Micro-Surfacing used in

Micro-Surfacing used in

“Pavement Preservation

“Pavement Preservation

(2)

The problem

The problem

 Too many roads, not enough fundsToo many roads, not enough funds

The opportunity

The opportunity

 A sound pavement preservation A sound pavement preservation

(3)

Pavement Preservation

Pavement Preservation

“Strategy including all activities to provide & Strategy including all activities to provide & maintain serviceable roadways”

maintain serviceable roadways”

The right treatment, The right treatment,

on the right pavement, on the right pavement,

at the right time at the right time

Lower life cycle costs, higher quality pavements Lower life cycle costs, higher quality pavements

Keeping good pavements goodKeeping good pavements good

(4)

What is Pavement

What is Pavement

Preservation?

Preservation?

 Asset managementAsset management  Protect investment Protect investment

 Enhance cost-efectiveness of treatmentsEnhance cost-efectiveness of treatments  Lower life cycle costsLower life cycle costs

 Preventive maintenance (PM) seals & protectsPreventive maintenance (PM) seals & protects  Extend pavement lifeExtend pavement life

 Delay future deteriorationDelay future deterioration

 Enhance pavement performanceEnhance pavement performance  Improve functional conditionImprove functional condition

 e.g. skid resistancee.g. skid resistance

 Reduce user delaysReduce user delays

(5)

Preventive Maintenance Cost

Preventive Maintenance Cost

Savings

(6)

P

Time or traffic

Conventional overlay

Preventive maintenance treatments

The Right Time

The Right Time

Strategy to Minimize Costs

(7)
(8)

Micro-Surfacing

Micro-Surfacing

The Right Treatment For:

The Right Treatment For:

 Restoring surface quality & skid resistanceRestoring surface quality & skid resistance  Rut fllingRut flling

 Quick construction, quick trafic returnQuick construction, quick trafic return  WeatherproofngWeatherproofng

 Sealing Sealing

 Reducing oxidationReducing oxidation

 Extending the life of HMA and chip-seal Extending the life of HMA and chip-seal

pavements. Including those HMA pavements

pavements. Including those HMA pavements

where edge-grinding practices have been

where edge-grinding practices have been

used and the curb has been compromised

used and the curb has been compromised

with many HMA overlays.

(9)

What is Micro-Surfacing?

What is Micro-Surfacing?

History

History

 Developed in Europe in 1970’s withDeveloped in Europe in 1970’s with

the proprietary name of “RALUMAC.”the proprietary name of “RALUMAC.”

 Introduced in U.S. in 1980’s and genericallyIntroduced in U.S. in 1980’s and generically

named: “Micro-Surfacing”.named: “Micro-Surfacing”.

 Now routinely used in more than 40 statesNow routinely used in more than 40 states

 Used for rut flling & texturing.Used for rut flling & texturing.

 Strictly a topical treatment. Will not correctStrictly a topical treatment. Will not correct

(10)

Micro-Surfacing

Micro-Surfacing

 A designed mixture of:A designed mixture of:

 polymer modifedpolymer modifed

emulsifed asphalt emulsifed asphalt

 100% crushed aggregate:100% crushed aggregate:

limestone, slag, trap-rocklimestone, slag, trap-rock

 mineral fllermineral fller  waterwater

 other additivesother additives

 Proportioned, mixed & uniformly spread over a Proportioned, mixed & uniformly spread over a

properly prepared surface properly prepared surface

 ISSA A-143ISSA A-143

(11)
(12)

Micro-Surfacing

Micro-Surfacing

Emulsion

Emulsion

emulsifier water acid polymer asphalt

MILL

Polymer Modified Emulsion

emulsifier water acid polymer asphalt

MILL

(13)

Micro-Surfacing

Direction 15 to 45 secondsMixing time

Mixture Brown & Homogeneous

Breaking Time

60 to 120 seconds

Traffic in Approximately One Hour

Mixture Black

(14)

Micro-Surfacing Machine

Micro-Surfacing Machine

9 (1) Aggregate bin

(2) Mineral filler bin (3) Additive storage (4) Metered aggregate

(5) Metered micro-surfacing emulsion

(6) Metered water & additive (7) Pugmill

(8) Micro-surfacing

(9) Surfacing spreader box (10) Brown to black color (11) Road water spray bar

(15)
(16)

