Bid – A signed offer or proposal to assume a contract submitted by a bidder in response to and in accordance with the requirements of the bidding documents. Bidder – Refers to a contractor, manufacturer, supplier, distributor and/or consultant who submits a bid in response to the requirements of the bidding documents. Consulting Services – Refer to services for infrastructure projects and other types of projects or activities of the GOP that require sufficient external technical and professional expertise beyond the ability and/or capacity of the GOP to perform, such as, but not limited to: (i ) advisory and auditing services; (ii) prior investments or feasibility studies; (iii) design; (iv) construction supervision; (v) management and related services; and (vi) other technical services or special investigations.

A procurement project is described, detailed and planned in the procurement project management plan prepared by the agency, which will be consolidated into the annual procurement plan of the procuring entity. Interested bidders may obtain a complete set of bid documents on June 8, 2023 until July AM - 5:00 PM CEST at the address and website(s) provided below and upon payment of the applicable bid document fee, in accordance with the latest guidelines issued by the GPPB, in the amount of ten thousand pesos. All bids must be accompanied by a bid bond in one of the acceptable forms and for the amount specified in ITB Clause 15.

Bids will be opened in the presence of the bidders' representatives who choose to attend the activity. Cavite State University reserves the right to reject all bids, declare a bid unsuccessful, or not award the contract at any time prior to contract award in accordance with Sections 35.6 and 41 of the 2016 Revised Implementing Rules and Regulations (IRR) of RA Nr.

I NSTRUCTIONS TO B IDDERS

  • Scope of Bid
  • Funding Information
  • Bidding Requirements
  • Corrupt, Fraudulent, Collusive, Coercive, and Obstructive Practices
  • Eligible Bidders
  • Origin of Associated Goods
  • Subcontracts
  • Pre-Bid Conference
  • Clarification and Amendment of Bidding Documents
  • Documents Comprising the Bid: Eligibility and Technical Components
  • Documents Comprising the Bid: Financial Component
  • Alternative Bids
  • Bid Prices
  • Bid and Payment Currencies
  • Bid Security
  • Sealing and Marking of Bids
  • Deadline for Submission of Bids
  • Opening and Preliminary Examination of Bids
  • Detailed Evaluation and Comparison of Bids
  • Post Qualification
  • Signing of the Contract

The Bidders shall comply with the eligibility criteria under Section 23.4.2 of the 2016 IRR of RA No. The Procuring Entity will hold a pre-bid conference for this Project on the specified date and time as indicated in paragraph 6 of the IB. The first envelope shall contain the eligibility and technical documents of the Bid as specified in Section IX.

Any offer that exceeds the ABC stated in paragraph 1 of the IB will not be accepted. Bidders shall submit bids that comply with the requirements of the tender documents, including the basic technical design as shown in the drawings and specifications. Bid prices may be quoted in the local currency or a traded currency accepted by the BSP at the Bidder's discretion.

The ordering party may request additional paper copies and/or electronic copies of the Bid. The preliminary examination of bids is subject to section 30 of the revised IRR from 2016 of RA no.

B ID D ATA S HEET

The amount of not less than one hundred thirteen thousand two hundred seventy two pesos and ABC if the bid security is cash, cashier's/manager's check, banker's check/guarantee or irrevocable letter of credit;. The infrastructure project is packaged in a single lot, and the lot may not be divided into sub-lots for the purpose of tendering, evaluation and contract award. 21 Additional contract documents relevant to the project that may be required by existing laws and/or the procuring entity, such as construction plan and S-curve, manpower plan, construction methods, equipment usage schedule, construction safety and health program approved by DOLE , and other acceptable tools for project planning.

G ENERAL C ONDITIONS OF C ONTRACT

  • Scope of Contract
  • Sectional Completion of Works
  • Possession of Site
  • The Contractor’s Obligations
  • Performance Security
  • Site Investigation Reports
  • Warranty
  • Liability of the Contractor
  • Termination for Other Causes
  • Dayworks
  • Program of Work
  • Instructions, Inspections and Audits
  • Advance Payment
  • Progress Payments
  • Operating and Maintenance Manuals

Herein, clauses serve as a secondary source for the terms of the Contract. If the contractor is delayed or incurs costs due to the contracting authority's failure to provide possession in accordance with the terms of this clause, the contracting authority's representative shall grant the contractor an extension of the contract term and confirm such amount as is reasonable to cover the assignment. costs incurred, which amount is paid by the contracting authority. The resulting contract duration adjustments to address such delay may be remedied through contract renewal as provided in Schedule "E" of the 2016 revised IRR of RA No.

The Contractor shall employ the key personnel identified in the key personnel schedule with their designation, in accordance with ITB Clause 10.3 and specified in the BDS, to carry out supervision of the works. The contracting authority will only approve any proposed replacement of key personnel if their relevant qualifications and capabilities are equal to or better than those of the personnel listed in the Annex. Within ten (10) calendar days of receipt of the notification of award from the contracting authority, but in no case later than the signature of the contract by both.

