Risk Based Inspection

OPTIMASI INTERVAL INSPEKSI, ESTIMASI REMAINING LIFE, DAN TOTAL MAINTENANCE CREW PADA MESIN CAULKING LINE PRODUKSI KE-6 MENGGUNAKAN METODE RISK BASED INSPECTION (RBI) DAN LIFE CYCLE COST (LCC) PADA PT DNS INSPECTION INTERVAL OPTIMIZATION, ESTIMATED REMAINI
10

PERHITUNGAN KUANTITATIF RISK BASED INSPECTION BERDASARKAN API 581 PADA PIPELINE PRODUCTION GATHERING LINE DI DURI FIELD - Diponegoro University | Institutional Repository (UNDIP-IR)
24

Analisis Remaining Life dan Penjadwalan Program Inspeksi pada Pressure Vessel dengan Menggunakan Metode Risk Based Inspection (RBI)
5

Studi Aplikasi Metode Risk Based Inspection (RBI) Semi-Kuantitatif API 581 pada Production Separator
6

Risk Based Inspection (RBI) of Gas Cooling Heat Exchanger - ITS Repository
125

Studi RBI (Risk Based Inspection) Floating Hose pada SPM (Single Point Mooring)
6

PERHITUNGAN KUANTITATIF RISK BASED INSPECTION BERDASARKAN API 581 PADA PIPELINE PRODUCTION GATHERING LINE DI DURI FIELD - Diponegoro University | Institutional Repository (UNDIP-IR)
8

PERHITUNGAN KUANTITATIF RISK BASED INSPECTION BERDASARKAN API 581 PADA PIPA AMMONIA DI PT. KALTIM PASIFIK AMONIAK - Diponegoro University | Institutional Repository (UNDIP-IR)
21

PERHITUNGAN KUANTITATIF RISK BASED INSPECTION BERDASARKAN API 581 PADA STORAGE TANK - Diponegoro University | Institutional Repository (UNDIP-IR)
30

isprsarchives XL 3 W3 257 2015
6

DEFECT INSPECTION SYSTEM FOR SHAPE-BASED MATCHING USING TWO CAMERAS.
10

Information Support Technology of Ship Survey Based on Case-based Reasoning
12

Process Report on Disaster Risk Reduction Field Session in Chiang Mai
10

Process Report on Disaster Risk Reduction Field Session in Yaan, Sichuan, China 21 30 May 2012
10

Process Report on Disaster Risk Reduction Field Session in Yangon, Myanmar 3 12 Dec 2012
12

2007 Pratono participatory earth system governance
16

STUDI APLIKASI RISK-BASED INSPECTION (RBI) MENGGUNAKAN API 581 PADA FUEL
126

Manajemen Risiko Mutu di Industri Farmasi - FARMASI INDUSTRI
23

isprs annals III 8 19 2016
8

PENGARUH RISK BASED CAPITAL TERHADAP PRO
20