• Tidak ada hasil yang ditemukan

MNL-133-11 1st Edition, First Printing, 1997 2nd Edition, First Printing, 2003

N/A
N/A
Protected

Academic year: 2019

Membagikan "MNL-133-11 1st Edition, First Printing, 1997 2nd Edition, First Printing, 2003"

Copied!
43
0
0

Teks penuh

(1)

BRIDGE DESIGN MANUAL

3rd Edition, First Release, November 2011

(2)

Appendix B - 1 (Nov 11)

AASHTO Solid and Voided Slab Beams ... 3

AASHTO Box Beams ... 5

AASHTO I-Beams ... 7

AASHTO-PCI Bulb-Tees ... 9

Deck Bulb-Tees ... 11

Double Tee Beams ... 13

AASHTO-PCI-ASBI Standard Segment For Span-By-Span Construction... 15

(3)
(4)

Appendix B - 3 (Nov 11) AASHTO Solid and Voided Slab Beams

Dimension (inches)

Type L H L1 L2 No. of Voids D1 D2

Properties

(5)
(6)

Appendix B - 5 (Nov 11) AASHTO Box Beams

Dimensions:

Type W H

Properties:

Type

Area in.2

ybottom

in.

Iner tia in.4

(7)
(8)

Appendix B - 7 (Nov 11) AASHTO I-Beams

Dimensions ( inches)

Type D1 D2 D3 D4 D5 D6 B1 B2 B3 B4 B5 B6

Properties:

Type

Area in.2

ybottom

in.

Iner tia in.4

(9)
(10)

Appendix B - 9 (Nov 11) AASHTO-PCI Bulb-Tees

Properties

Type in. H Hin. w Area in.2 Inertia in.4 ybottomin. Weight kip/ft

BT-54 54 36 659 268,077 27.63 0.686

BT-63 63 45 713 392,638 32.12 0.743

(11)
(12)

Appendix B - 11 (Nov 11) Deck Bulb-Tees

Dimensions and Pr operties

H

ybottom

in.

(13)
(14)

Appendix B - 13 (Nov 11) Double Tee Beams

Light Sections

W

ybottom

in.

Weight kip/ ft

Heavy Sections

W

ybottom

in.

(15)

Appendix B - 14 (Nov 11) Double Tee Beams

Light Sections

(16)

DESIGN

4,916,000 4,984,000 5,051,000 5,119,000 5,186,000 5,254,000 5,321,000 5,389,000 5,456,000 5,524,000 5,591,000

(17)

DESIGN

6,050,000 6,117,000 6,185,000 6,252,000 6,320,000 6,387,000 6,455,000 6,522,000 6,590,000 6,657,000

(18)

DESIGN

5,177,000 5,245,000 5,312,000

(19)

DESIGN

6,327,000 6,395,000 6,462,000 6,530,000 6,597,000 6,665,000 6,732,000 6,800,000 6,867,000 6,935,000

(20)
(21)
(22)

Appendix C - 3 (Nov 11)

NEXT D BEAMS

Beam Designation

Beam Width Inches

Beam Depth Inches

Base Stem Width Inches

Ar ea IN2

I IN4

Yb Inches

Yt Inches

St IN3

Sb IN3

Weight PLF

A B C D E Minimum Width Beams

Next 40 D 96.00 40.00 13.00 1666 238059 25.47 14.54 16378 9348 1735 Next 36 D 96.00 36.00 13.25 1562 176674 23.03 12.97 13624 7671 1627 Next 32 D 96.00 32.00 13.50 1455 126111 20.57 11.43 11033 6131 1516 Next 28 D 96.00 28.00 13.75 1346 85651 18.06 9.94 8620 4742 1402

Maximum Width Beams

Next 40 D 120.00 40.00 13.00 1858 258171 26.55 13.45 19201 9722 1935 Next 36 D 120.00 36.00 13.25 1754 191453 24.01 11.99 15973 7973 1827 Next 32 D 120.00 32.00 13.50 1647 136502 21.44 10.57 12920 6368 1716 Next 28 D 120.00 28.00 13.75 1538 92597 18.80 9.20 10069 4924 1602

