No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING
1 Statistical Process Control BERBASIS MINITAB 14 3 24-26 28-02 28-30 25-27 23-25 27-29 25-27 13-15 26-28 24-26 28-30 26-28 5.950.000 2 BASIC CIVIL 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 04-07 7.950.000 3 CARTOGRAFI 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 03-06 7.950.000 4 CATHODIC PROTECTION CORROSION CONTROL ANDPREVENTION 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 11-14 7.950.000 5 CIVIL CONSTRUCTION OBSERVATION of EXECUTIONBUILDING 4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 17-20 7.950.000 6 CIVIL CONSTRUCTION PENGAWASAN PELAKSANAANBANGUNAN 4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 03-06 7.950.000 7 CONTROL VALVE AND VALVE OPERATION AND SIZING 4 23-26 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 23-26 05-08 18-21 7.950.000 8 DOKUMEN KONTROL 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 17-20 7.950.000 9 FUZZY LOGIC CONTROL 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 04-07 7.950.000 10 GAS AND LIQUID FLOW MEASUREMENT 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 10-13 7.950.000 11 PROCESS CONTROL SYSTEMS APPLICATION, DESIGN,AND TUNING 4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 11-14 7.950.000 12 SUPERVISORY CONTROL AND DATA ACQUISITION(SCADA) 4 23-26 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 23-26 05-08 03-06 7.950.000 13 Survey & Mapping 4 30-02 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 30-02 12-15 11-14 7.950.000 14 PRESSURE SAFETY VALVE SELECTION AND SIZING 3 29-31 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 29-31 05-07 26-28 5.950.000 15 CHOKE AND CONTROL VALVE 4 22-25 20-23 20-23 17-20 28-31 04-07 17-20 28-31 18-21 22-25 20-23 10-13 7.950.000 16 MARINE CORROSION AND PREVENTION FOR OFFSHORESTRUCTURE 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 27-29 24-26 01-03 26-28 26-28 6.500.000 17 ADVANCED FLOW MEASUREMENT 4 02-05 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 01-04 19-22 17-20 8.500.000 18 ADVANCED PID CONTROLLER 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 08-11 26-29 03-06 8.500.000 19 CONTROL AND CHOKE VALVES 4 15-18 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 15-18 05-08 10-13 8.500.000 20 CONTROL SYSTEM FUNDAMENTALS 4 22-25 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 22-25 12-15 18-21 8.500.000 21 FIELDBUS AND INDUSTRIAL DATA COMMUNICATION 4 16-19 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 16-19 13-16 03-06 8.500.000 22 FISCAL AND CUSTODY METERING 4 23-26 19-22 19-22 16-19 07-10 05-08 16-19 13-16 17-20 23-26 19-22 10-13 8.500.000 23 FLOW ASSURANCE IN PIPING SYSTEMS 4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 18-21 8.500.000 24 FLUID FLOW – GAS METERING AND CUSTODY TRANSFER 5 08-12 05-09 05-09 02-06 21-25 04-08 02-06 30-03 03-07 01-05 05-09 03-07 9.500.000 25 HUMAN MACHINE INTERFACE (HMI) 4 02-05 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 08-11 12-15 11-14 8.500.000 26 OPC (OPEN PROCESS CONTROL) 4 15-18 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 15-18 20-23 17-20 8.500.000 27 ROOT CAUSE FAILURE ANALYSIS (RCFA) 4 02-05 12-15 13-16 10-13 29-01 26-29 10-13 07-10 11-14 01-04 13-16 18-21 8.500.000 28 SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 13-16 17-20 09-12 19-22 04-07 8.500.000
29 SCADA SYSTEMS 4 16-19 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 16-19 26-29 11-14 8.500.000 30 Ultrasonic Gas Flow Meter 5 22-26 05-09 05-09 02-06 21-25 04-08 02-06 30-03 03-07 22-26 05-09 17-21 9.500.000 31 WELLHEAD INSTRUMENTATION AND HYDRAULICCONTROL SYSTEMS 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 06-09 10-13 29-01 12-15 03-06 8.500.000 32 WIRELESS LAN IN INDUSTRIAL AUTOMATION & ISA100.11a 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 02-05 20-23 10-13 8.500.000 33 CALIBRATION ISO IEC 17025 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 08-11 27-30 17-20 8.500.000 34 DESIGN OF EXPRIMENTS (DOE) FUNDAMENTAL CONCEPTAND APPLICATION 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 15-18 05-08 03-06 8.500.000 35 Electrical Test Instrumentation dan Sistem Pengukuran(Measurements) 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 30-02 10-13 22-25 12-15 10-13 8.500.000 36 Instrumentation Systems 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 29-01 19-22 17-20 8.500.000 37 Measurements Systems 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 13-16 24-27 01-04 26-29 04-07 8.500.000 38 Energy Audit and Application 4 15-18 12-15 12-15 09-12 21-24 25-28 09-12 30-02 10-13 15-18 12-15 17-20 8.500.000 39 STATISTIK INDUSTRI 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 27-30 10-13 01-04 12-15 17-20 7.950.000 40 CATHODIC PROTECTION FOR MINE STEEL STRUCTUREAND MINING SUPORTING FACILITIES 4 29-01 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 29-01 05-08 03-06 8.750.000 41 Cathodic Protection for Onshore and Offshore Structure 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 01-04 12-15 10-13 8.750.000 42 CORROSION AND SCALING PREVENTION 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 04-07 8.750.000 43 Corrosion Engineering for Non Corrosion Engineers 4 22-25 06-09 06-09 03-06 29-01 04-07 03-06 31-03 04-07 22-25 06-09 11-14 8.750.000 44 INTERNAL AND EXTERNAL CORROSION CONTROL ANDMONITORING FOR PIPELINE AND SURFACE FACILITY 4 16-19 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 16-19 05-08 17-20 8.750.000 45 CCTV INSTALASI, PEMROGRAMAN DAN PERAWATAN 3 29-31 12-14 12-14 09-11 02-04 27-29 09-11 06-08 10-12 29-31 12-14 26-28 5.950.000 46 ADVANCED CCTV Perencanaan, Desain dan Implementasi 3 22-24 19-21 19-21 16-18 23-25 06-08 16-18 13-15 17-19 22-24 19-21 19-21 5.950.000 47 INSTRUMENTATION AND CONTROL SYSTEM 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 13-16 04-07 08-11 06-09 11-14 7.950.000 48 Scale In Oilfield Water 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 09-12 12-15 04-07 7.950.000 49 SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 30-02 17-20 15-18 19-22 11-14 7.950.000 50 PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURANDAN PENGUJIAN 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 5.950.000 51 BASIC FUZZY LOGIC CONTROL AND ITS SIMULATIONWITH SPREADSHEET APPLICATION PROGRAM 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 29-01 19-22 17-20 8.500.000 52 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 18-21 7.950.000 53 CALLIBRATION OF MEASURING TOOL 4 23-26 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 23-26 06-09 17-20 7.950.000
54 CONTROL VALVE OPERATION, MAINTENANCE, ANDTROUBLESHOOTING 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 18-21 7.950.000 55 FINITE ELEMENT METHODS (FEM) 4 16-19 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 16-19 13-16 18-21 7.950.000 56 Flow Measurement and Control Element 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 04-07 7.950.000 57 INDUSTRIAL METROLOGY 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 10-13 7.950.000 58 Inspeksi dan Korosi 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 18-21 7.950.000 59 MEASUREMENT SYSTEM ANALYSIS 4 22-25 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 22-25 13-16 03-06 7.950.000 60 ANSYS BASIC FLUENT CFD 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 27-30 10-13 22-25 12-15 10-13 9.500.000 61 ANSYS INTERMEDIATE FLUENT CFD 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 30-02 17-20 29-01 19-22 17-20 9.500.000 62 ANSYS ADVANCED FLUENT CFD 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 06-09 24-27 01-04 26-29 03-06 9.500.000 63 ADVANCE PROCESS CONTROL, INSTRUMENTATION ANDMETERING 4 15-18 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 15-18 05-08 03-06 8.500.000 64 OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTEDCOMPONENT OBJECT MODEL (DCOM) 4 22-25 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 22-25 12-15 10-13 8.500.000 65 PROCESS CONTROL AND INSTRUMENTATION 4 29-01 19-22 19-22 16-19 21-24 05-08 16-19 06-09 17-20 29-01 19-22 17-20 8.500.000 66 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 01-04 26-29 04-07 8.500.000 67 SAFETY RELIEF VALVE FUNDAMENTAL CONCEPTS, SIZINGAND SELECTION 4 08-11 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 08-11 06-09 11-14 8.500.000 68 FLUID FLOW MEASUREMENT AND METER PROVING INOIL AND GAS INDUSTRY 4 30-02 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 30-02 06-09 03-06 7.950.000 69 GPS(Global Positioning System) for mining andPetroleum 4 15-18 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 15-18 19-22 10-13 8.500.000 70 INDUSTRIAL COMBUSTION AND BURNER 4 22-25 05-08 05-08 02-05 28-31 04-07 02-05 30-02 03-06 22-25 05-08 17-20 8.500.000 71 WATER TREATMENT 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 01-04 26-29 18-21 8.750.000 72 LIFE CYCLE COSTING 3 29-31 26-28 26-28 23-25 28-30 25-27 23-25 27-29 24-26 29-31 26-28 26-28 6.500.000 73 PRODUCTION SAFETY SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 07-10 25-28 30-02 27-30 10-13 7.950.000 74 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 02-05 05-08 17-20 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MECHANICAL
