• Tidak ada hasil yang ditemukan

CYPRESS TOWERS

N/A
N/A
Protected

Academic year: 2023

Membagikan "CYPRESS TOWERS "

Copied!
6
0
0

Teks penuh

(1)

UNIVERSITY OF THE PHILIPPINES LOS BAÑOS College of Engineering and Agro-Industrial Technology

Department of Civil Engineering

CONCRETE CONSTRUCTION REWORK AND ITS EFFECT ON LABOR PRODUCTIVITY: THE CASE OF

CYPRESS TOWERS

ARCEO ANTONIO RONQUILLO MANILA

BACHELOR OF SCIENCE IN CIVIL ENGINEERING

March 2009

(2)

CONCRETE CONSTRUCTION REWORK AND ITS EFFECT ON LABOR PRODUCTIVITY: THE CASE OF

CYPRESS TOWERS

ARCEO ANTONIO RONQUILLO MANILA

SUBMITTED TO THE FACULTY OF THE

COLLEGE OF ENGINEERING AND ARO-INDUSTRIAL TECHNOLOGY UNIVERSITY OF THE PHILIPPINES LOS BAÑOS

IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE

DEGREE OF

BACHELOR OF SCIENCE IN CIVIL ENGINEERING

MARCH 2009

(3)

TABLE OF CONTENTS

Title Page

Acceptance Sheet About the Author Acknowledgements Table of Contents List of Tables List of Figures

i ii iii iv v vii viii

1. INTRODUCTION

1.1 Background of the Study 1.2 Significance of the Study 1.3 Objectives of the Study

1.4 Scope and Limitations of the Study 1.5 Date and Place of the Study

2. REVIEW OF RELATED LITERATURE 2.1 Definition of Rework

2.2 Cost of Rework 2.3 Rework Classification 2.4 Measuring Rework

2.5 Rework Studies in Other Countries

3. STUDY METHODOLOGY

4. OBSERVATIONS

4.1 Labor Distribution of Cypress Towers 4.2 Pre-concreting Reworks

4.2.1. Rebar Adjustments 4.2.2. Formwork Adjustments 4.3 Post-concreting Reworks

4.3.1. Beam Adjustment 4.3.2. Concrete Reapplication

5. DISCUSSION AND ANALYSIS 5.1 Expended Labor Hours for Rework

5.1.1. Schedule of Activities 5.1.2. Pre-concreting Rework 5.1.3. Post-concreting Rework 5.2 Productive Labor Yield

5.2.1. Potential Labor Hours

5.2.2. Labor Yield For Rework Activities 5.3 Causes of Rework

5.3.1. Pre-concreting Rework 5.3.2. Post-concreting Rework

6. CONCLUSION

7. RECOMMENDATIONS

1 1 3 3 3 4

5 5 7 7 9 10

13

14 14 15 15 16 17 18 19

21 21 21 22 22 23 23 25 26 26 27

28

29

(4)

BIBLIOGRAPHY

APPENDICES

Appendix A-1. Concrete Pouring Request First Page Appendix A-2. Concrete Pouring Request Second Page Appendix A-3. Concreting Form Schedule of Cypress Towers Appendix A-4. Cypress Towers Labor Form

Appendix B-1. Fifth Floor Columnation Plan of Tower Celesta Appendix B-2. Second Floor Slab and Girder Plan of Tower Celesta Appendix C. Manpower Report of Cypress Towers

Appendix D. Manpower Distribution of Cypress Towers Appendix E. Manhour Montoring of Cypress Towers

30

31 32 33 34 34 35 36 37 38 38

(5)

LIST OF TABLES

Table 2-1. Deviation Categories Causing Rework Table 4-1. Labor Distribution of Cypress Towers

Table 5-1. Constructed Three-Week Rolling Schedule of Tower Celesta

Table 5-2. Pre-concreting Rework Activities on the 5th Floor of Tower Celesta Table 5-3. Man-hours Consumed by the Adjustment of Beam 2G-26

Table 5-4. Man-hours Consumed by Concrete Reapplication

Table 5-5. Manpower Needed for Structural Concrete in Cypress Towers Table 5-6. Total Labor Hours for Concrete Based on Labor Distribution Table 5-7. Percentage of Rework for Each Activity in Tower Celesta

8 14 21 22 23 23 24 24 25

(6)

LIST OF FIGURES

Figure 1-1. The Cypress Towers of DMCI Homes Figure 1-2. Vicinity map of Cypress Towers Figure 2-1. Components of Rework

Figure 2-2. Generic cause-and-effect (CE) Rework Diagram Derived From Qualitative Data

Figure 2-3. COAA’s Fishbone Rework Cause Classification

Figure 2-4. Relationship Between Rework Costs And Training Costs in Indonesia Figure 4-1. Cypress Towers in Different Stages of Construction

Figure 4-2. Improper Placement of Stirrups

Figure 4-3. Anchorage That Needed to be Installed in Rebars Figure 4-4. Rebar Inspection Precedes Installation of Formworks Figure 4-5. Installation of the Missing Beam

Figure 4-6. Careful Removal of Concrete to Avoid Damaging Rebars Figure 4-7. Beam concrete that needed repairing

Figure 5-1. 5th Floor Area Assignments

Figure 5-2. Productive Labor Yield of Tower Celesta from 7-13 May 2008

1 2 7

8 9 11 14 16 16 17 18 19 19 21 26

Referensi

Dokumen terkait

Proposal UNIVERSITY OF THE PHILIPPINES LOS BAÑOS Office of the Vice-Chancellor for Research and Extension 3F UPLB Main Library Building, UPLB, College, Laguna 4031 Telefax Nos: 049