• Tidak ada hasil yang ditemukan

Perancangan Instrument Miniatur Monitoring Arus Listrik PLN

N/A
N/A
Protected

Academic year: 2019

Membagikan "Perancangan Instrument Miniatur Monitoring Arus Listrik PLN"

Copied!
17
0
0

Teks penuh

(1)

5

LAMPIRAN A

(2)

6

LAMPIRAN B

GAMBAR SENSOR ARUS YANG DILILITI KAWAT EMAIL 1,2 mm

(a) (b)

(c)

(3)

LAMPIRAN C

PROGRAM BAHASA C PADA SOFWARE CODE VISION AVR

#include <mega8535.h> #include <delay.h> #include <stdio.h>

#define ADC_VREF_TYPE 0x00

unsigned int read_adc(unsigned char adc_input) {

ADMUX=adc_input | (ADC_VREF_TYPE & 0xff);

// Delay needed for the stabilization of the ADC input voltage delay_us(10);

// Start the AD conversion ADCSRA|=0x40;

// Wait for the AD conversion to complete while ((ADCSRA & 0x10)==0);

ADCSRA|=0x10;

// Communication Parameters: 8 Data, 1 Stop, No Parity // USART Receiver: On

(4)

while (1) {

I1 = read_adc(0)/4; printf("%c",I1); delay_ms(100); };

(5)

LAMPIRAN D

PROGRAM VISUAL BASIC 6.0 PADA PC

Dim x, y2, y1, L1, L2, R As Integer Dim data As String

Dim Temp1, Arus_tersedia, Arus_terpakai, Arus_sisa, cal As Single Dim Dtime(1 To 100000), DArus(1 To 100000) As Single

Dim oXL As Excel.Application Dim a, j As Integer

Private Sub Command1_Click() Line2(4).BorderColor = &HFF& Line2(2).BorderColor = &HFF0000 Grids

Set oXL = New Excel.Application Set oxlbook = oXL.Workbooks.Add FileName = "C:\Data\ Arus" + Text3

oxlbook.Worksheets(1).Range("A1") = " Tanggal " oxlbook.Worksheets(1).Range("B1") = " Waktu "

oxlbook.Worksheets(1).Range("C1") = " Arus Masukan PLN (A) "

oxlbook.Worksheets(1).Range("E1") = " Arus Yang Tidak Digunakan (A) " oxlbook.Worksheets(1).Range("D1") = " Arus Yang Digunakan (A) " oxlbook.SaveAs FileName

For a = 2 To j

(6)
(7)
(8)

Label9.Visible = False Timer5.Enabled = True Timer6.Enabled = False End Sub

Private Sub Trace_Click()

Line2(4).BorderColor = &HFF0000 Line2(2).BorderColor = &HFF& Trace.Enabled = True

Picture1.Line (568, Q)-(15000, Q), QBColor(1) Q = Q + R

Picture1.Line (568, 568)-(568, 8500), QBColor(14) Picture1.Line (568, 8500)-(15000, 8500), QBColor(14) End Sub

Private Sub Timer3_Timer() Grids

(9)

LAMPIRAN E

GAMBAR MONITORING PADA PC UNTUK PENGUJIAN

KESELURUHAN

Pengujian instrument monitoring keseluruhan menggunakan bola lampu 100 sampai 100 Watt pada sumber beban 2 Ampere dan 4 Ampere.

E.1 Pengujian Sumber Arus Listrik untuk 2 Ampere

Gambar E.1 Pengujian Instrument Monitoring pada 200 W

Gambar E.2 Pengujian Instrument Monitoring pada 300 W

Gambar E.3 Pengujian Instrument Monitoring pada 400 W

(10)

Gambar E.4 Pengujian Instrument Monitoring pada 600 W

Gambar E.6 Pengujian Instrument Monitoring pada 700 W

Gambar E.7 Pengujian Instrument Monitoring pada 800 W

Gambar E.8 Pengujian Instrument Monitoring pada 900 W

(11)

E.2 Pengujian Untuk Sumber Arus listrik 4 Ampere

Gambar E.10 Pengujian Instrument Monitoring pada 200 W

Gambar E.11 Pengujian Instrument Monitoring pada 300 W

Gambar E.12 Pengujian Instrument Monitoring pada 400 W

Gambar E.13 Pengujian Instrument Monitoring pada 500 W

Gambar E.14 Pengujian Instrument Monitoring pada 600 W

(12)

Gambar E.16 Pengujian Instrument Monitoring pada 800 W

Gambar E.17 Pengujian Instrument Monitoring pada 900 W

(13)

LAMPIRAN F

DATA ARUS PENGUJIAN INSTRUMENT MINIATUR MONITORING ARUS LISTRIK PLN YANG DI SIMPAN DI

MICROSOFT EXCEL

F.1 Data Arus Listrik yang Dimonitoring untuk 2 Ampere pada Setrika

Tanggal Waktu Arus Masukan PLN(A)

Arus Yang Digunakan (A)

(14)

F.2 Data Arus Listrik yang Dimonitoring untuk 4 Ampere pada Setrika

Tanggal Waktu Arus Masukan PLN (A)

Arus Yang Digunakan(A)