Polymer Modifed

Polymer Modifed

Residual Asphalt

Residual Asphalt

 Reduces temperature susceptibilityReduces temperature susceptibility

 Polymer either mixed into the AC base, Polymer either mixed into the AC base,

or or

co-milled with the AC in making the co-milled with the AC in making the

emulsion emulsion

 Minimum of 3% polymer solids based on Minimum of 3% polymer solids based on

AC content of emulsion AC content of emulsion

 IL-DOT uses an elastic recovery test toIL-DOT uses an elastic recovery test to

(17)

Micro-Surfacing

Micro-Surfacing

 Mix can be placed in thicker Mix can be placed in thicker

lifts and still remain stable lifts and still remain stable

 Mix retains macro-textureMix retains macro-texture  Mix can be “feathered” nextMix can be “feathered” next

to the curb/fagto the curb/fag

 Quick setting for quick Quick setting for quick

trafic return. Usually 15 trafic return. Usually 15

minutes to 1 hour minutes to 1 hour

 Enhanced durabilityEnhanced durability

 No dust, no loose stones,No dust, no loose stones,

no trackingno tracking

 Aggregate is encapsulated inAggregate is encapsulated in

(18)

Micro-Surfacing

Micro-Surfacing

Machine

Machine

Continuous Self-Propelled

Continuous Self-Propelled

Paver

Paver

with Support Units

(19)

Continuously Run &

Continuously Run &

(20)

Loading Area. Aggregate

Loading Area. Aggregate

stock-pile, emulsion, water

stock-pile, emulsion, water

(21)

Support unit for continuous

Support unit for continuous

(22)

Support unit: water tank,

Support unit: water tank,

fow-boy feed hydraulic drive,

boy feed hydraulic drive,

emulsion tank

(23)

Continuous paver waiting

Continuous paver waiting

(24)

Support unit coupled to paver.

Support unit coupled to paver.

Notice dark steel-slag

Notice dark steel-slag

aggregate.

(25)

Adding Portland cement. Paver

Adding Portland cement. Paver

meters 1 to 2% depending on

meters 1 to 2% depending on

Micro mix-design.

(26)

Micro slurry being fed into

Micro slurry being fed into

(27)

Continuous, seamless

Continuous, seamless

Micro-Surfacing

Micro-Surfacing

(28)
(29)

The Micro-Surfacing

The Micro-Surfacing

Process

Process

(30)

Construction

Construction

Quality Micro-Surfacing

(31)

Appropriate

Appropriate

Specifcations

Specifcations

 Specifcations should Specifcations should describe & match the

describe & match the

job

job

 Specifcations should Specifcations should describe & meet your

describe & meet your

expectations

(32)

Surface Preparation

Surface Preparation

 Crack sealingCrack sealing

 Asphalt patchingAsphalt patching

 Clean the surfaceClean the surface

 Sweep - washSweep - wash

 Pavement marking removalPavement marking removal

 Tape – paintTape – paint

 Cover the utilities Cover the utilities

(33)

Crack Filled Street:

Crack Filled Street:

polished,

polished,

(34)

Crack-flled, polished, some

Crack-flled, polished, some

(35)

Excellent pavement

Excellent pavement

integrity.

integrity.

Cracked flled, great

Cracked flled, great

(36)

Pavement has excellent integrity.

Pavement has excellent integrity.

If construction seam is not flled,

If construction seam is not flled,

it will eventually fail. Excellent

it will eventually fail. Excellent

candidate.

(37)

Polished, oxidized

Polished, oxidized

pavement.

pavement.

Some patches. Good

Some patches. Good

(38)
(39)

Road contaminants: dirt, mud,

Road contaminants: dirt, mud,

sand, vegetation. Pavement

sand, vegetation. Pavement

must be cleaned before

must be cleaned before

application.

(40)

Ruts < ½” May Be Filled

Ruts < ½” May Be Filled

With Scratch Course

With Scratch Course

Full Width Lane

Pavement

o o o o o o o o o o

Steel Strike Off Scratches Surface

(41)

Applying Leveling

Applying Leveling

(42)
(43)

Reprofling Rutted

Reprofling Rutted

Wheelpaths

Wheelpaths

Original Pavement Cross Section Crown

Ruts in Wheelpath

For each inch of applied Micro-Surfacing mix, add 1/8” to 1/4” crown to each rutfill

to compensate for return traffic compaction

Ruts 1/2” & over must use the rut box

(44)

Rut Filling Lay Down Box.

Rut Filling Lay Down Box.

