The tender documents shall clearly and adequately define, among others: (i) the objectives, purpose and results and/or expected results of the proposed contract; (ii) eligibility requirements of bidders; (iii) the expected duration of the contract; and (iv) the obligations, duties and/or functions of the successful bidder. Care should be taken to check the relationship of the provisions of the PBDs to the requirements of the specific Works to be procured. If duplication of a subject is unavoidable in other sections of the document prepared by the Procuring Entity, care must be taken to avoid contradictions between clauses dealing with the same issue.

Specific details, such as "name of procuring entity" and "address for submission of bids," must be provided in the instructions to bidders, the tender data sheet and special conditions of contract. The cover should be modified as necessary to identify the bidding documents as to the names of the project, contract and procurement entity in addition to the date of issue. Bid – A signed offer or proposal to assume a contract made by a bidder in response to and in accordance with the requirements of the bidding documents.

Bidder – Refers to a contractor, manufacturer, supplier, distributor and/or consultant who submits a bid in response to the requirements of the bidding documents.

Invitation to Bid

West Visayas State University-Lambunao Campus intends through its income (F164 2020) to apply the sum of TWO MILLION TWO MILLION TWO HUNDRED FOUR-FOUR-FOUR THOUSAND FOUR-FOUR THOUSAND PESOS and 62/100 ONLY (Php payments in under the contract for the construction of WVSU-Lambus Motorpool/Garage Bids received beyond ABC are automatically rejected upon opening of bids. The description of an eligible bidder is contained in the bidding documents, particularly in Section II. Bidding is limited to Filipino citizens/sole proprietorships, cooperatives and partnerships or organizations with at least sixty percent (60%) interest or outstanding capital belonging to citizens of the Philippines and to citizens or organizations of a country whose laws or regulations grant similar rights or privileges to Filipino citizens pursuant to RA5183.

It may also be downloaded free of charge from the Philippine Government Electronic Procurement System (PhilGEPS) website and the Procuring Entity's website, provided that bidders must pay the applicable tender documents fee no later than when submitting their bids. All bids must be accompanied by a bid bond in any acceptable form and in the amount specified in ITBC Clause 14. Bids will be opened in the presence of Bidders' representatives who choose to physically/virtually attend the activities.

West Visayas State University-Lambunao Campus reserves the right to reject any and all bids, declare a bid failure or not award the contract at any time prior to contract award in accordance with Sections 35.6 and 41 of the 2016 Revised IRR of RA 9184 and its IRR , without thereby incurring any liability towards the bidder(s) concerned.

Instructions to Bidders

  • Scope of Bid
  • Funding Information
  • Bidding Requirements
  • Corrupt, Fraudulent, Collusive, Coercive, and Obstructive Practices
  • Eligible Bidders
  • Origin of Associated Goods
  • Subcontracts
  • Pre-Bid Conference
  • Clarification and Amendment of Bidding Documents
  • Documents Comprising the Bid: Eligibility and Technical Components
  • Documents Comprising the Bid: Financial Component
  • Alternative Bids
  • Bid Prices
  • Bid and Payment Currencies
  • Bid Security
  • Sealing and Marking of Bids
  • Deadline for Submission of Bids
  • Opening and Preliminary Examination of Bids
  • Detailed Evaluation and Comparison of Bids
  • Post Qualification
  • Signing of the Contract

They or through an agent shall not engage in corrupt, fraudulent, secret, coercive and obstructive practices defined in Annex “I” of the 2016 Revised IRR of RA No. Bidders must comply with the eligibility criteria in Section 23.4.2 of the 2016 IRR of RA No. Subcontractors must submit the document requirements in accordance with Section 23.1 of the 2016 Revised IRR of RA No.

Any bid in excess of the ABC specified in point 1 of the IB will not be accepted. For foreign-financed procurement, a bid price cap may be applied, provided the conditions are met under Section 31.2 of the 2016 Revised IRR of RA No. The procuring entity may request additional hard copies and/or electronic copies of the Bid.

The preliminary review of offers will be regulated by Article 30 of the revised IRR in 2016 of RSH No.

Bid Data Sheet

An amount not less than Php Php 45,090.01 if the bid security is in cash, cashier's/manager's check, bank draft/guarantee or irrevocable letter of credit;. 21 List of additional contract documents relevant to the project: construction plan and S-curve, manpower plan, construction methods, equipment usage plan, Ministry of Labor and Employment approved construction safety and health program and PERT/CPM .

