AUTHORITY TO ENTER ENGINE-ROOM
(Section 74 (1) (i))
58. (1) No person (other than the person directly employed) shall at any time enter any engine-room while the machinery is in motion unless he possesses a written order from the manager, or is accompanied by the manager or some person appointed by the manager.
(2) Any person who enters an engine-room with or without authority and converses with, or attempts to converse with, or interferes, or in any way draws the attention of an engine-driver in charge of a winding-engine shall be liable to a penalty not exceeding $200.
Decimal currency reference substituted pursuant to section 7 of Decimal Currency Act of 1965.
126 R.egs. 59, 60 REGULATIONS
ABSTRACTS OF ACT TO BE POSTED
(Section 48; see also section 74 (1) ( 0) )
59. In all places where machinery and boilers are used there shall be kept printed, posted, or affixed true abstracts of the sections of the Act specified opposite each such class respectively, together with true abstracts of such clauses of these Regulations as relate to the same matters:-
(1) Powers and duties of inspectors-section 11 (1).
(2) Power to enter and inspect certificates-section 11 (2).
(3) Obstructing an inspector-section 13.
(4) A male person under 18 years of age or a female under 21 years of age shall not have the care, custody, management,
or working of any lift-section 28 (1).
(5) A male person under eighteen years of age or a female not to clean any machinery in motion-section 28 (3) (a) . ( 6) A male person under eighteen years of age or a female not to
work between fixed and traversing parts of machinery- section 28 (3) (b).
(7) A male person under eighteen years of age or a female not to have charge of any steam engine or boiler, except a dairy boiler not exceeding three-horse power-section 28 (3) (c).
(8) Fencing machinery, dangerous machinery-sections 22 (1), 24 (1), 25 (1).
(9) Removing or damaging fencing-section 23 (1).
( 10) 'When machinery to be inspected-section 29 (1 ) (2 ) and (3).
( 11) Certificate of inspection and copy of certificate of the person in charge to be exhibited-section 36 (1).
( 12) Machinery not to be used without a certificate-section 38 (i) and (ii).
( 13) Boilers to have safety valves-section 40 (i).
(14) Penalty for increasing pressure on boiler-section 43.
(15) Selling or hiring machinery-section 45.
(16) Owner to give notice of accident-section 52.
(17) Person to have charge of engine and boiler, etc.-section 15.
( 18) Prohibiting unauthorised persons in engine-room-section 74 (1) (i).
(19) Certificates may be suspended or cancelled-section 74 (1) (n).
GENERAL DUTY OF INSPECTOR
(Section 74 (1) ( a) )
60. It shall be the duty of every inspector and officer appointed for the purpose of the Act or these Regulations so to act in the exercise and discharge of his powers and duties thereunder as not unreasonably or unduly to interfere with the work or processes being carried on in a factory or shop or other place, or in connection with any boiler.
REGULATIONS FORMS
(Section 74 (1) (k))
Regs. 61-64 127
61. The forms prescribed by these Regulations or forms to the like effect may be used, with such variations or additions or omissions as circumstances may require.
GARAGE TO EXHIBIT NOTICE
(Section 69)
62. (1) The notice to be exhibited by garage shall be ill the following form:-
(a) This garage employs-
... (No. of) "A" grade motor-mechanics;
(No. of) "B" grade motor-mechanics;
... (No. of) unqualified motor-mechanics.
(b) This garage only employs qualified motor-mechanics.
(c) This garage does not employ qualified motor-mechanics.
(2) The minimum size of lettering on notice to be two inches and the notice to have the name of the owner printed thereon.
GENERAL PENALTY
63. When any matter or thing is by these Regulations directed or forbidden to be done, or where any authority is given by these Regulations to any person to direct any matter or thing to be done, or to forbid any matter or thing to be done, and such act so directed to be done remains undone, or such act so forbidden to be done is done, in every such case every person offending against such direction or prohibition shall be deemed guilty of a breach of these Regulations.
Any person guilty of a breach of these Regulations shall, if no other penalty is provided for such breach, be liable to a penalty not exceeding
$200.
Received Registered No.
Decimal currency reference substituted pursuant to section 7 of Decimal Currency Act of 1965.
64. (a) In any proceedings for a breach of these Regulations any document or booklet purporting to be published by or under the authority of the Standards Association of Australia shall, unless the contrary is proved, be deemed to have been published by the Standards Association of Australia and is evidence of the matters appearing on and in such document or booklet.