Generally a Type III gradation

Generally a Type III gradation

is used for rut-flling

(45)

Rut Fill & Strike Of

Rut Fill & Strike Of

(46)
(47)

Rut-flling

Rut-flling

 BeforeBefore

(48)
(49)
(50)
(51)

Feathering up to the

Feathering up to the

curb/fag

curb/fag

(52)

Smooth Ride

Smooth Ride

(53)

Good Straight Edge

Good Straight Edge

(54)

Why do Surface

Why do Surface

Treatments Fail?

Treatments Fail?

 Improper road selectionImproper road selection

 Improper pavement Improper pavement

preparation preparation

 Lack of control of Lack of control of

materials during materials during

application

(55)

Delaminating/Pushing. No

Delaminating/Pushing. No

(56)

The Right

The Right

Pavements

Pavements

for

for

(57)
(58)
(59)
(60)
(61)
(62)
(63)
(64)
(65)

Rutted Pavements

Rutted Pavements

(66)

Rut Filled With

Rut Filled With

(67)

Raveled Surface.

Raveled Surface.

(68)
(69)

The Wrong

The Wrong

Pavements

Pavements

for

for

(70)

Micro-Surfacing Can’t

Micro-Surfacing Can’t

Work Miracles…Bad,

Work Miracles…Bad,

(71)

Instances where pavements have

Instances where pavements have

reached their “critical mass”.

reached their “critical mass”.

Beyond preservation or any topical

Beyond preservation or any topical

treatments.

(72)

Bad. Draining issues.

Bad. Draining issues.

(73)
(74)

Bad. Done. Blowing

Bad. Done. Blowing

(75)

Bad. What else can I say?

Bad. What else can I say?

(76)
(77)

2009 Micro-Surfacing in

2009 Micro-Surfacing in

Galesburg, IL with steel slag. 1

Galesburg, IL with steel slag. 1

of 5

(78)

2009 Micro-Surfacing in

2009 Micro-Surfacing in

Galesburg, IL with steel slag. 2

Galesburg, IL with steel slag. 2

of 5

(79)

2009 Micro-Surfacing in

2009 Micro-Surfacing in

Galesburg, IL with steel slag.

Galesburg, IL with steel slag.

Very little curb left to HMA

Very little curb left to HMA

lifts over fag. 3 of 5

(80)

2009 Micro-Surfacing in

2009 Micro-Surfacing in

Galesburg, IL with steel slag.

Galesburg, IL with steel slag.

Notice quality of existing

Notice quality of existing

pavement. 4 of 5

(81)

2009 Micro-Surfacing in Galesburg, IL

2009 Micro-Surfacing in Galesburg, IL

with steel slag. Check texture. 60K yd2

with steel slag. Check texture. 60K yd2

in 2008, 105K yd2 in 2009. 5 of 5.

(82)

Knox County CH 8. 13 Mile Cape-Seal

Knox County CH 8. 13 Mile Cape-Seal

2007/2008. Stage construction. Micro

2007/2008. Stage construction. Micro

with steel-slag on top of the new

with steel-slag on top of the new

polymer chip-seal. 1 of 5

(83)

Knox County CH 8. 13 Mile Cape-Seal

Knox County CH 8. 13 Mile Cape-Seal

2007/2008. Stage construction. Micro

2007/2008. Stage construction. Micro

with steel-slag on top of the new

with steel-slag on top of the new

polymer chip-seal. 2 of 5

(84)

Knox County CH 8. 13 Mile Cape-Seal

Knox County CH 8. 13 Mile Cape-Seal

2007/2008. Stage construction. Micro

2007/2008. Stage construction. Micro

with steel-slag on top of the new

with steel-slag on top of the new

polymer chip-seal. 3 of 5

(85)

Knox County CH 8. 13 Mile Cape-Seal

Knox County CH 8. 13 Mile Cape-Seal

2007/2008. Stage construction. Micro

2007/2008. Stage construction. Micro

with steel-slag on top of the new

with steel-slag on top of the new

polymer chip-seal. 4 of 5

(86)

Knox County CH 8. 13 Mile Cape-Seal

Knox County CH 8. 13 Mile Cape-Seal

2007/2008. Stage construction. Micro

2007/2008. Stage construction. Micro

with steel-slag on top of the new

with steel-slag on top of the new

polymer chip-seal. 5 of 5

(87)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 1 of 10

(88)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 2 of 10

(89)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 3 of 10

(90)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 4 of 10

(91)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 5 of 10

(92)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 6 of 10

(93)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 7 of 10

(94)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 8 of 10

(95)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro. 9 of 10

(96)