Arus Yang Tidak Digunakan (A) 06 August 2013 15:54:47 4 1.407272696 2.592727304 06 August 2013 15:54:48 4 1.407272696 2.592727304 06 August 2013 15:54:48 4 1.407272696 2.592727304 06 August 2013 15:54:49 4 1.407272696 2.592727304 06 August 2013 15:54:49 4 1.407272696 2.592727304 06 August 2013 15:54:50 4 1.407272696 2.592727304 06 August 2013 15:54:50 4 1.407272696 2.592727304 06 August 2013 15:54:51 4 1.407272696 2.592727304 06 August 2013 15:54:51 4 1.25090909 2.74909091 06 August 2013 15:54:52 4 1.25090909 2.74909091 06 August 2013 15:54:52 4 0.781818211 3.218181789 06 August 2013 15:54:53 4 0.781818211 3.218181789 06 August 2013 15:54:53 4 1.407272696 2.592727304 06 August 2013 15:54:54 4 1.407272696 2.592727304 06 August 2013 15:54:54 4 1.407272696 2.592727304 06 August 2013 15:54:55 4 1.407272696 2.592727304 06 August 2013 15:54:55 4 1.407272696 2.592727304 06 August 2013 15:54:56 4 1.407272696 2.592727304 06 August 2013 15:54:56 4 1.407272696 2.592727304 06 August 2013 15:54:57 4 1.407272696 2.592727304 06 August 2013 15:54:57 4 1.407272696 2.592727304 06 August 2013 15:54:58 4 1.407272696 2.592727304 06 August 2013 15:54:58 4 1.407272696 2.592727304

F.3 Data Arus Listrik yang Dimonitoring untuk 2 Ampere pada Kompor Listrik

Tanggal Waktu Arus Masukan PLN (A)

Arus Yang Digunakan (A)

(15)

06 August 2013 14:56:40 2 1.368181825 0.631818175 06 August 2013 14:56:41 2 1.368181825 0.631818175 06 August 2013 14:56:41 2 1.368181825 0.631818175 06 August 2013 14:56:42 2 1.368181825 0.631818175 06 August 2013 14:56:42 2 1.368181825 0.631818175 06 August 2013 14:56:43 2 1.368181825 0.631818175 06 August 2013 14:56:43 2 1.368181825 0.631818175 06 August 2013 14:56:44 2 1.329090953 0.670909047 06 August 2013 14:56:44 2 1.329090953 0.670909047 06 August 2013 14:56:45 2 1.329090953 0.670909047 06 August 2013 14:56:45 2 1.329090953 0.670909047 06 August 2013 14:56:46 2 2.383636475 ERROR

Tanggal Waktu Arus Masukan PLN (A)

Arus Yang Digunakan (A)

(16)

06 August 2013 14:54:20 4 2.383636475 1.616363525 06 August 2013 14:54:20 4 2.383636475 1.616363525 06 August 2013 14:54:21 4 2.383636475 1.616363525 06 August 2013 14:54:21 4 2.383636475 1.616363525

F.5 Data Arus Listrik yang Dimonitoring untuk 2 Ampere pada Setrika dan Kompor Listrik

F.6 Data Arus Listrik yang Dimonitoring untuk 4 Ampere pada Kompor Listrik dan Setrika

Tanggal Waktu Arus Masukan PLN (A)

Arus Yang Digunakan (A)

(17)

06 August 2013 15:37:18 4 3.24545455 0.75454545

06 August 2013 15:37:18 4 4.234545231 ERROR

06 August 2013 15:37:19 4 4.234545231 ERROR

06 August 2013 15:37:19 4 4.234545231 ERROR

06 August 2013 15:37:20 4 4.265454769 ERROR

06 August 2013 15:37:20 4 4.265454769 ERROR

06 August 2013 15:37:21 4 4.234545231 ERROR

06 August 2013 15:37:21 4 4.234545231 ERROR

06 August 2013 15:37:22 4 4.203636169 ERROR

Gambar

GAMBAR PERANCANGAN INSTRUMENT MINIATUR MONITORING ARUS LISTRK PLN
GAMBAR SENSOR ARUS YANG DILILITI KAWAT EMAIL 1,2 mm
Gambar E.4 Pengujian Instrument Monitoring pada 500 W
Gambar E.9 Pengujian Instrument Monitoring pada 1000 W
+3

Referensi

Dokumen terkait

Berdasarkan crossplot di atas persebaran data yang terdapat pada sumur LG- 1 berada pada zona sandstone yang memiliki densitas dan porositas yang tinggi, hal itu didukung oleh

Bagi Penyedia Jasa atau Pemilik Kapal yang sedang menjalani pemeriksaan oleh instansi yang terkait, antara lain pihak kepolisian, TNI, Bea Cukai, Perpajakan, atas dugaan

Apakah dalam perbuatan yang tidak baik kita juga harus bekerja sama.. Dalam hal apa sajakah kerja sama dan gotong royong

Pengaruh Pengungkapan Sukarela, Ukuran Perusahaan, Leverage, Manajemen Laba, Dan Risiko Pasar Terhadap Biaya Modal Ekuitas (Studi Empiris Pada Perusahaan Dektor

Peningkatan pengetahuan membuktikan bahwa pengetahuan merupakan hasil dari seseorang yang menangkap informasi dengan penginderaan terhadap suatu objek, dimana pada penelitian

Dari hasil penelitian, komunikasi interpersonal yang efektif bagi tenaga pendidik dalam pencapain prestasi belajar, diantaranya: Di MTs Nahdliyatul Islamiyah Blumbungan

Penambahan asam sitrat menghasilkan panjang gelombang dan absorbansi yang lebih besar dibandingkan kontrol sehingga terjadi pergeseran batokromik dan efek hiperkromik pada