The contractor, by concluding the contract with the Procuring Entity, recognizes the right of the Procuring Entity to undertake actions in accordance with RA no. The procuring entity will lose its performance security, subject its properties to seizure or garnishment proceedings and permanently disqualify it from participating in any public tender. All GOP payables in his favor will be offset to recover costs.

The warranty against structural defects/failure, except in cases of force majeure, covers the period from the date of issue of the certificate of final acceptance by the procuring entity. Subject to any additional provisions set forth in the SCC, the contractor's liability under this contract shall be in accordance with the laws of the Republic of the Philippines. Contract termination must be initiated if it is immediately determined by the contracting authority that the contractor has engaged in illegal acts and conduct in connection with contract acquisition and execution, such as, but not limited to, prior to or during the execution of the contract. to corrupt, fraudulent, secret, coercive and obstructive practices as specified in ITB section 4.

Subject to the Amending Decision Guidelines in Annex "E" of the Revised IRR of RA No. 2016. The Contractor shall allow the GOP or the contracting authority to inspect the Contractor's accounts and records relating to the Contractor's performance and audited by GOP or contracting authority auditors as required. The contracting authority shall, at the written request of the contractor, to be submitted as a contract document, pay to the contractor an advance of not more than fifteen percent (15%) of the total contract price, payable in one lump sum, or a maximum of two installments on a schedule specified in the SCC subject to the requirements in Appendix "E" of the 2016 Revised IRR of RA No.

S PECIAL C ONDITIONS OF C ONTRACT

4.1 [Indicate the schedule for delivery of possession of the site to the contractor, whether in whole or in part.]. In the case of permanent structures such as Type 4 and 5 buildings as classified under the National Building Code of the Philippines and other structures made of steel, iron or concrete that comply with relevant construction regulations (e.g. DPWH Standard Specifications) such as, but not limited to, steel/concrete bridges, flyovers, aircraft movement areas, harbors, dams, tunnels, filtration and treatment plants, sewage systems, power plants, transmission and communication towers, railway systems and other similar permanent structures:] Fifteen (15) years. In the case of semi-permanent structures such as Type 1, 2 and 3 buildings as classified under the National Building Code of the Philippines, concrete/asphalt roads, concrete flood control, drainage, irrigation canals, river landing, deep wells, rock bridge, footbridge and other similar semi-permanent structures:] Five (5) years.

In the case of other structures, such as bay and wooden bridges, shallow wells, spring developments and other similar structures:] Two (2) years. 13 The amount of the advance payment is [insert amount as a percentage of the contract price which will not exceed 15% of the total contract price and schedule of payment]. 14 [If permitted by the Procuring Entity, state:] Materials and equipment delivered to the site but not fully installed will be included for payment.

S PECIFICATIONS

The contractor must fully describe the differences between the specified standards and the proposed alternative standards in writing and submit them to the client's representative at least twenty-eight (28) days before the date on which the contractor wishes to obtain the consent of the client's representative. In the event that the client's representative determines that the deviations proposed in this way do not ensure substantially the same or higher quality, the contractor must comply with the standards specified in the documents. These notes are intended only as information for the client or the person preparing the tender documentation.

D RAWINGS

B ILL OF Q UANTITIES

Bid Form

Bid Securing Declaration Form

Omnibus Sworn Statement (Revised)

Referensi

Dokumen terkait

The total Contract Price is [insert BDT both in figure and words] The Procuring Entity shall retain or in other words deduct from the Payment due to the Supplier, at the rate of five

If the Procuring Entity allows the submission of bids through online submission or any other electronic means, the Bidder shall submit an electronic copy of its Bid, which must be

Bid Notice Abstract Request for Quotation RFQ Reference Number 9579445 Procuring Entity BATAAN PENINSULA STATE UNIVERSITY Title BPSU: MCO-PRES Procurement of Meals for the Mass and

Bid Notice Abstract Request for Quotation RFQ Reference Number 9717384 Procuring Entity BATAAN PENINSULA STATE UNIVERSITY Title BPSU MC The GUILDS Supply & Delivery of

Bid Notice Abstract Request for Quotation RFQ Reference Number 9717836 Procuring Entity BATAAN PENINSULA STATE UNIVERSITY Title BPSU MC CEA-ME-Procurement of Transportation for the

Bid Notice Abstract Request for Quotation RFQ Reference Number 8730005 Procuring Entity BATAAN PENINSULA STATE UNIVERSITY Title BPSU: MC-CSG Supply and Delivery of Meals for the

Bid Notice Abstract Request for Quotation RFQ Reference Number 8585725 Procuring Entity BATAAN PENINSULA STATE UNIVERSITY Title BPSU: CO-Admission_Meals for the conduct of BPSU

Bid Notice Abstract Request for Quotation RFQ Reference Number 8029278 Procuring Entity LEYTE NORMAL UNIVERSITY Title Snacks & Lunch for the Internalization Write-Shop Area of