• Tidak ada hasil yang ditemukan

Analisis Biaya dan Produktivitas Produksi Kayu Pada Hutan Tanaman Industri (Studi Kasus: PT. Sumatera Riang Lestari-Blok I, Sei Kebaro, Kab. Labuhanbatu Selatan dan Kab. Padang Lawas Utara)

N/A
N/A
Protected

Academic year: 2017

Membagikan "Analisis Biaya dan Produktivitas Produksi Kayu Pada Hutan Tanaman Industri (Studi Kasus: PT. Sumatera Riang Lestari-Blok I, Sei Kebaro, Kab. Labuhanbatu Selatan dan Kab. Padang Lawas Utara)"

Copied!
2
0
0

Teks penuh

(1)

ABSTRAK

WARSEIN ROY M. S : Analisis Biaya dan Produktivitas Produksi Kayu pada Hutan Tanaman Industri (Studi Kasus PT. Sumatera Riang Lestari-Blok I, Sei Kebaro, Kab. Labuhanbatu Selatan dan Kab. Padang Lawas Utara), yang dibimbing oleh MUHDI dan YUNUS AFIFUDDIN.

Analisis biaya dan produktivitas produksi kayu dilakukan di PT. Sumatera Riang Lestari. Penelitian ini dilakukan dari bulan Agustus 2014 sampai bulan September 2014. Tujuannya adalah untuk menganalisis biaya pemanenan yang berfokus kepada tahapan penebangan, pembagian batang, penumpukan, pengupasan, penyaradan, dan pemuatan serta menganalisis produktivitas pemanenan kayu di HTI PT. Sumatera Riang Lestari. Metode analisis pengambilan sampel pohon dilakukan dengan purposive sampling. Untuk menganalisis biaya pemanenan di HTI digunakan rumus-rumus perhitungan biaya tetap dan biaya tidak tetap (variabel). Untuk menganalisis produktivitas pemanenan kayu dilakukan dengan menghitung besarnya produktivitas kayu yang dikeluarkan dari lokasi HTI ke tempat pengolahan kayu dengan alat angkut (truck). Untuk mendapatkan data dalam perhitungan biaya dan produktivitas pemanenan kayu diperoleh dengan melakukan pengamatan langsung ke lapangan.

Hasil penelitian menunjukkan bahwa biaya pemanenan kayu, yaitu biaya

tetap dan tidak tetap (variabel) yang digunakan adalah Rp 288.243 dan Rp 398.849,38. Produktivitas pemanenan kayu yang didapat pada hutan tanaman

industri (HTI) PT. Sumatera Riang Lestari adalah sebesar 314,80 m3/hari.

(2)

ABSTRACT

WARSEIN ROY M. S: Analysis of Costs and Productivity in Plant Forest Wood Production Industry (Case Study PT. Sumatera Riang Lestari-Block I, Sei Kebaro, Kab. Labuhanbatu South and the District. North Padang Lawas), which is guided by MUHDI and YUNUS AFIFUDDIN .

Analysis of costs and productivity of timber production is done in PT. Sumatera Riang Lestari. This research was conducted since August 2014 until September 2014. The purpose of this research is to analyze the cost of harvesting that focus on the stages of harvesting, the division of the stem, stacking, stripping, extraction, loading and analyzing productivity and harvesting of timber in HTI PT. Sumatera Riang Lestari. The method of analysis in the sampling trees is done by purposive sampling. To analyze the cost of harvesting used calculation formulas fixed costs and variable costs (variable). To analyze the productivity of harvesting is done by calculating the productivity of timber extraction from the location of HTI to sawmills with conveyances (truck). Data in the calculation of costs and productivity of timber harvesting obtained by direct observation in the field.

The research results showed that the cost of harvesting, fixed and variable costs (variable) used is Rp 288.243 and Rp 398.849,38. Productivity harvesting of timber obtained in plantation forests (HTI) PT. Sumatera Riang Lestari is 314,80 m3/hari.

Referensi

Dokumen terkait

Terbentuknya Forum Kelapa Sawit Berkelanjutan Indonesia atau FoKSBI menunjukkan bahwa semua pihak; pemerintah, sektor swasta, lembaga swadaya masyarakat, asosiasi pengusaha, dan

Berdasarkan pada Berita Acara Pembuktian Kualifikasi Nomor : 675/ULP-Pokja-I-JK /2016 tanggal 24 Mei 2016, pekerjaan Penyusunan Rencana Pembangunan Industri

Pengelolaan kelas merupakan keterampilan guru untuk menciptakan dan memelihara kondisi belajar yang optimal dan mengembalikan ke kondisi yang optimal jika terjadi

Akan tetapi, penemuan tersebut bukan merupakan tanda pasti faringitis Streptokokus, karena dapat juga ditemukan pada penyebab tonsilofaringitis yang lain.. Sedangkan

Dari hasil pembahasan data hasil pelaksaan tindakan dapat disimpulkan bahwa disimpulkan bahwa menggunakan model blended learning sudah berhasil meningkatkan

Schools that improve student achievement are more likely to have principals who are strong organizational managers than are schools with principals who spend more of their

In these figures the blue points are data points, the green lines depict the edges of minimum spanning tree constructed from neighborhood graphs of data points before

RKPA - SKPD 2.2.1 Rincian Perubahan Anggaran Belanja Langsung menurut Program dan Per Kegiatan Satuan Kerja Perangkat Daerah.. ANDI