Materials 0.00 Frosted Glass 1/2 Thickness 570.00 Sq/ft

N/A
N/A
Protected

Academic year: 2023

Membagikan "Materials 0.00 Frosted Glass 1/2 Thickness 570.00 Sq/ft"

Copied!
2
0
0

Teks penuh

(1)

Location:

Item

No. QTY UNIT UNIT PRICE No. of

Days AMOUNT

I 1 lot 0.00

Mobilization/Demobilization 1.00 lot 0.00

Water and Power Utilization 1.00 lot 0.00

Site Preparations 1.00 lot 0.00

Sub-total 0.00

Unit Cost 0.00

II 1.0 lot

FABRICATION OF SHELVES

a. Materials 0.00

Frosted Glass 1/2 Thickness 570.00 Sq/ft. 0.00

1.00

set 0.00

2.00

set 0.00

Aluminum Frame 3'' to 4'' 168.00 ln.ft 0.00

Blind revit 1/8 x1/2 10.00 boxes 0.00

Grinding Wheel 4'' 12.00 pcs 0.00

Sealant 26.00 pcs 0.00

2.00

set 0.00

1.00

lot 0.00

55.80

sq.m 0.00

b. Labor 0.00

Foreman 1.00 m-days 0.00

skilled 1.00 m-days 0.00

Unskilled 2.00 m-days 0.00

c. Equipment 0.00

Welding Machine 1.00 lot 0.00

Compressor Machine 1.00 lot 0.00

Metal Cut Off Machine 1.00 lot 0.00

Grinder 1.00 lot 0.00

Sub-total 0.00

Unit Cost 0.00

TOTAL DIRECT COST

Combi-blinds dual shades - Horizontal type

: INSTALLATION OF GLASS PARTITION AT THE OFFICE OF THE UNIVERSITY PRESIDENT FOR THE PRESIDENT'S LOUNGE

: Leyte Normal University TACLOBAN CITY

D E T A I L E D E S T I M A T E S DESCRIPTION

Name of Project:

GENERAL REQUIREMENTS

ARCHITECTURAL WORKS

Double patch fitting door 1/2"thk tempered clear with frost tint

1H.P aircondition unit (Split inverter type) Dining set hard wood (1 Table and 6 Chairs)

single patch fitting door 1/2"thk tempered clear with frost tint

Republic of the Philippines LEYTE NORMAL UNIVERSITY

Tacloban City

Page 1

(2)

0.00 0.00 0.00 TOTAL INDIRECT COST

A.

1.) Materials .

2.) Labor 3.) Equipment

TOTAL PROJECT COST - B.

0.00

1.) OCM 0.000

2.) Contractor's Profit 0.000

3.) Tax 0.00

Page 2