1 BOILER CONTROL SYSTEMS ENGINEERING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 10-13 7.950.000
2 PLUMBING SYSTEM AND MAINTENANCE 3 22-24 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 22-24 26-28 26-28 6.500.000
3 SISTEM KONTROL RHVAC (REFRIGERATION HEATINGVENTILATING AND AIR CONDITIONING) 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 06-10 03-07 29-02 05-09 10-14 9.500.000
4 REFRIGERATION RETROFIT 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 17-20 8.500.000
5 Pipeline Risk & Integrity Management 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 06-08 03-05 22-24 05-07 03-05 6.950.000
7 PLANT LIFE MANAGEMENT THROUGH RELIABILITYBASED INSPECTION 5 08-12 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 01-05 19-23 17-21 9.500.000
8 QC for Water Network (Pipeline) Construction 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 10-12 28-30 26-28 6.950.000
9 Risk Based Inspection 3 24-26 12-14 14-16 11-13 23-25 27-29 11-13 13-15 12-14 24-26 14-16 12-14 6.950.000
10 Basic CNC 3 15-17 12-14 12-14 09-11 14-16 25-27 09-11 13-15 10-12 15-17 12-14 10-12 7.250.000
11
COMPRESSOR OPERATION, MAINTENANCE, TROUBLESHOOTING AND DIAGNOSTIC OF FAILURE ANALYSIS
4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 22-25 19-22 17-20 7.950.000
12 MACHINERY FLUID MECHANICS 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.950.000
13 PELUMAS DAN SISTEM PELUMASAN 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 01-04 05-08 10-13 7.950.000
14 ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OFHEAVY DUTY EQUIPMENT 4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 15-18 19-22 03-06 7.950.000
15 ELECTRO-PNEUMATICS SYSTEM PRINCIPLES ANDAPPLICATION 4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 10-13 7.950.000
16 INSTRUMENTATION AND CONTROL SYSTEM 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.950.000
17 KONTROL ELEKTRIK 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 01-04 12-15 04-07 7.950.000
18 MECHATRONICS APPLICATION IN INDUSTRY 4 08-11 20-23 20-23 17-20 22-25 04-07 17-20 28-31 18-21 08-11 20-23 11-14 7.950.000
19 Mekatronika 4 16-19 27-02 27-30 24-27 29-01 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.950.000
20 PNEUMATIC SYSTEM AND APPLICATION 4 23-26 06-09 06-09 03-06 08-11 05-08 03-06 07-10 04-07 23-26 06-09 03-06 7.950.000
21 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 30-02 12-15 13-16 10-13 15-18 26-29 10-13 13-16 11-14 30-02 13-16 10-13 7.950.000
22 REKAYASA ELEKTRO HIDROLIK AND APLIKASI 4 02-05 19-22 19-22 16-19 21-24 04-07 16-19 27-30 17-20 02-05 19-22 17-20 7.950.000
23 REKAYASA HIDROLIK AND APLIKASI 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 09-12 26-29 04-07 7.950.000
24 INSTRUMENTATION AND BASIC CONTROL SYSTEM 3 15-17 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 15-17 05-07 26-28 5.950.000
25 BELT CONVEYOR OPERATION & MAINTENANCE 4 02-05 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 01-04 12-15 10-13 7.950.000
26 MANAJEMEN MATERIAL 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 15-18 26-29 03-06 7.950.000
27 Manajemen Perbengkelan 4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 22-25 05-08 11-14 7.950.000
28 PENGETAHUAN MATERIAL HANDLING & APLIKASI 4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 13-16 11-14 29-01 13-16 18-21 7.950.000
29 AC & REFRIGERATION PRINCIPLES, OPERATION ANDTROUBLESHOOTING 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 10-13 7.950.000
30 ADVANCED VIBRATION MONITORING TECHNIQUE 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 03-06 7.950.000
31 BEARING TECHNOLOGY AND LUBRICATION SYSTEM 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 17-20 7.950.000
32 CENTRIFUGAL GAS COMPRESSOR Anti Surge Control 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 7.950.000
33 CENTRIFUGAL GAS COMPRESSOR OPERATION &MAINTENANCE 4 22-25 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 22-25 26-29 04-07 7.950.000
34 CENTRIFUGAL PUMP OPERATION AND MAINTENANCE 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 10-13 7.950.000
35 COLD STORAGE PRINCIPLE, OPERATION &TROUBLESHOOTING 4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 11-14 7.950.000
37 GAS TURBINE OPERATION, PERFORMANCE &TROUBLESHOOTING 4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 17-20 7.950.000
38 HYDRAULICS SYSTEMS Engineering Applications 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 02-05 06-09 18-21 7.950.000
39 HYDRAULICS SYSTEMS MAINTENANCE &TROUBLESHOOTING 4 09-12 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 09-12 13-16 04-07 7.950.000
40 MATERIAL ATTITUDE USES AND PROBLEMS 4 23-26 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 23-26 06-09 10-13 7.950.000
41 MATERIAL IDENTIFICATION 4 30-02 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 30-02 13-16 17-20 7.950.000
42 METALLURGY FOR NON METALLURGIST 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 11-14 7.950.000
43 MOTOR CONTROL CENTER OPERATION & MAINTENANCE 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 18-21 7.950.000
44 OPERATING AND MAINTENANCE OF HEAVY DUTYEQUIPMENTS 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 10-13 7.950.000
45 PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 16-19 13-16 11-14 7.950.000
46 PRACTICAL WELDING 4 09-12 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 09-12 12-15 17-20 7.950.000
47 PRACTICE CONSIDERATIONS OF ARC WELDING 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 03-06 7.950.000
48 ROTOR BALANCING AND SHAFT ALIGNMENT 4 02-05 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 01-04 13-16 04-07 7.950.000
49 Welding 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 03-06 7.950.000
50 Welding Joint Inspection 4 02-05 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 01-04 27-30 11-14 7.950.000
51 Welding Metallurgy 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 08-11 05-08 18-21 7.950.000
52 Welding Oxy Acetylene 4 16-19 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 16-19 12-15 04-07 7.950.000
53 MANAJEMEN BENGKEL 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 01-04 05-08 03-06 7.950.000
54 THERMAL SPRAY COATING 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 01-04 12-15 10-13 8.500.000
55 MATERIAL HANDLING & PACKAGING 4 08-11 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 08-11 26-29 17-20 7.950.000
56 AEROENGINE BEARING INSPECTION 3 29-31 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 29-31 19-21 26-28 6.500.000
57 AIR COMPRESSOR 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 01-03 26-28 26-28 5.950.000
58 ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT 3 08-10 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 08-10 05-07 26-28 5.950.000
59 BEARING LUBRICATION TECHNOLOGY 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 13-16 10-13 15-18 12-15 03-06 7.950.000
60 Compressor and Prime Mover Operation & Maintenance 3 31-02 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 31-02 28-30 26-28 6.500.000
61 GAS TURBINE OPERATION & MAINTENANCE 4 09-12 12-15 13-16 10-13 07-10 26-29 10-13 13-16 11-14 09-12 13-16 17-20 7.950.000
62 Machinery Diagnostic 4 16-19 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 16-19 19-22 04-07 7.950.000
63 MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM 3 24-26 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 24-26 26-28 26-28 6.500.000
64 PIPELINE PIGGING OPERATIONS AND EQUIPMENT 3 29-31 05-07 05-07 02-04 02-04 06-08 02-04 06-08 03-05 29-31 05-07 26-28 5.950.000
65 Vibration Monitoring & Control System 3 31-02 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 31-02 14-16 26-28 6.500.000
67 MATERIAL CERTIFICATION REQUIREMENT FOR OIL ANDGAS INDUSTRY 3 08-10 05-07 05-07 02-04 07-09 06-08 02-04 30-01 03-05 08-10 05-07 03-05 6.500.000
68 PROTECTIVE COATING TECHNOLOGY FOR CORROSIONCONTROL 3 15-17 13-15 14-16 11-13 14-16 25-27 11-13 08-10 12-14 15-17 14-16 12-14 6.500.000
69 ROTATING EQUIPMENTS 3 24-26 28-02 28-30 25-27 23-25 25-27 25-27 29-31 26-28 24-26 28-30 26-28 6.500.000
70 ANALISIS VIBRASI 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 13-16 03-06 01-04 05-08 03-06 8.500.000
71 PIPING SYSTEM 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 27-30 10-13 08-11 12-15 10-13 8.500.000
72 MOTOR DIESEL PRINSIP DASAR, OPERASI DANPERAWATAN 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 7.950.000
73 PELUMASAN MESIN 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 7.950.000
