DETAIL ENGINEERING DESIGN
LAPORAN AKHIR PRAKTIK KERJA PERENCANAAN DETAIL ENGINEERING DESIGN PENYEDIAAN JARINGAN AIR BAKU WOSUSOKAS (KONSENTRASI : ANALISIS HIDRAULIKA) - Unika Repository
148
1. Pengumuman pemenang Detail Engineering Design (DED) Dermaga Ponton
1
STUDI DETAIL ENGINEERING DESIGN (DED) GEOMETRIK JALUR GANDA KERETA API STASIUN RENGAS - STASIUN SULUSUBAN, LAMPUNG
15
STUDI DETAIL ENGINEERING DESIGN (DED) GEOMETRIK KERETA API JALUR GANDA ANTARA STASIUN SULUSUBAN SAMPAI STASIUN KALIBALANGAN, LAMPUNG
89
STUDI DETAIL ENGINEERING DESIGN (DED) GEOMETRIK JALUR GANDA KERETA API STASIUN RENGAS - STASIUN SULUSUBAN, LAMPUNG
74
STUDI DETAIL ENGINEERING DESIGN (DED) JALUR KERETA API GANDA STASIUN REJOSARI SAMPAI STASIUN RENGAS, LAMPUNG
96
STUDI DETAIL ENGINEERING DESIGN (DED) JALUR KERETA API GANDA STASIUN REJOSARI SAMPAI STASIUN RENGAS, LAMPUNG
15
Peng. Undangan Pembuktian
1
Undangan pembuktian Kualifikasi
3
DESAIN DETAIL SISTEM DISTRIBUSI AIR BERSIH KECAMATAN WELAHAN, KABUPATEN JEPARA - Diponegoro University | Institutional Repository (UNDIP-IR)
1
Undangan Klarifikasi dan negosiasi
1
Undangan Pembuktian Kualifikasi
1
Pengumuman Short List Desain Interior
2
EVALUASI PERANCANGAN TEBAL PERKERASAN JALAN DENGAN METODE ANALISA KOMPONEN DAN METODE AUSTROADS MENGGUNAKAN PROGRAM KENPAVE (Studi Kasus Jalan Palbapang - Simpang Kweden STA 0+000 – STA 2+650 Dan Jalan Bakulan – Barongan STA 0+000 – STA 3+198)
113
13 Undangan Klarifikasi dan Negosiasi PLTBm
2
Undangan pembuktian kualifikasi
2
Pengumuman Pemenang Detail Design
2
Renc Pembelaj SPAIII.docx
51