Location:
Item
No. QTY UNIT UNIT PRICE No. of
Days AMOUNT
I 1 lot 0.00
Mobilization/Demobilization 1.00 lot 0.00
Water and Power Utilization 1.00 lot 0.00
Site Preparations 1.00 lot 0.00
Sub-total 0.00
Unit Cost 0.00
II 1.0 lot
FABRICATION OF SHELVES
a. Materials 0.00
Frosted Glass 1/2 Thickness 570.00 Sq/ft. 0.00
1.00
set 0.00
2.00
set 0.00
Aluminum Frame 3'' to 4'' 168.00 ln.ft 0.00
Blind revit 1/8 x1/2 10.00 boxes 0.00
Grinding Wheel 4'' 12.00 pcs 0.00
Sealant 26.00 pcs 0.00
2.00
set 0.00
1.00
lot 0.00
55.80
sq.m 0.00
b. Labor 0.00
Foreman 1.00 m-days 0.00
skilled 1.00 m-days 0.00
Unskilled 2.00 m-days 0.00
c. Equipment 0.00
Welding Machine 1.00 lot 0.00
Compressor Machine 1.00 lot 0.00
Metal Cut Off Machine 1.00 lot 0.00
Grinder 1.00 lot 0.00
Sub-total 0.00
Unit Cost 0.00
TOTAL DIRECT COST
Combi-blinds dual shades - Horizontal type
: INSTALLATION OF GLASS PARTITION AT THE OFFICE OF THE UNIVERSITY PRESIDENT FOR THE PRESIDENT'S LOUNGE
: Leyte Normal University TACLOBAN CITY
D E T A I L E D E S T I M A T E S DESCRIPTION
Name of Project:
GENERAL REQUIREMENTS
ARCHITECTURAL WORKS
Double patch fitting door 1/2"thk tempered clear with frost tint
1H.P aircondition unit (Split inverter type) Dining set hard wood (1 Table and 6 Chairs)
single patch fitting door 1/2"thk tempered clear with frost tint
Republic of the Philippines LEYTE NORMAL UNIVERSITY
Tacloban City
Page 1
0.00 0.00 0.00 TOTAL INDIRECT COST
A.
1.) Materials .
2.) Labor 3.) Equipment
TOTAL PROJECT COST - B.
0.00
1.) OCM 0.000
2.) Contractor's Profit 0.000
3.) Tax 0.00