REPUBLIC OF THE PHILIPPINES
D EPARTMENT OF F INANCE
ROXAS BOULEVARD CORNER PABLO OCAMPO SR.,STREET
MANILA 1004
BIDS AND AWARDS COMMITTEE Supplemental Bid Bulletin No. 1
November 6, 2013
Department of Finance – 8th Floor Office Renovation (Phase‐1)
This Supplemental Bid Bulletin No. 1 is issued to modify or amend the item in the Bid Documents. This shall form an integral part of the Bid Documents.
REFERENCE
AMENDMENT/CHANGE/CLARIFICATION Page 18
12.1. b (iii) Sworn statement in accordance with Section 25.2(b)(iv) of the IRR of RA 9184 and using the form prescribed in Error!
Reference source not found.
Page 18
12.1. b (iii) Sworn statement in accordance with Section 25.2(b)(iv) of the IRR of RA 9184 and using the form prescribed in Error! Reference source not found..
Page 18
13.1. Unless otherwise stated in the BDS, the financial component of the bid shall contain the following:
(a) Financial Bid Form in accordance with the form prescribed in Error!
Reference source not found.; and
Page 18
13.1. Unless otherwise stated in the BDS, the financial component of the bid shall contain the following:
(a) Financial Bid Form in accordance with the form prescribed in Error! Reference source not found.; and
Page 23
19.1. Format and Signing of Bids
Bidders shall submit their bids through their duly authorized representative using the appropriate forms provided in Error! Reference source not found. on or before the deadline specified in the ITB Clause Error!
Reference source not found. in two (2) separate sealed bid envelopes, and which shall be submitted simultaneously.
Page 23
19.1. Format and Signing of Bids
Bidders shall submit their bids through their duly authorized representative using the appropriate forms provided in Error! Reference source not found. on or before the deadline specified in the ITB Clause Error!
Reference source not found. in two (2) separate sealed bid envelopes, and which shall be submitted simultaneously.
2
Page 35
12.1 (a) (iii) The statement of all ongoing government and private contracts shall include all such contracts for the period CY 2008 – 2013 including those contracts that have been awarded but not yet started. Cut‐off dates shall be from October 2008 to October 2013
Page 35
12.1 (a) (iii) Statement of the prospective bidder of all its ongoing government and private contracts, including contracts awarded but not yet started, if any, whether similar or not similar in nature and complexity to the contract to be bid. Cut‐off dates should be three (3) years prior the Pre‐Bid
Conference.
Page 35
12.1.(a) (iii) Statement identifying the bidder’s single largest completed contract similar to the bid, except under conditions provided for in Section 23.5.1.3 of IRR of R.A.
9184.
The following proofs for the single largest completed contract similar to the contract to be bid must be submitted:
1. Owner’s Certificate of Final Acceptance; or
2. Certificate of Completion and whenever applicable, the Constructors Performance Evaluation Summary (CPES) Final Rating, which must be satisfactory.
Page 35
12.1.(a) (iii) Statement identifying the bidder’s single largest completed contract similar to the bid, except under conditions provided for in Section 23.5.1.3 of IRR of R.A.
9184.
The following proofs for the single largest completed contract similar to the contract to be bid must be submitted:
1. Owner’s Certificate of Final Acceptance; or 2. Certificate of Completion.
Note: All statements and formats referring to this clause should be amended/corrected accordingly.
Page 79
Section VIII. Bill of Quantities.
Page 79
Section VIII. Bill of Quantities. All pages to be submitted should have the name and signature of the representative, name of the company and the date.
For guidance and information of all concerned.
GIL S. BELTRAN Undersecretary and BAC Chairman