The proposed development does not comply with the relevant provisions of the Hills Development Control Plan 2012, Part B, Section 6 - Business in relation to the location of outdoor playgrounds. The outdoor playground is also narrow and unusable near the proposed substation.
The modification does not seek any changes to the subdivision component of the application
The Hills Development Control Plan 2012
DEVELOPMENT
DEVELOPMENT
Both dwellings are appropriately designed to remove any potential privacy issues and on the
Issues Raised in Submissions
A Traffic Impact Assessment (TIA) has been provided and assessed as part of the parent development application. Concerns were expressed about the width of the carriageway and that there is no provision for a 7 meter right of way.
5. Internal Referrals
IS AMENDED TO
Approved Plan
IS AMENDED TO
External Finishes
IS AMENDED TO
Provision of Parking Spaces
CONDITION 12 IS AMENDED TO
Tree Removal
Site Stormwater Drainage
IS AMENDED TO
Section 7.12 Contribution
CONDITION 18A IS ADDED UNDER THIS HEADING
IS AMENDED TO
Project Arborist
IS AMENDED TO
Compliance with BASIX Certificate
ATTACHMENTS
ATTACHMENT 1 – LOCALITY PLAN
ATTACHMENT 2 – AERIAL PHOTOGRAPH
ATTACHMENT 3 – LEP ZONING MAP
ATTACHMENT 4 – LEP MINIMUM LOT SIZE MAP
ATTACHMENT 5 – LEP HEIGHT OF BUILDINGS MAP
ATTACHMENT 6 – APPROVED PLAN OF SUBDIVISION (DA 1055/2018/ZA)
ATTACHMENT 7 – SITE PLAN
ATTACHMENT 8 – LOWER GROUND FLOOR PLAN
ATTACHMENT 9 – GROUND FLOOR PLAN
ATTACHMENT 10 – FIRST FLOOR PLAN
ATTACHMENT 11 – ROOF PLAN
ATTACHMENT 12 – ELEVATIONS
ATTACHMENT 13 – SECTIONS
ATTACHMENT 14 – CUT AND FILL PLAN
ATTACHMENT 15 – DWELLING 1 DRIVEWAY PLAN
ATTACHMENT 16 – LANDSCAPING PLANS
ITEM-3 DA 35/2021/LA - ALTERATIONS AND ADDITIONS TO AN
EXECUTIVE SUMMARY
ISSUES FOR CONSIDERATION
Compliance with DCP Part B Section 2 – Residential
3. Issues Raised in Submissions
5. Internal Referrals
- Development in Accordance with Submitted Plans
 - External Finishes
 - Construction Certificate
 - Building Work to be in Accordance with BCA
 - Adherence to Waste Management Plan
 - Management of Construction and/or Demolition Waste
 
CD-144/20-V1 Floor Plan - Alfresco Area 7 of 7 A No work (including excavation, earth filling or land conversion) where planning permission is required shall be carried out prior to the issue of planning permission. Plans submitted with planning permission must be amended to include the terms of the building consent. All construction work must be carried out in accordance with the provisions of the Building Code of Australia.
All requirements of the waste management plan submitted as part of the development application must be implemented, except where it conflicts with other consent conditions. Any material moved to another location must be transported in accordance with the requirements of the Protection of the Environment Operations Act 1997 and only to a place that can be legally used as a disposal facility.
