• Tidak ada hasil yang ditemukan

Electrical Preparation for Plant Start-up During Blackout Done ... - Uplb

N/A
N/A
Protected

Academic year: 2023

Membagikan "Electrical Preparation for Plant Start-up During Blackout Done ... - Uplb"

Copied!
5
0
0

Teks penuh

(1)

ELECTRICAL PREPARATION FOR PLANT START-UP

DURING BLACKOUT DONE AT

STA. RITA POWER PLANT

DEAN LAWRENCE M. BUENO

2004-08750

SUBMITTED TO THE FACULTY OF THE

COLLEGE OF ENGINEERING AND AGRO-INDUSTRIAL TECHNOLOGY, UNIVERSITY OF THE PHILIPPINES LOS BAÑOS,

IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF

BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING

MAY/2009

(2)

The report attached hereto entitled Electrical Preparation for Plant Start-up During Blackout Done at Sta. Rita Power Plant, prepared and submitted by Dean Lawrence M. Bueno in partial fulfillment of the requirements for the degree of Bachelor of Science in Electrical Engineering is hereby accepted.

____________________ ________________________ ______________________

Engr. John D.G. Agsalud Engr. Rodolfo A. Aguirre Jr. Engr. Ericson B. Poja Panel Member Panel Member Panel Member

_________________ _________________ ________________

Date Signed Date Signed Date Signed

_______________________

Engr. Roderick L. Catriz Academic Adviser

________________

Date Signed

_____________________

Engr. Roderick L. Catriz Officer-in-Charge

Department of Electrical Engineering

_____________

Date Signed

______________________

Dr. Arsenio N. Resurreccion Dean

College of Engineering and Agro-Industrial Technology UPLB

______________

Date Signed

(3)

TABLE OF CONTENTS

About the Author i

Acknowledgement ii

Table of Contents iv

List of Figures vi

List of Tables viii

I. Introduction 1

A. Description of the Study 2

B. Significance of the Study 3

C. Objectives 4

D. Scope and Limitations 4

E. Date and Place of Study 5

F. Company Profile 6

G. Training Activities 7

II. Review of Literature 10

III. Study Methodology 23

IV. Discussion and Analysis 25

V. Observations 43

VI. Conclusions 46

VII. Recommendations 48

Literature Cited 51

Appendices 53

(4)

LIST OF FIGURES

Figure No. Description Page

1 Sta. Rita and San Lorenzo Power Station 6 2 Single Line Diagram at the Diesel Generator Set 27 3 Simplified Single Line Diagram at a Generator Unit 30

4 230kV Switchyard 32

5 Single Line Diagram at the Genereator Unit 6.6kV Switchgear 34

(5)

LIST OF TABLES

Table No. Description Page

1 Activities Done at the Electrical Engineering and

Maintenance Department 7

2 Diesel Generator Loading of One Generator Unit 38

Referensi

Dokumen terkait

UNIVERSITY OF THE PHILIPPINES LOS BAÑOS Office of the Vice-Chancellor for Research and Extension 3F UPLB Main Library, UPLB, College, Laguna 4031 Telefax: +63 49 536-2354 Main |

UNIVERSITY OF THE PHILIPPINES LOS BAÑOS Office of the Vice-Chancellor for Research and Extension 3F UPLB Main Library Building, UPLB, College, Laguna 4031 Telefax Nos: 049 536-2354 and