2009 Mason County Cape-Seal.

2009 Mason County Cape-Seal.

Manito Rd. 2 Sections totaling 8.8

Manito Rd. 2 Sections totaling 8.8

miles. Crack-sealing+polymer

miles. Crack-sealing+polymer

chip-seal+Micro.10 of 10

(97)

Benefts of

Benefts of

Micro-Surfacing

Micro-Surfacing

 Restoration of surface propertiesRestoration of surface properties

& skid numbers& skid numbers

 Rut-fllingRut-flling

 Sealing & waterproofngSealing & waterproofng

 Delineates pavement markings Delineates pavement markings

& shoulders

& shoulders

 Usually no additional shoulder Usually no additional shoulder

aggregate is required, resulting in additional aggregate is required, resulting in additional savings

savings

versus other methodsversus other methods

(98)

Benefts of

Benefts of

Micro-Surfacing

Micro-Surfacing

 Preserves investmentPreserves investment  Quick trafic, Quick trafic,

1 hour or less 1 hour or less

 Minimizes trafic Minimizes trafic

disruptions disruptions

 Cost efectiveCost efective

 No appurtenance No appurtenance

adjustments adjustments

(99)

Typical

Typical

Micro-Surfacing Costs

Micro-Surfacing Costs

 Price varies depending upon Price varies depending upon

treatment

treatment

 Surface courseSurface course

 Leveling & surfaceLeveling & surface  Rut-fll & surfaceRut-fll & surface

 Cape-Seal: additional chip-seal costCape-Seal: additional chip-seal cost

 Typical life - 5 to 12 yearsTypical life - 5 to 12 years

 Depends upon condition of pre-existing Depends upon condition of pre-existing

pavement, construction quality, climate, pavement, construction quality, climate,

(100)

The Right Treatments

The Right Treatments

Estimated Life Extension

Estimated Life Extension

(101)

IL Counties who have used

IL Counties who have used

Micro, or will be using it this

Micro, or will be using it this

year.

Champaign Kendall McHenry Shelby

Champaign Kendall McHenry Shelby

(102)

IL Municipalities who have

IL Municipalities who have

used Micro, or will be using it

used Micro, or will be using it

this year.

Port Byron Rapids City Belvidere Neoga Port Byron Rapids City Belvidere Neoga

(103)

Summary

Summary

 Micro-surfacing, theMicro-surfacing, the right treatment for

right treatment for

 RutfllingRutflling  TexturizingTexturizing

 Improving skid resistanceImproving skid resistance  Sealing out moistureSealing out moisture

 Ultrathin surfacingUltrathin surfacing

 Quick construction & trafic returnQuick construction & trafic return

Referensi

Dokumen terkait

(2008) proposed the Theory of Planned Behavior, and showed that the TPB variables (i.e., attitudes, subjective norms, and perceived behavioral control)

Oleh sebab itu pemberdayaan keluarga dalam upaya-upaya kesehatan jiwa di atas sangat diperlukan yang dapat memberikan pengetahuan mengenai cara pemberdayaan keluarga melalui

Pertama , auditor menggunakan materialitas dalam perencanaan audit, dengan membuat estimasi materialitas karena terdapat hubungan terbalik antara jumlah dalam laporan keuangan

Penanganan dilakukan secara menyeluruh mulai sebelum , pada saat dan setelah terjadi bencana dengan lebih menekankan pada upaya penanggulangan kedaruratan yang memerlukan kecepatan

Surat Pernyataan Sanggup Menyelesaikan Pekerjaan sesuai waktu yang ditentukan dalam Dokumen Lelang dan apabila melewati waktu yang ditentukan maka penyedia siap dikenakan

luasi dokum ara Kode auan, mak kualifikasi Kamis, 29 10.00 s/d 1 Kantor Pen Dimohon dimasukan upload/diu proses pele ng telah d..

Perbedaan Kecenderungan anorexia nervosa pada Remaja Putri di Sekolah Menengah Atas dan Sekolah Menengah Kejuruan .. METODE

Seri Bahan Bimbingan Teknis Impelentasi KTSP SMK (Teknik Penyusunan Kurikulum Tingkat Satuan Pendidikan dan Silabus Sekolah Menengah Kejuruan).. Jakarta: Direktorat