DIMENSION A (MAXIMUM 10’-0”) FOR 10’-8” BEAM SPACING

DIMENSION A (MAXIMUM 8’-0”) FOR 8’-8” BEAM SPACING

DECK FINISH

(23)

Appendix C - 4 (Nov 11)

NEXT F BEAMS

Beam Designation

Beam Width Inches

Beam Depth Inches

Base Stem Width Inches

Ar ea IN2

I IN4

Yb Inches

Yt Inches

St IN3

Sb IN3

Weight PLF

A B C D E Minimum Width Beams

Next 36 F 95.50 36.00 13.00 1287 160240 21.77 14.23 11261 7361 1341 Next 32 F 95.50 32.00 13.25 1182 115813 19.51 12.49 9272 5936 1231 Next 28 F 95.50 28.00 13.50 1075 79901 17.24 10.76 7426 4635 1120 Next 24 F 95.50 24.00 13.75 966 51823 14.95 9.05 5726 3466 1006

Maximum Width Beams

Next 36 F 143.50 36.00 13.00 1479 185525 23.36 12.64 14678 7942 1541 FINISH

0.375

(24)

Appendix C - 5 (Nov 11)

(25)

Appendix C - 6 (Nov 11)

(26)

Appendix C - 7 (Nov 11)

(27)

Appendix C - 8 (Nov 11)

(28)

Appendix C - 9 (Nov 11)

(29)

Appendix C - 10 (Nov 11)

(30)

Appendix C - 11 (Nov 11)

(31)

Appendix C - 12 (Nov 11)

(32)

Appendix C - 13 (Nov 11)

(33)

Appendix C - 14 (Nov 11)

(34)

Appendix C - 15 (Nov 11)

(35)

Appendix C - 16 (Nov 11)

(36)

Appendix C - 17 (Nov 11)

(37)

Appendix C - 18 (Nov 11)

(38)

Appendix C - 19 (Nov 11)

(39)

Appendix C - 20 (Nov 11)

(40)

Appendix C - 21 (Nov 11)

(41)

Appendix C - 22 (Nov 11)

(42)

Appendix C - 23 (Nov 11)

(43)

Appendix C - 24 (Nov 11)

Referensi

Dokumen terkait

Berdasarkan tabel 4.10 dapat dilihat pada tabel Independent Samples T-Test bahwa nilai signifikansi pada kolom T-Test For Equality Of Means diperoleh nilai signifikan

Perancangan aplikasi portal mall berbasis WEB Mobile pada Mobile (gadget) ini diharapkan dapat menyelesaikan masalah penyediaan informasi yang sekarang ada di

[r]

33 SMRA ERNST&YOUNG (PURWANTONO,SARWOKO&SANDJAJA) ERNST&YOUNG (PURWANTONO,SARWOKO&SANDJAJA) 34 SSIA ARYANTO AMIR JUSUF&MAWAR (RSM AAJ ASSOCIATES) ARYANTO

Puji syukur kepada Tuhan Yesus, karena atas berkat dan karunia-Nya penulis dapat menyelesaikan penyusunan skripsi dengan judul “Pengaruh Independensi, Objektifitas,

Dalam proses berkomunikasi tersebut erat kaitannya dengan kemauan individu untuk melakukan keterbukaan diri ( self disclosure ) terhadap pasangan (Lestari, 2012, h. Salah

Calon suksesor memiliki keinginan dari dalam dirinya sendiri untuk menjalankan bisnis keluarga ini selain sudah memiliki ketertarikan dengan bisnis ini cukup lama yaitu sejak

Seperti yang sudah penulis uraikan sebelumnya, bahwasannya penduduk di Kecamatan Jati Agung setiap tahun terus bertambah, sebagai contoh pada tahun 2010 jumlah penduduk