8910 Swimming enclosures

REVISION 02/03/2022

8910.1 Introduction

This Supplementary Specification relates to the supply and installation of swimming enclosure components.

8910.2 Referenced Documents

This supplementary specification shall be read in conjunction with the following:

• MRS01 “Introduction to Specifications”;

• MRTS01 “Introduction to Technical Specifications”;

• MRS & MRTS 04 “General Earthworks

• MRS & MRTS 70 “Concrete” and

• the project Drawings.

8910.3 Description of Work Items

The following work items are covered by this supplementary specification:

Task Item No. Description Unit of

Measurement

8910 Supply and installation of marine piles each

8911 Supply and installation of 200 x 50mm timber rail, 4m long each 8912 Supply and installation of 26.9 x 2.0mm S/S CHS hangers each 8913 Supply and installation of 12.5mm S/S rope hangers each 8914 Supply and installation of 12.5 dia 7x7 strand GR316 S/S

rope m

8915 Supply and installation of 12mm nylon rope m

8916 Supply and installation of 16kg concrete anchor blocks each 8917 Installation of netting [netting supplied by MRC] lump sum

8918 Removal of existing swimming enclosure lump sum

8910.4 Work Operations

Work operations included in these items include:

a) Work Operations included in Clause 2.1.5 of MRS 01 “Introduction to Specifications”;

b) Supplying all materials;

c) Carrying out excavations;

d) Utilising or disposing of excavated materials; and

(2)

e) All other activities and work operations required for the installation of the swimming enclosure components, as specified in the project Drawings.

8910.5 Measurement and Payment

No separate payment will be made for the works specified in this Supplementary Specification.

Provision for these works shall be deemed to be included in the scheduled unit rates for the items shown in Clause 8910.3.

Referensi

Dokumen terkait

TAJUK SEBUTHARGA : DESIGN, FABRICATE, SUPPLY, DELIVERY, INSTALLATION, TESTING, AND COMMISSIONING 1 (ONE) SET OF LEVEL AND PRESSURE MEASUREMENT AND CALIBRATION

ABC for Lot 2 ……….………PhP31,206.00 Lot 3 – for installation/demolition/replacement at room 331, CSM Supply of Labor and materials in the installation / demolition / replacement of the

The main matters of welding fabrication planning and management can be categorized by each of the 4M factors as follows: Materials, Machine, Methods and Man.. Please explain each of

BETONIO Chair, Technical Working Group Supply, Delivery and Installation of HRM Laboratory Supplies, Materials and Equipment

After completion of the supply and installation, the firm will submit tax invoice as per GST format for payment, with a certificate of successful installation of the materials from the

NITP/19-20/12 Name of the work: - Supply and installation of 500 KVA Transformer & Installation of 315 KVA Transformer Instructions to the bidders 1.1 Sealed bids are invited on

Installation details of the wooden door including specification TDS of the filler materials to be used in the spaces/gaps between the brick wall and the jamb of the Timber doors.. Floor

MANN* Summary Survival of lambs born in a flock of 355 ewes was studied in three fox-proof and three unprotected enclosures, each of 4 acres 1.6 ha, at Minnipa, South Australia..