Inserted by reg. pubd. Ind. Gaz. Jan.-Apr. 1963, p. 42.
64. (b) A certificate purporting to be signed by the Chief Inspector endorsed upon or annexed to any such document or booklet and certifying that any standard contained in that document or booklet was in force on a specified date or during a specified period of time shall be evidence that such standard was in force at the date, or as the case may be during the period so specified.
Inserted by reg. pubd. Ind. Gaz. Jan.-Apr. 1963, p. 42.
128 REGULATIONS
"The Inspection of Machinery Act of 1951"
ApPLICATION FOR A COpy OF CERTIFICATE
Date, To the Chief Inspector of Machinery, Brisbane.
, 19
I, engineer or engine-driver, of , in the State
of Queensland, do solemnly and sincerely declare that I am the person to whom a certificate was granted by the Board of Examiners for engineers' and engine-drivers' certificates in the State of Queensland, and that the said certificate has been
and I desire that a certified copy may be issued in lieu thereof.
Particulars of applicant:
Full name and address:
Place and date of birth:
Date of issue of certificate:
Grade:
No.
And I make this solemn declaration by virtue of the provisions of the "Oaths Act of 1867."
Shell
Declared before me at this day of
FORM B (1)
"The Inspection of Machinery Act of 1951"
(Section 74 (1) (h))
SPECIFICATION OF CONSTRucnON OF BOILER
Material: Class of:
Diameter: Pitch of Rivets:
Working Pressure: Joints Diameter of Rivets:
Hydraulic test: Strength of:
Furnace Type I Length Diameter
(Signature) , 19
J.P.
Thickness Tubes- "Mean Diameter Thickness of How Fasten ed** Maker's Name
Galloway*
Common Stay**
Stays- Longitudinal Screwed*
Girder**
Gusset Palm
Fittings
Manholes and Doors ..
Compensating Rings ..
Gauge
1----
Length Diameter of Pitch*
Bottom of Thread
I
Safety \ Water I Test Valves Gauge Cocks
i Mountings
- - - -
- - -
Blow Down
Cock
Check Valves
Signature of Maker: Address:
Date:
and Test
How Fastened and Arrangcd*
Stop
Valves Other f"ittings
REGULATIONS
FORM B (2)
"The Inspection of Machinery Act of 1951"
JIB CRANE DATA SHEET
Size and Type: Owner:
Jib-Length: Section: Material: Distinguishing number:
Mast-Length: Section: Material: Job:
Sleeper-Length: Section: Material:
Backstay-Length: Section: Material: Maker:
129
Top Glands-Width: Thickness: Length (pivot to bend): Side-set: Material:
Top Glands Bolts-Size: Number:
Top Pivot-Dia.: Gland acting at: Rope acting at: Material:
Top Pivot Bolt or Cotter-Section:-
Bottom Glands-Width: Thickness: Length (pivot to bend): Side-set: Material:
Bottom Glands Bolts-'-:Size: Number:
Bottom Glands Pin-Dia.:
Bottom Glands Pin Cotter-Section:
Bottom Pivot-Dia.: Sleeper acting at: Material:
Sleeper Shoes-Type:
Sleeper Shoe Bolts-Size: Number:
Main Spur-Dia.: Face: Pitch: Tooth length: Tooth thickness: Material:
Sec. Pinion-Dia.: Face: Shroud: Tooth length: Tooth tbickness: Material:
Derrick Wheel-Dia.: Face: Shroud: Tooth length: Tooth thickness: Materi al:
Hoist Barrel-Dia.: Shaft-Dia. : Derrick Barrel-Dia.: Shaft-Dia. :
Hoist Rope-Dia.: eirc.:
Derrick Rope-Dia.: Circ.: Number of parts:
Hoist Speed: per min. Slewing Hook Type:
Speed: per min.
Test marks:
Derricking Speed: per Signature of Owner:
Address:
Date:
FORM B (3)
"The Inspection of Machinery Act of 1951"
(Section 74 (1) (d), Regulation 14)
CONSTRUCTION AND ERECTION OF LIFTS
, 19
min.
I hereby give you notice of intention and also now apply for a permit (Reg.