74 PEMBANGKIT UAP (BOILER) 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 7.950.000
75 PENGGERAK MULA (PRIME MOVER) 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 7.950.000
76 TURBIN GAS 4 15-18 20-23 20-23 17-20 22-25 04-07 17-20 31-03 18-21 15-18 20-23 04-07 7.950.000
77 TURBIN UAP 4 23-26 27-02 27-30 24-27 29-01 25-28 24-27 07-10 25-28 23-26 27-30 11-14 7.950.000
78 PIPELINE INTERNAL CORROSION CONTROL ANDMONITORING 4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 29-01 19-22 11-14 8.750.000
79 Chiller and Cooling Tower Design and Operation 3 08-10 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 08-10 05-07 26-28 6.500.000
80 DESIGN OF HEATING, VENTILATION AND AIRCONDITIONING SYSTEM 5 15-19 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 15-19 12-16 03-07 9.500.000
81 HVAC SYSTEM Operation & Maintenance 4 22-25 12-15 19-22 16-19 07-10 05-08 16-19 13-16 17-20 22-25 19-22 10-13 8.500.000
82 PETROLEUM INDUSTRIAL REFRIGERATION OPERATIONAND MAINTENANCE 4 29-01 26-01 26-29 23-26 14-17 25-28 23-26 27-30 24-27 29-01 26-29 17-20 8.500.000
83 Practical and Advanced Course on HVAC Systems 4 02-05 06-09 06-09 03-06 21-24 04-07 03-06 31-03 04-07 01-04 06-09 03-06 8.500.000
84 CENTRIFUGAL PUMP Selection, Operation, andMaintenance 5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 08-12 12-16 10-14 9.500.000
85 Gas Compressor Operation, Maintenance &Troubleshooting 4 15-18 12-15 19-22 16-19 07-10 04-07 16-19 13-16 17-20 15-18 19-22 17-20 8.500.000
86 Hydraulics Power System 5 22-26 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 22-26 26-30 03-07 9.500.000
87 KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN,DAN TROUBLESHOOTING 4 29-01 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 29-01 05-08 10-13 8.500.000
88 PUMP AND COMPRESSOR OPERATION, MAINTENANCE &TROUBLESHOOTING 5 08-12 19-23 12-16 09-13 28-01 25-29 09-13 06-10 10-14 01-05 12-16 17-21 9.500.000
89 SISTEM HIDROLIK DAN PNEUMATIK 4 02-05 12-15 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 03-06 8.500.000
90 NON DESTRUCTIVE TEST(NDT) 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.950.000
91 ASME PTC 4 – 1 4 08-11 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 08-11 05-08 03-06 7.950.000
92 BASIC GAS ENGINE 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 10-13 7.950.000
94 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 04-07 7.950.000
95 COAL FIRED POWER PLANT COMBUSTION OPERATION &MAINTENANCE 4 02-05 06-09 06-09 03-06 08-11 04-07 03-06 28-31 04-07 01-04 06-09 11-14 7.950.000
96 DIESEL ENGINE OPERATION AND MAINTENANCE 4 09-12 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 09-12 13-16 18-21 7.950.000
97 DIESEL GUNSET OPERATION AND MAINTENANCE 4 16-19 20-23 20-23 17-20 22-25 05-08 17-20 07-10 18-21 16-19 20-23 03-06 7.950.000
98 GAS TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 10-13 7.950.000
99 OPERATION & MAINTENANCE OF BOILER 4 30-02 05-08 05-08 02-05 07-10 04-07 02-05 27-30 03-06 30-02 05-08 17-20 7.950.000
100 OPERATION, MAINTENANCE AND TROUBLESHOOTINGOF GAS TURBINE 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 04-07 7,950,000
101 Perawatan Belt Conveyor 3 08-10 19-21 19-21 16-18 02-04 06-08 16-18 06-08 17-19 08-10 19-21 26-28 5.950.000
102 STEAM GENERATOR AND TURBINE OPERATION ANDMAINTENANCE 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 13-16 24-27 15-18 26-29 11-14 7.950.000
103 TRANSMISI DAYA MEKANIK (MECHANICAL POWERTRANSMISSION) 4 29-01 12-15 13-16 10-13 08-11 25-28 10-13 31-03 11-14 29-01 13-16 03-06 7.950.000
104 VALVE 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 07-10 18-21 01-04 20-23 10-13 7.950.000
105 Turbomachinery Operation, Maintenance andTroubleshooting 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 09-12 27-30 17-20 7.950.000
106 PRESSURE VESSEL DESIGN, OPERATION & MAINTENANCE 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 27-30 03-06 16-19 05-08 04-07 7.950.000
107 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 01-04 26-29 03-06 7.950.000
108 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 08-11 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 08-11 05-08 10-13 7.950.000
109 BOILER (KETEL UAP) DAN TURBIN UAP OPERASI,PERAWATAN DAN TROUBLESHOOTING 4 15-18 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 15-18 12-15 17-20 7.950.000
110 POMPA DAN KOMPRESOR OPERASI, PERAWATAN DANTROUBLESHOOTING 4 02-05 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 02-05 06-09 18-21 7.950.000
111 Pump Operation, Maintenance & Troubleshooting 4 16-19 20-23 20-23 17-20 29-01 05-08 17-20 07-10 18-21 16-19 20-23 10-13 7.950.000
112 OPERATION AND MAINTENANCE OF HEAVY DUTYEQUIPMENT 4 15-18 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 15-18 26-29 03-06 7.950.000
113 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 29-31 19-21 19-21 16-18 28-30 04-06 16-18 13-15 17-19 29-31 19-21 17-19 5,950,000
114 BEARING AND OIL LUBRICATION FOR MACHINERY 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 01-03 26-28 26-28 5.950.000
115 BOILER OPERATION, MAINTENANCE &TROUBLESHOOTING 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 06-09 10-13 15-18 12-15 10-13 8.500.000
116 COMPRESSOR Operation, Maintenance andTroubleshooting 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.750.000
118 GAS TURBINE PRINCIPLES, INSPECTION, OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 01-04 05-08 11-14 8.500.000
119 HEAT EXCHANGERS Operation, maintenance andtroubleshooting 4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 07-10 11-14 08-11 13-16 18-21 8.500.000
120 HIGH PRESSURE PUMP (HPP) OPERATION,MAINTENANCE AND TROUBLESHOOTING 4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 13-16 18-21 16-19 20-23 04-07 8.500.000
121 Lubrication and Bearing Technology 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 28-31 25-28 23-26 27-30 10-13 8.500.000
122 LUBRIKASI Prinsip Dasar dan Aplikasi 3 31-02 07-09 07-09 04-06 02-04 06-08 04-06 01-03 05-07 31-02 07-09 26-28 6.500.000
123 OIL FILM BEARING (JOURNAL DAN THRUST BEARINGHYDRODYNAMIC BEARINGS) 4 02-05 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 02-05 12-15 17-20 8.500.000
124 PIPELINE Design, Testing, Inspection And Maintenance 4 09-12 19-22 19-22 16-19 14-17 04-07 16-19 13-16 17-20 09-12 19-22 03-06 8.500.000
125 Pressure Vessel Calculation, Codes, Production,Operation, Control & Safeties 4 15-18 26-01 26-29 23-26 21-24 26-29 23-26 27-30 24-27 15-18 26-29 11-14 8.500.000
126 PUMP OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 22-25 05-08 05-08 02-05 28-31 05-08 02-05 30-02 03-06 22-25 05-08 18-21 8.500.000
127 PUMP AND COMPRESSOR OPERATION, MAINTENANCEAND TROUBLESHOOTING 4 29-01 12-15 13-16 10-13 07-10 25-28 10-13 07-10 11-14 29-01 13-16 04-07 8.500.000
128 Refractory and Heat Insulation 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 13-16 18-21 01-04 20-23 10-13 8.500.000
129 REFRIGERATION OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 08-11 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 08-11 27-30 17-20 8.500.000
130 ROTATING EQUIPMENT 4 16-19 06-09 06-09 03-06 29-01 05-08 03-06 31-03 04-07 16-19 06-09 03-06 8.500.000
131 STEAM TURBINE OPERATION, MAINTENANCE ANDTROUBLESHOOTING 4 23-26 12-15 12-15 09-12 08-11 25-28 09-12 06-09 10-13 23-26 12-15 11-14 8.500.000
132 ELECTROPLATING 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 01-04 05-08 03-06 9.250.000
133 FAILURE ANALYSIS METHODS AND CASES 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 10-13 7.950.000
134 PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM(ELECTROPLATING) 4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 17-20 9.250.000
135 ALAT PENUKAR KALOR (HEAT EXCHANGER) OPERASI DANPERAWATAN 4 22-25 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.000
136 ANALISIS DAN PENGUKURAN GETARAN MEKANIK(ANALYSIS AND MEASURING OF VIBRATION MACHINERY) 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 10-13 7.950.000
137 BEARING AND OIL LUBRICATION FOR MACHINERY 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 04-07 7.950.000
138 COATING SYSTEM AND PROTECTION CORROSION 4 30-02 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 30-02 13-16 03-06 7.950.000
139 CONVEYOR OPERASI DAN PERAWATAN 4 15-18 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 15-18 05-08 04-07 7.950.000
140 DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OFJIGS AND FIXTURES) 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 11-14 7.950.000
142 DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 03-06 7.950.000
143 DYNAMIC OF MACHINE TOOLS 4 08-11 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 08-11 06-09 10-13 7.950.000
144 HAND TOOL UTILIZATION 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 11-14 7.950.000