Any material moved offsite is to be transported in accordance with the requirements of the
Tree Protection
10. Trenching within Tree Protection Zone
Consultation with Service Authorities
Approved Temporary Closet
Erosion and Sedimentation Controls
Stabilised Access Point
Details and Signage - Principal Contractor and Principal Certifier Details
Engagement of a Project Arborist
Survey Report and Site Sketch
19. Compliance with BASIX Certificate
Critical Stage Inspections and Inspections Nominated by the Principal Certifier Section 6.6 of the Environmental Planning and Assessment Act 1979 requires critical stage
Roof Water Drainage
Dust Control
ATTACHMENT 1 – LOCALITY PLAN
ATTACHMENT 2 – AERIAL PHOTOGRAPH
ATTACHMENT 3 – APPROVED SITE PLAN (DA 811/2014/LD)
ATTACHMENT 4 – SITE PLAN
ATTACHMENT 5 – ELEVATIONS (NORTH AND SOUTH)
ATTACHMENT 6 – ELEVATION (EAST)
ATTACHMENT 7 – ELEVATION (WEST)
ATTACHMENT 8 – SECTION A
ATTACHMENT 9 – ALFRESCO AREA
ITEM-4 68/2020/HA - ALTERATIONS AND ADDITIONS TO AN
EXECUTIVE SUMMARY
PROPOSAL
Compliance with LEP 2019 – Clause 8A – Savings provision relating to development applications
Compliance with Development Control Plan
DEVELOPMENT
The proposal is considered to be consistent with the control relating to ‘other roads which states
Internal Referrals
The development application has been assessed against the relevant considerations under Section 4.15 of the Environmental Planning and Assessment Act, 1979, Local. The issues raised in the comments have been addressed in the report and do not warrant refusal of the application. The proposed development is consistent with the planning principles, vision and objectives outlined in "Hills 2026 - Looking to the Future" as the proposed development.
RECOMMENDATION
Development in Accordance with Submitted Plans (as amended)
House Numbering
63A George Mobbs Drive, CASTLE HILL NSW 2154 Residence 2: 63B George Mobbs Drive, CASTLE HILL NSW 2154
3. Construction Certificate
Air Conditioner Location
Clause 94 Building Upgrade
7. Vehicular Access and Parking
Minor Engineering Works
9. External Finishes
Adherence to Waste Management Plan
Management of Construction and/or Demolition Waste
Asbestos Removal
Once the materials have been removed and delivered to the landfill site, receipts verifying the
Commencement of Domestic Waste Service
Provision of Domestic Waste Storage Area(s)
Section 7.12 Contribution
PRIOR TO WORK COMMENCING ON THE SITE
- Protection of Existing Trees
 - Trenching within Tree Protection Zone
 - Sydney Water Building Plan Approval
 - Consultation with Service Authorities
 - Approved Temporary Closet
 - Erosion and Sedimentation Controls
 - Stabilised Access Point
 - Details and Signage - Principal Contractor and Principal Certifier Details
 
Unhindered access must be available to the electricity supply authority, during and after construction, to electricity meters and measuring equipment. An approved temporary closet connected to the Sydney Water sewers, or alternatively an approved chemical closet must be provided on land, before construction operations commence. Erosion and sedimentation controls should be established prior to the commencement of site works;
Before work begins, you must submit a written notification to the main certification company of the main contractor's (builder's) name, address, phone number, email address and license number. A sign must be erected in accordance with § 98A, subsection 2, in the Environmental Plan and Assessment Regulations 2000.
25. Dilapidation Survey
Survey Report and Site Sketch
Location of Works
Compliance with BASIX Certificate
Roof Water Drainage
32. Dust Control
Landscaping Prior to Issue of any Occupation Certificate
Completion of Engineering Works
Retaining Walls
Maintenance of Landscaping Works
ATTACHMENT 1 – LOCALITY PLAN
ATTACHMENT 2 – AERIAL PHOTO
ATTACHMENT 3 – SITE PLAN
ATTACHMENT 4– ELEVATIONS
ATTACHMENT 5 – ELEVATION & SECTIONS
ATTACHMENT 6 – LANDSCAPE PLAN
ATTACHMENT 7 –COLOURS SCHEDULE
EXECUTIVE SUMMARY
A request for additional information letter was sent to the applicant on 25 August 2020 seeking
Assessment of Proposed Modification
Section 4.55(2) Modification of the Environmental Planning and Assessment Act, 1979
Compliance with The Hills Development Control Plan
Comment
Issues Raised in Submissions
The subject application provides a 1.75m side setback to both sides of the dwelling which meets the required setbacks under Part D Division 7 of the DCP. The subject property complies with the solar access provisions of the DCP which creates minimal overshadowing of the adjoining residences' private open space area at 6 Water Creek Blvd between the hours of 11:00am and 1:00pm. The property offers a double garage with opportunity for two stacked car spaces in front of the garage.