14) to erect a Lift at (a)
of the following description, and in conformity with the plans submitted herewith, I desire to commence the erection of this Lift on or about the
Description of Lift
(b) Power: Control: Type: Drive:
~aximum load: lb. persons: Speed: Travel:
Number of floors served: Number of car entrances:
Car-Weight: Floor area: Overall beight above floor:
Counter weight-Weight: Length: Width: Thickness:
Flying C. weight-Weight: Length: Width: Thickness:
Machine-Weight: Maker: Governor:
(a) State street and number, also name of premises, if known.
(b) "Power." State whether electric, hydraulic, or belt-driven.
"Control." Whether handrope, car-switch, etc.
"Type." State if a passenger, passenger-goods, or gnods lift or a service lift (i.e., with safety gear) or dumbwaiter (i.e., ~ithout safety gear), or hoist or whip.
"Drive," i.e., drum, vee wheel, or traction; or if hydraulic platform, lift direct action or suspended.
130 REGULATIONS
Overhead beams-Material: Sections: Spans:
Diverting sheaves-Number: Diameters: Pins:
Car construction-Beam: Side members: Floor frame: Girders: Safety gear:
Buffers-Type: Stroke: Make:
I Number I Size \ Material-
I
Breaking Load No. of Strands and Wires each RopeC:---
Ropes-1--- ----
Counter weight _ . Flying C. weight Governor .. I I
I
Power supplied by:
Enclosures---Designer:
Consulting engineer for installation:
Architect for building:
Owner of building:
Lift to be erected for:
Particulars of plans submitted herewith:
Builder:
Additional particulars to be supplied in respect of-- Flectric lift-
Maker
Supply: Direct [or three-phase alternating] current at volts
Maximum starting current: amps
Full load current: amps. Gear ratio of machine:
Control: Direct [or alternating] current of amps, at volts Make of control:
Types of doors, interlocks, or contacts:
Motor-Type (field wiring): Horse power: Speed:
Diameter of winding member (rope centres):
Intermediate speeds of lift: ft. per minute.
Dimensions of motor-room (including clear height):
Hydraulic lift-
Ram-Material: Dia.: Working stroke: Max. stroke:
Cylinder-Internal dia.: Thickness: Pressure per sq. in.:
Type of machine: Gear ratio:
Diameters of machine sheaves:
Weight of ram, sheaves, cross head, and balance:
Enclosure door (closing and locking devices):
Handrope (size and class):
Control valve (type and size):
Belt-driven lift-
Power provided by shafting driving other machinery [or special power unit]:
Diameter of machine belt pulleys: Width of belts:
Speed of worm shaft: Gear ratio of machine:
Diameter of winding member (rope centres):
Type of control gear:
Enclosure door (closing and locking devices):
Size and class of handrope:
Dated this day of , 19
(Signature) (Address)
To the Chief Inspector of Machinery, Brisbane, Queensland.
REGULATIONS
FORM B (4)
''The Inspection of Machinery Act of 1951"
(Section 74 (1) (d), Regulation 15)
131
NOTICE OF INTENTION TO CONSTRUCT OR ERECT HAND OR POWER CRANE, OVERHEAD TRAVELLER, HorST, ETC.
(This form must be forwarded to the Chief Inspector of Machinery Department at least twenty-four hours before commencing erection. Penalty for failing to do so not exceeding $200.)
I [orweJ hereby give you notice of intention to erect [inscrt hand or power crane, overhead traveller, hoist, etc.], particulars as to which are furnished here- under:-
Owner:
User:
Where to be erected (full address to be given):
Date erection to be commenced:
If appliance previously erected and used, state last address:
If permanent or temporary:
Power and type of crane, etc. (i,e., hand or powcr operated derrick, crane, overhead traveller, hoist, etc.):
Maker:
Lifting capacity Dr rating, Regulation 15):
tons cwt (to be clearly marked on crane, vide If jib crane, state jib length:
Distinguishing n umber: (Each crane erected must bear a number.) (Signed)
(Address)
Date: ; 19
To the Chief Inspector, 1\1achinery Department, Brisbane.
Decimal currency reference substituted pursuant to section 7 of Decimal Currency Act of 1965.
FORM B (5)
"The Inspection
at
Machinery Act of 1951"Regulation
i
*14-*15* LIFT (
~ '"'CRANE PERMIT TO CONSTRUCT, ERECT, ALTER, AIm TO OR REPAIR A
l * HorST
To
Application to , accompanied by plans, specifications and blue print, having been submitted and approved, permission is hereby granted to you to carry out such work in accordance with the particulars disclosed therein.
Dated at Brisbane this day of , 19
Chief Inspector of Machinery.