145 HEAVY DUTY EQUIPMENT 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 02-05 05-08 17-20 7.950.000
146 HYDRAULIC CONTROL SYSTEM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 03-06 7.950.000
147 KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS ANDDYNAMICS OF MACHINERIES) 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 11-14 7.950.000
148 MACHINERY NOISE AND PROBLEM SOLVING 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 17-20 7.950.000
149 MANUFACTURING PROCESS TO USE CNC MACHINING 4 02-05 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 02-05 20-23 04-07 7.950.000
150 MANUFACTURING PROCESSES TO USE CASTING 4 09-12 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 09-12 27-30 11-14 7.950.000
151 MANUFACTURING PROCESSES TO USE METAL FORMING 4 15-18 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 15-18 06-09 17-20 7.950.000
152 MEASUREMENT TECHNIQUE FOR MAINTENANCE ANDOPERATION LATHE MACHINE 4 29-01 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 29-01 19-22 10-13 7.950.000
153 NON DESTRUCTIVE TEST 4 08-11 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 08-11 05-08 04-07 7.950.000
154 OXY ACETYLENE WELDING 4 30-02 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 30-02 27-30 03-06 8.500.000
155 PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIALSELECTION) 4 02-05 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 02-05 06-09 10-13 7.950.000
156 PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL 4 09-12 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 09-12 13-16 18-21 7.950.000
157 PENGUJIAN MATERIAL BERSIFAT MERUSAK(DESTRUCTIVE TEST) 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 04-07 7.950.000
158 PERLAKUAN PANAS LOGAM (HEAT TREATMENT FORMETAL) 4 02-05 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 01-04 12-15 03-06 7.950.000
159 PNEUMATIC CONTROL SYSTEM 4 08-11 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 08-11 20-23 10-13 7.950.000
160 PRODUCTION OF HELICAL GEAR 4 09-12 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 09-12 26-29 03-06 7.950.000
161 PROSES PEMESINAN (MACHINING) 4 29-01 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 29-01 20-23 04-07 7.950.000
162 PUMP OPERATION AND MAINTENANCE 4 02-05 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 01-04 27-30 11-14 7.950.000
163 SISTEM PEMIPAAN (PIPING) 4 30-02 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 30-02 26-29 18-21 7.950.000
164 TESTING OF MACHINE TOOLS 4 22-25 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 22-25 27-30 03-06 7.950.000
165 Transmisi Daya Mekanik (Mechanical PowerTransmission) 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 13-16 11-14 01-04 13-16 18-21 7.950.000
166 TROUBLE SHOOTING, INSPECTION, AND MONITORINGOF MACHINERY 4 08-11 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 08-11 19-22 04-07 7.950.000
167 BASIC WELDING 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.950.000
168 GAS METAL ARC WELDING (LAS MIGMAG) 4 15-18 26-01 26-29 23-26 14-17 25-28 23-26 13-16 24-27 15-18 26-29 03-06 8.950.000
170 MANUAL METAL ARC WELDING (LAS LISTRIK) 4 29-01 12-15 12-15 09-12 28-31 26-29 09-12 30-02 10-13 29-01 12-15 18-21 8.950.000
171 OXY ACETYLENE WELDING (LAS ASETILIN) 4 02-05 20-23 20-23 17-20 08-11 04-07 17-20 07-10 18-21 01-04 20-23 04-07 8.950.000
172 WELDING INSPECTION 4 09-12 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 09-12 27-30 11-14 9.500.000
173 WELDING METALLURGY 4 16-19 06-09 06-09 03-06 22-25 05-08 03-06 28-31 04-07 16-19 06-09 17-20 8.950.000
174 WELDING SAFETY 3 24-26 12-14 14-16 11-13 02-04 27-29 11-13 01-03 12-14 24-26 14-16 26-28 6.950.000
175 WELDING TECHNOLOGY 4 30-02 19-22 19-22 16-19 29-01 04-07 16-19 06-09 17-20 30-02 19-22 03-06 8.950.000
176 BRAZING 4 02-05 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 02-05 26-29 10-13 8.950.000
177 ANALISIS GETARAN DALAM PERAWATAN ROTARYEQUIPMENT 4 15-18 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 15-18 12-15 17-20 7.950.000
178 BENGKEL ALAT BERAT 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.950.000
179 BOILER WATER TREATMENT 4 29-01 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 29-01 26-29 10-13 7.950.000
180 CENTRIFUGAL COMPRESSOR 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 01-04 05-08 18-21 7.950.000
181 CENTRIFUGAL COMPRESSOR & STEAM TURBINEPERFORMANCE 4 08-11 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 08-11 13-16 04-07 7.950.000
182 CENTRIFUGAL PUMP AND SEAL 4 16-19 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 16-19 20-23 11-14 7.950.000
183 CORROSION AND CATHODIC PROTECTION 4 23-26 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 23-26 27-30 17-20 7.950.000
184 HEAVY EQUIPMENT MANAGEMENT 4 02-05 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 02-05 12-15 10-13 7.950.000
185 HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 09-12 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 09-12 19-22 18-21 7.950.000
186 NON DESTRUCTIVE TESTING (NDT) 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 15-18 26-29 04-07 7.950.000
187 OPERASI DAN PEMELIHARAAN TURBIN GAS DANGENERATOR 4 22-25 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 22-25 05-08 11-14 7.950.000
188 POMPA OPERASI DAN PERAWATAN 4 29-01 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 29-01 13-16 17-20 7.950.000
189 ROTATING EQUIPMENTS 4 16-19 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 16-19 06-09 18-21 7.950.000
190 TURBIN & GENERATOR OPERATION 4 02-05 26-01 26-29 23-26 28-31 26-29 23-26 13-16 24-27 02-05 26-29 17-20 7.950.000
191 VALVE (CHOKE & CONTROL VALVE) 4 09-12 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 09-12 05-08 03-06 7.950.000
192 WELDING INSPECTION 4 15-18 12-15 13-16 10-13 15-18 25-28 10-13 31-03 11-14 15-18 13-16 10-13 7.950.000
193 LIQUID PENETRANT TESTING 5 29-02 05-09 05-09 02-06 07-11 04-08 02-06 30-03 03-07 29-02 05-09 17-21 11.500.000
194 MAGNETIC PARTICLE TESTING 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 06-10 10-14 01-05 12-16 03-07 11.500.000
195 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.950.000
196 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.950.000
197 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.950.000
198 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.950.000
199 ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSEPEOPLE 3 22-24 12-14 12-14 09-11 21-23 25-27 09-11 06-08 10-12 22-24 12-14 10-12 6.500.000
201 PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK 4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.950.000
202 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.950.000
203 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.000
204 Electric motor Operation, Maintenance &Troubleshooting 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.950.000
205 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 8.750.000
206 WELDING SAFETY 2 04-05 12-13 12-13 09-10 02-03 26-27 09-10 20-21 10-11 11-12 12-13 10-11 3.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MAINTENANCE
1 RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS 3 17-19 07-09 07-09 04-06 16-18 04-06 04-06 08-10 05-07 17-19 07-09 05-07 6.950.000 2 RELIABILITY ENGINEERING (TEKNIK KEANDALAN) 2 15-16 26-27 26-27 23-24 14-15 28-29 23-24 15-16 24-25 15-16 26-27 27-28 3.950.000 3 ADVANCED MAINTENANCE MANAGEMENT 4 22-25 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 22-25 12-15 17-20 7.950.000 4 MACHINERY CONDITION MONITORING FOR PREDICTIVEAND PREVENTIVE MAINTENANCE 4 08-11 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 08-11 19-22 18-21 7.950.000 5 MAINTENANCE PLANNING SCHEDULING ANDCOORDINATING 4 16-19 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 16-19 26-29 04-07 7.950.000 6 MAINTENANCE MANAGEMENT SYSTEM FORSUPERVISOR 4 29-01 26-01 26-29 23-26 07-10 25-28 23-26 27-30 24-27 29-01 26-29 17-20 7.950.000 7 MAINTENANCE AND SPARE PART MANAGEMENT 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 03-06 7.950.000 8 FAULT FINDING SKILLS TECHNICAL TROUBLESHOOTING 3 03-05 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 03-05 07-09 26-28 6.500.000 9 Production Optimization and Minimize Down Time 3 02-04 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 01-03 12-14 26-28 6.500.000 10 RELIABILITY CENTERED MAINTENANCE (RCM) 3 15-17 28-02 28-30 25-27 02-04 25-27 25-27 01-03 26-28 15-17 28-30 26-28 6.500.000 11 RELIABILITY CENTERED MAINTENANCE (RCM) IncreasingSafety & Reliability in Gas Pipeline System 3 22-24 07-09 07-09 04-06 02-04 06-08 04-06 08-10 05-07 22-24 07-09 26-28 6.500.000 12 MAINTENANCE MANAGEMENT 3 03-05 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 03-05 19-21 26-28 6.500.000 13 SPARE PARTS MAINTENANCE MANAGEMENT 3 10-12 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 10-12 26-28 26-28 6.500.000 14 EFFECTIVENESS DESIGN OF MAINTENANCEORGANIZATION AND ADMINISTRATION 3 17-19 13-15 14-16 11-13 14-16 25-27 11-13 14-16 12-14 17-19 14-16 26-28 5.950.000 15 MAINTENANCE CONTROL AND MONITORING 3 10-12 12-14 12-14 09-11 02-04 25-27 09-11 13-15 10-12 10-12 12-14 26-28 6.500.000 16 THE ECONOMICS OF MAINTENANCE MANAGEMENT 3 31-02 12-14 12-14 09-11 30-01 25-27 09-11 06-08 10-12 31-02 12-14 10-12 5.950.000 17 MAINTENANCE PLANNING AND SCHEDULING 3 02-04 05-07 05-07 02-04 02-04 06-08 02-04 30-01 03-05 01-03 05-07 03-05 6.500.000 18 PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) 4 08-11 12-15 12-15 09-12 07-10 26-29 09-12 06-09 10-13 08-11 12-15 10-13 8.500.000
