C1
B1 C1
C1 C1
B1
B1
B1
1 2
A
B
RB RB
RB RB
2" x 3" x 2.0mm C-PURLINS
2" x 3" x 1.5mm C-PURLINS
2" x 6" x 1.5mm C-PURLINS SENEPA
C1
C1 C1
C1
1 2
A
B
NGL NGL
PUMP HOUSE
1 2 A B
ROOF BEAM LINE
TOP OF APEX 2" X 3" X 1.5mm C-PURLINS
2" X 3" X 2.0mm C-PURLINS
2" X 6" X 1.5mm C-PURLINS 9mm THK. FIBER
CEMENT BOARD
SCHEDULE OF COLUMNS
DESIGNATION
DEPTH (MM) (D)
WIDTH (MM) (W)
NUMBER OF REBARS
LONGITUDINAL
STIRRUPS
C1 250 150
1@50mm; 5@100mm;
& REST @ 200MM O.C.
10mm def. bar
4-12mm GR 40
GR 40
B1 300 200
4-12mm
SCHEDULE OF BEAMS
DESIGNATION
DEPTH (MM) (D)
WIDTH (MM) (W)
NUMBER OF REBARS
@ SPRT @ MDSP
STIRRUPS
10mm def. bar
1@50mm; 7@100mm;
& REST @ 200MM O.C.
RB 200 150
4-10mm 4-10mM
1@50mm; 7@100mm;
& REST @ 200MM O.C.
4-12mm
GR 40 GR 40
GR 40 GR 40
GR 40
GR 40
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
DINALUPIHAN CAMPUS
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. ROXETTE S. UMEREZ
PREPARED BY:
REVIEWED BY:
PROJECT TITLE:
DIRECTOR OF PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY,
REPAIR & REHABILITATION OF ACADEMIC BLDG. II AT DINA-
LUPIHAN CAMPUS
CAMPUS DIRECTOR
MR. BILLY ALIPIO
1