(*Strike out whichever are not applicable.)
132 REGULATIONS
FORM B (6)
"The Inspection of Machinery Act of 1951"
TRAVELLING AND GANTRY CRANE DATA SHEET-STEAM OR ELECTRIC
Owner:
Maker:
Load: tons. Distance between girders:
Span of crane: Material of girders:
Type of girders: Size of girders:
Length of end carriage: Size and type of bearers:
Dia. end carriage wheels: Width: Dia. of axles:
Dia. of steam cylinders:
Dia. of travelling shaft: H.P. of motor: Maker:
Dia. of travelling pinion: Pitch: Dia. of spurwheel: Pitch:
Material of crab: Length of crab:
Dia. of first motion shaft: Dia. of pIllion: Pitch:
Dia. of second motion shaft: Dia. of pinion: Pitch:
Dia. of second motion shaft spur wheel : Pitch:
Dia. brake drum: Shaft dia.: Width:
Type of brake: Arc of contact:
H.P. traversing motor: Maker:
Dia. traversing motor axle: Dia. of spurwheel:
Weight of crab: Gear ratio motor shaft to rope drum:
H.P. hoist motor: Shaft dia.: Pinion dia.: Pitch:
Dia. rope drum: Shaft dia.: Spurwheel dia.: Pitch:
Rope dia.: Strands: Wires:
Rope maker:
Size and type of hook:
Size of blocks: No. of rope falls:
Size and type of runway materials:
Length of span between supports of runway:
Type of safety gear:
Means for prevention Means for prevention Means for prevention
Date
of overwinding:
of overtravelling:
of overtraversing:
19
FORM B (7)
(Signature of owner)
"The Inspection of Machinery Acts, 1951 to 1960"
(Section 15 (7) (a))
ApPLICATION FOR EXEMPTION FOR FULLY AUTOMATIC REFRIGERATION MACHINERY UP TO 50 TONS CAPACITY
I (or we) hereby apply for exemption from the application of section 15 of
"The Inspection of Machinery Acts, 1951 to 1960," for the following fully auto- matic refrigeration machinery not exceeding 50 tons capacity.
Maker: Serial No.:
Rated Capacity: Refrigerant:
Location:
Compressor Unit: No. of Cylinders:
Bore: Stroke: R.P.M.:
Motive Power Unit:
Horse Power:
Purpose of Plant:
Size of Room:
Quantity of Refrigerant in System:
V en tilation:
Signature of Owner.
Inserted by reg. pubd. Ind. Gaz. May-Aug. 1961, p. 264.
To:
REGULATIONS
FORM B (8)
"The Inspection of Machinery Acts, 1951 to 1960"
(Section 15 {7) (a»
EXEMPTION-AuTOMATIC REFRIGERATION MACEUNERY
133
This is to advise that your refrigeration machinery as described below, has been inspected by this Department, and is satisfactory to be operated unattended until further advised.
Maker: Serial No.:
Rated Capacity: Refrigerant:
Location:
No. of Compressors: No. of Cylinders each Compressor:
Cylinder Bore: Stroke: R.P.M.:
Purpose of Refrigeration:
Subject to the following condition:
Inserted by reg. pubd. Ind. Gaz. May-Aug. 1961, p. 264.
INDEX
The Inspection of Machinery Acts, 1951 to 1966 and Regulations thereunder
Abstract of Act to be posted up Accident-
A
inquiry into cause of . . . . . . . . no liability for defamation in relation to report of ..
report of by inspector relating to, open for inspection and copy by certain persons
to be notified Action for recovery of fees Administration of Act Aerating cylinders-
instructions and suggestions for the guidance of users of Amusement devices regulation re
Annual report on operation of Act Application-
for examination .. . . . . . . . . . of Act to machinery specified in First Schedule of Part VI
of tbis )\ct . . . . . . regulations may be made with respect to Appointment of officers
Arc welding certificatc- Board may grant. . . . qualifications of applicant for qualifications for
status of
Automated machinery-
exemption from being in charge of certificated person
B
Board-
appointment of members of . . . . . . classes of certificates of competency granted by constitution of . . . . . . . . . . . may grant certificate without examination
may require return of cancelled or suspended certificate of competency
meaning of term .. . . . . power of to grant interim certificate
quornm of . . . .