19 RELIABILITY CENTERED MAINTENANCE 3 15-17 21-23 21-23 18-20 14-16 04-06 18-20 14-16 19-21 15-17 21-23 19-21 6.500.000 20 Integrated Maintenance Management 4 02-05 20-23 20-23 17-20 07-10 04-07 17-20 30-02 18-21 02-05 20-23 18-21 7.950.000 21 Effective and Efficient of Maintenance Management 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 08-10 26-28 10-12 28-30 26-28 5.950.000 22 Total Productive Maintenance (TPM) 4 22-25 06-09 06-09 03-06 28-31 04-07 03-06 28-31 04-07 22-25 06-09 18-21 7.950.000 23 PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVEMAINTENANCE) 4 09-12 12-15 13-16 10-13 22-25 26-29 10-13 31-03 11-14 09-12 13-16 03-06 7.950.000 24 TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVEMAINTENANCE UNTUK KENDARAAN) 4 30-02 05-08 05-08 02-05 14-17 04-07 02-05 27-30 03-06 30-02 05-08 04-07 7.950.000 25 TEKNIK PERAWATAN MEKANIK 4 02-05 12-15 12-15 09-12 21-24 26-29 09-12 30-02 10-13 01-04 12-15 11-14 7.950.000 26 MAINTENANCE OF MACHINE TOOLS 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 30-02 03-06 08-11 05-08 03-06 7,950,000 27 COMPETITIVE MAINTENANCE & SPARE PARTSMANAGEMENT 4 15-18 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 15-18 19-22 03-06 7.950.000 28 Maintenance Strategic Planning 4 23-26 06-09 06-09 03-06 22-25 05-08 03-06 13-16 04-07 23-26 06-09 04-07 7.950.000 29 MAINTENANCE SYSTEM AND DOCUMENTATION 4 30-02 12-15 13-16 10-13 29-01 26-29 10-13 28-31 11-14 30-02 13-16 11-14 7.950.000 30 MANAGING MAINTENANCE RESOURCES 4 02-05 19-22 19-22 16-19 08-11 04-07 16-19 30-02 17-20 02-05 19-22 18-21 7.950.000 31 RELIABILITY CENTERED MAINTENANCE & RISK BASEDINSPECTION 5 22-26 19-23 12-16 09-13 21-25 25-29 09-13 27-31 10-14 22-26 12-16 10-14 8.950.000 32 ROOT CAUSE ANALYSIS 4 29-01 12-15 20-23 17-20 28-31 04-07 17-20 13-16 18-21 29-01 20-23 17-20 7.950.000 33 Spare Part Management 4 02-05 27-02 27-30 24-27 07-10 25-28 24-27 31-03 25-28 01-04 27-30 04-07 7.950.000 34 ADVANCED MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 15-18 19-22 17-20 7.950.000 35 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 02-05 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 02-05 19-22 10-13 7.950.000 36 MAINTENANCE MANAGEMENT 4 16-19 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 16-19 26-29 03-06 7.950.000 37 MAINTENANCE OF MACHINE COMPONENTS 4 23-26 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 23-26 05-08 10-13 7.950.000 38 MAINTENANCE SYSTEM AND COST 4 30-02 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 30-02 12-15 18-21 7.950.000 39 MODERN MAINTENANCE MANAGEMENT 4 02-05 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 01-04 26-29 18-21 7.950.000 40 PERENCANAAN DAN PENJADWALAN PERAWATAN(MAINTENANCE PLANNING AND SCHEDULING) 4 29-01 05-08 05-08 02-05 28-31 05-08 02-05 06-09 03-06 29-01 05-08 17-20 7.950.000 41 PREDICTIVE MAINTENANCE 4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 18-21 7.950.000 42 RELIABILITY CENTERED MAINTENANCE (RCM) 4 23-26 19-22 19-22 16-19 14-17 04-07 16-19 27-30 17-20 23-26 19-22 10-13 7.950.000 43 TEKNOLOGI PERAWATAN MESIN 4 15-18 20-23 20-23 17-20 15-18 04-07 17-20 28-31 18-21 15-18 20-23 17-20 7.950.000 44 Total Productive Maintenance (TPM) 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 07-10 04-07 29-01 06-09 10-13 7.950.000 45 PREVENTIVE MAINTENANCE 4 02-05 20-23 20-23 17-20 22-25 04-07 17-20 07-10 18-21 01-04 20-23 03-06 7.950.000 46 PREVENTIVE MAINTENANCE GENERATOR 4 08-11 27-02 27-30 24-27 29-01 26-29 24-27 13-16 25-28 08-11 27-30 10-13 7.950.000 47 CULTURE CHANGE FOR MAINTENANCE AND RELIABILITYIMPROVEMENT 3 22-24 19-21 19-21 16-18 21-23 04-06 16-18 13-15 17-19 22-24 19-21 17-19 6.500.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
1 ADVANCED CONTROL FOUNDATION 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 29-01 26-29 03-06 7.950.000 2 FLOWMETERING AND CUSTODY TRANSFER 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 13-16 10-13 08-11 12-15 17-20 7.950.000 3 PRACTICAL PROCESS CONTROL 4 15-18 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 15-18 19-22 04-07 7.950.000 4 Implementasi DSP (digital signal processing) DalamSistem Komunikasi 4 22-25 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 22-25 12-15 10-13 7.950.000 5 INDUSTRIAL ROBOTICS SENSING, PLANNING, ANDCONTROL 4 08-11 26-01 26-29 23-26 21-24 25-28 23-26 30-02 24-27 08-11 26-29 10-13 7.950.000 6 AUTOMATIC VOLTAGE REGULATOR(AVR) OPERATIONAND MAINTENANCE 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 18-21 7.950.000 7 GENERATOR OPERATION, MAINTENANCE &TROUBLESHOOTING 4 23-26 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 23-26 19-22 03-06 7.950.000 8 PLC ( Tingkat dasar ) 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 18-21 7.950.000 9 PLC (TINGKAT MAHIR) 4 30-02 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 30-02 27-30 04-07 7.950.000 10 POWER FACTOR IMPROVEMENT 4 02-05 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 02-05 05-08 10-13 7.950.000 11 PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR 4 29-01 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 29-01 06-09 18-21 7.950.000 12 SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGALISTRIK 4 08-11 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 08-11 20-23 10-13 7.950.000 13 SISTEM INSTALASI TENAGA LISTRIK 4 16-19 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 16-19 27-30 17-20 7.950.000 14 TRANFORMER OPERATION & MAINTENANCE 4 09-12 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 09-12 26-29 04-07 7.950.000 15 Uninterupted Power Suply 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 10-13 7.950.000 16 PERFORMANCE ANALISYS AND MAINTENANCE OFELECTRICAL DISTRIBUTION NETWORKS FOR SUPERVISOR 4 08-11 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 08-11 12-15 10-13 8.500.000 17 PERFORMANCE ANALISYS AND OPERATING OFGENERATOR SET FOR SENIOR OPERATOR AND ENGINEER 4 15-18 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 15-18 19-22 18-21 8.500.000 18 PERFORMANCE ANALISYS AND OPERATING OFINDUCTION MOTOR FOR SENIOR OPERATOR AND
JUNIOR SUPERVISOR
4 22-25 27-02 27-30 24-27 08-11 25-28 24-27 28-31 25-28 22-25 27-30 04-07 8.500.000 19
DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES, MAINTENANCE, OPERATION, PROGRAMMING & TROUBLESHOOTING
5 29-02 19-23 19-23 16-20 07-11 04-08 16-20 27-31 17-21 29-02 19-23 03-07 9.500.000 20 DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL 4 02-05 27-02 27-30 24-27 15-18 25-28 24-27 13-16 25-28 02-05 27-30 11-14 8.500.000 21 Electrical Control Wiring 4 09-12 06-09 06-09 03-06 22-25 04-07 03-06 31-03 04-07 09-12 06-09 17-20 8.500.000 22 PLC COMMUNICATION AND LAN 4 22-25 27-02 27-30 24-27 15-18 25-28 24-27 28-31 25-28 22-25 27-30 03-06 8.500.000 23 PLC OPERATION, PROGRAMMING, TROUBLESHOOTINGAND MAINTENANCE 4 30-02 05-08 05-08 02-05 21-24 05-08 02-05 30-02 03-06 30-02 05-08 10-13 8.500.000 24 ACDC ELECTRICAL MOTOR CONTROL 4 29-01 19-22 19-22 16-19 28-31 04-07 16-19 06-09 17-20 29-01 19-22 17-20 7.950.000