4 cars can be accommodated off street in accordance with the controls set by the DCP. The applicant has since modified the design of the fence to ensure that it complies with the SEPP Exempt & Compliant Development 2008 and does not exceed 1.2m.
Internal Referrals
Part D Section 7 of the DCP does not provide specific controls for the garage to be set back 1m behind the building line. The proposed dwelling is built in harmony with the adjoining properties 4, 6, 10 and 12 Water Creek Blvd which all contain the garage in front of or in line with the building line. During the assessment of the application, the applicant was advised that the front fence is considered unauthorized construction without development consent as it exceeds 1.2m in height.
The Hills Future Community Strategic Plan
No work (including excavation, land fill or earth reshaping) shall be undertaken prior to the issue
Compliance with BASIX Certificate
ATTACHMENT 1 – LOCALITY PLAN
ATTACHMENT 2 – AERIAL MAP
The land is zoned E4 Environmental Living under the terms of the SEPP Sydney Region Growth Centers 2006. The proposed dual occupancy (attached) is a permissible form of development on land zoned E4 Environmental Living subject to development consent. Accordingly, the proposal is considered satisfactory in relation to SEPP Sydney Regional Growth Centers 2006. ii) Compliance with SEPP Growth Centers – Zone Objectives.
The proposal is deemed consistent with the stated goals of the zone, in that the proposal will meet the housing needs of the community and will not adversely affect the values of the zone. Compliance with the North Kellyville Precinct Development Control Plan The proposal has been reviewed against the provisions of the North Kellyville Precinct.
Compliance with North Kellyville Precinct Development Control Plan The proposal has been assessed against the provisions of the North Kellyville Precinct
To protect and improve the aesthetic quality of the area by controlling the shape, scale and scale of earth-shaping operations. The proposed development is graded to ensure that the proposed dwellings are compatible with the slight slope of the land. The proposed change to the maximum control of 500mm per cut is considered satisfactory for this development.
The semi-detached residential development is considered to be designed to suit the topography of the site and is set back from the site to satisfactorily minimize the extent of. Given the above, the proposed change to maximum shear control is considered minor and is appropriate in this case.
Issues Raised in Submissions
The proposed carport is located behind the front building line and is integrated into the design of the building. Merit is not for consideration in accordance with Section 4.15 of the Environmental Planning and Assessment Act 1979. Notwithstanding the above, it is noted that the subject proposal for dual occupancy (attached) is a permitted form of development on land zoned E4 Environmental Residential in accordance with the provisions of SEPP Sydney Region Growth Centers 2006 with subject to development permission.
The development application has been assessed for relevant aspects in accordance with Section 4.15 of the Environmental Planning and Assessment Act 1979, State. The change in control of the largest cut under the North Kellyville DCP has been considered and discussed in the report and will not adversely affect the environmental amenity of the site.
Construction Certificate
Building Work to be in Accordance with BCA
No work (including excavation, pouring or soil deformation) may be carried out prior to the issuance of the building certificate, if a building certificate is required. DEVELOPMENT ASSESSMENT UNIT MEETING 03 NOVEMBER 2020 .. a) Water, electricity and gas must comply with section 7.4 of Planning for Bush Fire Protection 2019.. b) Where the rearmost or most remote part of the building is more than 70 meters from the nearest fire hydrant, a new fire hydrant must be installed in accordance with the Australian AS Fire Hydrant Installations' standard. Fire hydrant locations should be demarcated by blue road markings at a distance of 150mm from the center of the road.
The offset direction indicates which side of the road the fire hydrant is on. Landscaping on the site must comply with the principles of Schedule 4 of Planning for Bush Fire Protection 2019.
House Numbering
PAGE 118 iii) Design and construction . a) New construction shall comply with Section 3 and Section 7 (BAL 29) of Australian Standard AS3959 ``Construction of buildings in bushfire prone areas'' and the additional construction requirements contained in sections where applicable), and 7.6 (if applicable) of Planning of Bush Fire Protection 2019. Grasslands/mown lawns/ or ground cover plantings provided in the immediate vicinity of the building;. Limit planting in the immediate vicinity of the building which, over time and if not properly maintained, may come into contact with the building.