suhject matters for regulations with respect to suspension or cancellation of certificate tenure of office on
to observe rules in Second Scbedule to observe this Act
Boiler-And ~ee Machinery-
appurtenances, etc., proper for. . . . . . . . attendant to remain with inspector during inspection of construction, etc., of . . , . . .
coupled, authorised working pressure of determination of working pressure of ..
drilling of holes in ..
duties of owner for purposes of inspection of exhibition of certificates in relation to ..
fees to be paid for inspection of fittings, etc., of
flywbeels ..
s. 48, reg. 59 53 10 (2) 10 (1) 52 ss. 66, 67
s. 8
reg. 11 8B s. 76
r. 4. 2nd Sch.
s. 5 (4) 51
5 74 (1)
9 (1)
55
regs. 54G, 54r, 54K, 54M ..
rr. 21 (2), (4), (6), (8), (9), (10), (11), 2nd Sch.
r. 21, 2nd Sch.
s. 15 (6) (e) (vii)
s. 54 (2) 55 54 (1) rr. 2, 3, 2nd 8cb.
s. 61 (4) 7 (1) 55A
54 (4) 74 (1) 58 ..
54 (3) 57 (1)
- it>
reg. 22 s. 33 (6) regs. 18-22
-s.42 reg. 30
s. 33 (5) 33 (2) 36 reg. 12 s.40 reg. 23
Page
2B. 126
29 8 7 29 36 6 71 70 43
46 28 2 40 7
30 121-124 63-65 63
12
30 30 30 45. 4(' 34 4 31 30 40 32 30 32 32
91 85-91 22 26 95 22 22 24 74 25 91
/'
INDEX
Boiler-And see Machinery-continued:
horse power of . . . . . . . . instruction~ to persons in charge of steam marking dial of registered ..
may be tested by hydraulic pressure meaning of term .. . .
metal plates to be affixed to . . . . . . not to be worked at a higher pressure than that stated in
the certificate granted in respect thereof notice of accident in connection with notice of defective . . . . notice of internal inspection of ..
notice of proposed inspection of notice of repairs, etc., for notice of sale Of leHing of number in charge of one person owner required to desist using .. . . owner to obtain approval before repairing penalty on increasing pressure of ..
record of inspection of ..
registration of . . . .
steam, driven by electrically driven feed pumps, grades of certificates of competency reqnired in respect of steam, where holders of certificates not also in charge of feed
water pumps, grades of certificates required for subject matters for regulations with respect to when to be in charge of certificated person when to be inspected
Boiler attendant's certificate-- Board may grant ..
qualifications for . . . . qualifications of applicant for status of
British subjects
Certificate--
c
cancelled or suspended, return of . . . . . . for purposes of" The Traffic Act" and" The State Transport
Facilities Acts"
forgery of, ctc. . . improper obtaining of meaning of term .. . .
of appointment of inspector . . . . of appointment to be furnished to inspector of inspection . . . .
of inspection, duration of of inspection of machinery
of inspection of motor vehicle .. . . . . subject matters for regulations with respect to to be exhibited
Certificated persoDS- interference with .. . . when machinery to be in charge of when may require written instruction when to keep record book
Certificates of competency--
application for . . . . . . . . Board may grant without examination classes or grades of
fee for
interim .. .. ..
particulars to bc set out in preliminary requirements for restricted .,
rules relating to .. . . suspension or cancellation of Chief Inspector-
appointment of .. . . . . . . . . facilitation of matters of proof with respect to may authorise prosecution of offences
may direct machinery to be inspected more often than prescribed
may direct that requirements ofs. 21 (1) not to apply may direct that requirements of s. 27 (I) not to apply may recover fees .. . . . . . . . . . . . . may require machinery to be adequately manned by qualified
operatives
may require motor vehicles to be produced for inspection ..
may require return of cancelled or suspended certificate of inspection
meaning of term .. . . . . not liable for defamation in report, etc.
notice by owners of machinery to .•
power of, to grant interim certificatc ..
power of, to require that engine and its b·~ilers t~ be in charge of separate persons
reg. 35 33 31 ..
s. 33 (4) 7 (l) ..
35 (2), reg. 28 s.38
reg. 36 29 ..
s. 33 (I) reg. 16
32
34 .. ..
r. 18 (9), 2nd 8ch.
s.39 41 43 34
reg. 17 .. ..
r. 18 (7), 2nd 8ch.
r. 18 (8), 2nd Sch.
s. 74 (1)
15 29 (1) 55
r. 12A, 2nd Sch. . . regs. 46A, 46B, 46c, 46D ..
r. 18A, 2nd Sch.
r. 5, 2nd 5ch.
s. 61 (4) 29 (4) (b) 62 6t .