25 BASIC ELECTRICAL 3 02-04 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 01-03 26-28 26-28 5.950.000 26 BASIC ELECTRICAL FOR NON ELECTRICIAN 4 08-11 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 08-11 05-08 03-06 7.950.000 27 DISTRIBUTION SYSTEM PROTECTION 4 15-18 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 15-18 12-15 10-13 7.950.000 28 Electric Installation In Hazardous Area 4 22-25 20-23 20-23 17-20 21-24 04-07 17-20 07-10 18-21 22-25 20-23 18-21 7.950.000 29 ELECTRICAL CALIBRATION 3 31-02 28-02 28-30 25-27 30-01 25-27 25-27 14-16 26-28 31-02 28-30 26-28 5.950.000 30 ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE 4 02-05 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 02-05 06-09 04-07 7.950.000 31 ELECTRICAL POWER GENERATOR OPERATION,PROTECTION AND MAINTANANCE 5 08-12 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 08-12 12-16 10-14 8.950.000 32 ELECTRICAL POWER SYSTEM ANALYSIS 4 16-19 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 16-19 19-22 17-20 7.950.000 33 ELECTRICAL POWER SYSTEM ANALYSIS USINGSOFTWARE APPLICATION 4 23-26 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 23-26 26-29 03-06 7.950.000 34 ELECTRICAL POWER SYSTEM PROTECTION 4 29-01 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 29-01 05-08 10-13 7.950.000 35 ELECTRICAL SYSTEM GENERATORSET 4 02-05 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 01-04 12-15 18-21 7.950.000 36 ELECTRONIC SHUTDOWN AND LOGIC SYSTEM 4 08-11 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 08-11 20-23 04-07 7.950.000 37 GENERATOR EXCITATION SYSTEM 4 15-18 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 15-18 27-30 11-14 7.950.000 38 GROUNDING SYSTEM AND LIGHTNING PROTECTION 4 22-25 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 22-25 06-09 17-20 7.950.000 39 High Voltage Electrical Equipmment Operation,Maintenance and Repair 5 29-02 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 29-02 12-16 03-07 8.950.000 40 INSTRUMENTATION ELECTRIC Operation andMaintenance 4 02-05 12-15 19-22 16-19 22-25 04-07 16-19 06-09 17-20 02-05 19-22 10-13 7.950.000 41 LV AND MV GENERATOR 4 09-12 26-01 26-29 23-26 28-31 25-28 23-26 13-16 24-27 09-12 26-29 18-21 7.950.000 42 LV ELECTRICAL POWER DISTRIBUTION SYSTEM 4 16-19 05-08 05-08 02-05 07-10 05-08 02-05 27-30 03-06 16-19 05-08 03-06 7.950.000 43 LV SWITCHGEAR MAINTENANCE AND COORDINATION 4 23-26 12-15 12-15 09-12 14-17 26-29 09-12 30-02 10-13 23-26 12-15 11-14 7.950.000 44 POWER ELECTRICAL INSTALLATION SYSTEM 4 29-01 19-22 20-23 17-20 21-24 04-07 17-20 07-10 18-21 29-01 20-23 17-20 7.950.000 45 POWER ELECTRONICS 4 02-05 27-02 27-30 24-27 29-01 25-28 24-27 13-16 25-28 01-04 27-30 04-07 7.950.000 46 POWER PROTECTION RELAY SYSTEM 4 08-11 06-09 06-09 03-06 08-11 05-08 03-06 28-31 04-07 08-11 06-09 10-13 7.950.000 47 POWER TRANSFORMER 4 15-18 12-15 13-16 10-13 15-18 26-29 10-13 31-03 11-14 15-18 13-16 18-21 7.950.000 48 PROGRAMMABLE LOGIC CONTROLLER(PLC) 4 22-25 20-23 19-22 16-19 22-25 04-07 16-19 06-09 17-20 22-25 19-22 03-06 7.950.000 49 Soft Starter (Operation, Protection and Maintanance) 3 31-02 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 31-02 26-28 26-28 5.950.000 50 TRANSMISSION AND DISTRIBUTION OPERATION ANDMAINTENANCE 4 02-05 05-08 05-08 02-05 28-31 05-08 02-05 27-30 03-06 02-05 05-08 11-14 7.950.000 51 Uninterruptible Power Suply Operation andMaintenance 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 30-02 10-13 09-12 12-15 17-20 7.950.000 52 VARIABLE FREQUENCY DRIVES 4 16-19 19-22 20-23 17-20 14-17 04-07 17-20 07-10 18-21 16-19 20-23 04-07 7.950.000 53 VARIABLE SPEED DRIVES 4 23-26 27-02 27-30 24-27 21-24 25-28 24-27 13-16 25-28 23-26 27-30 10-13 7.950.000 54 POWER DISTRIBUTION TRANSFORMER 4 29-01 06-09 06-09 03-06 29-01 05-08 03-06 28-31 04-07 29-01 06-09 18-21 7.950.000
55 PEMELIHARAAN MOTOR MOTOR LISTRIK 4 02-05 12-15 13-16 10-13 08-11 26-29 10-13 31-03 11-14 01-04 13-16 03-06 7.950.000 56 TRANSFORMATOR DAYA OPERASI DAN PEMELIHARAAN 3 08-10 21-23 19-21 16-18 02-04 04-06 16-18 06-08 17-19 08-10 19-21 26-28 5.950.000 57 ELECTRONIC SWITCHBOARD RESCUE 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 13-15 24-26 15-17 26-28 26-28 5.950.000 58 GARDU INDUK 3 22-24 05-07 05-07 02-04 02-04 06-08 02-04 27-29 03-05 22-24 05-07 26-28 5.950.000 59 Electrical Panel Design 3 31-02 12-14 12-14 09-11 02-04 27-29 09-11 30-01 10-12 31-02 12-14 26-28 5.950.000 60 Electrical Safety For Electrical Technician 4 02-05 19-22 20-23 17-20 15-18 04-07 17-20 07-10 18-21 02-05 20-23 11-14 7.950.000 61 Motor Rewinding 3 10-12 28-02 28-30 25-27 02-04 25-27 25-27 14-16 26-28 10-12 28-30 26-28 6.500.000 62 Perhitungan Perkiraan Biaya Proyek Mekanikal ElektrikalUntuk Bangunan Gedung 2 18-19 08-09 08-09 05-06 02-03 07-08 05-06 20-21 06-07 18-19 08-09 26-27 3.950.000 63 Power Transformer (Operation, Testing, Asessment AndMaintenance) 4 23-26 12-15 13-16 10-13 22-25 26-29 10-13 28-31 11-14 23-26 13-16 17-20 7.950.000 64 ELECTRICAL SAFETY FOR POWER LINE 3 29-31 21-23 19-21 16-18 28-30 04-06 16-18 01-03 17-19 29-31 19-21 26-28 5.950.000 65 TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGIPADA BANGUNAN GEDUNG 4 23-26 26-01 26-29 23-26 07-10 25-28 23-26 13-16 24-27 23-26 26-29 17-20 7.950.000 66 Data Akuisisi, Interfacing, dan Sistem Monitoring 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 27-29 03-05 01-03 05-07 03-05 6.750.000 67 Pemrograman Mikrokontroler AVR denganCodeVisionAVR 3 08-10 12-14 12-14 09-11 07-09 25-27 09-11 30-01 10-12 08-10 12-14 10-12 6.750.000 68 Pemrograman Mikrokontroler untuk Robotika 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 06-08 17-19 15-17 19-21 17-19 6.750.000 69 ADVANCE COURSE ON LIGHTNING PROTECTION ANDGROUNDING SYSTEM 5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 30-03 24-28 15-19 26-30 03-07 9.500.000 70 Lightning Protection and Grounding System for Oil & GasRefinery and Petrochemical Installation 3 22-24 05-07 05-07 02-04 21-23 04-06 02-04 06-08 03-05 22-24 05-07 26-28 6.950.000 71 LIGHTNING PROTECTION AND GROUNDING SYSTEM FORPOWER PLANT, TRANSMISSION, DISTRIBUTION AND
LARGE INDUSTRY
3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 13-15 10-12 29-31 12-14 10-12 6.950.000 72 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 4 22-25 19-22 19-22 16-19 21-24 04-07 16-19 30-02 17-20 22-25 19-22 17-20 8.500.000 73 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 4 29-01 26-01 26-29 23-26 28-31 25-28 23-26 06-09 24-27 29-01 26-29 03-06 8.500.000 74 PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES,OPERATION AND PROGRAMMING 4 02-05 05-08 05-08 02-05 07-10 05-08 02-05 13-16 03-06 01-04 05-08 10-13 8.500.000 75
SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) PRINCIPLES, HARDWARE SYSTEM,
OPERATION & PROGRAMMING 4 08-11 12-15 12-15 09-12 14-17 26-29 09-12 27-30 10-13 08-11 12-15 18-21 8.500.000 76 NUMERICAL CONTROL AND ROBOTIC 4 22-25 26-01 26-29 23-26 28-31 25-28 23-26 30-02 24-27 22-25 26-29 03-06 7.950.000 77 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 22-25 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 22-25 12-15 18-21 7.950.000 78 Electric motor Operation, Maintenance &Troubleshooting 4 15-18 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 15-18 06-09 03-06 7.950.000
79 PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 17-20 7.950.000 80 GENSET TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 19-22 19-22 16-19 28-31 05-08 16-19 06-09 17-20 22-25 19-22 04-07 7.950.000 81 SISTEM KONTROL MOTOR LISTRIK 4 23-26 12-15 12-15 09-12 14-17 25-28 09-12 30-02 10-13 23-26 12-15 04-07 7.950.000 82 TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE 4 30-02 19-22 19-22 16-19 21-24 04-07 16-19 06-09 17-20 30-02 19-22 11-14 7.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - IT
1 AUTOCAD COSTUMIZATION 4 02-05 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 01-04 26-29 11-14 7.950.000
2 INFORMATION TECHNOLOGY & TELECOMUNICATION 4 22-25 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 22-25 27-30 17-20 7.950.000
3 Holistic Information Security 3 29-31 05-07 05-07 02-04 28-30 04-06 02-04 30-01 03-05 29-31 05-07 03-05 5.950.000
4 Information Security System 3 02-04 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 01-03 12-14 10-12 5.950.000
5 OPTIMALISASI CYBER PUBLIC RELATION 3 08-10 19-21 19-21 16-18 07-09 06-08 16-18 13-15 17-19 08-10 19-21 17-19 5.950.000
6 PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN 3 15-17 26-28 26-28 23-25 14-16 27-29 23-25 27-29 24-26 15-17 26-28 26-28 5.950.000
7 TEKNIK DESAIN GRAFIS PADA WEB 3 22-24 07-09 07-09 04-06 21-23 04-06 04-06 01-03 05-07 22-24 07-09 05-07 5.950.000
8 TEKNIK DESAIN WEB 3 31-02 13-15 14-16 11-13 30-01 25-27 11-13 08-10 12-14 31-02 14-16 12-14 5.950.000
9 ADVANCE MICROSOFT EXCEL 3 22-24 19-21 19-21 16-18 02-04 04-06 16-18 06-08 17-19 22-24 19-21 26-28 5.950.000
10 ADVANCE MICROSOFT POWERPOINT 3 08-10 28-02 28-30 25-27 07-09 25-27 25-27 14-16 26-28 08-10 28-30 26-28 5.950.000
11 ADVANCE MICROSOFT WORD 3 15-17 07-09 07-09 04-06 14-16 06-08 04-06 29-31 05-07 15-17 07-09 05-07 5.950.000
12 MICROSOFT EXCEL VISUAL BASIC For Application (VBA-MACRO) 3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 01-03 12-14 24-26 14-16 12-14 5.950.000
13 BASIC AUTOCAD 2D (2D TECHNICAL DRAWING WITHAUTOCAD) 5 15-19 05-09 05-09 02-06 14-18 04-08 02-06 30-03 03-07 15-19 05-09 03-07 8.950.000
14 BASIC AUTOCAD 3D (3D TECHNICAL DRAWING WITHAUTOCAD) 2 22-23 12-13 12-13 09-10 21-22 25-26 09-10 20-21 10-11 22-23 12-13 10-11 3.950.000
15 BASIC TELECOMMUNICATION PABX 3 15-17 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 15-17 26-28 26-28 5.950.000
16 BASIC VSAT SYSTEM 3 22-24 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 22-24 05-07 26-28 5.950.000
17 FIBER OPTIC SYSTEM 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 13-15 17-19 01-03 19-21 26-28 6.500.000
18 Fraud Management in telecommunication business 3 08-10 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 08-10 28-30 26-28 5.950.000
