• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:J-a:Journal Of Economic Dynamics And Control:Vol24.Issue8.Jul2000:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:J-a:Journal Of Economic Dynamics And Control:Vol24.Issue8.Jul2000:"

Copied!
31
0
0

Teks penuh

Loading

Gambar

Fig. 1. VAR: the e!ect of government spending shocks on total hours worked.
Fig. 2. VAR: the e!ect of government spending shocks on employment and hours worked perworker.
Table 1GMM estimates of parameters in the benchmark and search models
Fig. 3. Impulse response functions of total hours and hours worked per worker.
+4

Referensi

Dokumen terkait

This larger view nests conventional rational expectations general equilibrium theory in the sense that if the costs of acquiring & full knowledge of the true model expectations

Using the BDS and the NEGM tests, and 15-s, 1-min and 5-min returns (from September 1 to November 30, 1991), they reject the hypothesis of independence in favor of a nonlinear

The result states that, in the case of a quadratic cost function (or equivalently linear supply), for generic non-linear, decreasing demand curves (and therefore for generic

In this paper we show how the global dynamics of an economic model can be analyzed by the study of some global bifurcations that change the shape of the chaotic attractors and

Using a singular perturbation technique, we have derived conditions under which topological chaos occurs due to transverse homoclinic orbits to the golden rule steady state when

Although it is true that a correctly speci"ed neural network might be able to learn rational expectations even in more general models, the analysis of the reduced form considered

Several implications for the empirical testing of the relationship between risk and return come from the dynamic nature of this study. In Section 4, we have shown that the intercept

Once the grid had been constructed then the same interpolation routines used to interpolate the value function grids during the construction pro- cedure could be used to interpolate