by the BIDS AND AVVARDS⊂ OMM17「EE:
P[RFELiA R.BUEN Vice Chalrman
ARSENIA M.BAYONGAN Member
transactions.
Uo WACAS
tina - Srctun 3Edtlr.lRRo{ RAglSa
webgte; http6//$urduph Enrarit [email protected] @M; @1i-17+41g5
Member
Republic Ofthe Philippines
rAI鼎 出 精
Nalonal Highwayr PuЮ
k6′BulanaQTabuk Ciり
,Kalinga 38000「 FC=OF HEU‖ ERs″ v ttESFDEΠ
Datel dθll・
ι マ′ ク
)1かTo the Bids and Awards Committee:
ACti10Fp O「HoPFon 3ACFesoluriOn N●
.の
フ ′5ett
「ο2020 Recommendingハ waだ
ite University 3oard of Regents′ l hereby
ヽC based on the fore9oin9:
rest Calcu:ated and RespOnsive Bid(LCR3)or
tR3)。
la r.1′.30‐●^J、^」o^̲̲^̲̲1‐‐^"=」 ′″′ARヽ ´●
躍
i:組
ffキ1lξ:沿
tttli),h91ecalctJated and RespOnJve 8id lSCRBl or Single「 ノ
3え3′2θ′6R―′舶 οF餡 9, cOntraαApproval by Hり herAutho"ty。
I DISAPPKIVE the attached Resolution ofthe BAC due to rhe following Reseryafion Clauses:
[
] Secrrbn 4l {a), RA 9184; there b prknafilie
€ni&nce
of collusion between appropriate public officers or employees of the Procuring Entiry or between the BAC and any of the bidders, or the collusion is between or among the bidders themselves, or between a bidder and a third party, including any act which restricts, suppresses or nuilifies or tends to restric:, suppress or nuilifu compeiltion;[
] Secrion 4r ib), RA 9rM
theBAC faired to foilow txdding procedures.[
] ' Secrrbn 4l ic), RA 9t 84: any'ytslifhbh and reasonable i'round where the award cf contract will not reclound to the benefit of :he government:[
] tne physical and economic conditions have significantly changed so as to render the pro.,ect no ronger economicaily, financiaily, or technicaily fuasibre.[
] the project is no longer necessary.[]thesourceoffundsfortheprojefihasbeerwithheldorreducecthroughnofaulrofthe
tQi inga State U niversity.
lssued at KSU Main Campus, Nat Purok 6, Bulanao, Tabuk City, Kaiinga, phiiippines.