19 INTERNETWORKING DENGAN TCP IP 3 17-19 07-09 07-09 04-06 14-16 04-06 04-06 01-03 05-07 17-19 07-09 26-28 5.950.000
20 IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI 3 24-26 13-15 14-16 11-13 21-23 27-29 11-13 08-10 12-14 24-26 14-16 10-12 5.950.000
21 NETWORK MANAGEMENT AND OPERATIONS SUPPORTSYSTEM 3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 14-16 19-21 31-02 21-23 17-19 5.950.000
22 POWER LINE CARRIER 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 27-29 24-26 03-05 26-28 26-28 5.950.000
24 MANAJEMEN KABEL PADA JARINGAN TELEKOMUNIKASI 4 15-18 12-15 12-15 09-12 15-18 26-29 09-12 06-09 10-13 15-18 12-15 11-14 8.500.000
25 MIKROTIK FUNDAMENTAL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 29-31 26-28 29-31 28-30 26-28 5.950.000
26 FUNDAMENTAL OF RADIO COMMUNICATIONS 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 01-03 05-07 01-03 07-09 05-07 6.500.000
27 INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY(I T I L) VERSION 3.1 4 15-18 27-02 27-30 24-27 14-17 25-28 24-27 30-02 25-28 15-18 27-30 04-07 7.950.000
28 MASTERING MICROSOFT EXCEL 2007 2 11-12 26-27 26-27 23-24 10-11 25-26 23-24 20-21 24-25 11-12 26-27 26-27 3.950.000
29 CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICALAUTOCAD OR CATIA) 4 16-19 27-02 27-30 24-27 22-25 25-28 24-27 31-03 25-28 16-19 27-30 11-14 7.950.000
30 Teknologi CAD CAM 4 09-12 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 09-12 12-15 11-14 7.950.000
31 PENGEMBANGAN SITUS WEB 3 22-24 12-14 12-14 09-11 02-04 25-27 09-11 06-08 10-12 22-24 12-14 26-28 5.950.000
32 COLLABORATION MS Office AND EFFECTIVEPRESENTATION 3 02-04 21-23 21-23 18-20 02-04 04-06 18-20 08-10 19-21 01-03 21-23 17-19 5.950.000
33 PRESENTATION SKILL FOR PUBLIC RELATIONS &MARKETING STAFF (USING MICROSOFT POWER POINT) 2 22-23 22-23 22-23 19-20 21-22 07-08 19-20 20-21 20-21 22-23 22-23 20-21 3.950.000
34 IT AUDIT PRACTICES 3 08-10 21-23 21-23 18-20 07-09 04-06 18-20 01-03 19-21 08-10 21-23 17-19 5.950.000
35 IT HELPDESK 3 17-19 28-02 28-30 25-27 14-16 25-27 25-27 08-10 26-28 17-19 28-30 26-28 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MINING
1 BATUBARA 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 30-01 03-05 01-03 05-07 03-05 6.500.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 08-11 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 08-11 12-15 10-13 7.950.000
3 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 16-19 14-17 05-08 16-19 13-16 17-20 15-18 19-22 17-20 7.950.000
4 PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN 3 22-24 26-28 26-28 23-25 21-23 27-29 23-25 27-29 24-26 22-24 26-28 26-28 5.950.000
5 PEMINDAHAN TANAH MEKANIS 3 29-31 07-09 07-09 04-06 28-30 04-06 04-06 01-03 05-07 29-31 07-09 05-07 5.950.000
6 VENTILASI TAMBANG 3 03-05 12-14 14-16 11-13 02-04 25-27 11-13 08-10 12-14 03-05 14-16 12-14 6.500.000
7 EVALUASI STUDI KELAYAKAN DALAM USAHAPERTAMBANGAN 3 10-12 21-23 21-23 18-20 09-11 06-08 18-20 13-15 19-21 10-12 21-23 19-21 5.950.000
8 PERENCANAAN TAMBANG TERBUKA 3 17-19 28-02 28-30 25-27 16-18 27-29 25-27 29-31 26-28 17-19 28-30 26-28 5.950.000
9 PEMBORAN EKSPLORASI BATUBARA 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 30-01 03-05 24-26 05-07 03-05 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
ENGINEERING - MIGAS
1 GAS PROCESSING AND EQUIPMENT 4 08-11 19-22 19-22 16-19 07-10 04-07 16-19 06-09 17-20 08-11 19-22 17-20 8.500.000 2 BASIC OF SURFACE OPERATION AND MAINTENANCE FOROIL AND GAS INDUSTRIES 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 23-26 20-23 10-13 7.950.000
3 PENGETAHUAN TEKNIK PERMINYAKAN UNTUKMANAJERIAL 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 31-03 04-07 08-11 06-09 03-06 7.950.000 4 Oil and Gas Measurements 4 08-11 06-09 06-09 03-06 15-18 04-07 03-06 28-31 04-07 08-11 06-09 11-14 8.500.000 5 GAS DEHYDRATION AND GLYCOL REGENERATION 4 30-02 12-15 13-16 10-13 08-11 25-28 10-13 07-10 11-14 30-02 13-16 18-21 8.750.000 6 GAS SWEETENING H2S AND CO2 REMOVAL INCHEMICAL, OIL AND GAS 4 02-05 20-23 20-23 17-20 15-18 05-08 17-20 13-16 18-21 02-05 20-23 03-06 8.750.000 7 GAS HANDLING, CONDITIONING, AND PROCESSINGFACILITIES 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 13-16 03-06 15-18 05-08 03-06 7.950.000 8 OIL AND GAS HANDLING FACILITIES 4 16-19 12-15 13-16 10-13 22-25 25-28 10-13 28-31 11-14 16-19 13-16 18-21 7.950.000 9 OIL AND GAS PROCESSING PLANT DESIGN ANDOPERATION 4 23-26 20-23 20-23 17-20 29-01 05-08 17-20 31-03 18-21 23-26 20-23 03-06 7.950.000 10 Drilling operations for operator in oil and gas industries 4 29-01 05-08 05-08 02-05 07-10 04-07 02-05 06-09 03-06 29-01 05-08 10-13 8.500.000 11 NATURAL GAS PROCESSING - FRACTINATION ANDREFREGERATION 4 08-11 19-22 19-22 16-19 21-24 05-08 16-19 27-30 17-20 08-11 19-22 03-06 8.500.000 12 PETROLEUM ENGINEERING FOR NON PETROLEUMEMPLOYEE 4 15-18 26-01 26-29 23-26 28-31 26-29 23-26 30-02 24-27 15-18 26-29 11-14 8.500.000 13 PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FORPETROLEUM PRODUCTION SYSTEM 4 30-02 12-15 13-16 10-13 15-18 25-28 10-13 13-16 11-14 30-02 13-16 04-07 8.500.000 14 PRODUCTION LOGGING 4 02-05 20-23 20-23 17-20 22-25 05-08 17-20 28-31 18-21 02-05 20-23 10-13 8.500.000 15 SUPPLY CHAIN MANAGEMENT IN THE UPSTREAM OIL &GAS INDUSTRY 3 10-12 28-02 28-30 25-27 02-04 27-29 25-27 01-03 26-28 10-12 28-30 26-28 6.500.000 16 WATER FLOODING 4 16-19 05-08 05-08 02-05 29-01 04-07 02-05 06-09 03-06 16-19 05-08 17-20 8.500.000 17 WP&B, AFE and POD 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 13-16 10-13 23-26 12-15 03-06 8.500.000 18 ARTIFICIAL LIFT 4 29-01 19-22 19-22 16-19 14-17 05-08 16-19 27-30 17-20 29-01 19-22 11-14 8.500.000 19 OFFSHORE WELLHEAD FUNCTION ANDTROUBLESHOOTING 4 02-05 26-01 26-29 23-26 21-24 26-29 23-26 30-02 24-27 01-04 26-29 18-21 8.500.000 20 Advanced Oil and Gas Production System 3 29-31 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 29-31 26-28 26-28 7.950.000 21 BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &ENVIRONMENTAL CONSIDERATION 3 02-04 05-07 05-07 02-04 02-04 04-06 02-04 06-08 03-05 01-03 05-07 26-28 7.950.000 22 Basic Petroleum Engineering 3 08-10 12-14 12-14 09-11 02-04 27-29 09-11 13-15 10-12 08-10 12-14 26-28 7.950.000 23 Basic Reservoir Engineering for Non Petroleum Engineer 3 15-17 19-21 19-21 16-18 14-16 06-08 16-18 27-29 17-19 15-17 19-21 17-19 7.950.000 24 ELECTRIC SUBMERSIBLE PUMP PRINCIPLES,INSTALLATION, OPERATION, MAINTENANCE AND
TROUBLESHOOTING
3 31-02 07-09 07-09 04-06 28-30 04-06 04-06 08-10 05-07 31-02 07-09 03-05 7.950.000 25 FORMATION DAMAGE AND WELL STIMULATION 3 03-05 13-15 14-16 11-13 02-04 27-29 11-13 14-16 12-14 03-05 14-16 10-12 7.950.000 26 NATURAL GAS RESERVOIR, PROCESSING ANDECONOMICS ASPECTS 3 10-12 21-23 21-23 18-20 07-09 06-08 18-20 29-31 19-21 10-12 21-23 19-21 7.950.000
27 Oil & Gas Production System 3 17-19 26-28 26-28 23-25 16-18 25-27 23-25 30-01 24-26 17-19 26-28 26-28 7.950.000 28 OIL & GAS MEASUREMENT AND CALCULATION 3 24-26 05-07 05-07 02-04 23-25 04-06 02-04 06-08 03-05 24-26 05-07 05-07 7.950.000 29 OIL AND GAS HANDLING FACILITIES 3 29-31 12-14 12-14 09-11 30-01 27-29 09-11 13-15 10-12 29-31 12-14 12-14 7.950.000 30 OIL AND GAS WELLS STIMULATION BY ACIDIZING ANDHYDRAULIC FRACTURING 3 02-04 19-21 19-21 16-18 02-04 06-08 16-18 27-29 17-19 01-03 19-21 17-19 7.950.000 31 Oil Field, and 100 Methods to Maintain and IncreaseProduction 3 08-10 28-02 28-30 25-27 09-11 25-27 25-27 01-03 26-28 08-10 28-30 26-28 7.950.000 32 PETROLEUM ENGINEERING FOR NON PETROLEUMENGINEERS 3 15-17 07-09 07-09 04-06 14-16 04-06 04-06 08-10 05-07 15-17 07-09 03-05 7.950.000 33 PRODUCTION DOWNHOLE AND SUBSURFACEEQUIPMENTS 3 22-24 13-15 14-16 11-13 21-23 27-29 11-13 14-16 12-14 22-24 14-16 10-12 7.950.000 34 PRODUCTION OPERATION MANAGEMENT FORMANAGERS 3 31-02 21-23 21-23 18-20 28-30 06-08 18-20 29-31 19-21 31-02 21-23 19-21 7.950.000 35 Pump Selection, Design and Operation for Oil and GasSurface Production Facilities 3 03-05 26-28 26-28 23-25 02-04 25-27 23-25 30-01 24-26 03-05 26-28 26-28 7.950.000 36 SUCKER ROD PUMP DESIGN, OPERATION ANDTROUBLESHOOTING 3 10-12 05-07 05-07 02-04 07-09 04-06 02-04 06-08 03-05 10-12 05-07 05-07 7.950.000 37 Surface Production Operation and Equipments 3 17-19 12-14 12-14 09-11 16-18 27-29 09-11 13-15 10-12 17-19 12-14 12-14 7.950.000 38 WELL COMPLETION AND WORK OVER 3 24-26 19-21 19-21 16-18 23-25 06-08 16-18 27-29 17-19 24-26 19-21 17-19 7.950.000 39 BLOWOUT PREVENTION AND WELL CONTROL 3 29-31 28-02 28-30 25-27 30-01 25-27 25-27 01-03 26-28 29-31 28-30 26-28 7.950.000 40 ARUS MINYAK KORPORATE 3 02-04 07-09 07-09 04-06 02-04 04-06 04-06 08-10 05-07 01-03 07-09 03-05 7.950.000 41 MODERN HYDROCARBON WELL PRODUCTION LOGGINGDATA ANALYSIS AND INTERPRETATION 3 08-10 13-15 14-16 11-13 09-11 27-29 11-13 14-16 12-14 08-10 14-16 10-12 7.950.000 42 OIL SPILL - OIL BOOM AND ENVIRONMENTALMANAGEMENT 4 23-26 12-15 12-15 09-12 07-10 25-28 09-12 06-09 10-13 23-26 12-15 04-07 8.750.000 43 BASIC SURFACE SAFETY SYSTEM 3 22-24 28-02 28-30 25-27 21-23 25-27 25-27 01-03 26-28 22-24 28-30 26-28 7.950.000 44 PETROLEUM FINANCE, COST CONTROL & RESERVOIRMANAJEMEN (Petroleum Economics) 4 22-25 06-09 06-09 03-06 08-11 04-07 03-06 07-10 04-07 22-25 06-09 18-21 8.500.000 45 Gas, Oil and Water Pipeline Design and Maintenance 4 09-12 27-02 27-30 24-27 22-25 26-29 24-27 28-31 25-28 09-12 27-30 10-13 8.750.000 46 PETROLEUM PLANT & PIPELINE SECURITYMANAGEMENT 3 15-17 26-28 26-28 23-25 14-16 25-27 23-25 30-01 24-26 15-17 26-28 26-28 6.950.000 47 PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL(OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK 4 29-01 27-02 27-30 24-27 08-11 25-28 24-27 13-16 25-28 29-01 27-30 11-14 7.950.000 48 Oil Transportation Piping 4 16-19 12-15 12-15 09-12 07-10 26-29 09-12 13-16 10-13 16-19 12-15 11-14 7.950.000 49 GAS DISPERSION ANALYSIS 3 08-10 19-21 19-21 16-18 02-04 04-06 16-18 27-29 17-19 08-10 19-21 26-28 6.950.000 50 H2S AWARENESS 3 02-04 12-14 14-16 11-13 02-04 25-27 11-13 29-31 12-14 01-03 14-16 26-28 5.950.000
