• Tidak ada hasil yang ditemukan

Directory UMM :Journals:Journal_of_mathematics:OTHER:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Journals:Journal_of_mathematics:OTHER:"

Copied!
80
0
0

Teks penuh

Loading

Referensi

Dokumen terkait

Corollary 3.11. The proof is similar to the proof of Theorem 3.8.. The proof is similar to the proof of Proposition 3.6. The proof is similar to the proof of Theorem 3.10. The proof

In the latter problem, an ideal solution (again not always feasible) is obtained by schedules which equalise the production load allocated to each parallel machine.. In fact, the

The intuition behind this result is that as repair quality decreases, the quality of design improves (see Proposition 2) and this in turn results in an increase in the manufacturer '

" nish when the " nished goods batch is due to start and for the time to manufacture each subsequent process batch to be the same as the time for the previous process batch

In o rder to validate hypothesis H1 check-lists were inserted in the questionnaire for two different places in time: firstly the founder’s (pre-)start-up age, family and

In weed-free cauliflower plots, the model esti- mated sufficiently well total biomass production, leaf area growth, plant height and the size of the marketable organ (FigC.

We examined which parameter among stem height, number of green leaves and leaf length (the two latter parameters were only measured on two cultivars) was most sensitive to

compared to the University farm, was mainly due Taking into account the plant height and the yielding ability of the genotypes, the most promis- to the greater number of