7 (1) reg. 3
s. 9 (4) 35 37 reg. 26 27 s.62 36
18 15 50 ..
49 (2) reg. 40
r. 2, 2nd Sch.
s.55 reg. 38 ..
s.5SA ..
f. 7, 2nd Seh.
reg. 39 ..
r. 19, 2nd Sch.
s. 57 (1) 58
9 (I) 68 64 (3) 29 21 (2) 27 (3) 66 19 44 (I) 61 (4) 7 (I) to (2) 14 55A t6
135
Page 98 96 95 22 4 23,94 24 98 95 21 84 95 97 58 24 25 26 22 85 58 58 40 20 10
30 52 110-113 61 46
34 20 34 34 67 4 7 23 24 93 94 34 24 14 10 28 28 101 45 30 100 31 47 101 (;2 32 32 7 36 35 20 16 19 36 14 26 34 4 8 to 31 13
136 INDEX
Chief Inspector-continued:
power of, to require that engines severally be in charge of two persons
powers of, with respect to dangerous machinery powers of, with respect to fencing of machinery
powers with respect to certificates of inspection ..
powers with respect to fittings of boilers . . . . . . recommendation by as to exemption of certain refrigeration
machinery from provisions of s. 15 subject matters for regulations with respect to subject to Minister to administer Act .. . . . . to be satisned of boiler attendant being within safe distance
of boiler
to cause grant of certificate of inspection to cause issue of metal plate for boiler to furnish annual report . . . .
to hold office under" The Public Service Acts" . . . . to provide inspectors with proper standards and appliances Commencement of Act
Construction of Act Contracting out prohibited Court-
jurisdiction . . . . . . may make order without application ..
may order contravention to be remedied Crane--And see Machinery-
construction, erection, alteration, repair, and operation of ..
meaning of term ..
when to be in charge of certificated person Crane driver's certificate-
first class-
Board may grant ..
not to be granted to person under 21 qualifications for ..
qualifications of applicant for status of . . . . . . . . when holder of to deliver medical certificate second class-
Board may grant
qualifications for ..
qualifications of applicant for
status of . . . . .. .. ..
when holder of to deliver medical certificate
D
Defamation-
no liability of inspector [or, in reports Defence--
Principal not liable for failure to repair second-hand motor vehicle in certain circumstances
Districts, may be constituted, etc.
Doorways, fencing of ..
Driving belt-
not to creep onto fast pulley not to rest on a revolving shaft
Engine-And see Machinery- fencing of .. ..
meaning of term .. . . .
E
power of Chief Inspector to require engine and its boilers to be in charge of separate persons
power of Chief r nspector to require two persons to be in charge of engines
when to be in charge of certificated person Engine driver's certificatc-
Board may grant. . . . . . . . . . . . boiler attendants, status of certificates of competency first class, not to be granted to person under 21 medical certificates of fitness for
qualifications for. . . . qualifications of applicant for rules for examinations for slatus of
Engine room, authority to enter
s. 17 25 21 37 40 15 (7) 74
8 15 (5) (c) 35 35 76
9(1) 31
1 (2) 2 47 67 64 (5) 65
reg. 15 s. 7 (1)
15
55
r. 7 (3), 2nd Sch.
r. 13, 2nd Sch.
reg. 51 ..
r. 18 (10), 2nd Sch.
r. 20, 2nd Sch.
s. 55
r. 14, 2nd Sch.
reg. 52
r. 18 (11), 2nd Sch.
r. 20, 2nd Sch.
s. 10 (2)
44B (2)
9 (2) 26 21 (1) (d) 2J (1) (c)
s. 21 (l) 7 (1)
16 17 15 55
r. 18A, 2nd Sch.
r. 7 (3), 2nd Sch.
regs. 56. 57
rr. 9, 10, 12, 2nd Sch.
regs. 42-44, 46 reg. 55 ..
r. 1 S (2), (3), (5), 2nd Sch.
regs. 5-R
Page 13 17 14 24 25 12 40 6 11 23 23 43 7 21
28 36 35 35 82
4 10
30 47 54 117 58 63 30 54 118 58 63
8 17
7 18
15 IS
14 4 13 13 10 30 61 124, 125 47 49-51 104-106,108
124 58
68 ·69