No. Judul Durasi Jan Feb Mar Apr Mei Jun Juli Aug Sep Okt Nov Des Harga
HSE
1 MANAJEMEN LINGKUNGAN 4 08-11 12-15 12-15 09-12 14-17 25-28 09-12 13-16 10-13 08-11 12-15 17-20 7.950.000 2 AHLI HIGIENE INDUSTRI MADYA (HIMA) 5 15-19 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 15-19 26-30 03-07 8.950.000 3 AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACTASSESSMENT) FOR EXECUTIVE 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 13-16 03-06 22-25 05-08 10-13 7.950.000 4 APPLIED ERGONOMICS AT WORKPLACE 4 29-01 12-15 12-15 09-12 28-31 25-28 09-12 30-02 10-13 29-01 12-15 17-20 7.950.000 5 AUTHORISED GAS TESTING 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 03-06 8.500.000 6 BASIC SAFETY ORIENTATION FOR CONTRACTORS 5 08-12 26-02 26-30 23-27 14-18 25-29 23-27 27-31 24-28 08-12 26-30 10-14 9.250.000 7 CANTEEN HYGIENE 2 15-16 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 15-16 08-09 26-27 3.950.000 8 CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) 4 23-26 12-15 13-16 10-13 22-25 25-28 10-13 13-16 11-14 23-26 13-16 18-21 7.950.000 9 ELECTRICAL SAFETY 3 31-02 21-23 21-23 18-20 30-01 06-08 18-20 01-03 19-21 31-02 21-23 26-28 6.500.000 10 HAZARD AND OPERABILITY STUDIES (HAZOPS) 3 02-04 26-28 26-28 23-25 02-04 27-29 23-25 08-10 24-26 03-05 26-28 26-28 5.950.000 11 HEALTH IMPACT ASSESSMENT (HIA) 4 08-11 05-08 05-08 02-05 08-11 04-07 02-05 13-16 03-06 08-11 05-08 04-07 7.950.000 12 INCIDENT INVESTIGATION, PREVENTION AND PROACTIVEIMPROVEMENT 3 17-19 12-14 12-14 09-11 14-16 25-27 09-11 27-29 10-12 17-19 12-14 10-12 6.500.000 13 JOB SAFETY ANALYSIS (JSA) 2 22-23 19-20 19-20 16-17 21-22 07-08 16-17 20-21 17-18 22-23 19-20 17-18 3.950.000 14 K3 RUMAH SAKIT 2 29-30 01-02 29-30 26-27 28-29 28-29 26-27 20-21 27-28 29-30 29-30 26-27 3.950.000 15 LOCKOUT TAGOUT (LOTO) 2 04-05 08-09 08-09 05-06 02-03 04-05 05-06 20-21 06-07 01-02 08-09 03-04 3.950.000 16 MANAGING SAFE WORK 4 09-12 12-15 13-16 10-13 07-10 25-28 10-13 30-02 11-14 09-12 13-16 11-14 7.950.000 17 MATERIAL SAFETY DATA SHEETS (MSDS) 2 15-16 21-22 21-22 18-19 17-18 06-07 18-19 20-21 19-20 15-16 21-22 19-20 3.950.000 18 MODERN SAFETY MANAGEMENT (MSM) 4 23-26 26-01 26-29 23-26 22-25 26-29 23-26 06-09 24-27 23-26 26-29 04-07 7.950.000 19 OHSAS 180012007 AUDITOR 5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 27-31 03-07 29-02 05-09 10-14 9.250.000 20 OVERVIEW OF PROCESS SAFETY MANAGEMENT 2 02-03 12-13 12-13 09-10 03-04 25-26 09-10 20-21 10-11 03-04 12-13 27-28 3.950.000 21 PANITIA PEMBINA KESELAMATAN DAN KESEHATANKERJA (P2K3) 4 08-11 20-23 20-23 17-20 08-11 04-07 17-20 13-16 18-21 08-11 20-23 18-21 7.950.000 22 PENERAPAN PENGENDALIAN BISING TERPADU DITEMPAT KERJA 3 17-19 28-02 28-30 25-27 14-16 27-29 25-27 01-03 26-28 17-19 28-30 26-28 6.500.000 23 PENGELOLAAN BAHAN KIMIA BERBAHAYA 3 22-24 05-07 05-07 02-04 21-23 06-08 02-04 08-10 03-05 22-24 05-07 03-05 5.950.000 24 PERLINDUNGAN LINGKUNGAN DAN PENGELOLAANLIMBAH B3 4 29-01 12-15 13-16 10-13 28-31 25-28 10-13 13-16 11-14 29-01 13-16 10-13 7.950.000 25 PERMIT TO WORK (PTW) 2 04-05 19-20 19-20 16-17 02-03 04-05 16-17 20-21 17-18 04-05 19-20 17-18 3.950.000 26 Process Hazard Analysis (PHA) 3 10-12 26-28 26-28 23-25 07-09 27-29 23-25 27-29 24-26 10-12 26-28 26-28 5.950.000 27 Process Hazard Analysis (PHA) for Facilitator 4 15-18 06-09 06-09 03-06 15-18 05-08 03-06 30-02 04-07 15-18 06-09 04-07 7.950.000 28 Process Safety Management 3 24-26 12-14 12-14 09-11 23-25 25-27 09-11 06-08 10-12 24-26 12-14 12-14 5.950.000 29 PROJECT HSE MANAGEMENT 3 31-02 21-23 21-23 18-20 30-01 04-06 18-20 13-15 19-21 31-02 21-23 19-21 6.500.000 30 RISK ASSESSMENT AND OPTIMAL RISK MANAGEMENTBASED ON ISO 31000 2 02-03 01-02 29-30 26-27 03-04 28-29 26-27 20-21 27-28 01-02 29-30 26-27 3.950.000
31 SAFETY AUDITS AND SITE INSPECTION 3 08-10 05-07 05-07 02-04 09-11 06-08 02-04 29-31 03-05 08-10 05-07 03-05 5.950.000 32 SAFETY OFFICER DEVELOPMENT PROGRAM 5 15-19 19-23 12-16 09-13 14-18 25-29 09-13 30-03 10-14 15-19 12-16 10-14 9.250.000 33 SAFETY TRAINING FOR THE LABORATORY 3 22-24 13-15 19-21 16-18 21-23 04-06 16-18 08-10 17-19 22-24 19-21 17-19 6.500.000 34 SELF CONTAINED BREATHING APPARATUS(SCBA) 1 29-29 26-26 26-26 23-23 28-28 25-25 23-23 20-20 24-24 29-29 26-26 28-28 2.950.000 35 THE FUNDAMENTAL OF INDUSTRIAL HYGIENE 5 08-12 05-09 05-09 02-06 07-11 04-08 02-06 27-31 03-07 01-05 05-09 03-07 9.250.000 36 WORKING AT HEIGHT 2 15-16 19-20 22-23 19-20 14-15 04-05 19-20 20-21 20-21 15-16 22-23 20-21 3.950.000 37 PENERAPAN HACCP 4 23-26 27-02 27-30 24-27 22-25 26-29 24-27 13-16 25-28 23-26 27-30 03-06 7.950.000 38
IDENTIFIKASI BAHAYA, PENILAIAN, PENGENDALIAN RESIKO (HIRAC) DAN ANALISA BAHAYA DI PEKERJAAN (JSA)
5 29-02 05-09 05-09 02-06 28-01 04-08 02-06 30-03 03-07 29-02 05-09 10-14 9.500.000 39 Pengelolaan K3 di Pergudangan 4 16-19 26-01 26-29 23-26 15-18 26-29 23-26 27-30 24-27 16-19 26-29 04-07 8.500.000 40 Supervisor SMK3 Kontraktor 3 29-31 12-14 12-14 09-11 28-30 25-27 09-11 08-10 10-12 29-31 12-14 26-28 5.950.000 41 PENERAPAN BEHAVIOR BASED SAFETY 3 02-04 19-21 21-23 18-20 02-04 04-06 18-20 14-16 19-21 03-05 21-23 19-21 6.500.000 42 PENGELOLAAN B3 DAN LIMBAH B3 4 09-12 27-02 27-30 24-27 08-11 26-29 24-27 28-31 25-28 09-12 27-30 03-06 8.500.000 43 FIRE ALARMS & PROTECTION 4 29-01 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 29-01 20-23 18-21 7.950.000 44 HAZARDOUS MATERIAL HANDLING 4 30-02 26-01 26-29 23-26 07-10 26-29 23-26 27-30 24-27 30-02 26-29 11-14 7.950.000 45 INDUSTRIAL POLLUTION CONTROL 4 15-18 20-23 20-23 17-20 29-01 05-08 17-20 13-16 18-21 15-18 20-23 10-13 7.950.000 46 JOB SAFETY ANALYSIS TRAINING 4 29-01 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 29-01 05-08 03-06 7.950.000 47 LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADAINDUSTRI KIMIA 4 02-05 12-15 12-15 09-12 21-24 25-28 09-12 06-09 10-13 01-04 12-15 11-14 7.950.000 48 Water Treatment 4 22-25 12-15 13-16 10-13 22-25 25-28 10-13 07-10 11-14 22-25 13-16 17-20 7.950.000 49 AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACTASSESSMENT) FOR EXECUTIVE 4 22-25 19-22 19-22 16-19 28-31 04-07 16-19 13-16 17-20 22-25 19-22 10-13 7.950.000 50 HUMAN RELIABILITY ASSESSMENT & ANALYSIS 4 22-25 05-08 05-08 02-05 21-24 04-07 02-05 27-30 03-06 22-25 05-08 17-20 7.950.000 51 SYSTEM SAFETY ENGINEERING AND MANAGEMENT 4 02-05 19-22 19-22 16-19 07-10 05-08 16-19 06-09 17-20 01-04 19-22 10-13 7.950.000 52 BEHAVIOR BASED SAFETY (BBS) 3 08-10 26-28 26-28 23-25 07-09 25-27 23-25 27-29 24-26 08-10 26-28 26-28 6.500.000 53 HAZARD AND OPERABILITY STUDY ( HAZOPS ) 4 15-18 05-08 05-08 02-05 14-17 04-07 02-05 30-02 03-06 15-18 05-08 03-06 8.500.000 54 HAZARDOUS MATERIALS SAFE HANDLING 4 22-25 12-15 12-15 09-12 21-24 26-29 09-12 06-09 10-13 22-25 12-15 10-13 8.500.000 55 HEALTH, SAFETY & ENVIRONMENT (HSE) ASPECTS INLOGISTICS ACTIVITIES 4 29-01 19-22 19-22 16-19 28-31 05-08 16-19 13-16 17-20 29-01 19-22 17-20 8.500.000
56 Hot Works 3 02-04 28-02 28-30 25-27 02-04 25-27 25-27 29-31 26-28 01-03 28-30 26-28 6.500.000
57 HSE MANAGEMENT SYSTEM 4 09-12 06-09 06-09 03-06 08-11 04-07 03-06 31-03 04-07 09-12 06-09 04-07 8.500.000 58 HSE WORK PRACTICES AT CONFINED SPACE 3 17-19 12-14 14-16 11-13 16-18 27-29 11-13 08-10 12-14 17-19 14-16 12-14 6.500.000 59 JOB SAFETY ANALYSIS (JSA) ANALISA KESELAMATANPEKERJAAN 3 24-26 21-23 21-23 18-20 23-25 06-08 18-20 13-15 19-21 24-26 21-23 19-21 6.500.000 60 MANAGING CONTRACTOR SAFETY 3 31-02 26-28 26-28 23-25 30-01 25-27 23-25 27-29 24-26 31-02 26-28 26-28 6.500.000 61 MODERN SAFETY AND LOSS CONTROL MANAGEMENT 4 02-05 05-08 05-08 02-05 07-10 04-07 02-05 30-02 03-06 02-05 05-08 03-06 8.500.000