Planting should not give a continuous canopy to the building (i.e. trees or shrubs should be isolated or in small groups); External finishes and colors must be in accordance with the details submitted with the development application and approved with this permission.
Adherence to Waste Management Plan
Management of Construction and/or Demolition Waste
Commencement of Domestic Waste Service
A bin storage area with a size of a minimum of 3 x 240 liter bins must be provided within the premises boundaries. The area(s) must be screened from public land and neighboring residential property and must be located behind the building line in the rear courtyard, side access path or a dedicated area in the garage. A flat or ramped transfer path must be provided leading directly from the bin storage area(s) to the approved curbside refuse collection point.
The path must have a minimum clear floor width of 820mm, must not exceed the stairwell and must be external to the dwelling (excluding the garage). An accompanying length of natural clear strip of 1.66 m should be dedicated along the edge of each dwelling for the presentation of the bin.
Air Conditioner Location
Separate Construction Certificate Required for Retaining Walls
Rain Garden and Rainwater Reuse Tank
Minor Engineering Works
In high locations, a grate drain must be provided on the driveway at the property boundary. The entire construction site area must be graded, collected and drained by pits and pipes to the appropriate point of legal discharge. Earthworks and retaining walls are limited to those locations and elevations shown on the approved plans.
Where earthworks are not shown on the approved plan, the topsoil within plots must not be disturbed. Retaining walls between plots must be located on the high side plot retained, except for the need for easements for support on the low side plot adjacent.
Subdivision Not Permitted
The design, finish, slope and location of all driveway intersections must comply with the above documents and city driveway specifications. Specifically, unless additional ramp crossings are clearly marked on the approved plans, only one ramp crossing is approved/permitted.
Air Conditioner Location
Before paying the above contributions, the applicant is advised to contact the Council's Development Contributions Officer on 9843 0268. Council Contribution Plans can be viewed at www.thehills.nsw.gov.au or a copy can be viewed or purchased from the Council's Administration Centre.
Rain Garden and Rainwater Reuse Tank
Erosion and Sediment Control/ Soil and Water Management Plan
Special Infrastructure Contribution – Growth Centres
Sydney Water Building Plan Approval
Management of Building Sites
Consultation with Service Authorities
Approved Temporary Closet
Erosion and Sedimentation Controls
Stabilised Access Point
Not later than two days before work commences, the Council must have received written details from the Chief Certifier in accordance with Clause 103 of the Environmental Planning and Assessment Regulations 2000. The sign must be erected in a prominent position and show – a) the name, address and telephone number of the Chief Certifier for the work, .. b) the name and out-of-hours contact telephone number of the main contractor/person responsible for the work.
Erosion and Sediment Control/ Soil and Water Management
Roof Water Drainage
Survey Report and Site Sketch
Compliance with BASIX Certificate
Any subsequent version of this BASIX certificate will supersede all previous versions of the certificate. Critical Stage Inspections and Inspections Appointed by the Chief Certifier Section 6.6 of the Environmental Planning and Assessment Act 1979 requires a critical stage.
Critical Stage Inspections and Inspections Nominated by the Principal Certifier Section 6.6 of the Environmental Planning and Assessment Act 1979 requires critical stage
Landscaping Works
Dust Control
Deepened Edge Beam
Rain Garden – Construction Checklist Compliance
A Section 73 Compliance Certificate issued under the Sydney Water Act 1994 must be obtained from Sydney Water confirming that satisfactory arrangements have been made for the provision of water and sewerage services. Sydney Water's guidelines provide for deemed consent to the strata subdivision of a development approved by an earlier consent covered by a certificate of compliance. The only other exception to this is for services other than potable water supply, in which case the requirements of Flow Systems/Box Hill Water as a network operator under the Water Industry Competition Act 2006 will apply.
Completion of Engineering Works
Rain Garden and Rainwater Reuse Tank
Maintenance of Landscaping Works