General Conditions of Contract

  • Scope of Contract
  • Sectional Completion of Works
  • Possession of Site
  • The Contractor’s Obligations
  • Performance Security
  • Site Investigation Reports
  • Warranty
  • Liability of the Contractor
  • Termination for Other Causes
  • Dayworks
  • Program of Work
  • Instructions, Inspections and Audits
  • Advance Payment
  • Progress Payments
  • Operating and Maintenance Manuals

These clauses serve as a secondary source for the terms and conditions of the contract. If the Contractor incurs delay or costs because the Client has not given possession in accordance with the terms of this clause, the Client's representative will extend the contract period to the Contractor and confirm that the amount is fair to cover the costs incurred to be paid by the Client. Consequent contract time adjustments to address such delay may be addressed through the contract extension provided for in Annex “E” of the 2016 Revised IRR RA No.

The Contractor shall employ key personnel named in the Key Personnel Schedule, specifying their designation, in accordance with clause 10.3 of the ITB and specified in the BDS, to exercise control over the Works. The Employer will only approve any proposed replacement of key personnel if their relevant qualifications and abilities are equal to or better than those listed in the Schedule. By concluding a contract with the client, the contractor acknowledges the client's right to enforce measures under RA no.

In the event that the Contractor fails to undertake the repair works under Section 62.2.2 of the 2016 Revised IRR, the Procuring Entity shall forfeit its performance security, subject its properties to attachment or garnishment proceedings and will permanently disqualify him from participating in any public tender. All GOP payables in his favor will be offset to recover costs. The Warranty against Structural Defects/Failures, except in the case of force majeure, will cover the period from the date of issuance of the Final Acceptance Certificate by the Procuring Entity.

Subject to any additional provisions set forth in the SCC, Contractor's liability under this contract shall be as determined by the laws of the Republic of the Philippines. Contract termination will be initiated if it is prima facie determined by the contracting authority that the contractor has engaged in unlawful acts and conduct related to the acquisition and performance of the contract before or during the performance of the contract, such as, but not limited to to corrupt, fraudulent, covert, coercive and obstructive practices as listed in ITBClaus 4. Subject to the Amending Order Guidelines in Attachment "E" of the 2016 Revised IRR of RA No.

The Contractor shall permit the Government's Government or the Client to review the Contractor's accounts and records relating to the Contractor's performance and to have them audited by the Government's or the Client's government auditors as necessary. Upon the written request of the contractor, which will be submitted as a tender document, the client will make an advance payment to the contractor in an amount not exceeding fifteen percent (15%) of the total contract price, in a lump sum. the sum or a maximum of two installments according to the schedule specified in the SCC, taking into account the requirements of Annex “E” of the revised IRR 2016 RA no.

Special Conditions of Contract

2 The target completion date is sixty (60) calendar days for the entire scope of contract work.

Specifications

Drawings

Bill of Quantities

Checklist of Technical and Financial Documents

2005 as finally reviewed and approved by the Bureau of Internal Revenue (BIR). f) A statement by the prospective bidder on all of its ongoing government and private contracts, including contracts that have been awarded but not yet started, if any, regardless of whether they are similar or dissimilar to the contract in nature and complexity, to be submitted, and. g) Statement of Bidder's Largest Completed Contract (SLCC) which is similar to the contract to be awarded except under the conditions specified in the Rules;. h) Philippine Contractors Accreditation Board (PCAB) permit; or special PCAB license in case of joint ventures;. and registration of the type and cost of the order to be placed; and. i) Original of bid security. If it is in the form of a guarantee, also submit a certificate issued by the insurance commission; A list of the contractor's key personnel (eg project manager, project engineers, materials engineers and foremen) to be assigned to the contract to be awarded, with full details of their qualifications and experience;

List of contractors' major equipment units, owned, leased and/or under purchase agreements, supported by proof of ownership. or certification of availability of equipment from the equipment lessor/vendor for the duration of the project, as the case may be; and. k) Original duly signed Omnibus Sworn Statement (OSS);. and if applicable, Original Notarial Secretary's Certificate in the case of a corporation, partnership or cooperative; or Original Special Power of Attorney from all members of the joint venture giving full power and authority to its officer to sign the OSS and do acts to represent the Bidder. If applicable, duly signed Joint Venture Agreement (JVA) in accordance with RA No. 4566 and its IRR in case the joint venture already exists;. proper notarized declarations from all the potential joint venture partners declaring whether they will enter into and abide by the terms of the JVA in the event that the bid is successful. o) Original of duly signed and completed financial bid form; and other documentary requirements under UA no. p) Original of duly signed bid prices in the Bill of Quantities; and. q) Duly completed Detailed Estimate Form, including a summary sheet indicating the unit prices of construction materials, labor rates and equipment rental used to come up with the Bid; and.

Referensi

Dokumen terkait

As soon as practicable, but in any case no later than seven years after commencement of production of Petroleum in the Special Regime Area, the Greater Sunrise Contractor shall

NITT, whose decision shall be final and conclusive, shall without prejudice to any other right or remedy which shall have accrued shall accrue thereafter to NITT cancel the contract in